Kohoku-ku, Yokohama | Roofing Work & Cap Flashing | We have completed the roof replacement from Colonial Quad to Galtect!

施工実績

BEFORE

BeforeBefore

AFTER

AfterAfter

Hello!
This is Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior wall painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of an exterior renovation project in Kohoku-ku, Yokohama, Kanagawa Prefecture.
There are several types of exterior renovations, and this time we performed roof work, specifically a roof overlay (cover method) using Galtect and waterproofing work for the balcony to prevent leaks!

We also carried out exterior wall painting work for this residence!

⇩ Click here for our exterior wall painting project results ⇩

This page will explain the actual results of the work performed by Kakeru Koumuten!

Thank you very much for choosing Kakeru Koumuten from among many contractors.

Roof Overlay (Cover Method) Construction Procedure

1. Demolition of Existing Roofing Materials

Dismantling existing roofDismantling existing roofing material

We will dismantle the existing roofing material! The existing roofing material of this residence was asbestos-containing Colonial Quad! The asbestos-containing Colonial will be double-packaged and taken to the final disposal site in Chiba! The existing wooden batten was made of wood. The lifespan of wooden battens is approximately 10 to 15 years. Exceeding the lifespan can lead to corrosion and discoloration, resulting in the separation and scattering of ridge flashing.Due to the deterioration, it is evident that the existing waterproof sheet has also significantly deteriorated.

2. New Sheathing Installation

After dismantling the existing roofing material, we will process and install new sheathing to fit the dimensions! The wood used is coniferous plywood.

2. Roofing Installation (Waterproof Sheet)

Waterproof sheet

The roofing material used is Nisshin Kogyo/Kappa 23!
It is a modified asphalt roofing material, which is said to have double the lifespan of regular asphalt roofing.
As a primary waterproofing measure, if the roofing is properly installed, there will be no leaks!
We will ensure it is securely attached to prevent it from blowing away.

3. Custom Fabrication (Curlicue, Eaves, Valley)

Character processing

Before the main roof construction, we will process and install accessories such as eaves and decorative metalwork!
The accessories used are genuine accessories from Galttect, made of SGL steel plate.

4. Main Construction (Aijii Industry / Super Galttect)

Main construction

 

After processing the accessories, we will install the Galttect main body up to the ridge! Once it is installed up to the ridge, we will set up the necessary materials to secure the waterproofing board, which is essential for fixing the ridge cap, on the rafters. There are types of boards made of cedar and resin, and this time we used the resin type!
The resin type is expected to have three times the durability compared to the cedar type!

5. Ridge Cap Processing and Sealing at Various Locations

Ridge cap

Next, we will process and install the ridge cap. We will firmly apply sealing on the inside of the joints. At the wall edge, we will process and install a component called a rain guard.
The nails and screws used for fixing are made of stainless steel, which is resistant to rust!

Procedure for Installing Cap Flashing and Balcony Waterproofing

Next, we will carry out the installation of the cap flashing! We also have an article introducing cap flashing, so please take a look if you’re interested!

What is Cap Flashing? Introducing the Role and Repair Methods of Cap Flashing!

1. Demolition of Existing Cap Flashing

Dismantling the handrailDismantling the handrail

We will dismantle the existing handrail! You can see that rainwater has entered through the gaps and screws, causing significant deterioration and rotting of the underlying structure.

2. New Underlayment

Underlayment

We will cut the new underlayment to the correct size and secure it with screws! We will apply a water-repellent material to the installed sheathing to prevent corrosion!

3. Installing Roofing (Waterproof Sheet)

Waterproof Sheet

We will lay the roofing sheet (waterproof sheet) over the underlayment! The roofing used is Tajima Roofing/Tadisself!
It is made of a delayed adhesive modified asphalt roofing material, which is said to have double the durability of regular asphalt roofing.
Adhesive roofing sticks tightly to the underlayment, providing high waterproofing performance.

4. Installing Accessories (Curly Metal)

Curly Metal

Before the main construction of

, we will process a decorative piece called “karakusa” and proceed with the installation!
The material used for the decorative piece is Galvalume steel plate!

5. Installation of Cap Flashing and Caulking

CaulkingCaulking

After processing the decorative pieces

, we will install the cap flashing. The joints will be folded inward, and caulking will be applied to the overlapping parts of the cap flashing and the exterior wall for waterproofing.! If this caulking is not done properly, rainwater can seep in through the gaps, leading to accelerated deterioration!

6. Cleaning

Cleaning

We will clean up any debris that has fallen onto the balcony or rain gutters. We will thoroughly remove nails and metal scraps to prevent injuries.

About the Roofing Material Used

The roofing material used is the Super Galtect from Aijii Industrial.
The Super Galtect comes with a manufacturer warranty of 15 years for the coating and 25 years for perforation.
We also provide a 10-year construction warranty!

Additionally, it is made of SGL steel plate, which is resistant to rust.
The insulation material is tightly applied from end to end of the roofing material, creating a metal plate that integrates the steel plate and insulation.
When installed, insulation is applied even to the parts where the roofing materials overlap, and the surface is coated with a highly heat-resistant paint, allowing for a cool summer and warm winter experience.
Moreover, it has soundproofing properties, reducing the sound of rain.
Being lighter than other roofing materials, it also reduces the sway during earthquakes, providing earthquake resistance.
It excels in finish, durability, insulation, soundproofing, and wind resistance, and our company’s construction achievements show that the Super Galtect from Aijii Industrial is the most popular and highly regarded!

Color

■Shade Black
Shade Black
■Shade Brown
Shade Brown
■Shade Blue
Shade Blue
■Shade Moss Green
Shade Moss Green
■Shade Charcoal
Shade Charcoal

■Shade Wine Red

You can choose from these 6 colors!

This time, the cover work with Shade Wine Red turned out exceptionally well!
The customer was very satisfied, and I was also very happy!
Thank you very much!

Please check out other roofing work examples from here!

What is the Roof Overlay (Cover Method)?

The roof overlay method involves leaving the current roof almost as it is and placing a new roof on top of it, effectively covering it.
Literally, it is a method of covering a roof with another roof. Therefore, the roof becomes double-layered. Since the roof is laid over itself, it is also referred to as “overlapping roofing.”

Benefits of the Roof Overlay Method

Since a “new roof” is placed over the “existing roof,” demolition work is almost unnecessary, meaning that very little waste is generated.
This is the biggest feature, leading to various benefits.

The only part that requires demolition and waste disposal is the ridge cap, making itmore cost-effective compared to complete roof replacement.
In 2004, regulations regarding the concentration of asbestos in raw materials were changed (for more details, please see the Ministry of Health, Labour and Welfare website below).

Building materials used in structures constructed before 2004 maycontain asbestos. Asbestos-containing materials are difficult to demolish due to their high environmental impact, and the costs for demolition and waste disposal are also high. The roof overlay method, which generates almost no waste, is ideal for such roofs.

Some may wonder if it’s safe to live in buildings that use asbestos-containing materials, but rest assured.As long as there is no destruction or crushing, it will not disperse into the air.
If you are unsure about the type of roof on your home, please feel free to consult with us.

Additionally, the construction can be completed in a shorter time frame compared to painting or complete roof replacement.A shorter construction period means lower labor costs, which in turn makesthe expenses more affordable.
This also reduces the psychological anxiety of having to live in an unusual environment.
When scaffolding is set up, you may experience inconveniences such as difficulty entering and exiting or being unable to open windows. Being able to return to your normal life in a short period is a significant advantage.

Our company specializes in roofing work, but the roof overlay method is the most frequently performed type of work we undertake. We are very grateful that we have been continuously engaged in roof overlay projects without interruption.

Roof Material

IG Kogyo / Super Galtect

Super Galtect, awarded by the Minister of Education, Culture, Sports, Science and Technology and the National Invention Award
Manufacturer Warranty Coating 15 years, Red rust 20 years, Puncture 25 years
Expected Durability About 40 years
Color Used This Time

Shade Wine Red

Process of Roofing Work at Kakeru Koumuten

1. Inquiry

First, please let us know the condition of your roof by phone or email!

2. On-site Survey & Estimate

We will decide on a date and time for the on-site survey based on your preferences, and a representative will visit your home.

We will check the shape, material, and installation condition of the roof and building.

Later, we will create and provide an estimate that includes the necessary work and costs!

3. Decision on Whether to Proceed with Roofing Work

Based on the inspection results and estimate, you will decide whether to proceed with the roofing work.

Please rest assured that we will not pressure you into proceeding with the work.

It is also fine to compare with estimates from other companies before making your decision!

4. Contract & Schedule Construction Date

Once you have thoroughly reviewed the estimate and decided to request Kakeru Koumuten, we will have you fill out the contract (by mail or in person) and discuss your availability to set the construction date.

5. Start of Construction

Experienced workers will carry out the construction responsibly! Depending on the content of the work and weather conditions, the planned construction period may shift or extend. (We will strive to conduct the work in a manner that does not inconvenience you or your neighbors.)

6. Completion of Construction (Review Photos)

We will explain the repair items and show you photos of the completed roof before handing it over to you.

If you have any concerns at that time, please feel free to let us know!

7. Payment

 

Voices of Customers Who Have Actually Had Work Done

For Roof Renovations in Kohoku-ku, Yokohama, Trust Kakeru Koumuten!

We have extensive experience in roof renovations in Kohoku-ku.
We are happy to assist with roof overlay work, roof replacement work, and partial roof repairs such as leak repairs.
If you just want to know the estimate for roof renovation or have questions about roofing materials, please feel free to contact us!

In addition, since our company is concentrated in Aoba-ku, Yokohama, we can quickly respond to inquiries from customers in the nearby Kohoku-ku for estimates and cleaning!
Kohoku-ku, Yokohama, has many buildings located on hills with a lot of slopes, which gives the impression of being in a very windy area.
When the wind is strong, there are many troubles such as roofs peeling off or rain gutters getting damaged during typhoons or strong winds.
Kakeru Koumuten Co., Ltd. has a wide range of roof and rain gutter materials in stock, allowing us to respond quickly to sudden rain gutter or exterior issues!

Community-Focused Service

As an exterior renovation company based in Aoba-ku, Yokohama, we have handled many roof renovations in the nearby Kohoku-ku and have a deep understanding of the needs of local customers. Whether it’s “I want it to last a long time with one renovation,” “I want to keep costs down as much as possible,” or “I want to improve insulation because the indoors are hot,” we provide optimal solutions to specific requests.

Kohoku-ku, Yokohama – Area List

Aoba-ku, Yokohama Tarumachi/Aoba-ku, Yokohama Moroaka-cho/Aoba-ku, Yokohama Oosone/Aoba-ku, Yokohama Oosonedai/Aoba-ku, Yokohama Kikuna/Aoba-ku, Yokohama Fujizuka/Aoba-ku, Yokohama Nishikigaoka/Aoba-ku, Yokohama Shinohara Kita/Aoba-ku, Yokohama Shinohara Higashi/Aoba-ku, Yokohama Nakatehara/Aoba-ku, Yokohama Shinohara Daimachi/Aoba-ku, Yokohama Shinohara Nishicho/Aoba-ku, Yokohama Shinohara-cho/Aoba-ku, Yokohama Mamedo-cho/Aoba-ku, Yokohama Shin-Yokohama/Aoba-ku, Yokohama Kishine-cho/Aoba-ku, Yokohama Toriyama-cho/Aoba-ku, Yokohama Kozukue-cho/Kohoku Ward, Yokohama Okurayama/Kohoku Ward, Yokohama Minowa-cho/Kohoku Ward, Yokohama Tsunashima Higashi/Kohoku Ward, Yokohama Tsunashima Nishi/Kohoku Ward, Yokohama Tsunashima Dai/Kohoku Ward, Yokohama Tsunashima Kamicho/Kohoku Ward, Yokohama Shin Yoshida-cho/Kohoku Ward, Yokohama Nippa-cho/Kohoku Ward, Yokohama Shin Yoshida Higashi/Kohoku Ward, Yokohama Kita Shin Yokohama/Kohoku Ward, Yokohama Hiyoshi/Kohoku Ward, Yokohama Hiyoshi Honcho/Kohoku Ward, Yokohama Takada-cho/Kohoku Ward, Yokohama Shimoda-cho/Kohoku Ward, Yokohama Takada Higashi/Kohoku Ward, Yokohama Takada Nishi

Summary

Estimates and inspections are, of course, free! If you have any concerns regarding roofs, rain gutters, exterior walls, or exteriors, please consult Kakeru Koumuten Co., Ltd. in Aoba-ku, Yokohama!

Kakeru Koumuten Co., Ltd. is a remodeling company strong in exterior renovations, and we carry out everything from temporary scaffolding work to roof work and exterior painting completely in-house.
When it comes to exterior renovation work, we are confident that we will not be outdone by other companies in terms of “cost, quality, and efficiency”!

We are confident in our exterior renovations, so we welcome competitive estimates!
We also offer comprehensive construction guarantees and aftercare maintenance, and we have received positive feedback for our cost performance and appropriate proposals that align with our customers’ future life plans!

“I’m glad I asked them!” We take every request seriously to ensure you feel this way.

We also have information on roof construction costs and pricing plans for the roof overlay (cover method), so please take a look if you’re interested!

We look forward to your inquiries. Thank you very much.

Helpful information about exterior renovations can be found here!

LINEConsultations via LINE are also very welcome◎

We are also updating our Instagram regularly◎Please follow us◎

For roofing, guttering, and exterior work and repairs in Kanagawa, contact Kakerukoumuten Co., Ltd..

AAA is a young company with an average age in the early 20s, but our technology is second to none.

One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!

We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!