Construction example

[Kanagawa Prefecture, Hiratsuka City] Performed exterior wall painting with premium silicone, exterior painting with IP Yōheki coat, and balcony waterproofing work!

BEFORE

AFTER

Hiratsuka City, Kanagawa Prefecture | Construction Data

Construction Location
 Hiratsuka City, Kanagawa Prefecture
Construction Details
 Exterior Wall Painting Work
 Exterior Painting Work
 Balcony Waterproofing Work
New Materials Used
 ◯ Exterior Wall Painting  
  Primer: SK Kaken / SK Elastic Premium Filler
  Intermediate and Top Coat: SK Kaken / Premium Silicon (SR-178)   
 ◯ Accessory Painting
 [Eaves]
  Nippon Paint / Water-based Ken Ace (N-90)
 [Mailboxes, Posts, Shutters, Strips, Canopies, Entrance Doors, Slim Ducts, Grilles]
  Rock Paint / Yumelock (15-20B)
 ◯ Exterior Painting
  International Paint / IP Youheki Coat (SR178)
 ◯ Balcony Waterproofing Work
  Kanae Chemical Industry / Kanae Water-based FRP Top (Top coat for FRP waterproofing)
Price Range
 800,000 to 900,000 yen
Construction Period
 About 2 weeks
Completion Month
 February 2025

Exterior Wall Painting Construction Procedure

1. High-Pressure Washing

First, we thoroughly wash the exterior walls with high-pressure washing to remove dirt and moss! If dirt remains, it can affect the adhesion and durability of the paint, so we wash carefully. We also wash the exterior structures, concrete floors, and inside the rain gutters. This time, we used bio-cleaning!

2. Masking

Using masking tape, blue sheets, and polymer masks, we cover areas that will not be painted, such as windows, sashes, and floors. This is a very important task in the painting process!

Neglecting masking can create gaps, allowing paint to seep in or resulting in uneven lines.

3. Primer Application

This is the first step of applying paint after completing high-pressure washing and surface preparation. It is a primer that ensures the middle and top coats adhere firmly to the painted surface. A well-applied primer significantly impacts durability and finish!

The paint used is SK Kaken / SK Elastic Premium Filler.

4. Middle Coating

Next is the middle coating. This is a crucial process to bring out the performance of the paint, achieve a beautiful finish, and eliminate unevenness!

The paint used is SK Kaken / Premium Silicon. The manufacturer’s expected durability is about 14 to 16 years.

5. Top Coating

Next is the top coating. This is the finishing touch for the exterior wall painting. Care is taken to ensure there are no uneven spots or missed areas, resulting in a beautiful finish!

The paint used is the same as the middle coating, SK Kaken / SK Premium Silicon.

SK Kaken / Premium Silicon

SK Kaken / Premium Silicon

6. Painting of Auxiliary Parts (Eaves, Ceiling, Mailbox, Columns, Shutters, Band Boards, Canopies, Entrance Door, Slim Duct, Grilles)

Eaves

Mail Post

Pillar

Shutter

Band Board

Awning

Entrance Door

Slim Duct

The slim duct is disassembled for painting to avoid sticking! By detaching and painting, we can also thoroughly paint the exterior wall beneath the slim duct!

Grille

After finishing the surface preparation such as scraping for the attached parts, in the case of metal parts, we apply a rust preventive primer, followed by a mid-coat and top-coat using Rock Paint / Yumelock. We ensure that every detail is thoroughly painted!

For the eaves, we used Nippon Paint / Water-based Ken Ace. [/chat]

Exterior Painting Work Case Studies

1. High-Pressure Washing

We thoroughly remove dirt and moss with high-pressure washing!

2. Surface Preparation

Once the high-pressure washing is complete, we proceed with surface preparation.

3. Primer Application

This is the first step of applying paint after high-pressure washing and surface preparation, and it is a primer that ensures the mid-coat and top-coat adhere well to the painted surface.

We use a sealer specifically for exterior painting. To prevent bubbling, we used a highly breathable sealer! Surf and filler can cause bubbling, so they are not allowed for exterior painting!

4. Mid-Coat

To bring out the performance of

paint, it is an important process to achieve a beautiful finish and eliminate uneven application!

5. Top Coat

This is the finishing of the

painting. We consciously work to ensure that there are no uneven areas or missed spots, resulting in a beautiful finish!

The paint used is International Paint / IP Youheki Coat! This paint maintains the aesthetic of block walls and similar structures for a long time! It is a paint that prevents the most common trouble in exterior painting, which is blistering!

6. Completion of Exterior Painting Work

Finally, after removing the protective coverings and cleaning up, the work is complete! Once again, we achieved a beautiful finish! [/chat]

Balcony Waterproofing Construction Procedure

1. Surface Preparation and Roughening

To improve the adhesion of the paint, we will create fine scratches on the painting surface! This is known as surface preparation! We will make the smooth surface rough!We will move or elevate any obstacles, such as outdoor units, that may interfere with waterproofing work.

2. Acetone Wiping

Next, we will perform acetone wiping! This is also an important surface preparation step. Acetone wiping involves removing the oil film from the FRP waterproofing surface! Skipping this step can lead to paint peeling.

We will thoroughly clean any dirt that cannot be removed by washing. This step is crucial for enhancing the adhesion of the top coat.

3. Primer Application (Undercoat)

The primer acts as an adhesive that promotes the adhesion between the waterproof layer and the top coat!

4. Installation of New Glass Mat

After applying

primer, we lay down the glass mat.

5. Application of Epoxy Resin

We soak the glass mat with epoxy resin to cure the waterproof layer.

5. Application of Top Coat (Two Coats)

The top coat is typically applied in two layers!

Once finished, we check for any missed spots.

6. Completion of Balcony Waterproofing Work

Once the balcony is dry, the work is complete! We will return any moved items and the outdoor unit to their original positions to finish!

Please check out other painting work examples from here!

If you are looking for exterior remodeling in Hiratsuka City, Kanagawa Prefecture, please contact Kakeru Koumuten Co., Ltd.

Our company handles many roofing and exterior painting projects in Hiratsuka City, Kanagawa Prefecture. We are happy to assist with partial roof repairs such as roof overlays, roof replacements, exterior painting, exterior siding replacements, and leak repairs, as well as other repairs!

In case of emergencies such as roof leaks or if temporary measures can be taken without scaffolding, please consult with us!

We provide optimal solutions for specific requests such as “I want it to last long with a single renovation”, “I want to keep costs as low as possible”, and “I want to improve insulation because the indoors are hot”.

We carry out everything from temporary scaffolding construction to roofing and exterior painting entirely in-house.
We are confident that we will not be outdone in terms of cost, quality, and efficiency compared to other companies in exterior construction!
We welcome competitive estimates as we are confident in our work!

List of Areas in Hiratsuka City

Akasaka-cho, Hiratsuka City / Amanuma, Hiratsuka City / Iijima, Hiratsuka City / Denawa, Hiratsuka City / Irino, Hiratsuka City / Iribe, Hiratsuka City / Enoki-cho, Hiratsuka City / Oimatsu-cho, Hiratsuka City / Oiwake, Hiratsuka City / Oogami, Hiratsuka City / Ooshima, Hiratsuka City / Oohara, Hiratsuka City / Okazaki, Hiratsuka City / Kataoka, Hiratsuka City / Kamiyoshizawa, Hiratsuka City / Kamihiratsuka, Hiratsuka City / Kitakaname, Hiratsuka City / Kitatoyoda, Hiratsuka City / Shirodoko, Hiratsuka City / Kōgashira, Hiratsuka City / Kyūryōdai, Hiratsuka City / Kurobeoka, Hiratsuka City / Kawachi, Hiratsuka City / Goten, Hiratsuka City / Konobeshima, Hiratsuka City / Saiwaicho, Hiratsuka City / Sakuragaoka, Hiratsuka City / Sanada, Hiratsuka City / Shiranomiya, Hiratsuka City / Shimo Yoshizawa, Hiratsuka City / Shimojima, Hiratsuka City / Shinmachi, Hiratsuka City / Suga, Hiratsuka City / Sumirehira, Hiratsuka City / Suwa-cho, Hiratsuka City / Asama-cho, Hiratsuka City / Sengokukawagashi, Hiratsuka City / Chisugaya, Hiratsuka City / Sodegahama, Hiratsuka City / Daikan-cho, Hiratsuka City / Takane, Hiratsuka City / Takahamadai, Hiratsuka City / Takamura, Hiratsuka City / Takara-cho, Hiratsuka City / Tachinokata, Hiratsuka City / Tamura, Hiratsuka City / Tachijōgaoka, Hiratsuka City / Tsuchiya, Hiratsuka City / Tsutsumimachi, Hiratsuka City / Teradanawa, Hiratsuka City / Karagehara, Hiratsuka City / Tokunobu, Hiratsuka City / Toyoda Utemaki, Hiratsuka City / Toyoda Komine, Hiratsuka City / Toyoda Byoudouji, Hiratsuka City / Toyoda Hongou, Hiratsuka City / Toyoda Miyashita, Hiratsuka City / Toyohara-cho, Hiratsuka City / Nakazato, Hiratsuka City / Nakadō, Hiratsuka City / Nakahara, Hiratsuka City / Nakahara Kamijuku, Hiratsuka City / Nakahara Shimojuku, Hiratsuka City / Nagatoro, Hiratsuka City / Nagamochi, Hiratsuka City / Nadeshikohara, Hiratsuka City / Nishinarita, Hiratsuka City / Nishiyahata, Hiratsuka City / Nijigahama, Hiratsuka City / Nesakamata, Hiratsuka City / Hanamizudai, Hiratsuka City / Bairin, Hiratsuka City / Bairin Honmachi, Hiratsuka City / Higashinarita, Hiratsuka City / Higashi Toyoda, Hiratsuka City / Higashi Nakahara, Hiratsuka City / Higashi Yahata, Hiratsuka City / Hinataoka, Hiratsuka City / Hiratsuka, Hiratsuka City / Hirokawa, Hiratsuka City / Fujimimachi, Hiratsuka City / Fujimino, Hiratsuka City / Satsubamachi, Hiratsuka City / Kōbanya-cho, Hiratsuka City / Matsukaze-cho, Hiratsuka City / Matoi, Hiratsuka City / Mandai, Hiratsuka City / Mitsuke-cho, Hiratsuka City / Minami Kaname, Hiratsuka City / Minami Toyoda, Hiratsuka City / Minamihara, Hiratsuka City / Miya no Mae, Hiratsuka City / Miyamatsu-cho, Hiratsuka City / Megumigaoka, Hiratsuka City / Momohama-cho, Hiratsuka City / Yaezaki-cho, Hiratsuka City / Yachiyo-cho, Hiratsuka City / Yamashita, Hiratsuka City / Yahata, Hiratsuka City / Yuuhi ga Oka, Hiratsuka City / Yokouchi, Hiratsuka City / Yoshizawa, Hiratsuka City / Ryuujo ga Oka, Hiratsuka City

Summary

Estimates and inspections are, of course, free! If you have any issues with your roof, rain gutters, exterior, or landscaping, please consult Kakeru Koumuten Co., Ltd.株式会社翔工務店 in Kanagawa Prefecture!

Kakeru Koumuten Co., Ltd. is a company strong in exterior renovations. From temporary scaffolding work to roof work and exterior wall painting workWe handle everything in-house! When it comes to exterior renovation work, we are confident that we will not be outdone by other companies in terms of “cost, quality, and efficiency.”

We are confident in our exterior renovations, so we welcome competitive estimates! We also offer comprehensive construction guarantees and aftercare maintenance, receiving praise for our cost performance and appropriate proposals that align with our customers’ future life plans!

“I’m glad I asked them!” We take every request seriously to ensure you feel this way.

We look forward to your inquiries. Thank you very much.

Helpful information about exterior renovations can be found here!

We also welcome consultations via LINE◎

LINE

LINE

We are also updating our Instagram regularly ◎ Please follow us!

Instagram
Instagram
 
 
 
For roofing, guttering, and exterior work and repairs in Kanagawa, contact Kakerukoumuten Co., Ltd..

AAA is a young company with an average age in the early 20s, but our technology is second to none.

One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!

We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!