For solar panel and battery installation in
Ashigarakami District (Hakone Town, Manazuru Town, Yugawara Town),
Kakeru Koumuten is at your service!

Kakeru Koumuten is a company specializing in exterior renovations based in Kanagawa Prefecture.
As a company strong in roofing work, we are entrusted with solar panel and battery installation considering roofs and waterproofing!

“How to Choose a Solar Panel Contractor in Ashigarakami District (Hakone Town, Manazuru Town, Yugawara Town)”
“Costs for Solar Panel and Battery Installation”
“Subsidies Available for Solar System Installation in Ashigarakami District (Hakone Town, Manazuru Town, Yugawara Town)”
We will also explain the above three points!

Installing solar panels carries risks such as “the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtaining around three estimates!

For solar panel and battery installation in Ashigarakami District (Hakone Town, Manazuru Town, Yugawara Town), contact Kakeru Koumuten
Table of Contents (tap to open/close)
  1. Reasons why Kakeru Koumuten is chosen for solar panel installation in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)
  2. Roof inspection before solar panel installation
  3. Possible subsidies and grants available in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)
  4. Price list for solar panel installation and battery installation
  5. Breakdown of installation capacity, equipment, and construction costs
  6. Self-estimation and financial simulator for solar power generation
  7. Customer testimonials
  8. Case studies of solar panel installations
  9. How to choose a solar panel installation contractor in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)
  10. Benefits of introducing solar equipment
  11. Points to be careful about when introducing solar power generation
  12. How to choose solar panels
  13. Frequently asked questions about solar and battery installation in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)
  14. If you are looking for a solar panel installation contractor in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town), please contact Kakeru Koumuten
  15. Characteristics of Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town) and points for solar construction
  16. Service area in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)

Reasons why Kakeru Koumuten is chosen for solar panel installation in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)

Link banner to Kakeru Koumuten's strengths introduction page

The reasons why our company is entrusted with solar panel installation by customers in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)
“Our strengths in solar panel installation that cannot be imitated by other companies”
have received high praise from many customers.

In solar panel installation work in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town), we have absolute confidence in “cost,” “quality,” and “plans”.
We would appreciate it if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We can also handle exterior renovations other than solar panel installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Troubles such as leaks caused by the installation of solar panels may be due to insufficient checks on the roof and waterproofing at the installation site.
Even if one is knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside their expertise, so caution is necessary.
It is reassuring to have expertise in roofing to avoid maintenance issues and troubles after installation!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!

2.Facilities Specialized in Exterior Renovation

Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar and exterior renovation work.
We have established five bases centered around Yokohama City, Kanagawa Prefecture for material storage and showrooms.

In-house Scaffolding Materials

Entrance to the material storage areaIn-house owned scaffolding materials
To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding based on construction conditions and can assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also reduce the costs associated with scaffolding work.
We own scaffolding materials for approximately 50 single-family homes!
Even if there are height differences on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.

Storage of Materials in Our Large Warehouse

Appearance of the material warehouse Interior of the warehouse storing materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we canrespond quickly in emergencies!

In-house sorting and transportation of waste materials

Sorting space for waste materialsThe installation of solar panels often involves roofing work, generating various waste materials such as paints, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.

Exterior renovation dedicated showroom

Appearance of the exterior renovation dedicated showroomInterior of the showroom
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are attached to the roofing materials!
We can also provide simulations of potential earnings and installation costs when introducing solar panels!

Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing us to provide detailed explanations!

3.All work performed by our own team

Diagram of the system for performing scaffolding, painting, and roof renovations in-house

One of Kakeru Koumuten’s major strengths is its complete in-house construction.

By having Kakeru Koumuten manage everything from inquiries to project completion in a consistent system, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will handle everything from the estimate to project completion.
Since the same person is responsible for sales and construction management, smooth communication is possible.

We can provide consistent in-house construction from temporary scaffolding installation to exterior wall painting and roof renovations!

4. Various Permits and Skilled Workers

Construction Industry LicenseDisplay of Permits and Qualifications Obtained by Kakeru Koumuten
We have obtained construction industry licenses as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists, and we are confident in our construction techniques.
We can also handle large-scale roof projects for factories and other facilities!

5. Warranty and Aftercare

Link Banner to Kakeru Koumuten's Warranty Information Page

In addition to the manufacturer’s warranty for solar panel installation work, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed. The construction warranty is separate from the manufacturer’s product warranty, and the coverage and conditions vary based on the warranty details.)
Aftercare is available annually, and we send out reminder DM each year.
If you have questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Roof and Solar Panel Inspection Response

Our company is equipped to handle various roofing troubles and situations.

Even if you cannot access the roof at high altitudes, we can respond using a drone!
During leak investigations, we can also conduct inspections using a thermal imaging camera.

If the power generation of your solar panels decreases due to dirt or other factors, we can also provide cleaning of the solar panels using a specialized brush.
We will respond according to your wishes.

7. Human Resource Development

Training using models

To improve skills, we create various roof models and conduct practical training.
Since the construction methods change depending on the shape and slope of the roof, we regularly provide technical training so that each staff member can handle various cases.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Easy-to-Understand Materials and Simulations

Examples of materials and simulations provided for solar construction

Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction can easily understand the materials, including points to note and disadvantages!

We encourage you to obtain comparative estimates and compare them with other companies’ plans!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.

1. Types of Roofing Materials and Age The fixing method varies depending on the roofing material, such as slate, tiles, metal roofs, and flat roofs (rooftop waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first.
2. Condition of the Substrate and Waterproof Sheet If the sheathing or roofing (waterproof sheet) beneath the roofing material is damaged, it can affect the fixing strength and waterproofing. We also check for any signs of leaks.
3. Orientation, Slope, and Shadows of the Roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, can affect power generation. We create a layout diagram from the drawings and the site, and you can check it with a power generation simulation.
4. Shape of the Roof and Usable Area The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we compare based on the total output of the roof.
5. Fixing Method and Waterproofing Details We check whether the method involves drilling holes in the roofing material for fixing or using brackets to secure the roofing material. The fixing method varies by technique, so please confirm the waterproofing treatment of the fixing parts during the estimate.
6. Weight of the Roof The roof becomes heavier due to the panels being added. After investigating the existing roof, substrate, and load capacity, switching to lighter roofing materials may also be an option if necessary.
7. Location of Equipment Installation and Wiring We check the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring also affects costs.
8. Ease of Scaffolding Setup and Delivery Routes If there are height differences on the site, planning for scaffolding and delivery routes for equipment and materials may require some ingenuity. The width of the front road and any steps on the site are also confirmed during the site survey.

Fixing Methods and Checkpoints by Roofing Material

Roof Material Main Fixing Method Pre-Installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproofing treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is significant, consider roof overlay (cover method) or replacement first.
Tile Roof Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will secure to the substrate) Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lighter roofing materials before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available.
Flat Roof / Rooftop Fixed by installing a framework Type and deterioration status of the waterproof layer, waterproofing around the framework. Consider in conjunction with the timing of waterproofing work.
If you carry out roof renovations at the same time, you may reduce future costs for removing and reinstalling solar panels!
If you perform roof renovations 10 to 20 years after installation, additional costs for removing and reinstalling solar panels will apply. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ For roof renovations in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town), click here

Potential Subsidies and Grants in Kanagawa Prefecture, Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)

If you are introducing solar panels or storage batteries in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town), the systems from the “National Government,” “Kanagawa Prefecture,” and your local “Hakone Town,” “Manazuru Town,” or “Yugawara Town” may be applicable.
The following information is based on the official pages of each system as of October 6, 2026. The application status may change depending on the budget, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Timing for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Hakone Town “Renewable Energy Equipment Installation Subsidy” Must have a residence within the town and continuously use the equipment, with no delinquency on town taxes, etc. Solar power must be equipment under 10kW eligible for FIT (Feed-in Tariff), and storage batteries must meet the requirements of the ZEH support project and be registered products under the Environmental Co-Creation Initiative (SII). Application to the Environmental Division is required before starting construction. Solar: The lower amount between “the amount after deducting national and prefectural subsidies from the project cost” and “output × 15,000 yen” (maximum 50,000 yen)
Storage Battery: The amount after deducting national and prefectural subsidies from the project cost (maximum 50,000 yen)
The town’s official page (updated April 22, 2025) does not specify the application period.
Please confirm the application status for Reiwa 8 before contracting with the town.
Manazuru Town (Residential Solar Power Generation & Storage Batteries) As of October 6, 2026, the town’s subsidy program for residential solar power generation and storage batteries could not be confirmed on the town’s official page. ― Please confirm the existence of the program with the town before contracting.
Yugawara Town “Residential Smart Energy Equipment Installation Subsidy” Individuals installing new equipment in their own residences within the town (including purchasers of newly built homes with eligible equipment). Must have a record in the Basic Resident Register before application and have no delinquency on town taxes, etc. Submit the “Subsidy Grant Application Notification” to the Environmental Division before installation and apply for the grant after installation. Solar: 15,000 yen per kW (maximum 52,000 yen)
Storage Battery: Within 1/2 of the installation cost (maximum 50,000 yen)
The town’s official page (updated June 25, 2025) does not specify the application period or status.
Please confirm the application status for Reiwa 8 before contracting with the town.
Kanagawa Prefecture “Reiwa 8 Year Kanagawa Prefecture Residential Solar Power Generation & Storage Battery Installation Subsidy” Must install both solar power generation and storage systems in residential buildings (with earthquake resistance). The applicant must apply personally, and construction can begin after grant approval. Solar: 70,000 yen/kW
Storage Battery: 150,000 yen/unit
Phase 1: May 11, 2026 – June 30, 2026
Phase 2: Starts September 7, 2026 (first-come, first-served)
As of September 7, 2026, the application amount has reached the budget limit, and applications are closed. Please check the prefecture’s official page for future recruitment.
National “DR Home Storage Battery Project” (Reiwa 7 Fiscal Year Supplement) Newly install home storage systems that can be utilized for DR (demand response) with registered products. Calculated based on an initial effective capacity of 3.45 million yen per kWh (subsidy rate within 3/10; maximum 600,000 yen per application). As of May 29, 2026, the budget has been reached, and the public offering has ended (the official site states there are no plans to reopen the public offering, and applications cannot be made at this time).
National “Mirai Eco Housing 2026 Project” (Renovation) Storage batteries are one of the eligible facilities, but they must be combined with essential construction such as insulation renovation of windows (openings) and the building structure; applications cannot be made for the installation of storage batteries alone. Solar panels are not included as eligible facilities Storage Battery: 96,000 JPY/unit Ends as soon as the budget limit is reached. As of October 5, 2026, the official site shows that the application amount for renovations is 8% of the budget. Please check the official site for the current status.
Kanagawa Prefecture “Reiwa 8 Year Kanagawa Prefecture Self-Consumption Type Renewable Energy Introduction Subsidy” Corporations and individual business owners filing blue returns (individual residences are not eligible). Solar power must have a generation capacity of 10kW or more, for business facilities, and equipment not certified under FIT/FIP. Solar Power: 80,000 JPY/kW, etc.
Storage System: 50,000 JPY/kWh (maximum 5 million JPY)
Application closed on September 3, 2026 (when application amounts reached the budget).
Please pay attention to the “order of procedures” for subsidies!
In Hakone Town, applications for subsidies are required before construction begins, while in Yugawara Town, notifications must be submitted to the Environmental Division before installation, followed by a grant application after installation. For Manazuru Town, the town’s subsidy system for residential use cannot be confirmed on the official page, so it is recommended to check at the service counter. For Kanagawa Prefecture’s housing subsidies, construction must begin after receiving the “grant decision”; starting work beforehand will disqualify the application. Eligibility conditions, application procedures, and the possibility of combining different systems vary by program, and applying does not guarantee a grant, so please confirm before contracting and starting work.
Kakeru Koumuten will guide you on the eligibility conditions and application periods for each program after confirming them.

National Subsidy “DR Home Storage Battery Project (Support Project for Home Storage System Introduction for DR Resources)”

The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.

This program targets those who introduce new registered products of storage systems that can be utilized for demand response (DR). In the supplementary project for the fiscal year 2025, the subsidy amount was determined based on a standard amount of 34,500 JPY per initial effective capacity of 1kWh, with a subsidy rate of up to 30% and a maximum of 600,000 JPY per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.

However, the supplementary portion for the fiscal year 2025 reached the budget on May 29, 2026, and the public recruitment has ended. The official site also states that there are no plans to reopen public recruitment, and applications are currently not possible. Please check the official site for future public recruitment.

Furthermore, there are currently no subsidies confirmed for the installation of solar panels on existing homes.
👉 Click here for the official site of the DR Home Storage Battery Project

Kanagawa Prefecture “Reiwa 8 Year Kanagawa Prefecture Residential Solar Power Generation and Storage Battery Introduction Subsidy”

In Kanagawa Prefecture, subsidies are provided for those who introduce both “solar panels” and “storage batteries” together in their homes.

The subsidy details are as follows: 70,000 yen per 1kW of solar power generation output, and 150,000 yen per storage system.
For example, if you introduce a 4kW solar panel and one storage battery, the calculation for the subsidy amount would be 4kW × 70,000 yen + 150,000 yen = 430,000 yen.

The eligible homes must ensure seismic performance, the storage system must be a registered product, if construction begins before the grant decision, it will be ineligible, and the application must be made by the individual (applications by contractors on behalf are not allowed), among other conditions. Whether you can combine municipal and prefectural subsidies may vary by town and system, so please check with each office before signing a contract.

In the 2026 fiscal year, the first period (May 11 – June 30) and the second period (starting September 7, first-come-first-served) were accepted, and the second period was closed on September 7, 2026, as the application amount reached the budget amount. For future recruitment, please check the official page of Kanagawa Prefecture.
👉 Here is the official page of Kanagawa Prefecture

Kanagawa Prefecture “2026 Fiscal Year Kanagawa Prefecture Self-Consumption Type Renewable Energy Introduction Cost Subsidy” (for businesses)

Kanagawa Prefecture also provides subsidies for businesses that introduce “self-consumption type” facilities that use electricity generated by solar panels.

Eligible applicants are corporations or individual business owners who file blue returns, and individual residential installations are not eligible.
Conditions include that the solar power generation must be 10kW or more, supplying electricity to business facilities within the prefecture, and the facility must not be certified under FIT or FIP.

The subsidy amount is 80,000 yen per 1kW of solar power generation, and 50,000 yen per 1kWh for the accompanying storage system (with a maximum of 5 million yen).
As the application amount reached the budget amount in the 2026 fiscal year, the recruitment was closed on September 3, 2026.

Businesses considering the installation of solar panels on commercial buildings in Ashigarashimo District should check the official page of Kanagawa Prefecture for the next recruitment.
👉 For more details, click here

Hakone Town “Renewable Energy Equipment Introduction Cost Subsidy”

This subsidy is for solar power generation systems and stationary lithium-ion storage batteries installed in homes within the town. Household fuel cell systems, V2H charging and discharging equipment, and HEMS are also included in the subsidy.

◎Subsidy Amount◎
●Solar Power Generation System: The lower amount between “the amount after deducting national and prefectural subsidies from the project cost” and “output (truncated to the third decimal place) × 15,000 yen” (maximum 50,000 yen)
●Storage Battery: The amount after deducting national and prefectural subsidies from the project cost (maximum 50,000 yen)

Eligibility requires that the applicant has an address in the town, continuously uses the equipment, and has no outstanding town taxes. For solar power, eligible systems must have a total output or power conditioner rated output of less than 10 kW and be eligible for FIT certification. For storage batteries, products that meet the requirements of the ZEH support project and are registered with the Environmental Co-Creation Initiative (SII) are eligible. Submit the application form and estimate to the Environmental Division before starting construction, and after completion, submit the performance report, receipts, and installation photos.

On the town’s official page (updated April 22, 2025), I could not find information on the application period or budget. Please confirm the reception status for Reiwa 8 and the relationship with Kanagawa Prefecture’s subsidies with the town before signing a contract.
👉 Click here for Hakone Town’s official page

Subsidy System for Residential Solar Power Generation and Storage Batteries in Manazuru Town

As of October 6, 2026, the subsidy system for residential solar power generation and storage batteries in Manazuru Town could not be confirmed on the town’s official page. There may be new or resumed systems, so please check the latest information at the town office before signing a contract. For national and Kanagawa Prefecture systems, please refer to the table above.

Yugawara Town “Subsidy for Installation Costs of Residential Smart Energy Equipment”

This subsidy is for solar power generation systems and stationary lithium-ion storage batteries installed in residential properties within the town. HEMS and V2H are also included as eligible.

◎Subsidy Amount◎
●Solar Power Generation System: 15,000 yen per kW (maximum 52,000 yen)
●Stationary Lithium-Ion Storage Battery: Up to 1/2 of the installation cost (maximum 50,000 yen)
●HEMS: Up to 1/2 of the installation cost (maximum 10,000 yen) / V2H: Up to 1/2 of the installation cost (maximum 50,000 yen)

Eligibility is for those who install eligible equipment in a residential property where they reside or purchase a newly built house with eligible equipment. Conditions include having a record in the Basic Resident Register before applying for the subsidy, having no outstanding town taxes, and being able to cooperate in promoting the spread of eligible equipment. Submit the “Notification of Intent to Apply for Subsidy” to the Environmental Division before installation, and after installation, submit the “Application for Subsidy” and necessary documents.

On the town’s official page (updated June 25, 2025), I could not find information on the application period or reception status. Please confirm the reception status for Reiwa 8 and whether it can be combined with Kanagawa Prefecture’s subsidies with the town before signing a contract.
👉 Click here for Yugawara Town’s official page

Solar Panel Installation & Storage Battery Installation Price List

Solar Panel Installation and Battery Installation Menu
⇧Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here

Solar Panel Removal and Water Heater Removal Menu
⇧Service Menu | For Costs of Solar Panel Removal and Water Heater Removal, Click Here

Estimate Guidance

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and batteries should be checked separately for “Equipment Costs (Device Costs)” and “Construction Costs.”
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Battery Capacity (kWh)

The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Batteries are compared based on the amount of electricity they can store, expressed in kWh (kilowatt-hours).
The amount of kW that can be installed on a roof varies for each house based on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.

On our pricing page, we list solar panel costs as approximately 800,000 JPY to 1,200,000 JPY for 3-5 kW and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just approximate amounts and can vary based on wiring length, scaffolding range, existing roofing materials, panel layout, etc.)
▶ Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here

Items to Confirm in the Estimate (Cost Confirmation)

When comparing estimates from different companies, it’s common to compare items with different capacities and equipment. Please check if the following items are clearly stated in each company’s estimate!

1. Solar Panels Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also confirm whether it is a type that controls in conjunction with a battery.
3. Battery Manufacturer, model number, capacity (kWh), range of use during power outages (entire house or specific circuits), installation location.
4. Mounting Frame and Hardware Name of the hardware suitable for the roofing material and the method of securing it (whether it involves drilling holes or using clamps).
5. Wiring and Electrical Work Wiring route and length, work around the distribution board, presence of a monitor to check power generation.
6. Roof Reinforcement and Waterproofing Details of waterproofing treatment at the fixed parts, whether necessary roof repairs and substrate reinforcements are included.
7. Applications How much support is included for applications to the power company, certification applications for selling electricity (FIT), and subsidy applications.
8. Scaffolding Scope and quantity of scaffolding. If roof work and exterior painting are done simultaneously, check that the same scope and quantity are not double-counted.
9. Removal and Disposal Whether the removal of existing solar water heaters and old panels, as well as disposal costs for waste materials, are included.
10. Tax Classification and Warranty Whether the price is tax-inclusive or tax-exclusive, conditions under which additional costs may arise, and details and duration of manufacturer and workmanship warranties.
Tip for Comparison: Let’s compare by aligning “Installation Capacity (kW)” and “Equipment Model Numbers”!
If the capacities differ, both the price and power generation will change. Kakeru Koumuten Co., Ltd. welcome comparisons of estimates, so if you bring estimates from other companies, we will explain the differences item by item!

Self-Estimate and Profit Simulation for Solar Power Generation

Self-Estimate and Profit Simulation for Solar Power Generation

With the simulator above,
you can obtain an approximate estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the battery, you can get an approximate estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.

Customer Testimonials

Case Studies of Solar Panel Installation

BEFORE

Metal roof before solar panel installation

AFTER

Roof after solar panel installation

Construction Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh range
Base Mounting Hardware Used
 Niigata Manufacturing / Aluminum Catch Type Hardware
Fixing Method & Waterproofing Details
 Fixed using catch type hardware gripping the horizontal metal roof (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY
 Expected recovery period for construction costs: about 8 to 9 years (self-consumption)

 *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system.
Construction Period
 About 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that grants are available, and I would like to know how much will be provided.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels based on the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of grants to be provided, and we explained this to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Ashigarakami District (Hakone Town, Manazuru Town, Yugawara Town)

There are many solar panel installation contractors available in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town), and it can be confusing to choose which contractor to go with.

Therefore, when requesting solar panel installation and battery storage installation work, let’s check the following 4 points.

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the presence of warranties and aftercare maintenance

● Obtain estimates from multiple contractors (3 companies is a guideline)

● Check if they provide support for subsidy applications

By confirming the above 4 points, you will be able to choose a reliable contractor.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Knowledge about roofs as well as solar panels

Improper installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing

・Installing solar panels on a severely deteriorated roof, resulting in leaks
・Installing solar panels on a roof with a short lifespan, necessitating renovations to detach and reattach the solar panels within a few years
・Misjudging the type of waterproofing and performing incorrect treatment, leading to leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows for installation that avoids unnecessary expenses and unforeseen troubles.

▶ Go to “Roof Verification Before Installing Solar Panels” in this article

Confirm the presence of warranties and aftercare maintenance

When choosing a solar installation contractor, let’s confirm the presence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.

Solar panels and battery storage units come with manufacturer warranties, but also check for the presence of installation warranties in case leaks occur after installation!

For contractors that offer installation warranties, if leaks occur after installation, they may be able to respond under the warranty if it is within the warranty period and conditions.

Additionally, some contractors offer after-service separate from the warranty, so be sure to check if the contractor you are considering has after-service.
Changes or damage on the roof can be in areas that are not visible, so there is a possibility that customers may not notice them.
By conducting inspections in after-maintenance, even in areas that are not visible, it becomes easier to prevent major repairs or breakdowns by discovering abnormalities early!

Kakeru Koumuten Co., Ltd. provides a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, a roof renovation may be required to provide the warranty.)
We also conduct after-maintenance and send out DM every year!
Please check the DM, and if you wish, we will visit you for after-maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting solar panel installation, be sure to obtain estimates from multiple contractors.

Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-services may differ.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request from your preferred contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates, please check carefully the following:

“Check the items in the estimate”
“Type of solar panel”
“Warranties and after-services”

Make sure to compare these details closely! If the quality of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making judgments based solely on price!

▶ Go to “Breakdown of Installation Capacity and Equipment/Construction Costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Check if they provide support for subsidy applications

Subsidies may be available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
For systems like Kanagawa Prefecture’s housing subsidies, where application by the contractor is not allowed and personal application is required, it is reassuring to have a contractor who can support the preparation of necessary documents and the flow of procedures.
Be sure to complete the procedures specified for each system (for the prefectural housing subsidy, this means obtaining a grant decision) before proceeding with the construction!

For the prefectural housing subsidy, after the construction is completed, a performance report must be submitted, and it will go through a review before the grant is provided! (The flow of procedures varies by system)

▶ To “Subsidies and Grants That May Be Applicable in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)” within this article

Benefits of Introducing Solar Power Systems

The benefits of installing solar panels are summarized in the following 5 points!

Benefit 1: Economic Advantage

Household Budget Illustration

The biggest advantage of installing solar panels is the economic benefit!
While the selling price of electricity has decreased compared to 10 years ago, you can gain benefits by reducing the electricity you buy from power companies through self-consumption of generated power!
As electricity costs rise, the ability to cover your power consumption with solar power becomes increasingly attractive!
If you plan to use the generated power at night, installing a storage battery is essential!

Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the 5th year, it is generally more advantageous to use it at home (self-consumption), making the combination with a storage battery a viable option.
👉 Ministry of the Environment and Energy | For purchase prices, periods, etc., click here

Benefit 2 Utilizing Subsidies!

Illustration of a Person Happy to Reduce Costs

The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the requirements, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In the case of Ashigarashimo District, there may be applicable programs from the national government, Kanagawa Prefecture, and your local town (please check the application status for each program).

Benefit 3 Environmentally Friendly!

Environmentally Friendly Solar Power Illustration

Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Since solar panels themselves do not produce noise or exhaust gases during the generation process, they are considered an environmentally friendly method of power generation. (However, devices like power conditioners may produce operational noise.)

Benefit 4 Expected Heat Insulation Effect!!

Illustration of heat insulation using solar panels

By installing panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, it can help reduce the temperature rise of the roof, providing expected heat insulation effects!
(Note that this does not improve the building’s insulation performance itself.)

Benefit 5 Electricity can be used even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it becomes possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capabilities, you may be able to use electricity from a dedicated outlet during daytime generation.
(Note that the devices, output, and time that can be used during a power outage vary depending on the model and wiring method.)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Person explaining points to note

Point 1 Maintenance costs are incurred

A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.

It would be reassuring to consider maintenance costs in simulations before introducing solar panels!

Point 2 The risk of leaks increases depending on the roofing material

The fixing methods for slate roofs and tile roofs vary by construction method, but when fixing hardware with screws to the roofing material or substrate, waterproofing of the fixed parts is crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and fix the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and hardware, and it cannot be used with all metal roofs.)

Base metal fittings for horizontal metal roofsBase metal fittings for horizontal metal roofs

Note 3: The roof will become heavier

Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load capacity, switching to a lightweight roof may also be an option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

Choosing Method 1: Compare by Overall Roof Output

When installing solar panels on the roof, it is important to know how much power can be generated in a limited area, and the more power generated, the better!

The sizes and outputs of solar panels vary by manufacturer.
A panel with 350W output and a panel with 400W output may seem that the one with higher output is better at first glance.
However, if the size of the panel does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” leading to different installation capacities on the same roof due to the size difference of the panels.

400W × 15 panels = 6kW (total output of the roof)
350W × 20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!

It is important to consider the overall output of the roof rather than the output of a single panel!
*The above is the calculation of total output (kW). The actual power generation amount (kWh) will vary depending on conditions such as the roof’s orientation, slope, and shading.

Choosing Method 2: Compare by Degradation Rate of Solar Panels

Solar panels have a degradation rate, and their output gradually decreases after 10 years and 20 years.
The degree of output decline after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for the warranty and does not indicate the actual degradation rate or power generation amount.
By considering the degradation rate as well as the initial output, you can choose solar panels without regrets!

Choosing Method 3: Compare by Warranty Period

There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding output warranties, some manufacturers offer a 30-year warranty while others offer a 10-year warranty, so it varies!
A longer warranty is always better, so be sure to check the warranty period and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar Power and Storage Battery Installation in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)

We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town). (Tap to open the answers)

How much does it cost to install solar panels and storage batteries in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)?

The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

Estimated costs by capacity are published on the solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and site survey and provide a free estimate!

Are there any subsidies available for solar power and storage battery installation in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)?

As of October 6, 2026, the “Renewable Energy Equipment Installation Subsidy” in Hakone Town (15,000 yen per kW for solar power, with a maximum of 50,000 yen, and a maximum of 50,000 yen for storage batteries) and the “Residential Smart Energy Equipment Installation Subsidy” in Yugawara Town (15,000 yen per kW for solar power, with a maximum of 52,000 yen, and for storage batteries, within half of the installation cost, with a maximum of 50,000 yen) are listed on the town’s official pages. I could not confirm any residential subsidy system for Manazuru Town on the official page. The application status for the Reiwa 8 fiscal year varies by town, so please check with each town before contracting. The Kanagawa Prefecture subsidy (70,000 yen/kW for solar power and 150,000 yen per unit for storage batteries) reached its budget limit on September 7 for the second phase of the Reiwa 8 fiscal year and has been closed, and the national DR household storage battery project has ended its public recruitment.

Since the application status changes, please refer to the subsidy and grant section and consult with us before contracting.

Can I apply for subsidies after the construction is completed?

This depends on the system. The subsidy in Hakone Town requires application before the start of construction, while the subsidy in Yugawara Town requires notification to the Environmental Division before installation and application for disbursement after installation. On the other hand, the residential subsidy in Kanagawa Prefecture requires “starting construction after the grant decision,” and if construction starts beforehand, it will be excluded from eligibility.

The order of procedures varies by system, so please confirm before contracting and starting construction.

Can solar panels be installed on a slate roof? I’m worried about leaks.

Installation on a slate roof is possible, but it requires checking the condition of the roofing material and substrate. The fixing method varies by construction method, and if the method involves fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.

Kakeru Koumuten Co., Ltd. is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation and suggest methods such as roof overlay (cover method) or replacement if deterioration is progressing.

My roof is old. Should I do a roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed after 10 to 20 years of installation, there will be additional costs for removing and reinstalling solar panels. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with durable roofing materials before installation.

Please consult us about the installation process after checking the condition of the roof during the on-site survey!

Should I install a storage battery together with the solar panels?

If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.

Additionally, Kanagawa Prefecture’s subsidies require the simultaneous introduction of solar panels and storage batteries, and in the subsidies for Hakone Town and Yugawara Town, storage batteries are designated as eligible equipment (Hakone Town has a limit of 50,000 yen, and Yugawara Town covers up to half of the installation cost, with a limit of 50,000 yen). You can compare “solar panels only” and “solar panels + storage batteries” through a financial simulation.

How many kW can I install on my roof? Is it okay for north-facing or shaded roofs?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and on-site survey, and provide you with the installation capacity and power generation simulation.

In Ashigarakami District, the terrain varies by town, such as the mountainous area of Hakone Town, the peninsula of Manazuru Town, and the coastal and mountainous areas of Yugawara Town, which affects the shading from surrounding buildings and trees, as well as the installable capacity for each house. You can check the expected power generation through the power generation simulation.

How long will the construction period be?

For the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary if roofing work is done simultaneously or depending on the roof shape and installation capacity.

Additionally, please note that there will be a separate period for applications for subsidies and power companies, so please consult us as soon as possible.

What is the current selling price (FIT)?

For residential use (less than 10 kW), from the certification after October 2025, the first 4 years will be 24 yen/kWh, and from the 5th to the 10th year it will be 8.3 yen/kWh, and the same price will apply in the 2026 fiscal year.

The idea is to recover the initial costs quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation considering loan interest rates and electricity prices.

Can you take care of maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten sends out annual after-maintenance DM notices and visits customers who wish for inspections. We can also handle cleaning solar panels with a special brush if the power generation decreases due to dirt.

The roof is a place that is difficult to check by yourself, so please feel free to consult us if you have any concerns.

Can you also handle renovations for roofs that already have solar panels installed?

Yes, it is possible. Kakeru Koumuten Co., Ltd. can detach and reattach solar panels in-house, allowing us to perform roof overlay (cover method) or re-roofing after removing the panels, and then reinstall them consistently. The removed panels can be stored in our own warehouse.

For costs, please refer to the solar panel detachment and water heater removal pricing page.

If you are looking for a solar panel installation contractor in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town), please consult Kakeru Koumuten Co., Ltd.

Our company handles many exterior renovations, including solar panels, roof work, and exterior wall work in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town).
We receive requests from many customers, including renovation companies and real estate companies, who have contacted us!

Kakeru Koumuten Co., Ltd. promises “high-quality renovations at low cost”, and we have received great feedback from many customers.
We continue to update our construction achievements every year, and we will strive to improve quality to satisfy even more customers in the future.

Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior wall painting, and exterior wall cover methods.
We are also happy to handle small jobs such as partial repairs and rain gutter cleaning!

In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!

“I want to know about recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide the best solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and propose the best construction plan!

We are confident that we will not lose in terms of cost, quality, and organization compared to other companies in exterior work!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if our company is inferior to others, you are free to decline!

Features of Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town) and points for solar work

Ashigarakami District consists of three towns: Hakone, Manazuru, and Yugawara. Hakone Town features a rugged volcanic terrain shaped by the complex formation history of the Hakone volcano, with elevations ranging from 97m in Yumoto to 1,438m at Kamiyama. Manazuru Town is a small peninsula approximately 7km long and 1km wide, protruding from the southeastern outer rim of the Hakone volcano into Sagami Bay, while Yugawara Town is surrounded by mountains on three sides, consisting of hilly areas, flatlands around the Chitose and Shinasaki rivers, and coastline. We have summarized the characteristics of Ashigarakami District’s terrain and key points to consider when installing solar panels and storage batteries below. (Tap to open)

View the characteristics of Ashigarakami District (Hakone, Manazuru, Yugawara) and points for solar construction

■ Mountainous Hakone Town, peninsula Manazuru Town, and Yugawara Town nestled between the sea and mountains. Confirm site and delivery routes on-site

Hakone Town features diverse volcanic terrain due to the Hakone volcano, and Manazuru Town has townscapes on sloped land facing the sea. Yugawara Town also has a terrain where hilly areas and flatlands are adjacent to the coastline. Even within the same town, the height differences of each site and the width of the front road will affect the planning of scaffolding and the delivery routes for equipment and materials such as panels and storage batteries. Kakeru Koumuten plans scaffolding tailored to the site, even when there are height differences, using its own scaffolding team and materials.

■ In Hakone Town, where there is a significant elevation difference, check temperature, precipitation, and snowfall by location

The annual average temperature in Hakone Town in 2018 was 16.4°C in Yumoto and 12.5°C in Sengokuhara, showing differences based on elevation. The annual precipitation is also different, with Yumoto receiving 2,822.5mm and Sengokuhara 3,580.5mm, where snowfall has also been recorded. Since conditions vary even within Hakone Town, it is important to check the roof slope and surrounding environment before installation, and to confirm the installation conditions such as snowfall for your residence according to the manufacturer’s standards. On the other hand, Manazuru Town is warm even in winter due to the Kuroshio current, and Yugawara Town is described as warm in winter and relatively cool in summer.

■ Manazuru and Yugawara Towns, close to the sea, confirm installation conditions for equipment based on manufacturer standards

Manazuru Town is a peninsula that juts out into Sagami Bay, while Yugawara Town has a coastline facing Sagami Nada. In areas close to the sea, installation conditions for panels, frames, and fittings may be specified for each product (handling in salt damage areas). The response may vary depending on the distance from the coast, so please check the installation conditions of the manufacturer being used when requesting a quote.

■ Roof types and ages vary from house to house. Check the roof and waterproofing before installation

Even in regions with similar topography, roof types, ages, and sunlight exposure vary from house to house. At Kakeru Koumuten Co., Ltd., we will check the type and condition of the roof and the site situation before installation and propose methods for securing, waterproofing details, and scaffolding plans.

■ The annual sunshine hours in neighboring Odawara is about 1,945 hours

Hakone Town, Manazuru Town, and Yugawara Town all border Odawara City. According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours in Odawara is about 1,945 hours, with August (about 202 hours) being the most and June during the rainy season (about 131 hours) being the least.
The power generation in Ashigarashimo District can also vary due to elevation and the shadows of surrounding mountains and buildings, so conducting a year-round power generation simulation and selecting battery capacity to match peak electricity usage times are key points.

Our company is based in Kanagawa Prefecture and handles many exterior construction and solar power projects in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town).
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!

Service Area in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)

Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and Tokyo.

List of Areas in Ashigarashimo District (Hakone Town, Manazuru Town, Yugawara Town)

Hakone Town Ashinoyu/Hakone Town Ohiradai/Hakone Town Kiga/Hakone Town Kowakudani/Hakone Town Gora/Hakone Town Sugumo River/Hakone Town Sengokuhara/Hakone Town Sokokura/Hakone Town Tounosawa/Hakone Town Ninodaira/Hakone Town Hakone/Hakone Town Hatajuku/Hakone Town Miyagino/Hakone Town Miyanoshita/Hakone Town Motohakone/Hakone Town Yumoto/Hakone Town Yumoto Chaya
Manazuru Town Iwa/Manazuru Town Manazuru
Yugawara Town Yoshihama/Yugawara Town Chuo/Yugawara Town Doi/Yugawara Town Miyakami/Yugawara Town Fukuura

We welcome inquiries via LINE as well◎

LINE

LINE

We are also updating our Instagram regularly◎Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!