Hello!
We are Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior wall painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of an exterior renovation project we undertook in Asakura City, Saitama Prefecture, commissioned by Company S.
There are several types of exterior renovations, and the work we performed this time was a roof overlay (cover method) using Galtect!
We implemented measures against leaks due to the roofing work!
Colonial NEO is a roofing material that cannot be painted!
On this page, we will explain the actual results of the work done by Kakeru Koumuten!
Thank you very much for choosing Kakeru Koumuten Co., Ltd. from among many contractors.
目次
- 1 Roof Replacement Construction Procedure
- 2 What is the Roof Overlay (Cover Method)?
Roof Replacement Construction Procedure
1. Removal of Existing Roof Ridge Metal

2. Roofing Installation (Waterproof Sheet)
3. Component Processing (Curly Patterns, Eaves, Valleys)

The components used are genuine SGL steel sheets from Galtect.
4. Main Body Construction (Aijii Kogyo/Super Galtect)

Once the installation reaches the ridge, we will raise it on the rafters and install the ridge metal. There are types of batten, including cedar and resin, and this time we used cedar!
5. Ridge Sheet Metal Processing and Sealing

We use stainless steel nails and screws that are resistant to rust!
6. Cleaning


About Roofing Materials
The roofing material used is the Super Galtect from Aijii Industrial.
The Super Galtect comes with a manufacturer warranty of 15 years for the coating and 25 years for perforation.
Our company also provides a 10-year construction warranty!
It is made of SGL steel plate, which is also resistant to rust.
The insulation material is tightly applied from end to end of the roofing material, creating a metal sheet that integrates both the steel plate and insulation.
During installation, insulation is applied even to the parts where the roofing materials overlap, and the surface is coated with a highly heat-reflective paint, allowing for a cool summer and warm winter experience.
Additionally, it has soundproofing properties, which help reduce the sound of rain.
Furthermore, it is lighter compared to other roofing materials, which reduces the sway during earthquakes, providing earthquake resistance as well.
It excels in finish, durability, insulation, soundproofing, and wind resistance, and the Super Galtect from Aijii Industrial is our most frequently used material, gaining significant attention in our construction achievements!
Colors
■ Shade Black

■ Shade Brown

■ Shade Blue

■ Shade Moss Green

■ Shade Charcoal

You can choose from these 5 colors!
This time, the cover work with Shade Black turned out exceptionally well!
The customer was very satisfied, and I was also very happy!
Thank you very much!
Please check out other roofing work examples from here!
What is the Roof Overlay (Cover Method)?
The roof overlay method involves leaving the current roof almost as it is and placing a new roof on top to cover it.
Literally, it is a method of covering a roof with another roof. Therefore, the roof becomes double-layered. Since the roof is laid over another, it is also referred to as “overlapping roofing.”
Benefits of the Roof Overlay Method
Since a “new roof” is placed over the “existing roof,” demolition work is almost unnecessary, meaning that very little waste is generated.
This is the biggest feature and leads to various benefits.
The only parts that require demolition and waste disposal are the ridge cap, so compared to complete roof replacement, the cost is lower.
In 2004, regulations regarding the concentration of asbestos in raw materials were changed (for details, please refer to the Ministry of Health, Labour and Welfare website).
Building materials used in structures constructed before 2004 may contain asbestos. Asbestos-containing materials are difficult to dismantle due to their high environmental impact, resulting in high costs for both demolition and waste disposal. The roof overlay method, which generates almost no waste, is ideal for such roofs.
Some may wonder, “Is it safe to live in a building that uses asbestos-containing materials?” but rest assured. As long as there is no destruction or crushing, it will not disperse into the air.
If you are unsure about the type of roof on your home, please feel free to consult us.
Additionally, we can complete the work in a shorter time frame compared to painting or complete roof replacement. A shorter construction period means lower labor costs, which in turn makes the overall cost lower.
The psychological anxiety of having to live in an unusual environment is also reduced.
When scaffolding is set up, you may experience inconveniences such as difficulty entering and exiting or being unable to open windows. Being able to return to normal life in a short period is a significant advantage.
Our company specializes in roofing work, and the roof overlay method is the most frequently performed type of work we undertake. We are very grateful that we are continuously able to carry out roof overlay projects without interruption.
| Roof Material | Aiji Industry / Super Galtect
|
|---|---|
| Manufacturer Warranty | Coating 15 years, Red Rust 20 years, Perforation 25 years |
| Expected Durability | About 40 years |
| Color Used This Time | Shade Black
|
Estimates and inspections are, of course, free! If you have any concerns regarding roofs, rain gutters, exterior walls, or exteriors, please consult Kakeru Koumuten Co., Ltd.!
We carry out everything from temporary scaffolding work to roof construction and exterior painting entirely in-house. We are confident that our costs, quality, and efficiency in exterior work surpass those of other companies!
We welcome competitive estimates with confidence!
You will be glad you chose us! We take every request seriously to ensure your satisfaction.
We also have information on roof construction costs and pricing plans for the roof overlay method, so please take a look if you’re interested!
We look forward to your inquiries. Thank you very much.
Helpful information about exterior renovations can be found here!
・The Necessity and Timing of Exterior Wall Painting…
Limited to Kanagawa and Tokyo|A must-see for those who want to try DIY exterior wall painting! Scaffolding setup only! DIY Plan for Roof and Exterior Wall Painting!
・Introducing Roof Materials That Cannot Be Painted or Recommended!
・What Are the Average Costs for Roof Remodeling? Types of Work and How to Choose a Contractor
・Introducing Current Roof Materials and Remodeling Methods!
・Roof Remodeling | What is Roofing? Introducing the Important Roofing Material, Roofing Sheets!
・What Are the Average Costs for Rain Gutter Repair and Cleaning? Tips on Timing, Fire Insurance, and Choosing a Contractor!・Renovation Store in Kanagawa Prefecture, Yokohama | What is Roof Overlay (Roof Cover Method)?
Consultations via LINE are also very welcome◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!