Hello!
We are Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior wall painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of an exterior renovation project in Kohoku-ku, Yokohama.
The content of this roofing renovation involves replacing the existing shingles with Super Galtect.
Roof replacement work refers to the process of dismantling and removing the existing roofing materials and replacing them with new ones as a measure against roof leaks.
Thank you very much for choosing Kakeru Koumuten Co., Ltd. from among many contractors.
目次
- 1 Construction Data for Kohoku-ku, Yokohama
- 2 Roof Replacement Construction Procedure
- 2.1 1. Dismantling Existing Roofing Material
- 2.2 2. Installing New Roof Sheathing
- 2.3 3. Installing Roofing (Waterproof Sheet)
- 2.4 4. Fabrication of Accessories (Karakusa and Keraba)
- 2.5 5. Main Construction (Aiji Industry/Super Galtect)
- 2.6 6. Installation of Snow Guards
- 2.7 7. Processing of Ridge Metal and Sealing at Various Locations
- 2.8 7. Cleaning
- 2.9 About Roofing Materials
- 3 Rain Gutter Repair Construction Procedure
- 4 Leave your roof renovation in Kohoku-ku, Yokohama to Kakeru Koumuten!
Construction Data for Kohoku-ku, Yokohama
| Construction Location |
| Aoba-ku, Yokohama |
| Construction Details |
| Installation of Temporary Scaffolding Roof Replacement Work Rain Gutter Replacement |
| Background to the Construction |
|
〇Inquiry Details 〇Proposal Details |
| New Materials Used |
|
Existing roofing material: Shingle material |
| Price Range |
| 800,000 to 900,000 |
| Construction Period |
| About 1 week |
| Completion Month |
| November 2024 |
Roof Replacement Construction Procedure
1. Dismantling Existing Roofing Material

2. Installing New Roof Sheathing

3. Installing Roofing (Waterproof Sheet)

With the role of secondary waterproofing, if the roofing is properly installed, there will be no leaks! We will ensure it is firmly attached to prevent it from blowing away. The roofing sheet used is from Tajima Roofing/New Liner Roofing. Its durability is approximately 30 years, making it a highly durable roofing sheet. If the roofing material is highly durable, we recommend matching the durability of the roofing sheet as well.
4. Fabrication of Accessories (Karakusa and Keraba)

The accessories used are made of SGL steel plate. SGL steel plate offers three times the corrosion resistance compared to Galvalume steel plate!
5. Main Construction (Aiji Industry/Super Galtect)

Once the installation reaches the ridge, we will attach the ridge base to secure the ridge metal. We offer three types of batten: cedar, resin, and Galvalume steel, and this time we used Galvalume steel!
Galvalume steel is expected to have three times the durability compared to cedar! Unlike resin and cedar, it does not crack, providing peace of mind!
Our original integrated waste board made of Galvalume steel for the ridge base is highly durable, has strong fixation, and excellent wind resistance! Even if rainwater enters from the ridge, it has a mechanism to discharge rainwater to the outside, demonstrating high waterproofing performance! It is perfect for the Super Galtect ridge base!
6. Installation of Snow Guards

7. Processing of Ridge Metal and Sealing at Various Locations
We will process and install the
The screws used for fixing are made of rust-resistant stainless steel with waterproof packing!
Unlike nails, screws with packing are less likely to come loose and securely fix the ridge cap to the purlin!
Although it is not visible after installation, the waterproofing is enhanced by installing a face plate on the inside of the ridge cap!
We will firmly protect the ridge, which is a critical part of the roof.
7. Cleaning
About Roofing Materials
The roofing material used is the Super Galtect from Aijii Industries.
The Super Galtect comes with a manufacturer warranty of 15 years for the coating and 25 years for perforation.
Our company also provides a 10-year construction warranty!
Made of SGL steel plate, it is resistant to rust.
Insulation material is tightly adhered from edge to edge of the roofing material, creating a metal plate that integrates steel and insulation.
During installation, insulation is applied even to the parts where the roofing materials overlap, and the surface is coated with a high heat-reflective paint, allowing for a cool summer and warm winter experience.
It also has soundproofing properties, reducing the sound of rain.
Moreover, it is lightweight compared to other roofing materials, which reduces the sway during earthquakes, making it a good earthquake countermeasure.
It excels in finish, durability, insulation, soundproofing, and wind resistance, and the Super Galtect from Aijii Industries is the most frequently used in our construction achievements and is receiving considerable attention!
Color
■Shade Black

■Shade Brown

■Shade Blue

■Shade Moss Green

■Shade Charcoal

■New Color Shade Wine Red

You can choose from these 6 colors!
This time, the cover work was finished very well in Shade Charcoal!
The customer was very satisfied, and I was also very happy!
Thank you very much!
Please check out other roofing work achievements from here!
| Roof Material |
|
|---|---|
| Manufacturer Warranty | Coating 15 years, Red rust 20 years, Perforation 25 years |
| Expected Durability | About 40 years |
| Color Used This Time |
Shade Charcoal
|
Rain Gutter Repair Construction Procedure
1. Dismantling Existing Rain Gutter
2. Dismantling Existing Fixtures

We will dismantle the brackets carefully to avoid damaging the fascia board. After dismantling the brackets, we will also perform repairs due to the holes left by screws and nails.
3. Bracket Installation
We will install new rain gutter brackets. We will use stainless steel brackets. When installing the eaves brackets, we will use kite string or chalk lines to ensure the proper slope for the rain gutter, allowing rainwater to flow correctly. The slope of the rain gutter is crucial!
It is important to note that due to the fascia board (where the eaves brackets were attached) and any distortions in the building, even if we create a slope with the brackets, there may be backflow. It is essential to check the slope with a level against the fascia board before attaching the brackets!
4. Rain Gutter Installation
We will install the rain gutter onto the brackets that were just installed.
5. Water Flow Test, Cleaning, Completion
Finally, we will conduct a water flow test and cleaning to complete the job!
During the water flow test, we will actually run water through the rain gutter to check for any leaks and ensure that water flows properly!
For the eaves gutter, we used Panasonic/PC50.
It has a strong structure due to the steel plate inside.
Colors
■ Milk White

■ Pearl Gray

■ Modern Beige

■Oak Brown

■Shincha

■Black

This time, we completed the replacement work beautifully with Milk White!
Our customer was very satisfied!
Thank you very much!
Please check out other rain gutter construction achievements from here!
Leave your roof renovation in Kohoku-ku, Yokohama to Kakeru Koumuten!
Our company is based in Yokohama, but we also have many achievements in roof renovations in Tokyo.
We are happy to respond to partial roof repairs such as roof overlay work, roof replacement work, and leak repairs.
If you have any questions or concerns, such as “I just want to know the estimate for roof renovation” or “I want to know about roofing materials,” please feel free to contact us!
Long-term Reliability
All roofing materials we use are reliable products that offer long-term warranties. For example, the Super Galtect we used this time comes with a 15-year coating warranty and a 25-year hole warranty from the manufacturer. We also provide a 10-year construction warranty, so you can use it with peace of mind for a long time after a single renovation.
Galtect is a lightweight roofing material that excels in durability and cost performance, but we also handle roofing materials with even higher durability and better insulation properties.
Summary
This was a case of roof replacement work in Kohoku-ku, Yokohama!
We are happy to respond to partial roof repairs such as roof overlay work, roof replacement work, and leak repairs.
Estimates and inspections are of course free! If you have any concerns regarding roofs, rain gutters, exterior walls, or exterior structures, please consult Kakeru Koumuten Co., Ltd. in Aoba-ku, Yokohama!
Kakeru Koumuten Co., Ltd. is a remodeling company strong in exterior renovations, and we carry out everything from temporary scaffolding work to roof work and exterior painting completely in-house.
When it comes to exterior renovation work, we are confident that we won’t be outdone by other companies in terms of “cost, quality, and efficiency”!
We are confident in our exterior renovations, so we welcome competitive estimates!
We offer comprehensive construction guarantees and aftercare maintenance, and we have received positive feedback for our proposals that align with cost performance and our customers’ future life plans!
We want you to think, “I’m glad I asked them!” Therefore, we take every request seriously and work diligently on it.
We also have information on roofing costs and pricing plans for the roof overlay (cover method), so please take a look if you’re interested!
We look forward to your inquiries. Thank you very much.
Helpful information about exterior renovations can be found here!
・【Kohoku-ku, Yokohama】|Roof Overlay|We simultaneously performed roof overlay using Super Galtex and exterior painting!
・【Kohoku-ku, Yokohama】|We conducted exterior wall cleaning without the need for scaffolding!
・【Kohoku-ku, Yokohama】|Exterior Renovation|We replaced the fence!
・Aoba-ku, Yokohama|Kakeru Koumuten|Roof inspection using a drone!
・Exterior wall cleaning without the need for temporary scaffolding!
・What is the cost range for roof remodeling? Types of construction and how to choose a contractor.
・Latest! Information on subsidies and reduction systems available for renovations!
・How much does it cost to repair the roof? We introduce the cost range!
・About the Costs of Roof Overlay (Cover Method) | Roof Overlay (Re-roofing) Construction Plans!
・Renovation Store in Kanagawa Prefecture, Yokohama | What is Roof Layering (Roof Overlay Method)?
LINE consultations are also very welcome◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!