Construction example

Kamakura City | D Construction Company: We performed a renovation using the roof overlay (cover method) with Yokodori Roof αs, including eaves flashing and rain gutter replacement!

神奈川県|鎌倉市|D工務店様:屋根重ね葺き・破風板金・雨樋交換工事によるリフォームを行いました!

BEFORE
Kanagawa Prefecture | Kamakura City | D Construction Company: We carried out renovations including roof overlay, eaves flashing, and rain gutter replacement!Kanagawa Prefecture | Kamakura City | D Construction Company: We carried out renovations including roof overlay, eaves flashing, and rain gutter replacement!

AFTER

Kanagawa Prefecture | Kamakura City | D Construction Company: We carried out renovations including roof overlay, eaves flashing, and rain gutter replacement!Kanagawa Prefecture | Kamakura City | D Construction Company: We carried out renovations including roof overlay, eaves flashing, and rain gutter replacement!

Hello!
This is Yamanaka from Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of exterior renovations in Kamakura City, Kanagawa Prefecture.
There are several types of exterior renovations, and the work this time includes roof overlay (Yokodana Roof αs), eaves flashing, and rain gutter replacement (Panasonic/Iron Round 105)!
We implemented measures against leaks through roofing and rain gutter work!

On this page, I will explain the actual results of the work carried out by Kakeru Koumuten!


We received a request from our trusted renovation partner, D Construction Company!
Thank you very much for choosing Kakeru Koumuten from among many contractors.

1. Removal of existing ridge flashing and snow guards

1. Existing ridge flashing and snow guard removal
We will dismantle only the ridge flashing and snow guards that may obstruct the

roof overlay work!

2. Installing the sheathing

2. Installing the sheathing
We will process and install the sheathing!

3. Installing the roofing (waterproof sheet)

3. Installing the roofing (waterproof sheet)
The roofing used is Nissin Kogyo/Kappa 23!
It is made of modified asphalt roofing material, which is said to have double the durability of regular asphalt roofing.
As a primary waterproofing measure, if the roofing is properly installed, there will be no leaks!

We will ensure it is firmly attached so it won’t blow away. [/chat]

4. Fabricating accessories (curved eaves and gables)

4. Fabricating accessories (curved eaves and gables)

Before the main roof construction, we will fabricate and install accessories such as gables and curved eaves!
The materials used for the accessories will be galvalume steel.

4. Main construction (Nichiha/Yokodana Roof αs)

4. Main Construction (Nichiha/Horizontal Warm Roof αs)
After processing the

components, we will install the Horizontal Warm Roof main body up to the ridge!
Once the installation reaches the ridge, we will set up the necessary materials to fix the ridge cap, known as the “kanban.” There are two types of kanban: cedar and resin, and this time we used the resin type!
The resin type is expected to have three times the durability compared to the cedar type!

5. Processing of Ridge Cap and Sealing at Various Locations

5. Processing of Ridge Cap and Sealing at Various Locations
We will process and install the ridge cap and ventilation ridge. We will thoroughly apply sealing on the inside of the joints.

The nails and screws used for fixing are made of stainless steel, which is resistant to rust! [/chat]

6. Cleaning

6. Cleaning
We will clean up the debris that has fallen onto the balcony and rain gutters. We will conduct a thorough cleaning to prevent injuries from nails and metal fragments. [/chat]

The roofing material used this time is the Horizontal Warm Roof αS from Nichiha Corporation.
The Horizontal Warm Roof αS comes with a 15-year coating warranty, 20-year rust warranty, and 25-year hole warranty.
It is a high-performance metal insulated roof made by integrally molding metal steel plates (high-durability painted Galvalume steel plates), insulation material (rigid polyurethane foam), and aluminum laminate backing.
It is lightweight and resistant to earthquakes, demonstrating excellent insulation performance throughout the year, achieving long maintenance due to its high durability.

Color

Color

This time, we completed a cover construction with Brown S, and it turned out exceptionally well!
The customer was very satisfied, and I was also very happy!
Thank you very much!

Please check out other roofing construction achievements from here!

What is the Roof Overlay (Cover Method)?

The roof overlay method involves leaving the current roof almost as it is and placing a new roof on top of it, effectively covering it.
Literally, it is a method of covering a roof with another roof. Therefore, the roof becomes double-layered. Since the roof is laid over, it is also referred to as “overlapping roofing.”

Advantages of the Overlay Method

Since a “new roof” is placed over the “current roof,” demolition work is almost unnecessary, meaning that very little waste is generated.
This is the biggest feature and leads to various advantages.

The only parts that require demolition and waste disposal are the ridge cap, so compared to complete roof replacement, the cost is lower.
In 2004, regulations regarding the concentration of asbestos in raw materials were changed (for more details, please refer to the Ministry of Health, Labour and Welfare’s website).
Building materials used in constructions completed before 2004 may contain asbestos. Since materials containing asbestos have a high environmental impact, demolition is also difficult, and the costs for both demolition and waste disposal are high. The overlay method, which generates almost no waste, is ideal for such roofs.

Some may wonder if it is safe to live in a building that uses materials containing asbestos, but rest assured. As long as there is no destruction or crushing, it will not disperse into the air.
If you are unsure about the type of roof you have, please feel free to consult us.

Additionally, it can be completed in a shorter time frame than painting or complete replacement. A shorter construction period means lower labor costs, which in turn makes the costs lower.
This also reduces the psychological anxiety of having to live in an unusual environment.
If scaffolding is erected, you may experience inconveniences such as difficulty entering and exiting or not being able to open windows. Being able to return to your normal life in a short period is a significant advantage.

Our company specializes in roofing work, but the roof overlay method is the most frequently performed type of work we undertake. We are very grateful that we are continuously able to carry out roof overlay method projects without interruption.

Procedure for Eaves Board Metal Covering and Gutter Replacement

The fascia boards and the nose cover (the fascia board on the side with the rain gutter) play a crucial role in preventing wind from negatively impacting your home.
During strong winds, such as those from typhoons, rain can blow in horizontally, so the fascia boards and nose covers help to disperse the wind, which also disperses the rain being blown in, making it less likely to reach the junction between the roof and the exterior wall materials. This helps to prevent wind-driven rain from entering.

Generally, maintenance for fascia boards and nose covers (the fascia board on the side with the rain gutter) is done through “painting,” but when there is overall damage that cannot be repaired by painting, metal work is performed.
Metal work for the fascia board involves a renovation where Galvalume steel sheets are placed over the fascia board.
This is also referred to as metal wrapping or covering work.

In this case, since there was overall deterioration, we carried out metal covering work!

1. Removal of Existing Rain Gutter

1. Removal of Existing Rain Gutter
The nose cover (the fascia board on the side with the rain gutter) requires the rain gutter to be detached, so we will remove the existing rain gutter.
Since we are replacing the eaves gutter this time, we will proceed with the removal!

2. Flat Sheet Metal Processing

2. Flat Sheet Metal Processing
We will measure the dimensions at each location and process the sheet metal into the shape of the fascia and nose cover.

3. Nailing

3. Nailing

We will attach the processed sheet metal and proceed with nailing! We will also apply caulking to the inside of the joints!

4. Caulking Treatment

We will carry out caulking treatment.

4. Caulking Process
We will proceed with the caulking process.

5. Rain Gutter Installation

5. Rain Gutter Installation5. Rain Gutter Installation
We will install the removed rain gutters.
This time, we will replace the eaves gutter with a new one!

6. Cleaning and Water Flow Test to Complete!

6. Cleaning and Water Flow Test to Complete!

For the eaves gutter, we used Panasonic/Iron Round 105.
It has strength due to the steel plate inside.

Colors

■ Milk White
Milk White
■ Shincha
Shincha
■ Black
Black

That concludes everything!

This time, the replacement work in Shinchaa was beautifully completed!
The customer was very satisfied!
Thank you very much!

Please check out other rain gutter construction achievements from here!

Roof Material Nichihara/Yokodora Roof αs
Manufacturer Warranty Coating 15 years, Red Rust 20 years, Hole 25 years
Expected Durability Years About 40 to 50 years
Color Used This Time

Brown S

Brown S

 

Summary

Estimates and inspections are, of course, free! If you have any concerns about roofs, rain gutters, exterior walls, or exteriors, please consult Kakeru Koumuten Co., Ltd. in Aoba-ku, Yokohama!

Kakeru Koumuten is a remodeling company strong in exterior renovations, and we carry out complete in-house construction from temporary scaffolding to roof work and exterior painting.
We are confident that in terms of “cost, quality, and good planning”, we will not be outdone compared to other companies!

We are confident in our exterior renovations, so we welcome competitive estimates!
We offer robust construction guarantees and aftercare, and we have received praise for our appropriate proposals that match cost performance and our customers’ future life plans!

“I’m glad I asked them!” We take every request seriously to ensure you feel this way.

We have also posted information on roofing costs and pricing plans for the roof overlay (cover method), so please take a look if you’re interested!

We look forward to your inquiries. Thank you very much.

Helpful information about exterior renovations can be found here!

LINEConsultations via LINE are also very welcome◎

We are regularly updating our Instagram◎Please follow us◎

 
 
For roofing, guttering, and exterior work and repairs in Kanagawa, contact Kakerukoumuten Co., Ltd..

AAA is a young company with an average age in the early 20s, but our technology is second to none.

One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!

We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!