For
Solar Panel and Storage Battery Installation in Hadano City
Trust Kakeru Koumuten!

Kakeru Koumuten is a company specializing in exterior renovations based in Kanagawa Prefecture.
As a company strong in roofing work, we are entrusted with solar panel installation and storage battery installation considering roofs and waterproofing!

“How to Choose a Solar Panel Contractor in Hadano City”
“Costs for Solar Panel and Storage Battery Installation”
“Subsidies Available for Solar System Installation in Hadano City”
We will also explain the above three points!

Installing solar panels carries risks such as “the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtaining estimates from about three companies!

For Solar Panel and Storage Battery Installation in Hadano City, Trust Kakeru Koumuten
Table of Contents (Tap to Open/Close)
  1. Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Hadano City
  2. Roof Inspection Before Installing Solar Panels
  3. Possible Subsidies and Grants Available in Hadano City
  4. Price List for Solar Panel and Storage Battery Installation
  5. Breakdown of Installation Capacity, Equipment, and Construction Costs
  6. Self-Estimate and Profit Simulation for Solar Power Generation
  7. Customer Testimonials
  8. Case Studies of Solar Panel Installations
  9. How to Choose a Solar Panel Installer in Hadano City
  10. Benefits of Introducing Solar Equipment
  11. Points to Consider When Introducing Solar Power Generation
  12. How to Choose Solar Panels
  13. Frequently Asked Questions about Solar and Storage Battery Installation in Hadano City
  14. If You’re Looking for a Solar Panel Installer in Hadano City, Contact Kakeru Koumuten
  15. Characteristics of Hadano City and Points for Solar Installation
  16. Service Area in Hadano City

Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Hadano City

Link banner to Kakeru Koumuten's strengths introduction page

Regarding why we are entrusted with solar panel installation by customers in Hadano City,
“Our Unique Strengths in Solar Panel Installation That Cannot Be Imitated by Other Companies”
have received high praise from many customers.

In solar panel installation projects in Hadano City, we have absolute confidence in “Cost,” “Quality,” and “Plans”,
so we would appreciate it if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We Can Also Handle Exterior Renovations Besides Solar Panel Installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Troubles such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It is reassuring to have someone knowledgeable about the roof to avoid maintenance and troubles after installation!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!

2.Facilities Specialized in Exterior Renovation

Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases centered around Yokohama City, Kanagawa Prefecture for material storage and showrooms.

In-house Ownership of Scaffolding Materials

Entrance to the material storage areaIn-house owned scaffolding materials
To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding according to construction conditions and can assemble scaffolding in-house.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can also cut costs for scaffolding work.
We own scaffolding materials for approximately 50 detached houses!
Even if there is a height difference on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.

Storage of Materials in Our Large Warehouse

Appearance of the material warehouse Interior of the warehouse storing materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have roofing materials in stock, so we canrespond quickly in emergencies!

Sorting and transporting waste materials in-house

Sorting space for waste materialsThe installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.

Exterior renovation dedicated showroom

Appearance of the exterior renovation dedicated showroomInterior of the showroom
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and how they are attached to the roofing materials!
We can also provide simulations of the revenue and costs associated with the installation of solar panels!

Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing us to provide detailed explanations!

3.All work performed by our own team

Diagram of the system for performing scaffolding, painting, and roofing renovations in-house

One of Kakeru Koumuten’s major strengths is its complete in-house construction.

By having Kakeru Koumuten handle everything from inquiries to project completion in a consistent manner, we can keep costs down and provide high-quality roof renovations.
Additionally, one representative will handle everything from the estimate to project completion.
Since the person in charge does not change, whether it’s the sales representative or the construction management representative, smooth communication is possible.

We can provide consistent in-house construction from temporary scaffolding installation, exterior wall painting, to roof renovations!

4. Various Permits and Skilled Workers

Construction Industry LicenseDisplay of Permits and Qualifications Obtained by Kakeru Koumuten
We have obtained construction industry licenses and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting technicians on staff, and we are confident in our construction techniques.
We can also handle large-scale roofing projects such as factories!

5. Warranty and Aftercare

Link banner to Kakeru Koumuten's warranty information page

In addition to the manufacturer’s warranty for solar panel installation work, our own construction warranty (leak warranty) is also included!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless a roof renovation is performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary depending on the warranty content.)
Aftercare is available every year, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Roof and Solar Panel Inspection Response

Our company is equipped to handle various roofing troubles and situations.

If you are unable to access the roof due to height, we can utilize drones to assist!
During leak investigations, we can also conduct surveys using a thermal imaging camera.

If the power generation of solar panels decreases due to dirt, we can provide cleaning with a specialized brush.
We will respond according to the customer’s wishes.

7. Human Resource Development

Training using models

To improve skills, we create various roofing models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly provide technical training so that each staff member can handle various cases.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Easy-to-Understand Materials and Simulations

Examples of materials and simulations provided for solar panel installation

Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar installation guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar installations will receive materials that clearly summarize important points and disadvantages!

We encourage you to obtain comparative estimates and compare them with other companies’ plans!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 to 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.

1. Types of Roofing Materials and Age The fixing method varies depending on the roofing materials such as slate, tiles, metal roofs, and flat roofs (rooftop waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first.
2. Condition of Substrate and Waterproof Sheet If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it can affect the fastening strength and waterproofing. We will also check for any signs of leaks.
3. Orientation, Slope, and Shadows of the Roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, can affect power generation. We will create a layout diagram from the drawings and the site, and you can check it with a power generation simulation.
4. Shape of the Roof and Usable Area The number of panels that can be installed (installation capacity) is determined by the shape and size of the roof. The number of panels that can be installed varies depending on the size of the panels, so we will compare based on the total output of the roof.
5. Fixing Method and Waterproofing Details We will confirm whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please check the waterproofing treatment method for the fixing parts during the estimate.
6. Weight of the Roof The roof will become heavier due to the panels being installed. After investigating the existing roof, substrate, and load-bearing capacity, switching to lighter roofing materials may be an option if necessary.
7. Location of Equipment Installation and Wiring We will check the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring also affects the cost.
8. Ease of Scaffolding Setup and Delivery Routes If there are elevation differences on the site, planning for scaffolding and the delivery routes for equipment and materials may require some ingenuity. The width of the front road and any steps on the site will also be confirmed during the site survey.

Fixing Methods and Checkpoints by Roofing Material

Roof Material Main Fixing Method Pre-Installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first.
Tile Roof Fixed with brackets and methods suitable for the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lightweight roofing materials before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available.
Flat Roof / Rooftop Fixed by installing a framework Type and deterioration status of the waterproof layer, waterproofing around the framework. Consider in conjunction with the timing of waterproofing work.
If you carry out roof renovations at the same time, you may be able to reduce future costs for the removal and reinstallation of solar panels!
If you perform roof renovations 10 to 20 years after installation, there will be additional costs for the removal and reinstallation of solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ Click here for roof renovations in Hadano City

PotentialSubsidies and Grants in Hadano City, Kanagawa Prefecture

If you are introducing solar panels or storage batteries in Hadano City, you may be eligible for programs from the “National Government,” “Kanagawa Prefecture,” and “Hadano City.”
The following information is based on the official pages of each program as of October 6, 2026. The application status may change depending on the budget, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Timing for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Hadano City “Zero Carbon Living Creation Subsidy” (Solar Power System & Storage Battery System) Individuals who have an address in Hadano City at the time of application (or those who plan to have an address in Hadano City after the new construction or purchase of a residence) and have paid city taxes. Must not have received the same subsidy in the past. Solar power must be self-owned, PPA, or leased. Storage batteries must be those that store electricity generated by solar power equipment, and those that are only for emergency backup power are not eligible. Solar Power: 15,000 yen per kW (maximum 75,000 yen)
Storage Battery: 10,000 yen per kWh (maximum 50,000 yen)
According to the city’s official page (updated May 1, 2026), applications for the fiscal year 2026 have ended due to reaching the budget limit (solar power applications ended on June 15, and storage battery applications ended on June 12). Applications are currently not being accepted.
Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Residential Solar Power & Storage Battery Installation Subsidy” Installation of both solar power and storage systems in residential buildings (with ensured seismic performance) within the prefecture. Applications must be made by the individual, and construction must begin after the grant decision. Solar Power: 70,000 yen/kW
Storage Battery: 150,000 yen/unit
Phase 1: May 11, 2026 – June 30, 2026
Phase 2: Starts September 7, 2026 (first-come, first-served)
As of September 7, 2026, the application amount has reached the budget limit, and applications are closed. Please check the prefecture’s official page for future recruitment.
National “DR Home Storage Battery Project” (Fiscal Year 2025 Supplement) Newly introducing home storage systems that can be utilized for DR (demand response) with registered products. Calculated based on an initial effective capacity of 34,500 yen per kWh (subsidy rate within 3/10; maximum 600,000 yen per application). As of May 29, 2026, the budget has been reached, and the public recruitment has ended (the official site states that there are no plans to reopen public recruitment, and applications are currently not being accepted).
National “Mirai Eco Housing 2026 Project” (Renovation) Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovations of windows (openings) and the structure; applications cannot be made for just the installation of storage batteries. Solar panels are not included as eligible facilities. Storage Battery: 96,000 yen/unit Ends as soon as the budget limit is reached. As of October 5, 2026, the application amount for renovations is displayed as 8% of the budget on the official site. Please check the official site for the application status.
Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Self-Consumption Renewable Energy Installation Subsidy” Corporations and individual business owners filing blue returns (individual residences are not eligible). Solar power must have a generation output of 10 kW or more, be for business facilities, and not be certified under FIT/FIP. Solar Power: 80,000 yen/kW, etc.
Storage System: 50,000 yen/kWh (maximum 5,000,000 yen)
Application closed on September 3, 2026 (Application amount reached the budget amount)
Please pay attention to the “order of procedures” for subsidies!
The subsidy for creating a zero-carbon lifestyle in Hadano City has ended for the fiscal year 2026. The Kanagawa Prefecture housing subsidy also requires that construction begins only after receiving the “grant decision,” and starting work beforehand will make you ineligible. Eligibility conditions, application procedures, and the possibility of combining different systems vary, and applying does not guarantee a grant, so please confirm before contracting or starting work.
Kakeru Koumuten Co., Ltd. will provide guidance on the eligibility conditions and application periods for each system after confirming them.

National Subsidy “DR Home Battery Project (Support for the Introduction of Home Storage Systems for DR Resource Implementation)”

The government has been implementing the “DR Home Battery Project” to support the installation of home storage batteries.

This program targets those who are introducing new registered products of storage systems that can be utilized for demand response (DR), and in the fiscal year 2025 supplementary project, the subsidy amount was determined based on a standard amount of 34,500 yen per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum of 600,000 yen per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.

However, the fiscal year 2025 supplementary application amount reached the budget on May 29, 2026, and the public recruitment has ended. The official website also states that there are no plans to reopen the public recruitment, and applications are currently not possible. Please check the official website for future public recruitment.

Additionally, there are currently no subsidies available for the installation of solar panels on existing homes.
👉 Click here for the official DR Home Battery Project website

Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Housing Solar Power Generation and Storage Battery Installation Subsidy”

Kanagawa Prefecture provides subsidies for those who introduce both “solar panels” and “storage batteries” to their homes.

The subsidy details are 70,000 yen per kW of solar power generation output and 150,000 yen per storage system.
For example, if you introduce a 4 kW solar panel and one storage battery, the subsidy amount calculation would be 4 kW × 70,000 yen + 150,000 yen = 430,000 yen.

The eligibility includes homes that ensure seismic performance, the storage system must be a registered product, if construction begins before the grant decision, it will be ineligible, and the application must be made by the individual (proxy applications by contractors are not allowed), among other conditions. The possibility of combining this with Hadano City’s subsidy varies by system, so please check the official pages of each system before contracting.

In fiscal year 2026, the first phase (May 11 to June 30) and the second phase (starting September 7, first-come-first-served) were conducted, and the second phase has closed on September 7, 2026, as the application amount reached the budget amount. For future recruitment, please check the official Kanagawa Prefecture page.
👉 Click here for the official Kanagawa Prefecture page

Kanagawa Prefecture “Reiwa 8 Year Kanagawa Prefecture Self-Consumption Type Renewable Energy Introduction Subsidy” (For Businesses)

In Kanagawa Prefecture, there is also a subsidy for businesses to introduce “self-consumption type” facilities that use electricity generated by solar panels.

Eligible applicants are corporations or individual business owners who file blue returns, and the introduction to individual residences is not eligible.
Conditions include that the solar power generation must have an output of 10kW or more, supply electricity to business facilities within the prefecture, and not be equipment certified under FIT or FIP.

The subsidy amount is 80,000 yen per kW for solar power generation, and 50,000 yen per kWh for the accompanying storage system (with a maximum of 5 million yen).
As the application amount reached the budget amount for Reiwa 8, the recruitment was closed on September 3, 2026.

Businesses considering the installation of solar panels on commercial buildings in Hadano City should check the official page of Kanagawa Prefecture for the next recruitment.
👉 Click here for details

Hadano City “Zero Carbon Lifestyle Creation Subsidy”

Hadano City is implementing the “Zero Carbon Lifestyle Creation Subsidy,” which partially subsidizes the introduction costs of residential solar power generation systems and storage battery systems (together ZEH).

◎Subsidy Amount◎
● Solar Power Generation System: 15,000 yen per kW (maximum 75,000 yen)
● Storage Battery System: 10,000 yen per kWh (maximum 50,000 yen)

Eligible applicants are those who have an address in Hadano City at the time of application (or those who plan to have an address in Hadano City after the new construction or purchase of a residence), have paid city taxes, and are individuals who have not received the same subsidy in the past. The solar power generation system must be owned, PPA, or leased, and the storage battery system must store electricity generated by the solar power equipment, based on normal charging and discharging (not for emergency backup power). Solar power and storage batteries can be used together.

Applications for Reiwa 8 have ended as the budget number has been reached (solar power generation applications ended on June 15, storage battery system applications ended on June 12, and ZEH applications ended on May 15). The information published on the city’s official page (updated May 1, 2026) indicates that applications are currently not possible. The grant guidelines will be enforced from May 1, 2026, until March 31, 2031. Please check the city’s official page for future application details.
👉 Click here for Hadano City official page

Solar Panel Installation & Storage Battery Installation Price List

Solar Panel Installation and Battery Installation Services
⇧Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here

Solar Panel Removal and Water Heater Dismantling Services
⇧Service Menu | For Costs of Solar Panel Removal and Water Heater Dismantling, Click Here

Estimate Information

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and batteries should be confirmed by separating them into “Equipment Costs (Device Costs)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Battery Capacity (kWh)

The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Batteries are compared in terms of the amount of electricity they can store, expressed in kWh (kilowatt-hours).
The amount of kW that can be installed on a roof varies for each house based on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.

On our pricing page, we list solar panel costs as approximately 800,000 yen to 1,200,000 yen for 3 to 5 kW, and 1,200,000 yen to 1,900,000 yen for 6 to 10 kW. (These are just rough estimates and can vary based on wiring length, scaffold range, existing roofing materials, panel layout, etc.)
▶ Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here

Items to Confirm in the Estimate (Cost Confirmation)

When comparing estimates, it’s common to compare different capacities and equipment. Please check if the following items are clearly stated in each company’s estimate!

1. Solar Panels Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) should be specified.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also confirm whether it is a type that controls with a battery.
3. Battery Manufacturer, model number, capacity (kWh), range of use during power outages (entire house or specific circuits), installation location.
4. Mounting Frame and Fittings Name of the fittings suitable for the roofing material and the method of securing them (whether it involves drilling holes or clamping).
5. Wiring and Electrical Work Wiring route and length, work around the distribution board, presence of a monitor to check power generation.
6. Roof Reinforcement and Waterproofing Details of waterproofing treatment at fixed points, whether necessary roof repairs and substrate reinforcements are included.
7. Applications Extent of support for applications to the power company, certification application for selling electricity (FIT), and subsidy applications.
8. Scaffolding Scope and quantity of scaffolding. If roof work and exterior painting are simultaneous, check that the same scope and quantity are not double-counted.
9. Removal and Disposal Whether the removal of existing solar thermal water heaters and old panels, as well as disposal costs, are included.
10. Tax Classification and Warranty Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, details and duration of manufacturer and workmanship warranties.
Tip for Comparison: Compare by Matching “Installation Capacity (kW)” and “Equipment Model Number”!
If the capacities differ, both the price and power generation will change. Kakeru Koumuten Co., Ltd. welcome comparisons, so if you bring estimates from other companies, we will explain the differences item by item!

Self-Estimate and Profit Simulation for Solar Power Generation

Self-Estimate and Profit Simulation for Solar Power Generation

With the simulator above,
you can perform a rough estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the battery, you can perform a rough estimate and profit simulation!
*The simulation results are estimates. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.

Customer Testimonials

Case Studies of Solar Panel Installation

BEFORE

Metal roof before solar panel installation

AFTER

Roof after solar panel installation

Work Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh
Base Mounting Hardware Used
 Niigata Manufactured / Aluminum Catch Type Hardware
Fixing Method & Waterproofing Arrangement
 Fixed by catching the horizontal metal roof with catch type hardware (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 *Due to the subsidy being granted, the actual burden amount is approximately 1,000,000 JPY
 Estimated recovery period for construction costs: about 8 to 9 years (self-consumption)

 *The subsidy amount and recovery estimates are based on the system and calculations at the time of construction, and may differ under the current system.
Construction Period
 Approximately 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that subsidies are available, and I would like to know how much will be granted.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of subsidies, and we explained this to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Hadano City

There are many solar panel installation companies that serve Hadano City, and you may be unsure which one to choose.

Therefore, when requesting solar panel installation and storage battery installation work, let’s check the following 4 points.

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the presence of warranties and aftercare services

● Obtain estimates from multiple companies (3 companies as a guideline)

● Check if they provide support for subsidy applications

By confirming the above 4 points, you will be able to choose a reliable company.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Have knowledge not only about solar panels but also about roofs

Defective installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles due to insufficient verification of roofs and waterproofing

・Solar panels were installed on a severely deteriorated roof, leading to leaks
・Solar panels were installed on a roof with a short lifespan, requiring reinstallation within a few years
・Misjudgment of the type of waterproofing led to incorrect treatment and subsequent leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.

▶ Go to “Roof Verification Before Installing Solar Panels” in this article

Confirm the presence of warranties and aftercare services

When choosing a solar installation company, make sure to check for warranties. It is important to confirm not only the duration of the warranty but also the coverage, exclusions, and cost conditions.

While solar panels and storage batteries come with manufacturer warranties, also check for the presence of a workmanship warranty in case leaks occur after installation!

For companies that offer workmanship warranties, if leaks occur after installation, they may cover the repairs within the warranty period and conditions.

Additionally, some companies provide aftercare services separate from warranties, so be sure to check if the company you are considering has aftercare services.
Since abnormalities or damage on the roof may be in areas that are not visible, you might not notice them yourself.
By conducting inspections during aftercare, you can easily detect abnormalities early and prevent major repairs or failures!

At Kakeru Koumuten Co., Ltd., the installation of solar panels comes with a leak warranty as part of our workmanship warranty. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty without performing roof renovations.)
We also conduct aftercare maintenance and send out annual DM!
After checking the DM, if you wish, we will visit for aftercare maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting solar panel installation, let’s obtain estimates from multiple contractors.

Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-sales services may differ.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates, please check:

“Verification of estimate items”
“Types of solar panels”
“Warranties and after-sales services”

and make a detailed comparison! Avoid judging solely based on cost, as lower costs can result from using lower-grade materials or skipping processes!

▶ Go to “Breakdown of installation capacity, equipment, and construction costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Check if they provide support for subsidy applications

There may be subsidies available for solar panel installation and battery installation, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
For systems like Kanagawa Prefecture’s housing subsidies, where contractors cannot apply on behalf of the client and personal application is required, it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the prefectural housing subsidy, this means obtaining a grant decision) before proceeding with the construction!

For the prefectural housing subsidy, after the construction is completed, a performance report must be submitted, and it will go through a review process before the grant is awarded! (The flow of procedures varies by system)

▶ Go to “Subsidies and grants that may be applicable in Hadano City” in this article

Benefits of Introducing Solar Equipment

The benefits of introducing solar panels are as follows!

Benefit 1: Economic Benefits

Household Budget Illustration

The biggest advantage of introducing solar panels is the economic benefit!
The selling price of electricity has decreased compared to ten years ago, but by consuming the electricity generated, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity prices rise, the ability to cover your consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!

Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the fifth year, it is generally more advantageous to use it in your home (self-consumption) rather than selling it, making the combination with a storage battery a viable option.
👉 Ministry of Economy, Trade and Industry | For purchase prices and periods, click here

Advantage 2 Subsidies can be utilized!

Illustration of a person happy about reduced costs

The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the criteria, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In the case of Hadano City, there may be systems available from the national government, Kanagawa Prefecture, and Hadano City (please check the application status for each system).

Advantage 3 Environmentally friendly!

Illustration of environmentally friendly solar power generation

Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices such as power conditioners may have operational noise.)

Advantage 4 Heat insulation effects can be expected!!

Illustration of heat insulation by solar panels

By installing panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, this can help reduce the temperature of the roof, providing a heat insulation effect!
(Note that this does not improve the building’s insulation performance itself.)

Benefit 5: Electricity can be used even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it becomes possible to use electricity even during emergencies like power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation functionality, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Illustration of a person explaining points to note

Point 1: Maintenance costs can be incurred

A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof remodeling 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorating, it is reassuring to remodel it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to deterioration of the storage battery.

It would be reassuring to consider maintenance costs in simulations before introducing solar panels!

Point 2: The risk of leaks increases depending on the roofing material

The fixing methods for slate roofs and tile roofs vary by construction method, but when using screws or other fasteners to secure the roofing material and substrate, waterproofing of the fixed areas becomes crucial.
If the method involves making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and fasteners, and it cannot be used with all metal roofs.)

Catch-type base fixture specifically for horizontal metal roofsCatch-type base fixture specifically for horizontal metal roofs

Point 3 The Roof Becomes Heavier

Installing solar panels will make the roof heavier. After investigating the existing roof, substrate, and load capacity, replacing with a lightweight roof may also be an option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “This manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

How to Choose 1: Compare Based on Total Roof Output

When installing solar panels on the roof, it is important to know how much power can be generated in a limited area, and generating more power is always better!

Solar panels come in various sizes and outputs depending on the manufacturer.
A panel with 350W output and a panel with 400W output may seem like the higher output panel is better at first glance.
However, if the size of the panel does not fit well on the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” leading to different installable quantities on the same roof due to the size difference.

400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of one panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation amount (kWh) will vary depending on conditions such as roof orientation, slope, and shading.

How to Choose 2: Compare Based on Degradation Rate of Solar Panels

Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation amount.
By not deciding solely based on initial output and considering the degradation rate, you can choose solar panels without regrets!

How to Choose 3: Compare Based on Warranty Period

Solar panel warranties include various types such as “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding output warranties, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies!
Longer warranties are better, so be sure to check the warranty periods and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar Power and Storage Battery Installation in Hadano City

We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Hadano City. (Tap to open answers)

How much does it cost to install solar panels and storage batteries in Hadano City?

The cost varies depending on the installation capacity, equipment, and roof condition. In the above case study (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

Estimates by capacity are published on the solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!

Are there any subsidies available for solar and storage battery installation in Hadano City?

As of October 6, 2026, the Hadano City Zero Carbon Living Creation Subsidy (1.5 million yen per kW for solar, up to 750,000 yen; 10,000 yen per kWh for storage batteries, up to 50,000 yen) has reached its budget limit for the fiscal year 2026 and is no longer accepting applications. The Kanagawa Prefecture subsidy (70,000 yen/kW for solar, 150,000 yen per unit for storage batteries) reached its budget limit on September 7 for the second phase of fiscal year 2026, and the national DR household storage battery project has ended its public recruitment.

Since the application status may change, please check the subsidy and grant section and consult with us before signing a contract.

Can I apply for subsidies after the construction is completed?

The Kanagawa Prefecture subsidy requires procedures to be completed before construction, and “commencement of work after grant decision” is a condition; starting work beforehand will disqualify you. The Hadano City subsidy also has specific application timing and procedures outlined in the guidelines, so please check the official page before signing a contract or starting work.

The order of procedures varies by system, so please confirm before signing a contract or starting work.

Can solar panels be installed on a slate roof? I’m worried about leaks.

It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The fixing method varies by construction method, and when fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is crucial.

Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the roof condition before installation and propose methods such as roof overlay or replacement if deterioration is advanced.

My roof is old. Should I do a roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, the cost of removing and reinstalling the solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with durable roofing materials before installation.

Please consult us on how to proceed with the installation after checking the roof condition during the on-site survey!

Is it better to install a storage battery together with solar panels?

If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.

In Kanagawa Prefecture, subsidies are available on the condition that both solar power and storage batteries are installed together. The subsidy for creating a zero-carbon lifestyle in Hadano City also targets storage batteries that store electricity generated by solar power systems. You can compare “solar power only” and “solar power + storage batteries” through a financial simulation.

How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the blueprints and on-site surveys, and we will provide you with the installation capacity and power generation simulation.

Hadano City has locations near the Tanzawa mountain range, flat areas in the basin, and places close to rivers, so the shading from surrounding buildings and trees, as well as the installable capacity, will differ from house to house. You can check the expected power generation through the power generation simulation.

How long will the construction period be?

In the above construction example (solar panel 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is performed simultaneously or depending on the roof shape and installation capacity.

Additionally, please note that there will be a separate period required for applications for subsidies and power companies, so please consult us as soon as possible.

What is the current feed-in tariff (FIT) price?

For residential use (under 10 kW), the price from certifications after October 2025 will be 24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year, and the same price will apply for the 2026 fiscal year.

The idea is to recover initial costs quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity costs.

Can you handle maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten sends out annual after-service maintenance notices via direct mail, and we visit customers who wish to have inspections. We can also clean solar panels with a special brush if their power generation decreases due to dirt.

Since the roof is a place that is difficult to check by yourself, please feel free to consult us if you have any concerns.

Can you also handle renovations for roofs that already have solar panels installed?

Yes, we can. Kakeru Koumuten can detach and reattach solar panels ourselves, so we will handle the process of removing the panels, performing the roof overlay (cover method) or re-roofing, and then reinstalling them consistently. The removed panels can be stored in our own warehouse.

For costs, please refer to the solar panel removal and water heater removal pricing page.

Get a free estimate for solar power and storage batteries in Hadano City here

Estimates are completely free. We welcome competitive estimates!

If you are looking for a solar panel installation contractor in Hadano City, please consult Kakeru Koumuten

Our company handles a variety of exterior renovations in Hadano City, including roofing work and exterior wall work, as well as solar panel installations.
We receive requests from many customers, including renovation companies and real estate agencies, who have contacted us!

Kakeru Koumuten Co., Ltd. promises “high-quality renovations at low cost”, and we have received positive feedback from numerous customers.
We continue to update our construction performance records every year, and we will strive to improve quality to satisfy even more customers in the future.

Our company is capable of performing all exterior renovations, not only roof overlay (cover method) and re-roofing work but also partial roof repairs, exterior painting, and exterior wall cover installations.
We are also happy to assist with small jobs such as partial repairs and rain gutter cleaning!

In urgent cases such as leak repairs, we may be able to provide temporary measures without setting up scaffolding, as long as safety can be ensured, so please consult with us!

“I want to know about recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide optimal solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in our customers’ shoes and will propose the best construction plans!

We are confident that we will not be outdone in terms of cost, quality, and efficiency compared to other companies in exterior work!
We welcome competitive estimates with confidence!
Estimates are completely free, and if our company is found to be inferior to others, you are free to decline!

Characteristics of Hadano City and Points for Solar Panel Installation

Hadano City is a city that spreads across the Hadano Basin, surrounded by the Tanzawa mountain range on the east, north, and west, including mountains such as Oyama, Minotou, Tounoyama, and Nabewariyama, and blocked by the Shibusawa Hills to the south. Within the city, there are mountainous areas, flatlands in the basin, and areas close to rivers. Below, we have summarized the characteristics of Hadano City’s terrain and climate, as well as points to consider when installing solar panels and storage batteries. (Tap to open)

View the characteristics of Hadano City and points for solar panel installation

■ Areas close to mountains: Be cautious of tree shadows, fallen leaves, and scaffolding or delivery routes

Hadano City is known for its significant elevation difference, with the highest point being Tounoyama at 1490.9 meters and the lowest point at 16.2 meters in the Tsurumaki area. In sites close to mountains and trees, it is important to be aware of the effects of shadows and the decrease in power generation due to fallen leaves and dirt. Additionally, in sloped areas or sites with elevation differences, careful planning for scaffolding and delivery routes for equipment and materials may be necessary. Kakeru Koumuten Co., Ltd. responds to site conditions with our own scaffolding team and owned scaffolding materials, and we can also provide solar panel cleaning with specialized brushes and rain gutter cleaning.

■ Even in climates with little snowfall, check roof conditions before installation

The official city page introduces that Hadano City belongs to the Pacific coastal climate, which is less affected by frost and snowfall due to marine weather. The seasonal winds are predominantly from the northwest in winter and from the south in summer, and the overall wind speed is considered weak. However, conditions may vary depending on the roof shape, age of the building, and the surrounding buildings and trees, so it is important to check the panel fixation methods and roof conditions through a site survey for each individual house before installation.

■ For sites near rivers, check the placement of batteries and equipment

The rivers within the city mainly flow out from the Tanzawa mountain range, with the Mizunogawa in the central basin, the Katsuragawa and Kanamegawa to the east, and the Yotsuhasegawa to the west. For sites close to rivers, it is important to plan by checking the surrounding environment for the installation locations of batteries, distribution boards, power conditioners, etc. (such as whether it is a place where water tends to accumulate). Please check the information about your area using hazard maps and consult us regarding the installation location.

■ In a city where conditions differ between mountain areas and flatlands, confirm the roof and site through a site survey for each house

In Hadano City, where the conditions differ between mountain sites, flatlands in the basin, and sites near rivers, the types of roofs, ages of buildings, and sunlight exposure vary for each house. At Kakeru Koumuten, we will check the type and condition of the roof and the site before installation and propose fixation methods, waterproofing arrangements, and scaffolding plans.

■ The annual sunshine hours in Kanagawa Prefecture are approximately 2,018 hours (observed in Yokohama)

According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours at Yokohama, a representative observation point in Kanagawa Prefecture, are about 2,018 hours. Monthly, August (approximately 206 hours) has the most, while June during the rainy season (approximately 136 hours) has the least.
The amount of power generation varies by season and location, so it is important to conduct annual power generation simulations and choose battery capacities that match the times of high electricity usage.

Our company is based in Kanagawa Prefecture and has undertaken many exterior construction and solar projects in Hadano City.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!

Service Area in Hadano City

Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and Tokyo Metropolis.

List of Areas in Hadano City

Hadano City Imaizumi / Hadano City Imaizumidai / Hadano City Imagawa-cho / Hadano City Irifune-cho / Hadano City Ojiro / Hadano City Ochiai / Hadano City Kasugacho / Hadano City Kamimigawacho / Hadano City Kamiootsuki / Hadano City Kawaharacho / Hadano City Kitayanma / Hadano City Kotobuki-cho / Hadano City Komino / Hadano City Saiwaicho / Hadano City Sakaecho / Hadano City Sakuramachi / Hadano City Miya / Hadano City Shibusawa / Hadano City Shibusawa Kami / Hadano City Shimizucho / Hadano City Shimoootsuki / Hadano City Shimoochiai / Hadano City Ayame / Hadano City Shinmachi / Hadano City Suijincho / Hadano City Suehirocho / Hadano City Suzubari-cho / Hadano City Soya / Hadano City Ohada / Hadano City Ritenodai / Hadano City Chikura / Hadano City Tsurumaki / Hadano City Tsurumaki Minami / Hadano City Tsurumaki Kita / Hadano City Terayama / Hadano City Togawa / Hadano City Tochikubo / Hadano City Nagaki / Hadano City Namikimachi / Hadano City Nishi Otake / Hadano City Nishi Tahara / Hadano City Numashiro Shinmachi / Hadano City Hagi ga Oka / Hadano City Hazawa / Hadano City Hane / Hadano City Higashitahara / Hadano City Hibari ga Oka / Hadano City Hirasawa / Hadano City Fujimimachi / Hadano City Bunkyocho / Hadano City Bodai / Hadano City Horikawa / Hadano City Horiyamashita / Hadano City Horinishi / Hadano City Honmachi / Hadano City Magarimatsu / Hadano City Matsubaramachi / Hadano City Mikawa / Hadano City Midorimachi / Hadano City Minami ga Oka / Hadano City Minamiyanma / Hadano City Minoko / Hadano City Muromachi / Hadano City Motomachi / Hadano City Yanagawa / Hadano City Yanagimachi / Hadano City Yayoi-cho / Hadano City Yokono / Hadano City Wakamatsu-cho

We welcome inquiries via LINE as well◎

LINE

LINE

We are also updating our Instagram regularly◎ Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!