For solar panel and storage battery installation in
Akishima City, Tokyo,
Kakeru Koumuten is at your service!

Kakeru Koumuten is a company specializing in exterior renovations.
As a strong company in roofing work, we are entrusted with solar panel installation and storage battery work considering roofing and waterproofing!

“How to Choose a Solar Panel Contractor in Akishima City, Tokyo”
“About the Costs of Solar Panel and Storage Battery Installation”
“About Subsidies Available for Solar System Installation in Akishima City, Tokyo”
We will also explain the above three points!

The installation of solar panels carries risks such as “the occurrence of leaks” and other troubles.
To ensure a satisfactory solar panel installation, we recommend obtaining estimates from about three companies!

For solar panel and storage battery installation in Akishima City, Tokyo, contact Kakeru Koumuten
Table of Contents (Tap to Open/Close)
  1. Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Akishima City, Tokyo
  2. Roof Inspection Before Installing Solar Panels
  3. Subsidies and Grants That May Apply in Akishima City, Tokyo
  4. Price List for Solar Panel and Storage Battery Installation
  5. Breakdown of Installation Capacity, Equipment, and Construction Costs
  6. Self-Estimate and Profit Simulation for Solar Power Generation
  7. Customer Testimonials
  8. Case Studies of Solar Panel Installations
  9. How to Choose a Solar Panel Installation Contractor in Akishima City, Tokyo
  10. Benefits of Introducing Solar Equipment
  11. Points to Consider When Introducing Solar Power Generation
  12. How to Choose Solar Panels
  13. Frequently Asked Questions About Solar and Storage Battery Installation in Akishima City, Tokyo
  14. If You Are Looking for a Solar Panel Installation Contractor in Akishima City, Tokyo, Contact Kakeru Koumuten
  15. Characteristics of Akishima City, Tokyo and Points for Solar Construction
  16. Service Area in Akishima City, Tokyo

Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Akishima City, Tokyo

Link Banner to Kakeru Koumuten's Strengths Page

Regarding why our company is entrusted with solar panel installation by customers in Akishima City, Tokyo,
“Our Unique Strengths in Solar Panel Installation That Cannot Be Imitated by Other Companies”
have received high praise from many customers.

In solar panel installation projects in Akishima City, Tokyo, we have absolute confidence in “Cost,” “Quality,” and “Plans”,
so we would appreciate it if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We Also Handle Exterior Renovations Beyond Solar Panel Installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Issues such as leaks that occur during the installation of solar panels may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there may be cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It’s reassuring to have someone knowledgeable about roofs to avoid maintenance and issues after installation!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent issues after solar panel installation!

2.Facilities Specialized in Exterior Renovation

Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality solar and exterior renovation work.
We have established five bases for material storage and showrooms.

In-house Scaffolding Materials

Entrance to the material storage areaIn-house scaffolding materials
To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding based on construction conditions and can assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also reduce the costs of scaffolding work.
We own scaffolding materials for approximately 50 single-family homes!
Even if there are height differences on the site, our in-house scaffolding team will plan the scaffolding according to the site conditions.

Storage of Materials in Our Large Warehouse

Appearance of the material warehouse Interior of the warehouse storing materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we canrespond quickly in emergencies!

In-house sorting and transportation of waste materials

Waste material sorting spaceThe installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.

Exterior renovation dedicated showroom

Appearance of the exterior renovation dedicated showroomInterior of the showroom
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on roofing materials!
Simulations for potential earnings and installation costs when introducing solar panels are also available!

Since roofing and exterior wall work often accompany projects, we also provide samples of roofing materials and models that explain the structure, allowing for detailed explanations!

3.All work performed by our own team

Diagram of the system performing scaffolding, painting, and roof renovation in-house

One of Kakeru Koumuten’s major strengths is its complete in-house construction.

By having Kakeru Koumuten manage everything from inquiries to project completion in a consistent system, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will handle everything from the estimate to project completion.
Since the担当者 such as sales representatives and construction management personnel do not change, smooth communication is possible.

We can provide consistent in-house construction from temporary scaffolding installation to exterior wall painting and roof renovations!

4. Various Permits and Skilled Workers

Construction Industry LicenseDisplay of Permits and Qualifications Obtained by Kakeru Koumuten
We have obtained construction industry permits as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists, and we are confident in our construction techniques.
We can also handle large-scale roof projects such as factories!

5. Warranty and Aftercare

Link Banner to Kakeru Koumuten's Warranty Information Page

In addition to the manufacturer’s warranty for solar panel installation work, our own施工保証 (leak warranty) is also included!
(The施工保証 for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed. The施工保証 is separate from the manufacturer’s product warranty, and the scope and conditions vary depending on the warranty details.)
Aftercare is available every year, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Roof and Solar Panel Inspection Response

Our company is equipped to handle various roofing troubles and situations.

If you are unable to access the roof at high altitudes, we can utilize drones to assist!
During leak investigations, we can also conduct surveys using a thermal imaging camera.

If the power generation of your solar panels decreases due to dirt or other factors, we can provide cleaning services using specialized brushes.
We will respond according to your preferences.

7. Human Resource Development

Training using models

To improve skills, we create various roofing models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct technical training to ensure that each staff member can handle various scenarios.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Easy-to-Understand Materials and Simulations

Examples of materials and simulations provided during solar panel installation

Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction will receive materials that clearly outline important points and potential drawbacks!

We encourage you to obtain comparative estimates and review plans from other companies!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 to 30 years.
Confirming whether it is safe to install them directly on the current roof is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has compiled a list of items to check before installation.

1. Types of Roofing Materials and Year Built The fixing method varies depending on the roofing materials, such as slate, tiles, metal roofs, and flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest a roof renovation first.
2. Condition of the Substrate and Waterproof Sheet If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of leaks.
3. Orientation, Slope, and Shadows of the Roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect the power generation. We will create a layout diagram from the drawings and the site, and you can check it with a power generation simulation.
4. Shape of the Roof and Usable Area The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we will compare based on the total output of the roof.
5. Fixing Method and Waterproofing Details We will confirm whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please check the waterproofing treatment method for the fixed parts during the estimate.
6. Weight of the Roof The roof will become heavier due to the panels being added. After investigating the existing roof, substrate, and load-bearing capacity, replacing with lighter roofing materials may also be an option if necessary.
7. Location of Equipment Installation and Wiring We will check the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect the cost.
8. Ease of Scaffold Assembly and Delivery Route If there are elevation differences on the site, planning for scaffolding and the delivery route for equipment and materials may require some ingenuity. The width of the front road and any steps on the site will also be checked during the on-site survey.

Fixing Methods and Checkpoints by Roofing Material

Roof Material Main Fixing Method Pre-Installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first.
Tile Roof Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be a method to replace with lighter roofing material before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, a method that does not drill holes may be selectable.
Flat Roof / Rooftop Fixed by installing a frame Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work.
If you perform roof renovations at the same time, you may be able to reduce future costs for removing and reinstalling solar panels!
If you perform roof renovations 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ Click here for roof renovations in Akishima City, Tokyo

Subsidies and Grants Potentially Available inAkishima City, Tokyo

If you are introducing solar panels or storage batteries in Akishima City, Tokyo, there is a possibility that the “National,” “Tokyo,” and your local “Akishima City” systems may apply.
The following information is based on the official pages of each system as of October 7, 2026. The application status may change depending on the budget, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Timing for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Tokyo “Household Solar Power Generation Promotion Project” Individuals or organizations installing a new unused solar power system (output under 50kW, JET certification, etc.) in residential properties within Tokyo. The generated power must be used in the residential part. Pre-application is required Existing homes: 15,000 JPY per kW for 3.75kW or less (maximum 450,000 JPY), 12,000 JPY/kW for over 3.75kW and under 50kW
New homes: 12,000 JPY/kW for 3.6kW or less (maximum 360,000 JPY), 10,000 JPY/kW for over 3.6kW
For the fiscal year 2026, pre-applications are being accepted from May 29 (will end once the budget is reached). From the pre-application for fiscal year 2026, submission of a certificate issued by a financial institution at the time of performance report is mandatory
Tokyo “Household Storage Battery Promotion Project” Owners of eligible devices (storage batteries registered with SII, excluding national and local governments). Installation must occur between April 1, 2026, and March 30, 2031. If applying after October 1, 2026, only products registered with the national SII for fiscal year 2026 are eligible Storage battery package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household)
Additional for participating in DR demonstration (100,000 JPY per unit; 150,000 JPY per unit if energy management equipment is installed)
Expansion of storage battery unit: 60,000 JPY/kWh (maximum 720,000 JPY per household)
For the fiscal year 2026, pre-applications are being accepted from May 29. Grant applications and performance reports will be accepted from June 30
Akishima City “Subsidy for Promoting the Use of New Energy Equipment for Residential Use” Residents of individual homes within the city. Equipment installed between January 1, 2026, and December 31, 2026, is eligible, and applications must be made after installation (post-application). Only one device can be selected for application; multiple devices cannot be applied for Solar power generation: 15,000 JPY per kW (maximum 60,000 JPY)
Storage battery: 50,000 JPY
Applications will be accepted from December 1, 2026, to January 29, 2027 (must arrive by mail by January 29). In the past three years, the total application amount exceeded the budget, and the grant amount was determined by allocation
National “DR Household Storage Battery Project” (Fiscal Year 2025 Supplement) Newly installed household storage battery systems that can be utilized for DR (demand response) Calculated based on a standard amount of 34,500 JPY per kWh of initial effective capacity (subsidy rate within 30% and maximum 600,000 JPY per application) The budget was reached on May 29, 2026, and the public offering has ended (the official site states there are no plans to reopen the public offering, and applications cannot be made at this time)
National “Mirai Eco Housing 2026 Project” (Renovation) Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovation of windows (openings) and the structure; applications cannot be made for just the installation of storage batteries. Solar panels are not included as eligible facilities Storage battery: 96,000 JPY per household As soon as the budget limit is reached, applications will close. As of October 5, 2026, the amount applied for renovations is displayed as 8% of the budget on the official website. Please check the application status on the official site.
Please pay attention to the “order of procedures” for subsidies!
The Tokyo solar power and storage battery subsidy program requires prior application. For storage batteries applied for after October 1, 2026, only products registered with the national SII will be eligible, and the equipment requirements will change. The subsidy in Akishima City is a post-application system where applications are made after installation, with the application period from December 1, 2026, to January 29, 2027. Each program has different eligibility conditions, application procedures, and whether they can be combined, and applying does not guarantee that subsidies will be granted, so please confirm before contracting or starting work.
Kakeru Koumuten Co., Ltd. will guide you on the eligibility conditions and application periods for each program after confirming them.

National Subsidy “DR Home Storage Battery Project (Support Project for the Introduction of Home Storage Systems for DR Resource Implementation)”

The government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.

This program targets those who are newly introducing registered storage systems that can be utilized for demand response (DR), and in the fiscal year 2025 supplementary budget, the subsidy amount was determined based on a standard amount of 34,500 yen per 1 kWh of initial effective capacity, with a subsidy rate of up to 30% and a maximum of 600,000 yen per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.

However, the fiscal year 2025 supplementary budget reached its budget limit on May 29, 2026, and the public recruitment has ended. The official website also states that there are no plans to reopen public recruitment, and applications cannot be made at this time. Please check the official website for future public recruitment.

Currently, there are no subsidies confirmed for the installation of solar panels for existing homes.
👉 Click here for the official website of the DR Home Storage Battery Project

Tokyo “Promotion Project for the Introduction of Solar Power Generation in Homes”

This subsidy is for those installing unused solar power generation systems in residential homes in Tokyo. The simultaneous installation of storage batteries is not a condition.

◎Subsidy Amount◎
●Existing homes: For systems below 3.75 kW, 150,000 yen per kW (maximum 450,000 yen); for systems over 3.75 kW and below 50 kW, 120,000 yen per kW.
●New homes: For systems below 3.6 kW, 120,000 yen per kW (maximum 360,000 yen); for systems over 3.6 kW and below 50 kW, 100,000 yen per kW.
●Additional amounts are available for the installation of rooftop frames and waterproofing work.

The target is for unused panels that have obtained JET certification or similar, installed in homes in Tokyo with an output of less than 50 kW, and used in the living area. The process involves making a prior application and then applying for the grant after installation. Starting from the fiscal year 2026 prior application, it has become mandatory to submit a certificate issued by a financial institution at the time of performance reporting.

The official page of Tokyo states that pre-registration is being accepted from May 29, Reiwa 8. It will end once the budget is reached, so please check the official page for the registration status.
👉 Here is the official page of Tokyo (Cool Net Tokyo)

Tokyo’s “Promotion Project for the Introduction of Storage Batteries in Households”

This is a subsidy for the installation costs of storage battery systems aimed at increasing self-consumption of electricity generated by solar power and improving energy independence during emergencies.

◎Subsidy Amount◎
● Storage battery package: 100,000 JPY per kWh (up to 1,200,000 JPY per household)
● Additional for participating in DR demonstration: 100,000 JPY per unit (150,000 JPY per unit if energy management equipment is installed)
● Expansion of storage battery unit: 60,000 JPY per kWh (up to 720,000 JPY per household)

The eligible recipients are owners of the subsidized equipment (excluding national and local governments), and the installation must be completed between April 1, Reiwa 8 and March 30, Reiwa 11. If pre-registration is done after October 1, Reiwa 8, only products registered in the national SII for Reiwa 8 are eligible.

The official page of Tokyo states that pre-registration is being accepted from May 29, Reiwa 8. For detailed information, including conditions for combination with solar power generation, please check the official page.
👉 Here is the official page of Tokyo (Cool Net Tokyo)

Akishima City “Subsidy for the Promotion of New Energy Equipment for Residential Use” (Reiwa 8 Fiscal Year)

This is a subsidy for individuals living in private residences within the city who install new energy equipment. The equipment installed between January 1, Reiwa 8 and December 31, Reiwa 8 is eligible, and it is a post-application system where applications are made after the equipment is installed.

◎Subsidy Amount (Reiwa 8 Fiscal Year)◎
● Solar power generation: 15,000 JPY per kW (up to 60,000 JPY)
● Storage battery: 50,000 JPY
● Only one device can be selected; multiple applications for different devices are not allowed

The application period is from December 1, Reiwa 8 to January 29, Reiwa 9 (must arrive by January 29 for postal applications), as stated on Akishima City’s official page. As of October 7, 2026, the application period has not yet started. The official page also mentions that in the past three years, the total amount of applications exceeded the budget, leading to proportional measures being taken.

Conditions for eligible equipment and application methods may change, so those considering applying should check the official page.
👉 Here is the official page of Akishima City

Price List for Solar Panel Installation and Storage Battery Installation

Solar Panel Installation and Battery Installation Menu
⇧Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here

Solar Panel Removal and Water Heater Removal Menu
⇧Service Menu | For Costs of Solar Panel Removal and Water Heater Removal, Click Here

Estimate Guidance

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and batteries should be confirmed by separating them into “Equipment Costs (Device Costs)” and “Construction Costs.”
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Battery Capacity (kWh)

The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Batteries are compared in terms of the amount of electricity they can store, represented in kWh (kilowatt-hours).
The amount of kW that can be installed on the roof varies for each house based on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.

On our pricing page, we list that the cost for solar panels is approximately 800,000 yen to 1,200,000 yen for 3-5 kW, and 1,200,000 yen to 1,900,000 yen for 6-10 kW. (These are just approximate amounts and can vary based on the length of wiring, range of scaffolding, existing roofing materials, panel layout, etc.)
▶ Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here

Items to Confirm in the Estimate (Cost Confirmation)

When comparing estimates, it is common to compare items with different capacities and equipment. Please check if the following items are clearly stated in each company’s estimate!

1. Solar Panels Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also confirm if it is a type that controls in conjunction with a storage battery.
3. Storage Battery Manufacturer, model number, capacity (kWh), usable range during power outages (entire house or specific circuits), installation location.
4. Mounting Frame and Fittings Name of the fittings suitable for the roofing material and the method of securing them (whether it is a method that drills holes or a method that clamps and secures).
5. Wiring and Electrical Work Wiring route and length, work around the distribution board, presence of a monitor to check power generation.
6. Roof Reinforcement and Waterproofing Details of waterproofing treatment at fixed points, whether necessary roof repairs and substrate reinforcements are included.
7. Applications Extent of support for applications to the power company, certification applications for selling electricity (FIT), and subsidy applications.
8. Scaffolding Scope and quantity of scaffolding. If roofing work and exterior painting are done simultaneously, check that the same scope and quantity are not double-counted.
9. Removal and Disposal Whether the removal of existing solar thermal water heaters and old panels, as well as disposal costs for waste materials, are included.
10. Tax Classification and Warranty Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, and details and duration of manufacturer and workmanship warranties.
Tip for Comparison: Compare by Aligning “Installation Capacity (kW)” and “Equipment Model Numbers”!
If the capacities differ, both the price and power generation will change. Kakeru Koumuten Co., Ltd. welcome comparisons, so if you bring estimates from other companies, we will explain the differences item by item!

Self-Estimate and Profit and Loss Simulator for Solar Power Generation

Self-Estimate and Profit and Loss Simulator for Solar Power Generation

With the simulator above,
you can obtain a rough estimate and a profit and loss simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can get a rough estimate and profit and loss simulation!
*The simulation results are estimates. Actual profits and losses may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.

Customer Testimonials

Case Studies of Solar Panel Installation

BEFORE

Metal roof before solar panel installation

AFTER

Roof after solar panel installation

Construction Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh
Base Mounting Hardware Used
 Niigata Manufactured / Aluminum Catch Type Hardware
Fixing Method & Waterproofing Arrangement
 Fixed by gripping the horizontal metal roof with catch type hardware (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY
 Estimated recovery period for construction costs: about 8 to 9 years (self-consumption)

 *The grant amount and recovery estimates are based on the system and calculations at the time of construction and may differ under the current system.
Construction Period
 Approximately 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that grants are available, and I would like to know how much can be provided.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of grants, so we explained it to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Akishima City, Tokyo

There are many solar panel installation contractors available in Akishima City, Tokyo, and you may be unsure which contractor to choose.

Therefore, when requesting solar panel installation and battery storage installation work, let’s check the following 4 points.

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the presence of warranties and after-sales maintenance

● Obtain estimates from multiple contractors (3 companies as a guideline)

● Check if they provide support for subsidy applications

By confirming the above 4 points, you will be able to choose a reliable contractor.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Knowledge about roofs as well as solar panels

Defective installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing

・Solar panels were installed on a severely deteriorated roof, resulting in leaks
・Solar panels were installed on a roof with a short lifespan, necessitating a renovation to remove and reinstall the solar panels within a few years
・Misjudgment of the type of waterproofing led to incorrect treatment, resulting in leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unforeseen troubles.

▶ Go to “Roof Verification Before Installing Solar Panels” in this article

Confirm the presence of warranties and after-sales maintenance

When choosing a solar installation contractor, let’s confirm the presence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.

While the solar panels and battery storage units come with manufacturer warranties, also check for the presence of a workmanship warranty in case leaks occur after installation!

For contractors that offer a workmanship warranty, if leaks occur after installation, they may cover the repairs under the warranty if it falls within the warranty period and conditions.

Additionally, some contractors provide after-sales services separate from warranties, so make sure to check if the contractor you are considering has after-sales service.
Since abnormalities or damages on the roof can be in areas that are not visible, you may not notice them yourself.
By conducting inspections of hidden areas through after-sales maintenance, you can more easily prevent major repairs or failures by detecting abnormalities early!

Kakeru Koumuten Co., Ltd. offers a leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty without performing roof renovations.)
We also conduct aftercare maintenance and send out annual DM!
If you check the DM and wish to proceed, we will visit for aftercare maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting solar panel installation, be sure to obtain estimates from multiple contractors.

Even for the same manufacturer and the same work content, costs may vary, and warranties and after-sales services may differ.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request your preferred contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates, please check:

“Check the items in the estimate”
“Type of solar panel”
“Warranties and after-sales services”

Make sure to compare these details carefully! If the quality of the auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid judging solely based on price!

▶ Go to “Breakdown of installation capacity, equipment, and construction costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Check if they provide support for subsidy applications

There may be subsidies available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
Since there are systems like the Tokyo subsidy that require prior application, it is reassuring to have a contractor who can assist with the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the Tokyo subsidy, prior application is required) before proceeding with the construction!

For the Tokyo subsidy, after installation, you will need to submit a grant application and performance report, which will be reviewed before the grant is issued! (The flow of procedures varies by system)

▶ Go to “Subsidies and grants that may be applicable in Akishima City, Tokyo” in this article

Benefits of Introducing Solar Equipment

The benefits of introducing solar panels are as follows!

Benefit 1: Economic Benefits

Household Budget Illustration

The biggest advantage of introducing solar panels is the economic benefit!
The selling price of electricity has decreased compared to 10 years ago, but by consuming the electricity generated, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity costs rise, the ability to cover your consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!

Furthermore, the selling price (FIT) for residential use (under 10kW) will be set as “24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the 5th year, it is often more advantageous to use it at home (self-consumption) rather than selling it, making the combination with a storage battery a viable option.
👉 Ministry of the Environment and Energy | For purchase prices and periods, click here

Advantage 2 Subsidies can be utilized!

Illustration of a person happy to reduce costs

The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
The reduction of the actual burden amount through subsidies is a significant advantage!
In the case of Akishima City, there is a possibility of being eligible for the national, Tokyo, and Akishima City systems. The subsidy application for Akishima City is a post-application after installation, and the application period is stated as from December 1, Reiwa 8 (2026) to January 29, Reiwa 9 (2027) (please check the application status for each system).

Advantage 3 Environmentally friendly!

Environmentally friendly solar power illustration

Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices like power conditioners do have operational noise.)

Advantage 4 Heat insulation effects are expected!!

Illustration of heat insulation by solar panels

By installing panels on the roof or rooftop, they block direct sunlight to the roof.
Especially in summer, it can help reduce the temperature rise of the roof, providing a heat insulation effect!
(Note that this does not improve the building’s insulation performance itself.)

Benefit 5 Electricity can be used even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it becomes possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capability, you may be able to use electricity from a dedicated outlet during daytime generation.
(Note that the devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Illustration of a person explaining points to note

Point 1 Maintenance costs are incurred

A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reinstalling the solar panels.
If the existing roof is deteriorated, it is reassuring to renovate it with durable roofing materials before installing the solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to deterioration of the storage battery.

It is reassuring to be able to request a simulation considering maintenance costs before introducing solar panels!

Point 2 The risk of leaks increases depending on the roofing material

The fixing methods for slate roofs and tile roofs vary by construction method, but when fixing hardware to the roofing material or substrate with screws, waterproofing of the fixed parts becomes crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, replacing the roofing material with a metal roof and fixing the solar panels using the catch method is also an option. (The catch method has compatibility conditions between the roofing material and hardware, and it cannot be used with all metal roofs.)

Catch-type base hardware specifically for horizontal metal roofsCatch-type base hardware specifically for horizontal metal roofs

Point 3 The Roof Becomes Heavier

Installing solar panels will make the roof heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing it with a lightweight roof may also be an option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “This manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

Choosing Method 1 Compare Based on Total Output of the Roof

When installing solar panels on the roof, it is important to know how much electricity can be generated in a limited area, and generating more electricity is always better!

Solar panels come in various sizes and outputs depending on the manufacturer.
A 350W output panel and a 400W output panel may seem that the panel with higher output is better at first glance.
However, if the size of the panel does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” leading to different installation capacities on the same roof due to the size difference.

400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual electricity generation (kWh) will vary depending on conditions such as the roof’s orientation, slope, and shading.

Choosing Method 2 Compare Based on Degradation Rate of Solar Panels

Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or electricity generation itself.
By not deciding solely based on initial output and considering the degradation rate, you can choose solar panels without regrets!

Choosing Method 3 Compare Based on Warranty Period

There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding output warranties, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies!
A longer warranty is always better, so be sure to check the warranty period and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar Power Installation and Storage Battery Installation in Akishima City, Tokyo

We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Akishima City, Tokyo. (Tap to open the answers)

How much does it cost to install solar panels and storage batteries in Akishima City, Tokyo?

The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

Guidelines for costs by capacity are published on the solar panel installation and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!

Are there any subsidies available for solar and storage battery installations in Akishima City, Tokyo?

As of October 7, 2026, Tokyo’s “Promotion Project for Solar Power Generation in Homes” (for existing homes, 15,000 yen per kW for up to 45,000 yen for 3.75kW or less) and “Promotion Project for Storage Battery Installation in Homes” (100,000 yen per kWh, up to 1.2 million yen per household) are accepting pre-applications starting May 29, 2026, as stated on the official page of Tokyo (Cool Net Tokyo). Akishima City has a subsidy for residential new energy equipment promotion (15,000 yen per kW for solar power, up to 60,000 yen, and 50,000 yen for storage batteries) which will accept applications from December 1, 2026, to January 29, 2027, after installation, as stated on Akishima City’s official page. The national DR household storage battery project has ended its public recruitment.

Since the application status may change, please refer to the subsidy and grant section and consult with us before signing a contract.

Can I apply for subsidies after the construction is completed?

This varies by program. Tokyo’s subsidies require pre-application, while Akishima City’s grants are a post-application system after installation. Conditions such as whether you can contract and start construction before applying differ by program, so please confirm before signing a contract.

The order of procedures varies by program, so please check before contracting and starting construction.

Can solar panels be installed on a slate roof? I’m worried about leaks.

It is possible to install on a slate roof, but confirmation of the roofing material and substrate condition is a prerequisite. The fixing method varies by construction method, and if using a method that fixes brackets to the roofing material and substrate, waterproofing treatment of the fixed parts is essential.

Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the roof condition before installation and suggest methods such as roof overlay or replacement if deterioration is advanced.

My roof is old. Should I do a roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, the cost of removing and reattaching the solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate to a highly durable roofing material before installation.

Please consult us on how to proceed with the installation after checking the roof condition through an on-site survey!

Is it better to install a storage battery together with solar panels?

If you want to use the electricity generated at night or prepare for power outages, simultaneous installation is recommended. The selling price after the fifth year will be 8.3 yen/kWh, making it more advantageous to use the electricity at home rather than selling it.

Additionally, the subsidy for storage batteries in Tokyo (for Reiwa 8, it is 100,000 yen per kWh, with a maximum of 1,200,000 yen per household) is a program aimed at increasing the self-consumption of electricity generated by solar power. In Akishima City, storage batteries are also included in the subsidy (multiple device applications are not allowed; only one device can be selected). You can compare “solar power only” and “solar power + storage battery” through a financial simulation for your consideration.

How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and on-site survey, and provide you with the installation capacity and power generation simulation.

Akishima City gently slopes from northwest to southeast towards the Tama River, with the northern side being the Musashino Plateau and the area along the Tama River being an alluvial region. The shape and orientation of the roof, as well as the shadow cast by surrounding buildings, will differ for each house. You can check the expected power generation through the power generation simulation.

How long is the construction period?

For the above construction example (solar panel 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is done simultaneously or depending on the shape and installation capacity of the roof.

Additionally, please note that there is a separate period required for applying for subsidies and to the power company, so please consult us as soon as possible.

What is the current selling price (FIT)?

For residential use (under 10 kW), from the certifications after October 2025, the first 4 years will be 24 yen/kWh, and from the 5th to the 10th year, it will be 8.3 yen/kWh, and the same price will apply for the 2026 fiscal year.

The idea is to recover initial costs quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity rates.

Can you handle maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten sends out annual after-service maintenance DM and visits customers who wish to have inspections. If the power generation decreases due to dirt, we can also clean the solar panels with a special brush.

Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.

Can you also handle renovations for roofs that already have solar panels installed?

Yes, we can. Kakeru Koumuten can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them in a consistent manner. The removed panels can be stored in our warehouse.

For costs, please refer to the solar panel detachment and water heater removal pricing page.

Free estimate for solar power and storage batteries in Akishima City, Tokyo is here

Estimates are completely free. We welcome competitive quotes!

If you are looking for a solar panel installation company in Akishima City, Tokyo, please consult Kakeru Koumuten Co., Ltd.

Our company handles a wide range of exterior renovations, including solar panels, roof work, and exterior wall work in Akishima City, Tokyo.
We receive requests from many customers, including renovation companies and real estate agencies, who contact us!

Kakeru Koumuten Co., Ltd. promises “high-quality renovations at low costs”, and we have received positive feedback from numerous customers.
We continue to update our construction performance each year, and we will strive to improve quality to satisfy even more customers in the future.

Our company can perform all exterior renovations, not only roof overlay and re-roofing work but also partial roof repairs, exterior painting, and exterior cover installations.
We are also happy to assist with small jobs such as partial repairs and rain gutter cleaning!

In urgent cases such as leaks, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!

“I want to know about recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide the best solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s shoes and will propose the optimal construction plan!

We are confident that we will not be outdone in terms of cost, quality, and planning compared to other companies in exterior work!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if our company is found to be inferior to others, you are free to decline!

Characteristics of Akishima City, Tokyo, and Points for Solar Work

Akishima City is located about 35 kilometers west of the city center, almost in the center of Tokyo, with an area of 17.34 square kilometers. There is a gentle slope from the northwest to the southeast towards the Tama River, with the riverbank being alluvial and the northern side being the Musashino Plateau. We have summarized the characteristics of the terrain in Akishima City, Tokyo, and points to consider when installing solar panels and storage batteries below. (Tap to open)

View the characteristics of Akishima City, Tokyo, and points for solar work

■ Gently sloping terrain. Check the height differences and delivery routes for each site

The elevation within the city is approximately 170.72 meters at the highest point in Haijima Town, 6-chome, and about 76.68 meters at the lowest point in Goji Town, 3-chome (excluding river areas). The overall slope of the city is gentle, but the differences in elevation and the width of the front road vary by site, so the method of scaffolding and the delivery routes for panels and batteries will be confirmed on-site. At Kakeru Koumuten, our own scaffolding team plans the scaffolding according to the site conditions, creates layout diagrams from the drawings and on-site surveys, and you can check them with a power generation simulation.

■ Check the flood and internal water hazard maps. Pay attention to the installation location of equipment

The flood and landslide hazard map of Akishima City shows the areas expected to be inundated in the event of flooding from rivers such as the Tama River. Additionally, the water damage (internal water) hazard map assumes a maximum hourly rainfall of 153 millimeters and a total rainfall of 690 millimeters over 24 hours, targeting flooding due to rainfall exceeding the drainage capacity of the sewer system. The impact during flooding may vary depending on where the power conditioner and battery are installed, separate from the panels on the roof. Please check the assumptions for your residence on the city’s hazard map and consult with us about the installation location and height in conjunction with the installation conditions of the manufacturer you are using.

■ Roof types and ages vary from house to house. Check the roof and waterproofing before installation

Even within the same city, the types of roofs, their ages, and the shapes of the sites vary from house to house. The capacity and fixing methods that can be installed change depending on the shape and orientation of the roof and the materials used. At Kakeru Koumuten, we will propose fixing methods, waterproofing arrangements, and scaffolding plans after confirming the type and condition of the roof and the site conditions before installation.

■ The annual sunshine hours at the Tokyo Observatory are approximately 1,927 hours

According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours at the Tokyo Observatory are approximately 1,927 hours, with January (about 193 hours) having the most and June during the rainy season (about 124 hours) having the least. (This is not based on measurements within Akishima City, but is a reference value.)
The power generation in Akishima City may also be affected by shadows from surrounding buildings and trees, so conducting a year-round power generation simulation and selecting the battery capacity to match the times of high electricity usage are key points.

Our company handles many exterior construction and solar projects in Akishima City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!

Service Area in Akishima City, Tokyo

Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.

List of Areas in Akishima City, Tokyo

Asahicho, Akishima City / Higashimachi, Akishima City / Oogamimachi, Akishima City / Goji Town, Akishima City / Kamikawahara Town, Akishima City / Showamachi, Akishima City / Tanakamachi, Akishima City / Tamagawamachi, Akishima City / Tsukijimachi, Akishima City / Tsutsujioka, Akishima City / Nakagami Town, Akishima City / Haijima Town, Akishima City / Fukushima Town, Akishima City / Matsubaramachi, Akishima City / Midorimachi, Akishima City / Mibori Town, Akishima City / Miyazawamachi, Akishima City / Musashino, Akishima City / Mokuseinodori, Akishima City

We welcome inquiries via LINE as well◎

LINE

LINE

We are also updating our Instagram regularly◎Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!