Leave the repairs and renovations of condominiums and apartments in Fuchu City, Tokyo to Kakeru Koumuten Co., Ltd.!
Large-Scale Repairs for Condominiums, Apartments, and Buildings in Fuchu City
To owners, management associations, and management companies considering large-scale repairs for condominiums, apartments, and buildings in Fuchu City, Tokyo.
Kakeru Koumuten Co., Ltd. is a company that handles exterior repairs with comprehensive management and self-construction from the installation of temporary scaffolding to substrate repair, exterior wall painting, tile repair, sealing, waterproofing for rooftops and balconies, and roofing work. In Fuchu City, we have undertaken numerous large-scale repairs and exterior renovations for apartments, condominiums, and commercial facilities.
- On-site surveys and estimates are completely free (multiple estimates are welcome)
- Comprehensive management from temporary scaffolding to exterior and roofing work
- For considering the color of the exterior walls, color simulation and trial painting are available
- Consultations for partial repairs or emergency measures for leaks are also possible
- Cost Estimate / For condominiums, the cost per unit is 750,000 to 1,500,000 yen (according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% fall within this range, with the most common being 1,000,000 to 1,250,000 yen. This amount excludes consumption tax and common temporary costs). For wooden apartments, the estimate is 2,000,000 to 4,000,000 yen per building.
- Estimated Cycle / 12 to 15 years. However, the deciding factor is not the number of years but the condition of deterioration.
- Particularly Relevant in Fuchu City / Fuchu City is a landscape administrative organization, and there are color standards for exterior walls in the landscape plan. Areas such as the Kokubunji Cliff Line, Fuchu Cliff Line, along the Tama River, and around the Okunitama Shrine Zelkova tree-lined street are designated as landscape formation promotion areas. There are also 18 district plans within the city, which may involve notifications.
- Available Funds / There are no subsidies for the total construction costs of large-scale repairs in Fuchu City or Tokyo. If requirements are met, property tax reductions (one-third in Fuchu City, for work completed by March 31, 2027) and the city’s Condominium Advisor System Utilization Subsidy (including consultations in the consideration stage of large-scale repairs), as well as Tokyo’s Condominium Improvement Work Subsidy (interest compensation) may be available.
- Tips to Avoid Mistakes / At least three comparative estimates. Compare not only the amounts but also the quantities, methods, and materials.
Large-scale repair work that can be handled in Fuchu City
Large-scale repairs are not just “exterior wall painting” or “waterproofing,” but a comprehensive repair of the entire building while scaffolding is in place. At Kakeru Koumuten, we can handle all of the following work in-house, ensuring clear responsibility and coordination of the process.
| Type of Work | Main Details |
|---|---|
| Temporary Scaffolding Work | Installed by our own scaffolding team using our owned scaffolding materials. We handle mesh sheets, protection, and fall prevention measures. |
| Substrate Repair Work | Crack repairs, injection of floating mortar and tiles, explosion (exposed rebar) repairs, resin mortar repairs for missing parts. |
| Exterior Wall Painting Work | High-pressure washing, three coats from primer to topcoat, painting of auxiliary parts (metal parts, gutters, water cut-offs, etc.). We accommodate radical control type, fluorine, and inorganic paints. |
| Tile Repair Work | Replacement of broken tiles, joint repairs, clear waterproofing of tile surfaces (such as Seven S). |
| Sealing Work | Replacement and additional sealing around sashes and exterior wall joints. |
| Waterproofing Work | Urethane waterproofing for rooftops, roof balconies, shared corridors, and stairs, PVC sheet waterproofing, and long sheet installation. |
| Roof Work | Roof painting, overlay method, re-roofing, and ridge cap replacement. We have sheet metal craftsmen who can handle large roofs such as factories. |
| Metal and Hardware Work | Surface painting of steel stairs, handrails, and PS doors, replacement of coping and water cut-offs. |
| Drainage and Wastewater Work | Cleaning and renovation of roof drains (insertion of renovation drains), resolving gutter blockages. This work is particularly important for rooftops and balconies where rainwater tends to accumulate during heavy rain. |
| Others | Replacement of rain gutters, rooftop and exterior wall inspections using drones, leak investigations using thermography, and preliminary surveys of asbestos-containing building materials. |
Scope of Major Repairs Determined from Building Diagnosis
It is not always necessary to carry out all the above works. The extent of the work will be determined based on the results of the building diagnosis. At Kakeru Koumuten, we conduct a free on-site survey to confirm the following and compile a deterioration diagnosis report with photos, after which we will propose the scope of work.
| Diagnosis Area | Main Inspection Method | Scope of Work Determined by Diagnosis Results |
|---|---|---|
| Exterior Wall (Painted Surface) | Visual inspection, checking the width of cracks and the condition of the paint film | Methods and quantities for crack repair, specifications for painting (whether to repaint or to paint after removing the existing paint film) |
| Exterior Wall (Tile Surface) | Sounding inspection. High areas checked with a drone | Scope and estimated quantity for injection and replacement, whether clear waterproofing is necessary |
| Sealing | Checking for cracks, shrinkage, peeling, and hardening | Whether to replace or add to the existing sealant, scope of joints to be worked on |
| Rooftop, Balcony, Shared Corridor | Checking for blisters or breaks in the waterproof layer, puddles, and the condition of drains | Full renovation or partial repair, method (urethane waterproofing, PVC sheet waterproofing, long sheet), whether drain renovation is necessary |
| Leak Areas | Inspection using thermal imaging camera and drone | Identification of the cause and priority areas for repair |
| Metal Parts, Roof, Accessories | Checking for rust, corrosion, lifting, and cracking | Whether painting is sufficient or if material replacement or overlay installation is necessary |
| Site and Surroundings | Checking retaining walls, slopes, trees, access routes, and parking lots | Planning for scaffolding and the scope of temporary construction |
Reasons Kakeru Koumuten is Chosen for Large-Scale Renovations in Fuchu City
The reason why we can be entrusted with large-scale repairs in Fuchu City is our “initiatives that cannot be imitated by other companies in large-scale repair work”, which have received high praise from many customers.
1. Equipment Specialized for Exterior Renovations
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality exterior wall painting and waterproofing work for large-scale repairs. We have established five bases centered around Yokohama City for material storage and showrooms.
In-house Ownership of Scaffolding Materials
We own the scaffolding materials necessary for temporary scaffolding required for large-scale repairs and can assemble the scaffolding ourselves.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can cut costs associated with scaffolding work and provide quick and flexible responses.
We own scaffolding materials for approximately 100 detached houses!
Storage of Materials in Our Large In-house Warehouse
We store paints and substrate repair materials used for exterior renovations. By ordering a large quantity of materials at once, we can procure materials at a lower cost! Additionally, since we always have stock available, we can provide swift responses in emergencies!
In-house Sorting of Waste Materials
Large-scale repairs generate various waste materials such as waste paint, metal, and wood. By sorting and recycling waste materials in-house, Kakeru Koumuten is able to cut costs associated with waste disposal.
Showroom Dedicated to Exterior Renovations

In the showroom, you can not only have meetings but also check actual samples and colors of exterior materials. You can also perform color simulations for exterior wall painting and check heat insulation properties using a heat insulation testing machine!
2. Cost Reduction through In-House Management and Construction
One of Kakeru Koumuten’s major strengths is in-house management and construction.
By managing everything from inquiries to project completion in a unified system by Kakeru Koumuten, we can keep costs down while providing high-quality large-scale repairs. Additionally, one representative will handle everything from estimates to project completion. Since the same person is responsible for sales and construction management, smooth communication is possible.
We can handle everything from temporary scaffolding installation to exterior wall painting, substrate repairs, waterproofing work, and tile repairs with complete in-house construction! Those with specialized knowledge and experience will conduct inspections and actual construction for each process!
3. Obtaining Various Permits and Skilled Workers
We have obtained construction business licenses and permits for industrial waste collection and transportation! We also have nationally certified sheet metal and painting skilled workers, and we are confident in our construction techniques. We can also handle large-scale roofing work for factories! We have qualified personnel for asbestos work supervisors and building materials containing asbestos inspectors, so we can handle and conduct preliminary surveys for roofing materials containing asbestos.
4. Warranty and Aftercare

Most large-scale repair works, including “painting work,” “substrate repair work,” and “waterproofing work,” come with a warranty!
Aftercare maintenance is available every year, and we send out notification DM each year.
5. Flexible and Prompt Response
Our company is equipped to handle various troubles and situations related to apartments and condominiums.
We can also address exterior walls and rooftops that cannot be checked from high places using drones! During rain leak investigations, we can use a thermal imaging camera to help identify the cause of leaks!
We will respond according to your wishes. We also accept emergency measures for sudden rain leaks! We will promptly respond to urgent requests or emergencies!
6. Staff Development
Our staff create various models for skill improvement and conduct practical training. Since different sites require various processing and techniques, we regularly provide technical training to ensure each staff member can respond effectively. We also educate on points to be careful about and areas to check in each stage of large-scale repair work.
7. Consideration for Residents and Neighbors

During large-scale renovation work, we will not only notify residents and greet nearby residents, but also install a bulletin board at the entrance to display the construction schedule and notices! Additionally, we will thoroughly educate entrants on proper manners to minimize any inconvenience to residents and neighbors.
8. Strict Quality Control

Each stage will undergo inspections by a responsible person, along with detailed photographs of the work. We use film thickness inspection machines and check sheets to ensure that no inspections are overlooked. During exterior wall painting and waterproofing work, we check the number of used paint cans to confirm that the specified amount of paint has been used, and we order paint directly from our company to prevent construction defects. Of course, we will also take photographs of the used paint and report them.
9. Exterior Wall Painting Color Simulation
9-1 Self Color Simulation

The simulations we create can be done using actual photos of your apartment or building!You can also perform simulations on your smartphone or computer. By simulating before making a two-tone color change or image change, we hope to help enhance the stylish appearance and increase occupancy rates! Of course, we can also arrange paint samples for actual color confirmation.
* Fuchu City is a scenic administrative organization, and notifications and color standards based on the Fuchu City Landscape Plan are involved. The Kokubunji Cliff Line, Fuchu Cliff Line, the area around Mount Asama, along the Tama River, and the area around Okunitama Shrine and the Zelkova tree-lined street are designated as landscape formation promotion areas, and a different notification may be required in the district planning area. Whether the exterior wall repainting is applicable is determined by the location and scale of the building, so prior confirmation is necessary. Having a color simulation screen will make explanations at the neighborhood association and management union general meetings proceed smoothly.
9-2 Confirm the actual color with a test paint!
You can order samples of the paint you are considering and conduct a test paint on your exterior wall. By conducting a test paint, you can confirm the actual color and gloss!
9-3 Exterior Renovation Simulation
Exterior simulations for apartments and condominiums are also possible!
・Exterior wall color simulation (two-tone colors are also possible)
・Simulation for when metal siding is applied
・Simulation using accent materials such as cornices and louvers
・Simulation for roof painting and roof replacement work
With the exterior renovation simulation, you can minimize the risk of failure in image change to an absolute minimum! We hope that renovating the appearance of apartments and condominiums will help increase occupancy rates.
Cost Estimates for Large-Scale Repairs in Fuchu City
The cost of large-scale repairs varies greatly depending on the scale of the building, the degree of deterioration, the scope of work, and the materials used. First, please refer to the national average based on public statistics, then to our company’s cost estimates based on construction performance by scale, and finally to examples of unit prices for each construction.
The national average for condominiums is 750,000 to 1,500,000 yen per unit
According to a survey conducted by the Ministry of Land, Infrastructure, Transport and Tourism, which collected 818 construction cases (FY 2021), approximately 70% of the costs for large-scale repairs are concentrated in the range of 750,000 to 1,500,000 yen per unit, with the most common price range being 1,000,000 to 1,250,000 yen. Note that the amounts in this survey do not include consumption tax and common temporary construction costs, so the conditions differ from the current total construction cost including tax.
| Construction Cost per Unit | Percentage | Construction Cost per Unit | Percentage |
|---|---|---|---|
| Up to 750,000 JPY | 15.1% | 1,250,000 to 1,500,000 JPY | 17.4% |
| 750,000 to 1,000,000 JPY | 24.7% | 1,500,000 to 2,000,000 JPY | 9.1% |
| 1,000,000 to 1,250,000 JPY | 27.0% (most common) | Over 2,000,000 JPY | 2.8% |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (200 companies, 818 cases) *Amounts do not include consumption tax or common temporary costs. Percentages may not total 100% due to rounding and non-responses.
Breakdown of Construction Costs (What the Money is Spent On)
| Category | Composition Ratio | Main Contents |
|---|---|---|
| Construction-related Work | 60.3% | About half for exterior walls, about one-third for waterproofing. Substrate repairs, tiles, painting, waterproofing |
| Temporary Work | 22.8% | Scaffolding, mesh sheets, protective coverings, etc. (does not include common temporary costs) |
| Miscellaneous Expenses | 10.3% | Site management fees, general management fees, statutory welfare expenses, etc. (9.5%), insurance premiums for large-scale renovation defects (0.8%) |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (Second aggregation of large-scale renovation work. Overall average is construction-related 59.0%, temporary work 22.3%, miscellaneous expenses 9.9%). *The total does not equal 100% because it includes equipment-related work, exterior works, and others. This is an average value and is not a criterion for judging the appropriateness of individual estimates.
Cost Estimates by Building Size (Scaffolding, Substrate Repairs, Exterior Wall Painting, Waterproofing, Sealing as a Set)
| Type and Scale of Building | Estimated Cost | Estimated Duration |
|---|---|---|
| Wooden Apartment (2 stories, 6-10 units) | 2,000,000 – 4,000,000 JPY | 3 – 5 weeks |
| Steel Frame / RC Apartment (3 stories, 10-20 units) | 4,000,000 – 9,000,000 JPY | 1 – 2 months |
| Mixed-use Building / Small-scale Condominium (4-5 stories) | 5,000,000 – 15,000,000 JPY | 1.5 – 3 months |
| Medium-scale Condominium (30-50 units) | 20,000,000 – 50,000,000 JPY | 3 – 5 months |
| Large-scale Condominium (over 100 units) | Around 100,000,000 JPY – | 6 months – |
*The above estimates are based on Kakeru Koumuten’s construction records and may vary depending on the presence of roofing work, steel work, plumbing, etc. For condominiums, please also consider the amount obtained by multiplying the national statistics (750,000 – 1,500,000 JPY per unit) by the number of units as a reference.
Breakdown of Costs for Temporary Works, Substrate Repair, Exterior Walls, and Waterproofing
The estimate for large-scale repairs is broadly divided into “Temporary Works,” “Substrate Repair,” “Sealing,” “Exterior Wall Painting,” “Waterproofing,” and “Miscellaneous Expenses.” Before comparing total amounts, please check what each item includes, how much, and at what cost.
| Item | What to Check in the Estimate |
|---|---|
| Building Prerequisites | Structure (wooden, steel frame, RC), number of stories, number of units, exterior wall area, and waterproofing area. Also confirm whether the area is based on drawings or actual measurements. |
| Common Temporary Works / Scaffolding | Area and unit price of scaffolding, mesh sheets, protective measures, temporary toilets, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, temporary works such as scaffolding account for about 20% of construction costs (excluding common temporary costs). |
| Substrate Repair | Quantities and unit prices for repair methods such as cracks, lifting, and spalling. Since these items are not confirmed until scaffolding is set up, please check whether the quantities are estimated or settled based on actual numbers, and the settlement method if quantities increase or decrease. |
| Sealing | Whether it is a replacement or additional sealing, the length to be applied (m), and the name of the materials. |
| Exterior Wall Painting | Painting area (㎡), manufacturer name, product name, grade of paint, number of coats, and scope of additional parts. |
| Waterproofing | Area for each part such as rooftops, balconies, and common corridors, construction method, name of materials, and whether drain renovations are included. |
| Inspection and Reporting | Inspections for each process, construction photos, and whether a completion report and warranty are included. |
| Miscellaneous Expenses | Details and proportions of site management fees, general management fees, statutory welfare expenses, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, these average about 10% of construction costs, but this varies depending on the scale and conditions of the building, so there is no uniform standard. |
| Tax Classification | Whether the amounts are tax-inclusive or tax-exclusive. Since companies may display this differently, be sure to align them before comparing total amounts. |
Examples of Unit Prices for Repair Work
| Repair Method | Materials Used | Cost |
|---|---|---|
| Tile Replacement | Existing Similar Tiles | per piece / 2,000 JPY〜4,000 JPY |
| Repair of Floating Tile and Mortar Areas | Epoxy Resin Injection | per square meter / 3,000 JPY〜5,000 JPY (Varies depending on the degree) |
| Tile Joint Mortar Repair | Mortar for Tile Joints | per square meter / 1,000 JPY〜2,000 JPY (Varies depending on the degree) |
| Concrete Spalling Repair | Rust Prevention for Rebar + Resin Mortar | per location / 1,000 JPY〜2,000 JPY (Varies depending on the degree) |
| Crack Repair | Filler or Polymer Cement | per meter / 100 JPY〜2,500 JPY (Varies depending on the degree) |
| Exterior Wall Painting (3 Coats) | Radical Control Silicone Paint | per square meter / 2,500 JPY〜3,500 JPY |
| Roof Top Urethane Waterproofing (Ventilated Buffer Method) | High Strength Urethane | per square meter / 6,500 JPY〜9,500 JPY |
| Sealing Replacement | Modified Silicone | per meter / 900 JPY〜1,500 JPY |
| Temporary Scaffolding | In-house Owned Scaffolding Materials (Wedge Type) | per square meter / 700 JPY〜1,000 JPY |
*Costs and warranty years vary depending on shape, quantity, substrate condition, and type of materials. If you would like a detailed estimate, please feel free to contact us. Estimates are completely free.
Select Paint and Waterproofing Grades Based on “Years Until the Next Repair”
“Good paint does not equal the right choice.” The best way to choose is to align when the next major repair will be with the lifespan of the materials to minimize waste.
| Grade | Estimated Lifespan | Suitable Cases |
|---|---|---|
| Silicone / Radical Control Type | 10-16 years | Buildings that are cycled every 12-15 years. A good choice with a balance of cost and performance. The lifespan varies by product, so choose specifications that match the cycle. |
| Fluorine | 16-20 years | Buildings that want to set the next repair after 15 years, high-rise or complex-shaped buildings where scaffolding costs are high. |
| Inorganic | 18-22 years | Buildings that want to suppress dirt adhesion. Also effective for suppressing moss and algae on north-facing sides or areas surrounded by trees. |
| Urethane Waterproofing (Rooftop) | 8-15 years | Complex-shaped rooftops, when wanting to renovate while utilizing the existing waterproof layer. Mid-term inspections and repairs, such as re-coating the top coat, are prerequisites. |
| Vinyl Sheet Waterproofing | 20-25 years | Rooftops with a large area and simple shape. Short construction period. |
| Asphalt Waterproofing | 15-20 years | Rooftops planned for long cycles. The cost per instance increases. |
*The estimated lifespan is a general guideline and may vary depending on sunlight, location, and substrate condition. For shaded and humid areas, choosing paints with anti-algae and anti-mold properties can change durability.
Guidelines for Repair Reserve Funds and Options When Insufficient
The Ministry of Land, Infrastructure, Transport and Tourism guidelines indicate the estimated repair reserve fund on a monthly basis per unit area. Additional charges are required if there is a mechanical parking lot.
| Building Size (Less than 20 Floors) | Monthly Estimate (Average) | Range Covering Two-Thirds of Cases | Conversion for 70㎡ |
|---|---|---|---|
| Less than 5,000㎡ | 335 JPY/㎡ | 235-430 JPY/㎡ | Approximately 16,500-30,100 JPY |
| 5,000-10,000㎡ | 252 JPY/㎡ | 170-320 JPY/㎡ | Approximately 11,900-22,400 JPY |
| 10,000-20,000㎡ | 271 JPY/㎡ | 200-330 JPY/㎡ | Approximately 14,000-23,100 JPY |
| Over 20,000㎡ | 255 JPY/㎡ | 190-325 JPY/㎡ | Approximately 13,300-22,750 JPY |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines on Repair Reserve Funds for Condominiums” (Reiwa 6, June Revision, PDF) / National average is 13,378 JPY per unit per month (Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums)
In the Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums, 36.6% of management associations reported that “the repair reserve fund is insufficient compared to the plan.” There are four main options when insufficient.
| Options | Considerations and Cautions |
|---|---|
| ① Adjusting the Construction Schedule | Based on deterioration diagnosis, postpone less urgent work to the next time. However, it is essential to distinguish between work that can be postponed and work that cannot, as delaying waterproofing and tile fall prevention measures can ultimately be more costly. |
| ② Reviewing the Scope and Specifications of Work | Reviewing paint grades, changing from full renovation to partial renovation, etc. Please consider this separately from “apparent cost reductions” that skip processes. |
| ③ Utilizing Subsidies and Tax Systems | Subsidies for energy-saving renovations, etc. (to be discussed later). The reduction of fixed asset tax is a system that lowers the tax amount for each unit owner and does not directly increase the repair funds of the management association. |
| ④ Increasing Reserve Funds, Loans, and One-Time Payments | In addition to considering increasing the repair reserve fund at the general meeting, the Housing Finance Agency’s condominium common area renovation loans require no collateral. Interest rates can be lowered by obtaining management plan certification, etc. |
Subsidies, Tax Systems, and Loans to Check for Large-Scale Renovations in Fuchu City
In Fuchu City, Tokyo, there are no subsidies confirmed that cover the entire construction cost of large-scale renovations. Potential options include the city’s condominium advisor system utilization subsidy, the city’s seismic reinforcement subsidy for older buildings, Tokyo’s condominium improvement construction subsidy (interest subsidy), national energy-saving subsidies, and reductions in fixed asset tax. The available options can be broadly categorized into the following four types. The eligibility and application status of these systems may change even during the fiscal year, so please be sure to confirm with our company or the relevant offices before contracting or starting construction. (As of October 15, 2026)
| Type | Details |
|---|---|
| ① Support for Investigation and Consultation | Fuchu City’s management plan certification system (no fees to the city), subsidy for using the city’s condominium advisor system (subsidy for advisor dispatch fees from Tokyo. Includes consultations at the stage of considering large-scale repairs), free consultation meetings for condominiums, and Tokyo’s comprehensive consultation desk for condominiums. Can be used in the preliminary stages before large-scale repairs. |
| ② Construction Subsidies by Purpose | City’s earthquake resistance subsidy for condominiums (earthquake diagnosis and reinforcement design for certain buildings that received construction confirmation before May 31, 1981), Tokyo’s subsidy for “Tokyo Stay Condominiums,” and Tokyo’s insulation and renewable energy projects for owners of entire rental housing units. |
| ③ Tax Incentives | Reduction of fixed property tax under the condominium longevity promotion tax system (Fuchu City’s reduction rate is one-third). |
| ④ Public Loans and Interest Subsidies | Housing Finance Agency’s loans for condominium common area renovations and Tokyo’s interest subsidies (subsidies for condominium improvement works). As far as confirmed, there are no city loan arrangements or interest subsidies available. |
① Condominium Longevity Promotion Tax System (Reduction of Fixed Property Tax)
If large-scale repairs (including exterior painting, floor waterproofing, and roof waterproofing) that contribute to the longevity of certain condominiums meeting specific requirements are carried out, the fixed property tax amount for the building for the year following the completion of the work will be reduced. The reduction rate is determined by the municipality within the national range (one-sixth to one-half). Fuchu City’s reduction rate is one-third (up to the tax amount equivalent to 100㎡ per unit).
| Main Requirements | Newly built for over 20 years; total number of units 10 or more / All three works of exterior wall painting, floor waterproofing, and roof waterproofing must have been completed (the timing of past works does not need to be the same, and the three types must be implemented as a whole) / In a residential exclusive area, with a residential floor area ratio of more than half / Must meet one of the following: ① Certified management plan condominium (the average amount of repair reserve fund has been raised to the certification standard since September 1, 2021) ② Management association that has received advice and guidance from the city and has created or reviewed a long-term repair plan to meet the standards. Requirements must be met at both the time of declaration and the assessment date (January 1). |
|---|---|
| Reduction Rate | Fuchu City is one-third. The target is the fixed asset tax amount for up to 100 square meters per unit. The 23 wards of Tokyo are set at one-half, which is different from Fuchu City. |
| Construction Implementation Deadline | Construction completed between April 1, 2023, and March 31, 2027 is eligible, as stated on the city’s page. The reduction applies to the following fiscal year after the completion of the work (City page updated April 3, 2025). |
| Declaration | Within three months after completion of the work, you must declare to the Fuchu City Hall Asset Tax Division (the direct phone number is not listed on the city page; the representative number for the city hall is 042-364-4111). The main attached documents are the fixed asset tax reduction declaration form, large-scale repair certificate, past work certificate, and the condominium’s registration certificate. For certified condominiums, the certification notification and repair reserve fund increase certificate are required, and for management associations that received advice and guidance, the certificate of implementation of the advice and guidance is also required. Copies of the attached documents are acceptable. The Tokyo Metropolitan Tax Bureau’s page is based on buildings in the 23 wards of Tokyo, so please follow the city’s guidance for buildings in Fuchu City. |
| Notes | The reduction measures for seismic retrofitting, energy-saving renovations, and barrier-free renovations cannot be combined. Simply obtaining management plan certification does not qualify; there are requirements such as raising the repair reserve fund. A review of the long-term repair plan is also necessary, so it is recommended to prepare at least one year before the construction. |
② City and Tokyo Contact Points (Management Associations should start here)
The contact point for certification of management plans for condominiums and the subsidy for the advisor system is the Fuchu City Urban Development Department Housing Division Support Section (Phone 042-335-4458). Reporting the management status is based on Tokyo Metropolitan Ordinance and applies to residential condominiums with more than six units built before December 31, 1983.
| Contact & System | Details |
|---|---|
| Management Plan Certification System Contact (Fuchu City) | Housing Division Support Section (Phone 042-335-4458). The fee for certification application and modification application to the city is free. First, approval is obtained at the general meeting, then a preliminary confirmation (preliminary confirmation fee of 10,000 yen) is received through the condominium management center’s support services, and once the compliance certificate is issued, the application is submitted to the city using the same electronic system. A certification notification will be mailed after the review. The city has the “Fuchu City Condominium Management Appropriateness Promotion Plan.” The number of certified buildings is not listed on the city’s page (Page updated Reiwa 8, March 6). |
| Condominium Advisor System Utilization Subsidy (Fuchu City) | Targeting condominium management associations in the city (if there is no organization, any group of unit owners). The full cost of the A and B courses of the Tokyo Metropolitan Condominium Management Advisor, and half of the C-0 course of the management advisor C course is subsidized. Consultations regarding large-scale repairs are also eligible, including the repair work consideration stage of course B (investigation and diagnosis of deterioration, repair work methods, contractor selection, consensus building, etc.), and the large-scale repair work plan of course C. An application for subsidy must be submitted to the city before applying for dispatch, and the dispatch fee is initially borne by the management association, which will later be reimbursed by the city. Completion within the fiscal year is required, and there is a budget limit. Applications for dispatch should be made to the Tokyo Disaster Prevention and Urban Development Center (Phone 03-5989-1453) (Page updated Reiwa 8, April 1). |
| Condominium Management Status Reporting System (Tokyo Metropolis) | Residential condominiums with six or more units built before December 31, Showa 58 require reporting every five years, as stated on the city’s page. For details on how to report, please contact the Comprehensive Consultation Desk for Condominiums (Phone 03-6427-4900). |
| Tokyo Metropolitan Condominium Management Advisor & Comprehensive Consultation Desk | The Comprehensive Consultation Desk for Condominiums can be reached at Phone 03-6427-4900 (free. Monday to Friday, and the first Saturday and third Sunday from 9 AM to 5 PM, until 7 PM on Wednesdays). As of April Reiwa 6, the costs for management advisors are 16,500 yen for course A and 25,300 yen for course B (both including tax). Applications for dispatch should be made to the Tokyo Disaster Prevention and Urban Development Center, Urban Development Promotion Section (Phone 03-5989-1453). For telephone consultations at the Condominium Management Center, management and regulations can be reached at 03-3222-1517, and building and facilities at 03-3222-1519. |
| Consultation on Fixed Asset Tax (Fuchu City) | City Hall Asset Tax Division. The direct number is not listed on the city’s page and will be provided by the city hall representative (Phone 042-364-4111). For reductions on buildings in Fuchu City, a declaration must be made to the city. The declaration deadline is within three months after the completion of the work. |
| Consultation on Landscape & District Planning | Notifications for landscape plans and district plans should be directed to the Urban Development Department Planning Section. The direct number is not listed on the city’s page and will be provided by the city hall representative (Phone 042-364-4111) (For details, see the next section). |
Source: Fuchu City “Condominium Management Plan Certification System”/Fuchu City “Condominium Advisor System Utilization Subsidy Project”/Fuchu City “Support for Proper Management of Condominiums”/Fuchu City “Reduction of Fixed Property Tax for Condominiums that Undergo Large-Scale Renovation for Longevity”/Tokyo Metropolitan Government “Comprehensive Consultation Desk for Condominiums”/Tokyo Metropolitan Government “Condominium Management Advisor System” *The status of the system’s window and reception may change.
③ Management Plan Certification System (Entry for Tax and Interest Rate Benefits)
This is a national system certified by cities that have established a management optimization promotion plan. Upon certification, you can meet one of the requirements for lower interest rates on the Housing Finance Agency’s “Flat 35” and condominium common area renovation loans, as well as the longevity promotion tax system (certification alone does not guarantee tax reduction). The certification criteria consist of 17 items in accordance with national guidelines. The main criteria include holding general meetings at least once a year, improving management regulations, separating accounting for management fees and repair reserves, ensuring that the amount of arrears is within 10% of the total, and “having a long-term repair plan that includes two or more large-scale renovation works, created or reviewed within 7 years, with a planning period of over 30 years.”
*Certification is subject to renewal every 5 years, and approval from the general meeting is required for application. For the longevity promotion tax system, certification must be valid both on the assessment date (January 1) and at the time of declaration. The city office is the Housing Division Support Section. For details on procedures and certification criteria, please check the city’s website.
④ National Energy Saving Support | Housing Energy Saving 2026 Campaign
Changes for Fiscal Year 2026The “Childcare Green Housing Support Project” for Fiscal Year 2025 has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Additionally, the “Long-term Excellent Housing Renovation Promotion Project” will end in Fiscal Year 7, and will not be implemented in Fiscal Year 8. Please be careful not to create financial plans based on outdated information.
Mirai Eco Housing 2026 Project
| Target | Renovations of existing homes built before December 31, 2016, regardless of whether they are single-family or multi-family homes. Management associations and management corporations can also become joint project partners (i.e., can use funds for common area renovations). Rental housing is also eligible. |
|---|---|
| Required Work | Insulation renovations of openings, insulation renovations of the structure (floor, walls, ceiling), and installation of eco-friendly housing equipment are mandatory combinations. |
| Subsidy Limit | Depending on the age of the building and the energy-saving performance achieved, 400,000 to 1,000,000 yen per unit (1,000,000 yen if reaching the mandatory standards for houses built before 1991). |
| Period | Grant applications are generally made by registered contractors (construction contractors) after the completion of work (the ordering party cannot apply themselves). Reservations for grant applications must be made by November 16, 2026, and grant applications must be submitted by December 31, 2026, at the latest (will end once the budget limit is reached). |
Advanced Window Renovation 2026 Project
| Target | Renovations to high-performance thermal windows, including the installation of interior windows, replacement of exterior windows, and glass replacement in existing homes (single-family and multi-family). Subsidy rates are set for “low-rise” and “mid-to-high-rise” multi-family homes. |
|---|---|
| Bulk Application for Multi-Family Homes | As of May 29, 2026, applications for “bulk grant applications for multi-family homes (including reservations)” have begun. The application process is handled by registered contractors (window renovation contractors), and management associations cannot apply themselves, but they can apply for all units collectively, making it a good system for window and entrance door renovations in conjunction with large-scale repairs. |
| Subsidy Limit | For residential properties, 1,000,000 yen per unit (changed from 2,000,000 yen in Fiscal Year 2025). For non-residential properties over 240 square meters, 10,000,000 yen per building. |
| Period | Work commenced after November 28, 2025. Grant applications are to be made after the completion and handover of the work, with reservations due by November 16, 2026, and grant applications due by December 31, 2026, at the latest (will end once the budget limit is reached). |
⑤ Subsidies and Support in Tokyo and Fuchu City
| Tokyo Metropolitan Apartment Improvement Construction Subsidy (Interest Subsidy) | The management associations of fire-resistant condominiums in Tokyo can utilize the Housing Finance Agency’s “Condominium Common Area Renovation Loan,” with the Tokyo Metropolitan Government providing an interest subsidy that lowers the agency’s interest rate by 1% (the interest subsidy period is up to 20 years). The second phase for the fiscal year 2026 runs from October 1, 2026, to February 19, 2027, and applications will close when the number of applications reaches 2,500 units or the budget amount is reached (first-come, first-served basis for in-person and mail applications). Buildings constructed under the old seismic standards (before May 31, 1981) require a seismic diagnosis. The contact point is the Tokyo Metropolitan Housing Policy Headquarters, Condominium Division (phone 03-5320-7532). |
|---|---|
| Tokyo Metropolitan Rental Housing Insulation and Renewable Energy Concentration Promotion Project | This program targets owners of entire rental housing buildings. High-insulation windows (up to 300,000 JPY/unit), high-insulation doors (up to 270,000 JPY/unit), and insulation material renovations for walls and floors (up to 600,000 JPY/unit) are subsidized at a rate of two-thirds, and energy performance diagnosis and labeling have a maximum subsidy of 1,200,000 JPY/building. Solar power generation and storage batteries are also eligible, and when installing solar panels on the flat roofs of existing rental housing, there is an additional waterproofing cost (180,000 JPY/kW). Pre-application for the subsidy is from May 29, 2026, to March 31, 2027, and the program will end when the total application amount reaches the limit. The construction must be carried out by a contractor registered with the Tokyo Metropolitan Environmental Public Corporation “Cool-Net Tokyo.” |
| Tokyo Metropolitan Stay-in Tokyo Condominiums (Fiscal Year 2026) | This program is aimed at registered condominium management associations, providing subsidies for disaster preparedness stockpiling, storage facilities, emergency power sources, elevator entrapment prevention, flood prevention measures, and more. The subsidy rate and maximum amount are specified for each project. Applications are accepted from June 5, 2026, to January 15, 2027, but some projects may have earlier deadlines. There is no mention of remaining budget. The contact point is the reception office (phone 03-5989-1547), and for general inquiries about the program, contact the Condominium Division (phone 03-5320-5007). |
| Fuchu City Condominium Advisor System Utilization Subsidy Project | This program subsidizes the dispatch fees for condominium management advisors and reconstruction renovation advisors in Tokyo (full subsidy for A and B courses and reconstruction/renovation A course, while C-0 of the management advisor’s C course is half). Consultations during the consideration stage of large-scale repairs are also eligible, but some categories (B-8 (1)(2)) are excluded. The A and B courses for management advisors are limited to a total of three times in the same fiscal year. A grant application is required before applying for dispatch or payment, and due to budget limitations, applications may close mid-year. The contact point is the Housing Division, Support Section (phone 042-335-4458) (page updated April 1, 2026). |
| Fuchu City Condominium Earthquake Resistance Subsidy | This program targets management associations of condominiums that received construction confirmation before May 31, 1981, and are fire-resistant or quasi-fire-resistant buildings with three or more stories above ground (excluding buildings along emergency transport routes). The dispatch of seismic advisors is fully subsidized (up to 50,000 JPY per visit, up to five visits per association), seismic diagnosis is two-thirds subsidized (up to 2,000,000 JPY), and if guidance and advice from the city are received, it is five-sixths (up to 2,500,000 JPY), while reinforcement design is two-thirds (up to 2,000,000 JPY). Prior consultation is required before the grant application, and if a contract is made before applying, the grant will not be provided. The contact point is the Housing Division, Housing Safety Section (page updated August 20, 2026). The subsidy is for seismic diagnosis and reinforcement design, not for the reinforcement construction itself. |
* In Fuchu City, there do not appear to be any subsidies specifically for the costs of large-scale repairs such as exterior wall painting or waterproofing, as far as can be confirmed. The city’s page also mentions a free consultation for condominium management (held regularly in collaboration with the Musashino branch of the Tokyo Condominium Management Association), but the date for the next session has not been confirmed. There is also no confirmed assistance for asbestos investigation and removal. The Tokyo Metropolitan Government’s “Insulation and Renewable Energy Promotion Project for Rental Housing” is aimed at owners of entire rental buildings, and the management associations of condominium units are not included as eligible. Please be sure to check the conditions before signing a contract.
- Tokyo Metropolitan Government: Subsidies for Repairs of Condominiums (Official)
- Tokyo Metropolitan Government: Stay in Tokyo Condominiums Reiwa 8 (Official)
- Tokyo Metropolitan Government: Insulation and Renewable Energy Promotion Project for Rental Housing (Official)
- Cool Net Tokyo: Reiwa 8 Insulation and Renewable Energy Promotion Project for Rental Housing
- Fuchu City: Subsidy Program for Utilizing Condominium Advisors (Official)
- Fuchu City: Earthquake Resistance Subsidy System for Condominiums (Official)
⑥ Financing System (Housing Finance Agency Condominium Sumairu Loan)
If the management association borrows funds for large-scale repairs, they can utilize the Housing Finance Agency’s “Condominium Common Area Renovation Loan (Condominium Sumairu Loan).”
| Eligible Work | Large-scale repairs, earthquake resistance renovations, flood prevention measures, energy-saving measures, balcony repairs, safety measures for elevators and parking lots, asbestos measures, diagnostic and investigation design costs by specialists |
|---|---|
| Collateral | No collateral required (joint guarantee by the condominium management center, etc.) |
| Repayment Period | Generally 1 to 10 years, 1 to 20 years for specific works, up to 35 years if earthquake resistance, flood prevention, and energy-saving works are carried out after obtaining management plan certification |
| Interest Rate Reduction | ① Holding of Sumairu Bonds ② Obtaining Management Plan Certification ③ Implementation of earthquake resistance, flood prevention, and energy-saving works, each reducing by 0.2% per year (up to 0.6% per year) |
| Main Requirements | Improvement of management regulations, resolution at the general meeting, the delinquency rate of repair reserve funds must be within 10%. Applications are accepted year-round |
Source: Housing Finance Agency “Mansion Sumairu Loan” (Official)
Cases Where Fire Insurance Can Be Used and Cases Where It Should Not Be Used
Damage caused by typhoons, strong winds, flying rooftop waterproof sheets, caps, fences, hail damage, lightning strikes, and other “accidental incidents” may be covered by fire insurance. It is important to separate and record damage caused by accidents from normal wear and tear during the deterioration diagnosis.
On the other hand, normal wear and tear itself is not covered. There have been many incidents nationwide where contractors lure customers with claims like “You can repair without any out-of-pocket expenses using insurance,” and the National Consumer Affairs Center has repeatedly issued warnings. False claims can lead to insurance fraud charges. Please confirm the eligibility of your claim directly with your management association or owner with the insurance company or agent. Kakeru Koumuten Co., Ltd. will not provide such guidance.
Building Conditions and Repair Points in Fuchu City
Fuchu City is located almost in the center of Tokyo, about 22 km west of Shinjuku. The Tama River flows along the southern edge of the city, and about 1.7 km north of the river is flat land, with a cliff line about 6 to 7 meters high running east to west to the north of that. About 2.5 km north of the cliff line is the Tachikawa terrace. The city was established in April 1954 through the merger of Fuchu Town, Tama Village, and Nishi-Fu Village. However, this is general information about the city. Your building’s age and deterioration condition will be individually confirmed through an on-site survey.
(As of September 1, Reiwa 8, including foreign residents)
(As of September 1, Reiwa 8)
(City location and topography page)
(Condominiums in the city, city survey)
Source: Fuchu City “Population Based on the Basic Resident Register”/Fuchu City “Location, Topography, and Transportation Access”/Fuchu City “FY2023 Fuchu City Condominium Actual Survey”
Organizing the City and Buildings of Fuchu from a Repair Perspective
The table below summarizes only the items that can be confirmed from public documents of the city and the prefecture. Individual building circumstances cannot be determined from the overall city figures.
| Item | Verifiable Content | Perspective When Considering Repairs |
|---|---|---|
| History of the Town | According to the city’s page, Fuchu was established as the provincial capital of Musashi after the Taika Reforms (645 AD) and flourished as a post town on the Koshu Highway during the Edo period. In April 1954, two towns and one village merged to form a city with a population of about 50,000, and it has since developed as a suburban city of Tokyo. There are no publicly available documents regarding the layers of construction years corresponding to different development periods. | Since the development periods vary by area, the construction years of buildings can differ even within the same city. The construction year for each building will be verified individually. |
| Ratio of Apartment Buildings | According to the 2018 Housing and Land Statistics Survey, there are 75,530 apartment units (65.5%) and 36,540 single-family homes (31.7%). The number of owner-occupied apartments (such as condominiums) is 25,320 units (22.2%), while privately rented apartments account for 41,870 units (36.6%) (from the city’s housing master plan documents). | The decision-making authority for repairs differs between the management associations of condominiums and the owners of rental apartments and condominiums. The latest figures from the 2023 survey have not been verified. |
| Condominiums | The city conducted a survey in 2023 targeting 576 condominiums within the city, which included a questionnaire for management associations and individual visits by condominium management professionals to those that did not respond (page updated June 15, 2024). There are no details regarding the number of buildings or construction years listed on the city’s page. The city has a management optimization promotion plan. | Management associations with older buildings should expedite the review of long-term repair plans and reserve funds, as this can broaden options such as property tax reductions, management plan certifications, and consideration for advisor subsidies. |
| Housing Complexes | According to the city’s housing master plan review materials (July 2021), there are 20 complexes with 29 buildings and 616 units of public housing, of which 6 complexes were built in the 1960s. There are 870 units of rental housing from urban development corporations and public corporations (2% of all rentals as of 2018). The names and number of units in private complexes have not been verified. | Repairs in complexes are determined by the management association for owner-occupied units and by the project entity for rental units. Buildings constructed around the same time may be grouped together, and the scope of renovations will be assessed through deterioration diagnosis. |
| Aging Population and Living Conditions | The percentage of the population aged 65 and over has not been verified. | Consideration for the living conditions of residents, especially those who are home for extended periods or are elderly, is essential during construction. Information regarding the schedule, laundry and ventilation times, and safety in stairways and corridors will be carefully communicated through general meetings and notices. |
| Rental Apartments and Vacant Houses | According to the 2018 Housing and Land Statistics Survey, there are 44,530 privately rented units (87% of all rentals), and there are 15,030 vacant houses (vacancy rate of 11.4%), of which 3,560 units (24%) have decay or damage. There are no official descriptions limited to wooden apartments. | In rental apartments, it is crucial to inform tenants and create a construction schedule that matches the situation of vacant units. The condition of each building will be verified through on-site surveys. |
| Topography and Rivers | The highest point in the city is Musashidai 3-chome, at an elevation of about 82m. The western edge of the Tachikawa terrace is about 70m above sea level, while the eastern edge is about 40m, followed by flat land to the north of the Tama River, with a cliff line approximately 6 to 7m high, and then the Tachikawa terrace. The Kokubunji and Fuchu cliff lines are designated as scenic formation promotion areas in the landscape plan. | There are sites with elevation differences near the cliff lines. The arrangement of scaffolding and the transportation of materials will be determined on-site, considering the building’s location and surrounding conditions. |
| Assumptions of Flood, Landslide, and Earthquake Risks | The city’s flood hazard map (page updated April 24, 2026) consists of areas expected to be inundated by flooding due to the maximum possible rainfall from the Tamagawa River (national announcement in 2017) and a map of internal water flooding. The expectation for the Tamagawa River basin is a total rainfall of 588mm over 48 hours (city page updated April 9, 2021). The values for maximum inundation depth, the number of sediment disaster warning areas, and the expected damage from liquefaction and earthquakes have not been confirmed. | Please check the city’s hazard map for the expectations at the location of your building. We will include the condition of the drainage and waterproofing layers on the roof and balcony in our inspection items. |
| Roads and Delivery | There is no official description regarding the width of city roads or parking and delivery routes. The jurisdiction within the city is under the Fuchu Police Station. | The type of road (city road or metropolitan road) determines the window for occupancy permission. The layout of scaffolding and delivery will be confirmed on-site for each project. |
| Landscape and City Rules | Fuchu City is a landscape administrative organization, and the landscape plan was revised on May 12, 2022. The areas promoting landscape formation include around Okunitama Shrine, the Zelkova tree-lined street, the Kokubunji cliff line, the Fuchu cliff line, around Mount Asama, and along the Tamagawa River, in addition to general areas (commercial areas around stations, along main roads, along old highways, residential areas, etc.). There are color standards for buildings, where the basic color must cover more than 4/5 of each side, and the accent color must be less than 1/5. There are 18 district plans in the city, and if construction activities are to be carried out within these areas, notification is required at least 30 days prior to commencement. The existence of scenic districts and building agreements has not been confirmed. | Whether repainting the exterior walls requires notification depends on the location and size of the building. Early confirmation is necessary (please see the table below). |
| Prior Coordination with Neighbors | The city has the “Fuchu City Regional Town Development Ordinance,” which includes a collection of styles for development projects, including mid- to high-rise buildings. It has not been confirmed whether large-scale repairs or exterior wall renovations are included. | If you are concerned about this, please check with the city’s office (City Hall main line 042-364-4111). Providing prior explanations to neighbors is important at any site. |
Four Factors to Consider for Large-Scale Repairs Unique to Fuchu City
Based on the history of Fuchu City and the city’s rules, we have organized four factors to keep in mind for large-scale repairs. The circumstances for each building differ, so individual confirmation will be made through on-site investigations.
① Color Standards in the Landscape Plan
Fuchu City is a landscape administrative organization, and there are color standards for exterior walls in the landscape plan. The Kokubunji cliff line, Fuchu cliff line, along the Tamagawa River, around Mount Asama, and around Okunitama Shrine are areas promoting landscape formation. Confirm whether it is applicable during the investigation stage, and incorporate color considerations and notification preparations into the schedule.
② 18 District Plans and Notification Timing
In the areas of the 18 district plans within the city, notification is required at least 30 days prior to commencement. Since this is a separate procedure from building confirmation applications, calculating backward in conjunction with the schedule for general meetings and contracts will help prevent delays in the construction period.
③ Order of Using Support for Management Associations
There are 576 condominium buildings that have been surveyed within the city. The city’s Advisor System Utilization Subsidy is also applicable for consultations during the consideration stage of large-scale repairs, but an application for the grant is required before applying for dispatch. If you plan to use it, please confirm with the city’s office before making a consultation reservation.
④ Height Differences of Cliff Lines and Roads for Scaffolding
There are sites with elevation differences near the cliff line. If the road for scaffolding is municipal road, the contact point is the Road Division; if it is a metropolitan road, it is the Kitakama South Construction Office. For municipal roads, the process involves applying for road use at the Fuchu Police Station after the permit is issued. Our own scaffolding team will assess the site and plan the layout of the scaffolding according to the type and width of the road.
Source: Fuchu City “Historical Overview”/Fuchu City “Location, Topography, and Transportation Access”/Fuchu City “4th Fuchu City Housing Master Plan (Draft) Document 3”/Fuchu City “4th Fuchu City Housing Master Plan (Outline Draft) Document 4”/Fuchu City “Fuchu City Flood Hazard Map”/Fuchu City “Flood Inundation Areas Due to Maximum Expected Rainfall of the Tamagawa River”/Fuchu City “Regarding the Revision of the Fuchu City Landscape Plan”/Fuchu City Landscape Plan “Color Standards”/Fuchu City “District Plan”/Tokyo Metropolitan Police “Fuchu Police Station”
When Landscape Procedures are Required (Buildings)
According to city documents, the notifications related to landscape matters when repainting exterior walls in Fuchu City are as follows.
| Area and Scale | Applicable Actions | Procedure |
|---|---|---|
| Fuchu City Landscape Plan Area Landscape Formation Promotion District and General Area |
This is an action subject to notification under Article 16 of the Landscape Act. The city page states, “Depending on the scale and content, notification based on the landscape ordinance may be required,” and it has not been confirmed whether exterior wall repainting or color changes are subject to notification, nor the numerical scale of the notification. In areas facing city roads along the zelkova tree-lined streets, all new construction of buildings and structures has been subject to notification since September 1, 2022. | Notification to Fuchu City. Required documents include a description of the measures taken, a landscape consideration checklist, and a checklist for the applicable area. Urban Development Department, Planning Division (City Hall Main Line 042-364-4111). The timing for notification is not specified on the city page. |
| Building Color Standards | The basic color of the exterior wall must cover more than 4/5 of each side, the accent color must be less than 1/5, and the accent color must be less than 1/20 (the total with the accent color must be within 1/5). The upper limit of saturation is set at below 4.0 for basic colors in the warm color range with brightness between 4.0 and less than 8.5 in many categories. Colors not adhering to the standards will be treated as requiring consultation with the Land Use Landscape Adjustment Review Committee. | Please confirm with the Planning Division. Check at the counter to see which area your building falls under and whether exterior wall repainting is applicable. |
| District Planning Area 18 districts within the city |
This applies when conducting construction activities within the district improvement plan area. There is no mention on the city page regarding whether the color of the exterior wall or repairs to the exterior wall are subject to this. | Notification to Fuchu City (30 days prior to the start of construction before confirmation application). Urban Development Department, Planning Division (City Hall Main Line 042-364-4111). Depending on the district, there may also be a plan certification application. |
| Scenic Districts and Building Agreements | It has not been confirmed from the city page whether there are scenic districts and building agreements within the city. | If you are concerned about applicability, please confirm with the Planning Division. |
Source: Fuchu City “Are there restrictions on landscapes?” / Fuchu City “Notification based on the Landscape Ordinance” / Fuchu City Landscape Plan “Color Standards” / Fuchu City “District Planning” ※ The scale and procedures for notification may be reviewed. Please check the latest information from the city before making a notification.
Common Issues in Fuchu City During Construction
| Issue | Current Situation in Fuchu City and Kakeru Koumuten’s Response |
|---|---|
| Exterior Wall Color and Landscape Procedures | Fuchu City is a landscape administrative organization and has color standards in its landscape plan. Depending on the location and scale of the building, it may be subject to the landscape plan’s notification and the district plan’s notification. We will confirm whether it is subject during the investigation phase, decide on colors through color simulation and test painting, and assist in preparing the necessary documents for notification. |
| Rainwater Drainage and Drains | During heavy rain, drainage from rooftops and balconies is crucial. We will check the roof drains, gutters, and balcony drainage outlets during the investigation, and if there are blockages or damage to the waterproof layer, we will include it in our proposal. |
| Scaffolding and Temporary Enclosure Road Occupation | If scaffolding, temporary enclosures, or morning glories are placed on city roads, permission for occupation from the Urban Development Department, Road Division, and road use permission from Fuchu Police Station (phone 042-360-0110) are required. According to the city page, applications must be submitted directly at the counter, and mail and fax are generally not accepted. The Road Division does not respond to inquiries by phone or email. Prepare one copy of the application form (two pages), two copies of the site guide map, and two copies of the floor plan and elevation plan, and it takes about 1 week to 10 days to issue the permit. Upon issuance of the permit, you will receive a payment slip, and after issuance, you will apply for road use at Fuchu Police Station (there is no prior consultation description). The occupation fee is 1,940 yen per square meter per month (page updated April 1, Reiwa 8). The metropolitan road is handled by the Tokyo Metropolitan North Tama South Construction Office, Management Division, Road Management Section (phone 042-330-1806). The national road contact has not been confirmed. Our own scaffolding team will assess the site and plan the scaffolding layout according to the road conditions. |
| Narrow Site and Material Delivery | There is no official description from the city regarding the width of city roads or delivery routes. At narrow sites, our own scaffolding team will assess the site and plan the delivery route and scaffolding layout. Vehicles on the side where scaffolding will be placed will need to be temporarily moved, so we will arrange the relocation together about 2 to 3 months before construction starts. |
| Noisy/Vibrating Work and Neighbors | Specific construction work using pile drivers, rock drills, compressors, etc., requires notification to the city’s Environmental Policy Division at least 7 days before starting work (city page updated December 24, Reiwa 7. The contact is the city hall main number 042-364-4111). Whether scaffolding dismantling and chipping work is subject to this depends on the work content, so we will confirm according to the construction details. We will ensure to greet the neighbors and strictly adhere to the working hours. |
| Buildings with Operating Tenants | In buildings where the first floor is a store or office and the upper floors are residential, consideration for business hours and access is necessary. We recommend prior explanations through the management association or tenants, and we strictly adhere to greeting rounds, posting construction schedules, and maintaining working hours. |
| Old Buildings and Housing Complex Plans | For older buildings, understanding the condition of the substrate, tiles, and waterproof layers through building diagnostics is the starting point. Based on a deterioration diagnosis report with photos, we will sort and propose the construction to be repaired this time, construction that can be summarized while scaffolding is up, and construction that can be postponed to the next time. In housing complexes, we will gather and understand the conditions of each building, and organize the scope and timing of repairs in conjunction with the results of the diagnostics. |
* Kakeru Koumuten has established five bases centered around Yokohama City and will visit Fuchu City.
Signs of Deterioration Requiring Major Repairs and Timing
Generally, major repairs are estimated to occur every 12 to 15 years. According to a survey by the Ministry of Land, Infrastructure, Transport and Tourism, the actual repair cycle is most commonly 13 years, with about 70% falling within the 12 to 15 year range, and the cycle tends to shorten with each occurrence. However, the actual judgment should be based on the condition of deterioration rather than the number of years, so if you observe symptoms like those listed below, an early on-site inspection is recommended.
| Part | Dangerous Signs of Deterioration if Left Untreated | Main Actions |
|---|---|---|
| Exterior Wall (Painted Surface) | Chalking (white powder on hands), fading, cracks wider than 0.3mm, blistering or peeling of the paint film | Substrate repair + exterior wall painting |
| Exterior Wall (Tile Surface) | Tile lifting or falling off, missing grout, efflorescence, hollow sound when tapped | Injection of lifting, replacement, clear waterproofing |
| Sealing | Cracks in joints, shrinkage, peeling, hardening | Re-sealing |
| Roof and Balcony | Bloating or breaking of the waterproof layer, puddles, clogged drains, rain leaks to lower floors | Urethane waterproofing, sheet waterproofing, drain renovation |
| Metal Parts and Steel Stairs | Rust, peeling of the paint film, corrosion of treads | Grinding + rust prevention + painting, component replacement |
| Roof | Lifting of ridge cap, cracking or warping of slate, moss, displacement of tiles | Roof painting, roof overlay (cover method), re-roofing |
| Concrete | Spalling (exposed rebar with rust stains), water leakage from cracks | Spalling repair + resin mortar filling |
| Shared Corridor and Stair Floor | Lifting or peeling of long sheet flooring, exposed substrate | Replacement of long sheet flooring + substrate waterproofing |
Estimated Repair Cycles by Part (Ministry of Land, Infrastructure, Transport and Tourism Guidelines)
| Part/Work | Estimated Cycle | Part/Work | Estimated Cycle |
|---|---|---|---|
| Exterior Wall Painting (Repainting) | 12 to 15 years | Re-sealing | 12 to 15 years |
| Exterior Wall Painting (Existing Removal + Painting) | 24 to 30 years | Metal Parts Painting | 5 to 7 years |
| Roof Waterproofing (Repair) | 12 to 15 years | Water Supply Pipe (Rehabilitation/Replacement) | 19 to 23 years / 30 to 40 years |
| Roof Waterproofing (Removal + New Installation) | 24 to 30 years | Drain Pipe (Rehabilitation/Replacement) | 19 to 23 years / 30 to 40 years |
* The above are reference examples from the guidelines and are not uniform construction deadlines. The actual cycle will be set according to the specifications, location conditions, and deterioration status of the building.
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Creating Long-Term Repair Plans” (Reiwa 6 June Revision – PDF) / Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Repair Work for Condominiums in FY2021”
Examples of Large-Scale Renovation Work
This is an example of exterior renovation work on a mixed-use building undertaken by Kakeru Koumuten Co., Ltd. The building had leaks occurring in several places, and we combined clear waterproofing for the tile exterior wall with waterproofing for the roof for the renovation.
Exterior Renovation Work for a Mixed-Use Building (Tile Wall Waterproofing + Rooftop Waterproofing)
| Work Details | Partial tile replacement / Painting of ancillary parts (pipes, water drainage) / Rooftop waterproofing work (urethane waterproofing) / Exterior wall tile waterproofing (Seven S) / Sealing work around sashes / Repair of exterior wall tile mortar joints / Removal of vines |
|---|---|
| New Materials Used | Exterior wall tiles: Kunishiro Tiles / Painting of ancillary parts: Radical silicone paint / Rooftop waterproofing: High-strength urethane (Sarasene A) / Exterior wall tile waterproofing: Seven S |
| Price Range | 4,000,000 to 4,100,000 yen |
| Construction Period | 45 days |
| Location | Not disclosed |
| Background to the Construction | Due to leaks occurring from several areas such as the exterior walls and rooftop, we proposed waterproofing for the entire exterior wall. Seven S is a clear waterproofing material for tile walls, and while the cost is somewhat higher, its waterproofing performance is excellent, making it recommended for cases where leaks are occurring from several points on the exterior wall. |
Customer Feedback
Flow from On-Site Investigation to Completion of Work
From the initial inquiry to the completion of the work and aftercare, a single representative will consistently handle your case. For management associations, a resolution at the general meeting is required, so starting the process 1 to 1.5 years before the desired start date allows for a smoother progression.
- Inquiry (Free) Please contact us via phone, form, or LINE. If you have estimates from other companies, just presenting those is fine.
- On-site Investigation & Building Diagnosis (Free) We will conduct an exterior wall survey, check for cracks, sealing, and waterproofing layers, and if necessary, investigate the rooftop, high places, and leak areas using drones or thermal imaging. For properties in Fuchu City, we will also check the road width, distance to neighboring properties, delivery routes, parking, and drainage conditions of rooftops and balconies.
- Investigation Report & Estimate Submission We will provide a deterioration diagnosis report with photos and an estimate detailing quantities, methods, and materials for each work item. Multiple plan proposals are also possible.
- Plan Decision & Contract Confirm colors through color simulations, paint boards, and trial painting. For management associations, we will assist in preparing materials for the general meeting. In Fuchu City, some buildings may involve landscape planning notifications and color standards, so we will also explain the procedures and considerations for colors.
- Notification to Residents & Neighbors We will distribute construction notifications, conduct greetings to neighbors, and set up a bulletin board at the entrance (with a schedule and laundry information). If temporary relocation of parking is necessary, adjustments will be made at this stage.
- Installation of Temporary Scaffolding & Various Works Our in-house scaffolding team will set up the scaffolding, followed by high-pressure washing → substrate repair → sealing → exterior wall painting & tile repair → waterproofing → ironwork & ancillary work in that order. A responsible person will inspect and take construction photos for each process.
- Completion Inspection, Scaffolding Dismantling & Handover We will confirm the finish in the presence of the customer and provide construction photos, a report on the paints used, and the warranty.
- Aftercare We will send out annual DM notifications, and inspections can be conducted every year. Simple repairs such as partial sealing are provided free of charge.
Resident Communication, Additional Work Approval, Inspection Reports
Equally important as the construction itself is “when, what, and with what materials we report”. At Kakeru Koumuten, we will provide materials and reports in the following four situations.
| Situation | Materials Provided / Actions Taken |
|---|---|
| Before Construction Building Diagnosis |
We will provide a deterioration diagnosis report with photos. This document summarizes the deteriorated areas and the basis for the proposed scope of work. |
| Before Construction to During Construction Notification to Residents & Neighbors |
We will distribute construction notifications, conduct greetings to neighbors, and provide information on the schedule and laundry through the entrance bulletin board. |
| During Construction Approval for Additional Work |
Deterioration discovered after scaffolding is set up will be addressed by presenting photos, quantities, and costs for approval before proceeding with the work. |
| During Construction to Completion Inspection Report |
A responsible person will inspect each process and take construction photos. Upon completion, we will confirm the finish in the presence of the customer and provide construction photos, a report on the paints used, and the warranty. |
* For management associations, it is smooth to decide in advance who will approve additional work (such as the chairman or repair committee) and the approximate amount that will require approval before signing the contract.
How will life be during construction? Impact on residents
Large-scale repairs are principally carried out while residents remain in their homes. However, there will be restrictions on daily life while scaffolding is in place. Most troubles can be prevented by providing prior notice, so Kakeru Koumuten Co., Ltd. thoroughly explains and posts information before construction begins.
| What will be affected | What will actually happen / Our response |
|---|---|
| Laundry | On days of high-pressure washing, painting, and waterproofing, outdoor drying will not be possible. We will inform you via bulletin board and each unit’s mailbox about “which side will be worked on today” and will secure as many days as possible for drying. |
| Window opening and closing | In addition to washing and painting days, there may be times when windows cannot be opened during processes such as protection, drying, and waterproofing. We will inform you for each process, so please check the postings and notifications. We will organize the schedule to avoid consecutive days of being closed. |
| Balcony | During floor waterproofing and handrail painting, we ask for temporary relocation of personal items, potted plants, and air conditioning outdoor units. The timing will be notified in advance for each unit. |
| Noise and odor | The period of substrate repair (chipping and drilling) will produce the most noise. Working hours are generally from 8 AM to 5 PM, and we will accommodate requests such as refraining from work on Sundays and holidays. Low-odor paint options are also available. |
| Security and privacy | Scaffolding can become an entry route. We can take measures such as blocking sightlines with mesh sheets and installing locks and sensor lights on the scaffolding’s access stairs at night. We also thoroughly educate visitors on proper manners. |
| Parking | Vehicles on the side where scaffolding will be erected will need to be temporarily relocated. Since securing a new parking location may take time, we will work together to secure a relocation spot starting 2 to 3 months before construction begins. |
| Pets, small children, and remote work | If you have sensitivities to noise, please inform us in advance, and we may be able to adjust the work schedule accordingly. Please do not hesitate to let us know. |
| Rented rooms | We can assist owners in creating notification documents for residents. If there are concerns about the impact on occupancy rates due to construction, we can also propose a color simulation for an image change. |
How to choose a large-scale repair contractor and ordering methods
There are many large-scale repair contractors that cover Fuchu City, and you may be unsure which one to choose. When requesting renovations for apartments, condominiums, or buildings, please confirm the following four points.
● Have extensive experience in large-scale repairs
● Confirm the existence of warranties and aftercare services
● Obtain estimates from multiple contractors (at least 3 companies)
● Confirm whether they are self-managed
Have extensive experience in large-scale repairs
Large-scale repair contractors often have websites that showcase their exterior renovation achievements. If they provide detailed explanations of repair work with photos, it can give you peace of mind as a reference when you actually request work.
Using ratings from Google and review sites as a reference when comparing large-scale repair contractors can be effective! Be cautious if there are many negative reviews. If there are few reviews, it’s also important to check the contractor’s track record, the content of their explanations, and their management system.
Large-scale repair work can lead to troubles not only with the construction itself but also with residents and nearby neighbors. Therefore, it is necessary to post updates on the progress of the work and information about laundry on bulletin boards to prevent troubles before they occur. Kakeru Koumuten specializes in exterior work, and we receive many requests for exterior renovations of apartments and condominiums.
Check for warranties and aftercare services
When choosing a large-scale repair company, make sure to check for warranties. If any issues such as leaks occur after the work is completed, having a leak warranty from the contractor ensures that repairs can be made at no cost, providing peace of mind! Companies that offer warranty periods can be seen as having confidence in their work, which can serve as a criterion for selecting a contractor.
Warranty periods vary depending on the contractor and the scope of work, but typically range from 1 to 10 years. Emergency repairs or partial fixes often do not come with leak warranties. Some contractors also offer aftercare services separate from warranties, so be sure to check if there are warranties or aftercare services available.
Kakeru Koumuten sends out annual direct mail for aftercare maintenance, allowing for yearly inspections. We also provide free support for simple repairs such as partial sealing.
Obtain estimates from multiple contractors (at least 3 companies)
When requesting large-scale repairs, be sure to obtain estimates from multiple contractors. It is important to get estimates from at least three companies and compare their estimates and reports! Even for the same scope of work, costs may vary between contractors, and warranties and aftercare services may differ as well. Additionally, obtaining multiple estimates makes price negotiations easier.
When comparing estimates, consider not only the cost but also the “items in the estimate,” “methods and materials for substrate repair and exterior wall painting,” and “confirmation of the process.” Make detailed comparisons to make informed decisions! If the quality of auxiliary materials is low or if processes are skipped, costs can be reduced, so avoid making decisions based solely on price. Especially since substrate repair work can be difficult to assess from appearance alone, ensure that the repair methods are appropriate for the condition of the substrate!
Check this on the estimate (checklist)
| Confirmation Items | Points to Check |
|---|---|
| Is there an excessive use of “one set” notation? | Are the quantities and unit prices clearly stated? With “Exterior Wall Repair One Set,” comparisons and verifications cannot be made. |
| Do the quantities match the actual measurements? | Are there quantities recorded that are far from the drawings or actual measurements? This is the area where inflation is most likely to occur. |
| Proportion of miscellaneous expenses | Details and proportions of site management costs, general management costs, statutory welfare costs, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the 3rd year of Reiwa, the average is about 10% of the construction cost (excluding common temporary costs), but it varies depending on the scale and conditions of the building, so there is no uniform standard. |
| Are the names of materials written? | Are the manufacturer names, product names, grades, and number of coats for paints and waterproofing materials specified? |
| Treatment of quantities for substrate repairs | This is an item that cannot be accurately measured until scaffolding is set up. Is it stated whether it is “estimated quantity” or “actual quantity settlement,” and are there agreements for increases or decreases? This is the most important point. |
| Guarantees and after-inspections | Warranty period for each construction, frequency of inspections, and scope of free support. |
| Company backing | Types of construction industry licenses, track record of similar scale and structure, presence of qualified personnel. |
Confirm if it is managed in-house
Large-scale repair work includes various tasks such as “substrate repair work,” “exterior wall painting,” “waterproofing work,” and “pipe replacement,” and the plan content will change depending on the actual deterioration state and customer preferences.
If a contractor completely outsources to subcontractors, they may lack knowledge and experience, leading to proposals for repairs in irrelevant areas or unnecessary work. If you investigate and then request a subcontractor, it may incur additional time and costs. By managing in-house with knowledge and experience, responsible construction that keeps costs down becomes possible.
Additionally, contractors that outsource may respond slowly in the event of trouble during construction. It is safer to avoid having a company that has not actually met with the customer manage the construction. Kakeru Koumuten performs everything from temporary scaffolding setup to exterior wall painting and waterproofing work in-house, with knowledgeable and experienced personnel managing the construction!
There are three ordering methods. The choice affects how the process proceeds.
Especially for management associations, it is necessary to decide “how to request” before “which company to hire.” The main ordering methods are the following three.
| Method | Procedure | Advantages | Disadvantages |
|---|---|---|---|
| Responsibility Construction Method | The construction company handles investigation, design, construction, and management all at once | No additional costs for commissioning design consultants (investigation and design costs may be included in the construction costs) / A single point of contact reduces the burden on the management association / Responsibility is clear / The period until ordering can sometimes be shortened | Specifications can easily be left to the construction company, making it difficult to compare side by side / Third-party checks are hard to implement, requiring the management association to verify prices, specifications, and construction conditions |
| Design Supervision Method | A design office or consultant conducts investigation and design, while a separate company handles construction | Allows for comparison of construction companies under the same conditions / Independent supervision during construction | Consulting fees are required separately / Attention is needed for conflicts of interest and collusion risks / The period can easily become prolonged |
| Management Company General Contractor Method | The management company acts as the general contractor, with subcontractors performing the construction | Easy coordination with daily management / Minimal effort required from the management association | Can become expensive due to intermediate margins / Competition principles may not be effective |
Collusion and Inappropriate Consulting Issues in Large-Scale Renovations and Self-Defense Measures
Latest 2026 In the large-scale renovation industry, inappropriate orders linked between design consultants and construction companies have been a long-standing issue. The Ministry of Land, Infrastructure, Transport and Tourism issued warnings and notifications to management associations in January 2017 and April 2023, and on September 28, 2026, the Japan Fair Trade Commission announced that 38 companies received exclusion orders regarding large-scale renovation work commissioned by condominium management associations to design consulting firms, and 37 companies were ordered to pay a total of 1.63788 billion yen in surcharges (two design consulting firms were also subject to exclusion orders).
※Based on the announcement by the Japan Fair Trade Commission (September 28, 2026).
Three Typical Methods
① Dummy Estimates
A predetermined company is chosen to receive the order, while other companies only submit formal high estimates, creating a “fixed race.” It appears to the management association that “proper competitive estimates were obtained.”
② Collusion with Design Supervisors
While consultants contract at extremely low design management fees, they receive kickbacks from the high construction costs of their partner construction companies. Design management fees that are too low are a warning sign.
③ Back Margin
A certain percentage of the contract amount is kicked back, which is then added to the construction costs as an expense. As a result, the management association ends up paying extra.
Source: Yokohama City “What is collusion in large-scale repair work for condominiums?” / Ministry of Land, Infrastructure, Transport and Tourism “On the Proper Ordering of Large-Scale Repair Work for Condominiums” (Notification dated April 3, Reiwa 5, PDF)
Self-Defense Measures for Management Associations
- Obtain independent estimates from multiple companies
- Consult with neutral third parties such as condominium management professionals or architects
- Document the vendor selection process in meeting minutes to ensure transparency
- Confirm the reasons for unusually low design management fees from consultants
- Include a penalty clause in the contract for cases of collusion discovery
- Avoid concentrating information with a single consultant and verify specifications by the management association itself
Contact Points for Third-Party Consultation
If you are unsure about reading estimates or how to proceed with vendor selection, consulting a third party separate from the construction company can be effective. The main contact points available for management associations in Fuchu City are as follows.
| Contact Point | Details |
|---|---|
| Fuchu City Urban Development Department Housing Division Support Section | Phone 042-335-4458. This is the contact point for management plan certification and subsidies for using the condominium advisor system (including consultations during the consideration stage of large-scale repairs). As far as confirmed, the city does not appear to offer services for bidding agency or order support for large-scale repairs. |
| Free Consultation for Condominium Owners (Fuchu City) | It is stated on the city’s page that this is held regularly in collaboration with the Musashino branch of the Tokyo Condominium Management Association. The schedule for the next session will be announced on the city’s website and in public relations materials (page update April 1, Reiwa 7). |
| Tokyo Comprehensive Consultation Desk for Condominium Owners | Phone 03-6427-4900 (free). This service responds to consultations including preparations for large-scale repairs. For inquiries regarding ordering large-scale repairs, the contact point is the Condominium Division (Phone 03-5320-5004). |
| Smile Dial (Housing Renovation and Dispute Resolution Support Center) | Phone 03-3556-5147 (Monday to Friday 10:00 AM to 5:00 PM, excluding holidays and year-end/New Year). This service responds to consultations regarding ordering large-scale repairs, and the estimate checking service is free. |
| Condominium Management Center | Phone 03-3222-1519 (Monday to Friday 9:30 AM to 5:00 PM, excluding holidays and year-end/New Year). This service responds to consultations regarding the maintenance and management of buildings and facilities. For inquiries regarding the management plan certification support system, the contact number is 03-6261-1274. |
| Condominium Management Plan Certification System Consultation Dial | Phone 03-5801-0858. Condominium management professionals will answer questions regarding certification standards and application procedures. |
Source: Fuchu City “Condominium Management Plan Certification System”/Fuchu City “Support for Appropriate Management of Condominiums”/Tokyo Metropolitan Government “Comprehensive Consultation Desk for Condominiums”/Tokyo Metropolitan Government “Consultation Desk for Large-Scale Repair Work Orders”/Ministry of Land, Infrastructure, Transport and Tourism “Consultation Desk for Large-Scale Repair Work Orders”/Condominium Management Plan Certification System Consultation Dial
Frequently Asked Questions about Large-Scale Renovations in Fuchu City
- How much does a large-scale renovation in Fuchu City cost?
- For condominiums, according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for fiscal year 2021, about 70% of cases fall between 750,000 to 1,500,000 JPY (excluding consumption tax and common temporary construction costs), with the most common range being 1,000,000 to 1,250,000 JPY. Based on our construction records, the cost for a two-story wooden apartment ranges from 2,000,000 to 4,000,000 JPY, for a three-story steel or RC apartment from 4,000,000 to 9,000,000 JPY, and for small condominiums or mixed-use buildings from 5,000,000 to 15,000,000 JPY. The cost varies depending on the condition of the substrate and whether waterproofing and roofing work is needed, so we will provide an estimate through a free on-site survey.
- How often should large-scale renovations be performed?
- Generally, a cycle of 12 to 15 years is recommended, and the actual cycle is most commonly 13 years according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey, with about 70% falling within the 12 to 15-year range. However, the decision should be based on the condition of deterioration rather than just the number of years. If there are signs of deterioration in the sealing, lifting of tiles, or breaks in the waterproof layer, it is better to carry out repairs without waiting for the cycle, which can ultimately save costs. We will assess the age and condition of your building during the on-site survey to make a judgment.
- How long will the construction period be? Can residents stay during the work?
- For apartments, the duration is approximately 3 weeks to 2 months, for small condominiums or buildings about 1.5 to 3 months, and for condominiums with over 50 units around 4 to 6 months. Residents can remain in their homes during the construction. However, while scaffolding is in place, there may be restrictions on drying laundry outside and opening windows, so we take thorough measures to minimize the impact on daily life, including distributing advance notices, providing information on the process and laundry on bulletin boards, and strictly adhering to work hours.
- How long should I expect from the start of planning to the completion of construction?
- For management associations, it typically takes about 1 to 1.5 years for establishing a repair committee, conducting building diagnostics, selecting contractors, and passing resolutions at general meetings, followed by 3 to 6 months for construction. Overall, it is advisable to plan for around 2 years to proceed comfortably. If you are utilizing subsidies or tax incentives, please also factor in the time required to obtain management plan certification (the procedures for municipal certification).
- Are there any subsidies available for large-scale renovations in Fuchu City?
- In Fuchu City and Tokyo, there do not appear to be subsidies specifically for large-scale renovation work on condominiums based on the information available. Potential options include the city’s condominium advisor system subsidy (which subsidizes the advisor dispatch fee from Tokyo, including consultations during the consideration stage of large-scale renovations, requiring an application for the subsidy before dispatch), assistance for seismic diagnosis and reinforcement design for older earthquake-resistant condominiums, Tokyo’s condominium improvement construction subsidy (interest subsidies for management associations utilizing loans from the Japan Housing Finance Agency), subsidies for “Tokyo Stay Condominiums,” and reductions in fixed asset tax (1/3 in Fuchu City). If the work includes windows and insulation, it may also qualify for “Advanced Window Renovation 2026” or “Future Eco Housing 2026.” The application timing and applicants vary by program, so please check the eligibility conditions and application procedures for each program before contracting or starting construction.
- I heard that fixed asset tax can be reduced through large-scale renovations; is that true?
- If the requirements are met, it is true. Under the Long-Term Condominium Promotion Tax System, if a condominium that meets the criteria of being over 20 years old and having more than 10 units undergoes large-scale renovations (including exterior painting, floor waterproofing, and roof waterproofing), the fixed asset tax for the building for the year following the completion of the work will be reduced. The reduction rate in Fuchu City is 1/3, applicable to tax amounts for up to 100 square meters per unit (in the 23 wards of Tokyo, it is 1/2). The eligible renovations must be completed between April 1, 2023, and March 31, 2027, and a declaration must be made to the Fuchu City Asset Tax Division within 3 months after completion (the direct number is not listed on the city page; please call the city hall main line at 042-364-4111). For certified management plan condominiums, it is also a requirement to have raised the repair reserve fund to the certification standards after September 1, 2021, which takes time to prepare, so we recommend starting the process more than a year before construction.
- Are there any changes to subsidies starting from fiscal year 2026?
- There are four main options. ① Postpone low-urgency repairs based on a deterioration diagnosis, ② Review the scope and specifications of the work, ③ Check for support systems such as subsidies, ④ Consider increasing the repair reserve fund or financing from the Japan Housing Finance Agency. The agency’s condominium common area renovation loans do not require collateral, and interest rates can be reduced by up to 0.6% per year by obtaining management plan certification and implementing energy-saving or seismic work. Please note that postponing waterproofing and tile peeling measures often ends up being more expensive, so please consult us for a decision on separation.
Can scaffolding be set up on narrow sites or buildings close to neighboring properties?
Yes, it can. In Fuchu City, there are sites with limited road widths and buildings close to neighboring properties. Kakeru Koumuten Co., Ltd. owns scaffolding materials and has its own scaffolding team, allowing us to plan the delivery route and scaffolding layout after checking the site. This is an area where additional costs can easily arise after seeing the site, so it is important to confirm the delivery route during the estimation phase.What happens to the parking for residents during construction?
Vehicles on the side where scaffolding will be erected will need to be temporarily moved. In buildings where there is not enough parking space on the premises, it may take time to secure an alternative location. Kakeru Koumuten Co., Ltd. will coordinate with you about the availability of nearby parking starting 2 to 3 months before construction begins.Can I freely decide the color of the exterior walls?
Fuchu City is a landscape administrative body, and there are color standards for buildings in the Fuchu City Landscape Plan. The basic color should cover more than 4/5 of each side, while the accent color should be less than 1/5. It is not confirmed on the city’s page whether the repainting of exterior walls requires notification and what the scale of the notification is, so please check with the Urban Development Department, Planning Division (City Hall Main Line 042-364-4111). In the 18 district planning areas within the city, notification is required at least 30 days before starting work. We will also investigate this during our survey. Sharing a color simulation to visualize the completed image can facilitate discussions.Why is the north-facing exterior wall covered in moss and algae?
The north side receives less sunlight throughout the day, and when shadows from trees or neighboring buildings overlap, moisture can accumulate, making it easier for algae, moss, and mold to thrive. This is more likely to occur in locations close to trees. After thoroughly cleaning with high-pressure washing, choosing paint with anti-algae and anti-mold properties can help prevent recurrence. Additionally, we recommend checking for blockages in roof drains and gutters caused by fallen leaves, as these often lead to water pooling on the roof or leaks.Which construction method should I choose: responsibility construction method or design supervision method?
In smaller buildings, the burden of consulting fees tends to be heavier, so we believe that the responsibility construction method is often more suitable for small to medium-sized buildings. The design supervision method allows for comparison of construction companies under the same conditions since a third party creates the specifications; however, it incurs separate consulting fees and requires caution regarding conflicts of interest and collusion risks. Even with the responsibility construction method, verifying price, specifications, and construction status is essential. Kakeru Koumuten Co., Ltd. provides detailed estimates that specify quantities, methods, and materials for each construction item, allowing you to compare with other companies on the same level.How can I detect collusion in large-scale repairs?
There are three typical tactics. ① Pre-selecting a contractor and having other companies submit only formal high estimates, known as “dummy estimates,” ② A consultant contracts at an extremely low design supervision fee and receives kickbacks from affiliated contractors, creating collusion, ③ Adding a portion of the contract amount as a back margin to the construction costs. Countermeasures include obtaining independent estimates, consulting with a neutral third party, documenting the selection process in minutes, and including penalty clauses in contracts.How many companies should I get estimates from?
[[KAT0]]I recommend at least three companies. If there are too many, it becomes difficult to compare, and if there are too few, competition does not occur. What is important is not the number of companies but “to create the same playing field before comparing.” By creating a common specification sheet and quantity table and requesting under the same conditions, and by making detailed breakdowns mandatory instead of accepting “one set” notation, it becomes clear whether the price difference is due to differences in range or unit price. - What is the difference if we own our own scaffolding?
- In large-scale repair construction costs, temporary construction accounts for about 20% (according to the Ministry of Land, Infrastructure, Transport and Tourism’s fiscal year 2021 survey). By not outsourcing scaffolding work, it is easier to control costs in this area, and our own scaffolding team can respond flexibly to sudden changes in the schedule or additional work. Kakeru Koumuten Co., Ltd. owns scaffolding materials for about 100 detached houses and plans according to the site, even in areas with limited road width.
- I’m in the middle of getting multiple estimates; can I just have a look at the estimate?
- Of course, that’s possible. If you bring in estimates from other companies, we will check for free whether the items, quantities, methods, and materials are appropriate and provide you with an estimate under the same conditions. We welcome multiple estimates.
- Can I request just emergency repairs for a leak?
- Yes. As a preliminary step before large-scale repairs, we also accept requests for emergency repairs for leaks or partial repairs. We will identify the cause using thermography and drones and propose the minimum necessary repairs.
- Can you handle roofing or exterior wall materials that contain asbestos?
- Yes, we can. We have qualified personnel, including asbestos work supervisors and building material surveyors, who can handle everything from the legally required preliminary surveys to the cover method and removal of asbestos-containing roofing materials. We have not confirmed any municipal subsidies for asbestos surveys and removals in Fuchu City. The availability of subsidies may change from year to year, so please check with the municipal office. We will also provide guidance based on the survey results.
- What happens if large-scale repairs are not done?
- There are risks such as personal injury accidents due to falling exterior wall tiles, structural deterioration due to corrosion of rebar, leaks, and a decrease in asset value. Furthermore, for buildings subject to periodic reporting under Article 12 of the Building Standards Act, investigations using full probing and other methods are required under certain conditions, such as when the exterior wall has exceeded 10 years since completion or exterior wall renovation. The scale and timing of reports for apartment buildings can be confirmed in the list published by the Tokyo Metropolitan Bureau of Urban Development. The applicable uses and scales may be revised, so please check the latest information with the Fuchu City Building Guidance Division (City Hall main line 042-364-4111). Even if not subject to statutory investigations, regular inspections and maintenance are essential, so if you are unsure, please consult us.
- How much does large-scale repair for an apartment (about 10 units) cost?
- For wooden two-story buildings with 6 to 10 units, it is estimated to be between 2,000,000 and 4,000,000 yen, and for three-story steel or RC buildings with 10 to 20 units, it is estimated to be between 4,000,000 and 9,000,000 yen based on our company’s track record (including scaffolding, substrate repairs, exterior wall painting, sealing, and waterproofing). It is common for apartments to be repaired every 10 to 15 years. For owners, there is an increasing trend to change the appearance using color simulations during repairs to improve occupancy rates.
If you are looking for a large-scale repair contractor in Fuchu City, contact Kakeru Koumuten
Our company handles many exterior wall renovations and large-scale repairs for condominiums and apartments in Fuchu City. We are happy to assist not only with large-scale repair work but also with partial repairs and leak repairs. “I want it to last long with one renovation” “I want to keep costs down as much as possible” “I want to improve insulation performance because the indoors are hot” We will propose the best solutions for your specific requests and future repair plans.
From temporary scaffolding work to roofing and exterior wall painting, all work is performed by our own team. We are confident that we will not lose in terms of cost, quality, and planning compared to other companies, so we welcome multiple estimates!
On-site surveys, estimates, and color simulations are all free of charge
Please feel free to consult us via the inquiry form, phone, or LINE.
It’s perfectly fine to just present estimates from other companies.
Large-scale Repair Work Service Area
Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and all of Tokyo.
Asahicho / Oshitatecho / Katamachi / Kitayama-cho / Kotobukicho / Koyanagi-cho / Koremasa / Saiwaicho / Sakaecho / Shimizugaoka / Shiraitodai / Shinmachi / Sumiyoshicho / Asama-cho / Tamamachi / Tenjincho / Toshichicho / Nishiharamachi / Nishifucho / Nikkocho / Nisshinmachi / Yahata-cho / Harumicho / Hiyoshicho / Fuchucho / Bunbaicho / Honjuku-cho / Honcho / Midoricho / Minamicho / Miyanishi-cho / Miyamachi / Miyoko-cho / Musashidai / Momijioka / Yazakicho / Yotsuya / Wakamatsu-cho
・When should large-scale renovations be carried out? An explanation of the optimal timing and risks of postponement!
・Estimates are essential when conducting large-scale renovations! Key comparison points and precautions!
・5 common troubles in large-scale renovations of condominiums! A thorough explanation of causes and prevention measures!
・What is waterproofing work in large-scale renovations? A thorough explanation of its role, signs of deterioration, and precautions!
・Not enough funds for large-scale renovations… An explanation of how to deal with funding shortages and preparations you can do right now!
・What is substrate repair in large-scale renovations? A thorough explanation of its necessity, signs of deterioration, and types of work!
・What is sealing work in large-scale renovations? An introduction to its role, methods, and tips for avoiding mistakes!
・What is tile repair in large-scale renovations? An explanation of signs of deterioration, types of work, and cost estimates!
・What is exterior wall painting in large-scale renovations? A thorough explanation of its necessity, signs of deterioration, and cost estimates!
・For exterior renovations in Fuchu City, Tokyo, trust Kakeru Koumuten!
・For roof renovations in Fuchu City, Tokyo, trust Kakeru Koumuten!
・For exterior wall painting in Fuchu City, Tokyo, trust Kakeru Koumuten!
We welcome inquiries via LINE as well◎
We are also updating our Instagram regularly◎ Please follow us!
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!



