Kamakura City, Mr. S
Thank you very much for choosing Kakeru Koumuten Co., Ltd. for your project.
Roof replacement work (Ridgeway)
Here are the construction photos.
Roof Replacement Construction Photos
1. Existing roof demolition

2. New sheathing installation

3. Roofing installation (waterproof sheet)
4. Custom processing (eaves, decorative elements)
5. Main construction
6. Ridge metal processing

About the Roofing Material
The roofing material used is Ridgeway by Asahi Fiberglass.
Ridgeway comes with a 10-year manufacturer warranty.
Since it uses natural stone that is baked onto the surface, it is a roofing material that does not require painting, which helps reduce maintenance costs!
Additionally, because it uses fine natural stones on the surface, you won’t be troubled by rain noise.
Moreover, it is a lightweight roofing material, making it strong against earthquakes and providing seismic resistance.
* After installation, some of the surface decorative stones may fall off for about a week, but this does not indicate a quality issue.
Color
■Dual Black

■Harvard Slate

■Vintage Green

■Dual Brown

■Earthtone Cedar
This time, we completed the roof work with Harvard Slate very well!
The customer was very satisfied, and I was also very happy!
Thank you very much!
Please take a look at other roofing work achievements from here!
What is the Roof Overlay (Cover Method)?
The roof overlay method involves leaving the current roof almost intact and placing a new roof on top of it, effectively covering it.
Literally, it is a method of covering a roof with another roof. Therefore, the roof becomes double-layered. It is also referred to as “重ね葺き” (kasanebuki) because the roofs are layered.
Advantages of the Overlay Method
Since a “new roof” is placed over the “current roof,” demolition work is almost unnecessary, meaning very little waste is generated.
This is the biggest feature and leads to various advantages.
The only part that requires dismantling and waste disposal is the ridge cap, so compared to a complete roof replacement, the cost is lower.
In 2004, regulations regarding the concentration of asbestos in raw materials were changed (for more details, please visit the Ministry of Health, Labour and Welfare’s website).
Some building materials used in structures built before 2004 contain asbestos. Asbestos-containing materials are difficult to dismantle due to their high environmental impact, resulting in high costs for both dismantling and waste disposal. The roof overlay method, which generates almost no waste, is ideal for such roofs.
Some may wonder, “Is it safe to live in a building that uses asbestos-containing materials?” but rest assured. As long as there is no destruction or crushing, it will not disperse into the air.
If you are unsure about the type of roof on your home, please feel free to consult with us.
Additionally, the construction can be completed in a shorter timeframe than painting or a full roof replacement. A shorter construction period means lower labor costs, which in turn makes the overall cost lower.
This also reduces the psychological anxiety of having to live in an unusual environment.
If scaffolding is set up, you may experience inconveniences such as difficulty entering and exiting or opening windows. Being able to return to normal life in a short period is a significant advantage.
Our company specializes in roofing work, but the roof overlay method is the most frequently performed service we offer. We are very grateful that we have been continuously engaged in roof overlay projects without interruption.
| Roof Material |
|
|---|---|
| Manufacturer Warranty | 10 years |
| Expected Durability | 25 to 30 years |
| Color Used This Time |
Harvard Slate
|
Summary
Estimates and inspections are, of course, free! If you have any concerns regarding roofs, rain gutters, exterior walls, or exterior work, please consult Kakeru Koumuten Co., Ltd.!
We carry out everything from temporary scaffolding work to roof construction and exterior painting completely in-house. We are confident that our costs, quality, and organization are unmatched compared to other companies in exterior work!
We welcome competitive estimates with confidence!
You’ll be glad you chose us! We take every request seriously to ensure you feel satisfied with our service.
We also have information on roof construction costs and pricing plans for the roof overlay (cover method), so please take a look if you’re interested!
We look forward to your inquiries. Thank you very much.
Helpful information about exterior renovations can be found here!
・Kohoku-ku, Yokohama | Roofing | We performed roof replacement and cap metal replacement work!
・Kamakura City | Roofing | We conducted roof overlay using Super Galtect!
・Kamakura City | Roof Overlay Method | We performed overlay using Super Galtect!
・Painting DIY Plan! A must-see for those who want to try DIY roof and exterior wall painting! We will only set up the scaffolding!
・What is the market price for roof remodeling? Types of work and how to choose a contractor!
・Latest | Grants and subsidies available for remodeling, and reduction systems!
・How much does it cost for roofing work? We will introduce the cost market!
・What is the market price for rain gutter repair and cleaning? Tips on timing, fire insurance, and choosing a contractor!
・Renovation Store in Kanagawa Prefecture, Yokohama | What is Roof Overlay (Roof Cover Method)?
Consultations via LINE are also very welcome◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!