Leave the installation of solar panels in Hino City, Tokyo to Kakeru Koumuten Co., Ltd.!
For solar panel and battery installation in
Hino City, Tokyo,
trust Kakeru Koumuten!
Kakeru Koumuten is a company specializing in exterior renovations.
As a strong company in roofing work, we are entrusted with solar panel and battery installation considering roofs and waterproofing!
“How to Choose a Solar Panel Contractor in Hino City, Tokyo”
“Costs for Solar Panel and Battery Installation”
“Subsidies Available for Solar System Installation in Hino City, Tokyo”
We will also explain the above three points!
Installing solar panels carries risks such as “the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtaining estimates from about three companies!
Table of Contents (tap to open/close)
- Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Hino City, Tokyo
- Roof Inspection Before Installing Solar Panels
- Subsidies and Grants That May Apply in Hino City, Tokyo
- Price List for Solar Panel and Storage Battery Installation
- Breakdown of Installation Capacity, Equipment, and Construction Costs
- Self-Estimate and Financial Simulator for Solar Power Generation
- Customer Testimonials
- Case Studies of Solar Panel Installations
- How to Choose a Solar Panel Installer in Hino City, Tokyo
- Benefits of Introducing Solar Equipment
- Points to Note When Introducing Solar Power Generation
- How to Choose Solar Panels
- Frequently Asked Questions About Solar and Storage Battery Installation in Hino City, Tokyo
- If You Are Looking for a Solar Panel Installer in Hino City, Tokyo, Contact Kakeru Koumuten
- Characteristics of Hino City, Tokyo and Points for Solar Construction
- Service Area in Hino City, Tokyo
Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Hino City, Tokyo
Regarding why our company is entrusted with solar panel installation by customers in Hino City, Tokyo,
we have unique strengths in solar panel installation that cannot be imitated by other companies, which have been well received by many customers.
so we would be grateful if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from any number of companies!
1. We Can Also Handle Exterior Renovations Besides Solar Panel Installation!


Issues such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if one is knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside their expertise, so caution is necessary.
It is reassuring to have someone knowledgeable about roofs to avoid maintenance and trouble after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent issues after solar panel installation!
2.Facilities Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has established the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases for material storage and showrooms.
In-house Ownership of Scaffolding Materials


To ensure safety during work on the roof, we own the necessary scaffolding materials for temporary scaffolding based on construction conditions and can assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs for scaffolding work.
We own scaffolding materials for approximately 50 detached houses!
Even if there are height differences on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.
Storage of Materials in Our Large Warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you can purchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we can respond quickly in emergencies!
In-house sorting and transportation of waste materials
The installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.
Exterior renovation dedicated showroom


In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on roofing materials!
We can also provide simulations for potential earnings and installation costs when introducing solar panels!
Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!
3.All work performed by our own team
One of Kakeru Koumuten’s major strengths is its complete in-house construction.
By having Kakeru Koumuten handle everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will assist you from the estimate to the completion of the work.
Since the担当者 does not change, whether it be the sales representative or the construction management representative, smooth communication is possible.
We can provide comprehensive in-house construction services from temporary scaffolding installation, exterior wall painting, to roof renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry licenses and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists, and we are confident in our construction techniques.
We are capable of handling large-scale roof projects such as factories!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty for solar panel installation work, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless a roof renovation is performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary depending on the warranty details.)
Aftercare is available every year, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roofing troubles and situations.
If you cannot access the roof at high altitudes, we can utilize drones to assist!
During leak investigations, we can also conduct inspections using a thermal imaging camera.
If the power generation of solar panels decreases due to dirt or other factors, we can provide cleaning services using specialized brushes.
We will respond according to your preferences.
7. Human Resource Development
To improve skills, we create various roof models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct technical training to ensure that each staff member can handle various cases.
8. Creation of Easy-to-Understand Materials and Simulations
Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and “profit and loss simulations” that take into account loan interest rates and electricity costs.
Profit and loss simulations can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction will receive materials that clearly summarize important points and disadvantages!
We encourage you to obtain comparative estimates and review them against other companies’ plans!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 to 30 years.
Confirming whether it is safe to install them directly on the current roof is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.
| 1. Types of Roofing Materials and Age | The fixing method varies depending on the roofing material, such as slate, tiles, metal roofs, and flat roofs (rooftop waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first. |
| 2. Condition of the Substrate and Waterproof Sheet | If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it can affect the fastening strength and waterproofing. We will also check for any signs of leaks. |
| 3. Orientation, Slope, and Shadows of the Roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, can affect power generation. We will create a layout diagram from the drawings and the site, and you can confirm it with a power generation simulation. |
| 4. Shape of the Roof and Usable Area | The number of panels that can be installed (installation capacity) is determined by the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we will compare based on the overall output of the roof. |
| 5. Fixing Method and Waterproofing Details | We will check whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please confirm the waterproofing treatment method for the fixing parts during the estimate. |
| 6. Weight of the Roof | The roof will become heavier due to the panels being installed. After investigating the existing roof, substrate, and load-bearing capacity, replacing with lighter roofing materials may be an option if necessary. |
| 7. Installation Location of Equipment and Wiring | We will confirm the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring also affects costs. |
| 8. Ease of Scaffolding Setup and Delivery Routes | If there is a height difference on the site, planning for scaffolding and the delivery routes for equipment and materials may require some ingenuity. The width of the front road and any steps on the site will also be checked during the site survey. |
Fixing Methods and Confirmation Points by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets to the roof material and substrate with screws) | Waterproofing treatment of fixed parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first. |
| Tile Roof | Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) | Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lightweight roofing materials before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a frame | Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work. |
If you carry out roof renovations 10 to 20 years after installation, additional costs for removing and reinstalling solar panels will apply. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!
▶ Click here for roof renovations in Hino City, Tokyo
Possible Subsidies and Grants in Hino City, Tokyo
When introducing solar panels or storage batteries in Hino City, Tokyo, there is a possibility of being eligible for programs from the “National Government” and “Tokyo Metropolitan Government”. The official page of Hino City does not list its own subsidy program for solar power generation or storage batteries, but provides information on the Tokyo Metropolitan Government’s programs.
The following is based on information checked on the official pages of each program as of October 7, 2026. The application status may change depending on the budget, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Timing for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Tokyo Metropolitan Government “Solar Power Generation Promotion Project for Households” | Individuals, corporations, or management associations installing a new unused solar power generation system (output less than 50kW, JET certification, etc.) in residential properties within Tokyo. The generated power must be used for residential purposes. Pre-application is required. | Existing homes: 150,000 JPY per kW for up to 3.75 kW (maximum 450,000 JPY), 120,000 JPY per kW for over 3.75 kW to under 50 kW. New homes: 120,000 JPY per kW for up to 3.6 kW (maximum 360,000 JPY), 100,000 JPY per kW for over 3.6 kW. |
For the fiscal year 2026, pre-applications are being accepted from May 29 (will end once the budget is reached). From the pre-application for fiscal year 2026, submission of a certificate issued by a financial institution at the time of performance reporting is mandatory. |
| Tokyo Metropolitan Government “Battery Storage Promotion Project for Households” | Owners of eligible equipment (battery storage registered with SII) excluding national and local governments. Installation must occur between April 1, 2026, and March 30, 2031. If applying after October 1, 2026, only products registered with the national SII for fiscal year 2026 are eligible. | Battery storage package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household). Additional amount for participating in DR demonstration (100,000 JPY per unit; 150,000 JPY per unit if energy management equipment is installed). Expansion of battery storage unit: 60,000 JPY per kWh (maximum 720,000 JPY per household). |
For the fiscal year 2026, pre-applications are being accepted from May 29. Grant applications and performance reports will be accepted from June 30. |
| National “DR Household Battery Project” (Fiscal Year 2025 Supplement) | Newly introducing a household battery storage system that can be utilized for DR (demand response) with registered products. | Calculated based on an initial effective capacity of 34,500 JPY per kWh (subsidy rate within 30% and maximum 600,000 JPY per application). | The budget was reached on May 29, 2026, and the public offering has ended (the official site states there are no plans to reopen the public offering, and applications are currently not accepted). |
| National “Mirai Eco Housing 2026 Project” (Renovation) | Battery storage is one of the eligible facilities, but it must be combined with essential works such as insulation renovation of windows (openings) and the structure; applications cannot be made for just the installation of battery storage. Solar panels are not included as eligible facilities. | Battery storage: 96,000 JPY per household. | Ends once the budget limit is reached. As of October 5, 2026, the official site shows that the application amount for renovations is 8% of the budget. Please check the official site for the current status. |
The Tokyo Metropolitan Government’s subsidies for solar power and storage batteries require prior application. For storage batteries applied for after October 1, 2026, only products registered with the national SII will be eligible, and the equipment requirements will change. The official page of Hino City does not list its own subsidies for solar power and storage batteries, but provides information on the Tokyo Metropolitan Government’s system. Eligibility conditions, application procedures, and the possibility of combining different systems vary by program, and applying does not guarantee that subsidies will be granted, so please confirm before contracting or starting work.
Kakeru Koumuten Co., Ltd. will provide guidance on eligibility conditions and application periods for each program after confirming them.
National Subsidy “DR Home Storage Battery Project (Support for the Introduction of Home Storage Systems for DR Resource Implementation)”
The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.
This program targets individuals who are newly introducing registered storage systems that can be utilized for demand response (DR). In the fiscal year 2025 supplementary budget, the subsidy amount was determined based on a standard amount of 34,500 JPY per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum subsidy of 600,000 JPY per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.
However, the fiscal year 2025 supplementary budget application amount reached the budget on May 29, 2026, and the public recruitment has ended. The official site also states that there are no plans to reopen the public recruitment, and applications are currently not possible. Please check the official site for future public recruitment.
Additionally, there are currently no subsidies confirmed for the installation of solar panels on existing homes.
👉 Click here for the official site of the DR Home Storage Battery Project
Tokyo Metropolitan Government “Promotion of Solar Power Introduction in Households” Project
This subsidy is for those who are newly installing unused solar power systems in residential properties within Tokyo. The simultaneous installation of storage batteries is not a requirement.
●Existing homes: For systems under 3.75 kW, 150,000 JPY per kW (maximum 450,000 JPY); for systems over 3.75 kW and under 50 kW, 120,000 JPY per kW
●New homes: For systems under 3.6 kW, 120,000 JPY per kW (maximum 360,000 JPY); for systems over 3.6 kW and under 50 kW, 100,000 JPY per kW
●Additional amounts are available for the installation of rooftop structures and waterproofing work
The target is for unused panels with an output of less than 50 kW that have obtained JET certification, installed in residential properties in Tokyo, and used in living spaces. The process involves prior application followed by a grant application after installation, and starting from the fiscal year 2026 prior application, submission of a certificate issued by a financial institution during the performance report is now mandatory.
The official page of the Tokyo Metropolitan Government states that prior applications have been accepted since May 29, 2026. It will end as soon as the budget is reached, so please check the official page for the application status.
👉 Click here for the official page of the Tokyo Metropolitan Government (Cool Net Tokyo)
Tokyo Metropolitan Government “Promotion of Storage Battery Introduction in Households” Project
This is a subsidy for the installation costs of battery storage systems aimed at increasing self-consumption of electricity generated by solar power and improving energy independence during emergencies.
●Battery package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household)
●Additional for participating in DR demonstration: 100,000 JPY per unit (150,000 JPY per unit if energy management equipment is installed)
●Expansion of battery units: 60,000 JPY per kWh (maximum 720,000 JPY per household)
Eligible applicants are owners of the subsidized equipment (excluding national and local governments), and installation must be completed between April 1, 2026, and March 30, 2027. If applying in advance after October 1, 2026, only products registered in the national SII for the fiscal year 2026 will be eligible.
The official page of Tokyo states that advance applications have been accepted since May 29, 2026. For detailed information, including conditions for combining with solar power generation, please check the official page.
👉 Here is the official page of Tokyo (Cool Net Tokyo)
About Hino City’s Subsidy System
The official page of Hino City, “Subsidy Information from the Ministry of the Environment and Tokyo Metropolitan Government” (updated October 6, 2025), does not list any unique subsidy programs for solar power generation and battery storage in Hino City, but provides information on Tokyo’s “Zero Initial Cost Installation for Residential Solar Power” and “Solar Power for Everyone (Solar Panels and Battery Storage)” programs. For residential solar power generation and battery storage, the above-mentioned Tokyo and national programs will be the main focus. Please check the latest information before signing a contract, as programs may change.
👉 Here is the official page of Hino City
Additionally, the Hino City Consumer Life Center has issued a warning regarding contracts for solar power systems and battery storage, highlighting cases where individuals are solicited by door-to-door sales claiming “subsidies are available” (updated October 24, 2025). It is recommended to obtain estimates from multiple companies, check for on-site surveys, review warranty and maintenance details, and confirm the total amount. Contracts made through door-to-door sales or phone solicitations can be canceled within eight days from the date the contract document is received.
👉 Here is the warning from the Hino City Consumer Life Center
Solar Panel Installation & Battery Storage Pricing Table

⇧ Construction Menu | For costs regarding solar panel installation and battery storage, click here

⇧Service Menu | For costs related to solar panel removal and water heater dismantling, click here
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and storage batteries should be confirmed by separating them into “Equipment Costs (Device Costs)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.
Considerations for Installation Capacity (kW) and Battery Capacity (kWh)
The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatt). Storage batteries are compared based on the amount of electricity they can store, expressed in kWh (kilowatt-hour).
The amount of kW that can be installed on a roof varies for each house based on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.
On our pricing page, we list solar panels as approximately 800,000 yen to 1,200,000 yen for 3 to 5 kW, and 1,200,000 yen to 1,900,000 yen for 6 to 10 kW. (These are merely estimated amounts and can vary based on wiring length, scaffolding range, existing roofing materials, panel layout, etc.)
▶ Service Menu | For costs related to solar panel installation and storage battery installation, click here
Items to Confirm in the Estimate (Cost Verification)
When comparing estimates, it is common to compare different capacities and equipment by only looking at the amounts. Please check if the following items are clearly stated in each company’s estimate!
| 1. Solar Panels | Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified. |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls with a battery. |
| 3. Battery | Manufacturer, model number, capacity (kWh), range available during power outages (whole house or specific circuits), installation location. |
| 4. Mounting Frame and Hardware | Name of the hardware suitable for the roofing material and the method of securing it (whether it is a method that drills holes or a method that clamps and secures). |
| 5. Wiring and Electrical Work | Wiring route and length, work around the distribution board, presence of a monitor to check power generation. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment at the fixing points, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Application | How much support is included for applications to the power company, certification applications for selling electricity (FIT), and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If roof work and exterior painting are done simultaneously, check that the same scope and quantity are not counted twice. |
| 9. Removal and Disposal | Whether the removal of existing solar water heaters or old panels and disposal costs for waste materials are included. |
| 10. Tax Classification and Warranty | Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, details and duration of manufacturer warranty and workmanship warranty. |
If the capacity differs, both the price and power generation will change. Kakeru Koumuten Co., Ltd. warmly welcomes competitive estimates, so if you bring estimates from other companies, we will explain the differences by item!
Self-Estimate and Profit Simulation for Solar Power Generation
With the simulator above,
you can obtain an approximate estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the battery, you can obtain an approximate estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.
Customer Voices
Case Studies of Solar Panel Installations


| Work Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh range |
| Base Mounting Hardware Used |
| Niigata Manufactured / Aluminum Catch Type Hardware |
| Fixing Method & Waterproofing Arrangement |
| Fixed by catching the horizontal metal roof with catch type hardware (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the subsidy being granted, the actual burden amount is approximately 1,000,000 JPY Expected recovery period for construction costs: about 8 to 9 years (self-consumption) *The subsidy amount and recovery estimates are based on the system and calculations at the time of construction and may differ under the current system. |
| Construction Period |
| Approximately 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the installation of solar panels and storage batteries. I heard that subsidies are available, and I would like to know how much can be granted. |
Our Proposal
We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of subsidies that will be granted, so we explained this to the customer along with the estimate!
How to Choose a Solar Panel Installation Contractor in Hino City, Tokyo
There are many solar panel installation contractors available in Hino City, Tokyo, and you may be unsure which contractor to choose.
Therefore, when requesting solar panel installation and battery storage installation work, let’s check the following 4 points.
● Have extensive knowledge not only about solar panels but also about roofs
● Confirm the presence of warranties and aftercare services
● Obtain estimates from multiple contractors (3 companies is a guideline)
● Check if they provide support for subsidy applications
By confirming the above 4 points, you will be able to choose a reliable contractor.
Have knowledge not only about solar panels but also about roofs
Improper installation of solar panels can be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing
・Solar panels installed on a deteriorated roof causing leaks
・Solar panels installed on a roof with a short lifespan, requiring renovations to detach and reattach the solar panels within a few years
・Misjudging the type of waterproofing and applying incorrect treatment, resulting in leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.
▶ Go to “Roof Verification Before Installing Solar Panels” in this article
Confirm the presence of warranties and aftercare services
When choosing a solar installation contractor, let’s confirm the presence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.
While solar panels and battery storage come with manufacturer warranties, also check for the presence of a workmanship warranty in case leaks occur after installation!
For contractors that offer workmanship warranties, if leaks occur after installation, they may cover it under the warranty if it falls within the warranty period and conditions.
Additionally, some contractors provide aftercare services separate from warranties, so be sure to check if the contractor you are considering has aftercare services.
Since abnormalities or damages on the roof may not be visible, you might not notice them yourself.
By conducting inspections of hidden areas during aftercare maintenance, you can more easily detect abnormalities early and prevent major repairs or failures!
Kakeru Koumuten Co., Ltd. offers a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed.)
We also conduct aftercare maintenance and send out annual DM!
After checking the DM, if you wish, we will visit for aftercare maintenance!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting solar panel installation, let’s obtain estimates from multiple contractors.
Even with the same manufacturer and the same construction content, costs may vary, and warranties and after-services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request from your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates, please check:
“Check the estimate items”
“Type of solar panels”
“Warranties and after-services”
and make a detailed comparison! Avoid judging solely based on cost, as using lower-grade materials or skipping processes can reduce costs!
▶ Go to “Breakdown of Installation Capacity and Equipment/Construction Costs” in this article
Check if they provide support for subsidy applications
There may be subsidies available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
Since there are systems like the Tokyo subsidy that require pre-application, it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the Tokyo subsidy, pre-application) before proceeding with the construction!
For the Tokyo subsidy, after installation, you will need to submit a grant application and performance report, which will be reviewed before the grant is issued! (The flow of procedures varies by system)
▶ Go to “Subsidies and Grants that May Apply in Hino City, Tokyo” in this article
Benefits of Introducing Solar Equipment
The benefits of introducing solar panels are as follows!
Benefit 1: Economic Benefits
The biggest benefit of introducing solar panels is the economic advantage!
The selling price of electricity has decreased compared to ten years ago, but by consuming the generated electricity, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity prices rise, the ability to cover your consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!
For residential use (under 10kW), the selling price (FIT) from certifications after October 2025 is set at “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year.” The same price will apply for the 2026 fiscal year. After the fifth year, it is often more advantageous to use it at home (self-consume) rather than sell it, making the combination with a storage battery a viable option.
👉 Ministry of Economy, Trade and Industry | For purchase prices and periods, click here
Benefit 2 Subsidies can be utilized!
The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the criteria, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In Hino City, there is a possibility of being eligible for national and Tokyo metropolitan government programs. The official page of Hino City does not list its own subsidies for solar power and storage batteries, but provides information on the Tokyo metropolitan government’s programs (please check the official page for the status of applications for Tokyo’s programs).
Benefit 3 Environmentally friendly!
Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices like power conditioners do have operational noise.)
Benefit 4 Heat insulation effects can be expected!!
By installing panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, this can help reduce the temperature of the roof, providing a heat insulation effect!
(Note that this does not improve the building’s insulation performance itself.)
Benefit 5 Electricity can be used even during power outages!!
If a storage battery is installed, it becomes possible to use electricity even during power outages or emergencies!
Even without a storage battery, if you have a power conditioner with autonomous operation functionality, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)
What points should be noted when introducing solar power generation?
Next, we will explain the “three points to note” when installing solar panels!
Point 1 Maintenance costs can be incurred
One maintenance cost that is often overlooked is the roof where solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reinstalling the solar panels.
If the existing roof is deteriorated, it is reassuring to renovate it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It is reassuring to be able to request a simulation that considers maintenance costs before introducing solar panels!
Point 2 The risk of leaks increases depending on the roofing material
The fixing methods for slate roofs and tile roofs vary by construction method, but in methods that fix hardware to the roofing material or substrate with screws, waterproofing treatment at the fixed points is crucial.
In methods that create holes in the roof, the risk of leaks inevitably arises.
Of course, we will perform thorough waterproofing treatment, but if you are concerned about making holes, replacing the roofing material with a metal roof and fixing the solar panels using the catch method is also an option. (The catch method has compatibility conditions between the roofing material and hardware, and it cannot be used with all metal roofs.)
Catch-type base hardware exclusive for horizontal metal roofs
Point 3 The Roof Becomes Heavier
Installing solar panels will make the roof heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing it with a lightweight roof may also be an option if necessary.
How to Choose Solar Panels?
There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!
How to Choose 1: Compare Based on Total Output of the Roof
When installing solar panels on the roof, it is important to consider how much power can be generated in a limited area, and the more power generated, the better!
Solar panels come in various sizes and outputs depending on the manufacturer.
A 350W output panel and a 400W output panel may seem like the higher output panel is better at first glance.
However, if the size of the panel does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” resulting in different numbers of panels that can be installed on the same roof due to size differences.
400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of one panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation (kWh) will vary depending on conditions such as roof orientation, slope, and shading.
How to Choose 2: Compare Based on Degradation Rate of Solar Panels
Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation itself.
Choosing solar panels by considering the degradation rate as well as the initial output will help you avoid regrets!
How to Choose 3: Compare Based on Warranty Period
Solar panel warranties include “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
For output warranties, some manufacturers offer a 30-year warranty, while others may only offer a 10-year warranty, so it varies!
The longer the warranty, the better, so be sure to check the warranty period and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Power and Storage Battery Installation in Hino City, Tokyo
We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Hino City, Tokyo. (Tap to open answers)
How much does it cost to install solar panels and storage batteries in Hino City, Tokyo?
The cost varies depending on the installation capacity, equipment, and roof condition. In the above case study (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
Estimates by capacity are published on our solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!
Are there any subsidies available for solar and storage battery installation in Hino City, Tokyo?
As of October 7, 2026, Tokyo’s “Household Solar Power Generation Promotion Project” (for existing homes, 15,000 yen per kW for systems under 3.75kW, with a maximum of 450,000 yen) and “Household Storage Battery Promotion Project” (100,000 yen per kWh for storage batteries, with a maximum of 1.2 million yen per household) are accepting pre-applications starting May 29, 2026, as listed on the official Tokyo (Cool Net Tokyo) page. There are no unique subsidies for solar and storage batteries listed on Hino City’s official page. The national DR household storage battery project has ended its public recruitment.
Since the application status may change, please check the subsidy and grant section and consult with us before signing a contract.
Can I apply for subsidies after the construction is completed?
This depends on the system. Tokyo’s subsidies require pre-application. Conditions such as whether you can contract and start construction before applying may vary by system, so please confirm before signing a contract.
The order of procedures varies by system, so please check before signing a contract or starting construction.
Can solar panels be installed on a slate roof? I’m worried about leaks.
It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The method of securing the panels varies by construction method, and when securing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.
Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the roof condition before installation and suggest methods such as roof overlay or replacement if deterioration is advanced.
My roof is old. Should I do a roof renovation first?
This depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, the cost of removing and reinstalling the solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate to a highly durable roofing material before installation.
Please consult us on how to proceed with the installation after checking the roof condition through an on-site survey!
Is it better to install a storage battery together with solar panels?
If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. Since the selling price of electricity will be 8.3 yen/kWh after the fifth year, it is becoming more advantageous to use it in your home rather than selling it.
Additionally, the subsidy for storage batteries in Tokyo (for Reiwa 8, it is 100,000 yen per kWh, with a maximum of 1,200,000 yen per household) is a program aimed at increasing self-consumption of electricity generated by solar power. You can compare “solar only” and “solar + storage battery” in the income and expenditure simulation.
How many kW can be installed on our roof? Is it okay for north-facing roofs or roofs with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and on-site survey, and we will provide you with the installation capacity and power generation simulation.
Hino City has a varied terrain with hills, plateaus, and lowlands, and the shape and orientation of the roof, as well as the shadows cast by surrounding buildings, differ for each house. You can check the expected power generation through the power generation simulation.
How long will the construction period be?
In the above construction example (solar panel 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is performed simultaneously or depending on the roof shape and installation capacity.
Please note that additional time is required for applications for subsidies and to the power company, so please consult us as soon as possible.
What is the current selling price (FIT)?
For residential use (under 10 kW), from the certifications after October 2025, the first 4 years will be 24 yen/kWh, and from the 5th to the 10th year, it will be 8.3 yen/kWh, and the same prices will apply in the 2026 fiscal year.
The idea is to recover initial costs quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides income and expenditure simulations that take into account loan interest rates and electricity prices.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-maintenance notices via DM and visits customers who wish for inspections. We can also clean solar panels using a specialized brush if the power generation decreases due to dirt.
Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.
Can you also handle renovations of roofs that already have solar panels installed?
Yes, we can. Kakeru Koumuten can detach and reattach solar panels in-house, so we can remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them consistently. The removed panels can be stored in our own warehouse.
For costs, please refer to the solar panel removal and water heater removal pricing page.
If you are looking for a solar panel installation company in Hino City, Tokyo, please consult Kakeru Koumuten
Our company handles a wide range of exterior renovations, from roofing work to exterior wall work, including solar panels, in Hino City, Tokyo.
We receive requests from many customers, including renovation companies and real estate agencies, who have contacted us!
Kakeru Koumuten Co., Ltd. promises “high-quality renovations at low cost”, and we have received great feedback from many customers.
We continue to update our annual construction achievements and will strive to improve quality to satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior wall painting, and cover methods for exterior walls, all with our own team.
We are also happy to assist with small jobs like partial repairs and rain gutter cleaning!
In urgent cases like water leakage, we may be able to provide temporary measures without setting up scaffolding, as long as safety can be ensured, so please consult with us!
“I want to know about recommended solar panels“, “I want to keep costs down as much as possible“, “I just want an estimate for now“, we will provide optimal solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in our customers’ shoes and will propose the best construction plan!
We are confident that we will not lose in terms of cost, quality, and organization compared to other companies in exterior work!
We welcome competitive estimates with confidence!
Estimates are completely free, and if our company is found to be inferior to others, you are free to decline!
Features of Hino City, Tokyo and Points for Solar Work
Hino City has an area of 27.55 square kilometers, and its terrain consists of a rich variety of hilly areas, plateaus, and lowlands, with the Tama River flowing in the northern part and the Asakawa River running through the central part of the city, as stated on the city’s official page. The same page describes that the southern side of the Asakawa River features hilly areas with the undulating Tama Hills, the northern side has a plateau with two tiers of cliff formations, and the area along the Asakawa and Tama Rivers consists of residential and agricultural lands in alluvial lowlands. We have summarized the characteristics of the terrain in Hino City, Tokyo, and points to consider when installing solar panels and storage batteries below. (Tap to open)
View the features of Hino City, Tokyo and points for solar work
■ A terrain consisting of hilly areas, plateaus, and lowlands. Check the height differences and slopes of each site on-site
In hilly areas with rich undulations and plateaus with cliff formations, the height differences of the sites, the step differences with the front road, and the road widths vary from house to house even within the same neighborhood. It may be necessary to devise ways to set up scaffolding and the transportation routes for panels and storage batteries, and the way shadows are cast by the roof orientation and surrounding buildings and trees also changes from place to place. At Kakeru Koumuten, our own scaffolding team plans the scaffolding according to the site, creates layout diagrams from the drawings and on-site surveys, and you can confirm this with a power generation simulation.
■ Check the flood hazard of the Tama River and Asakawa River, and the sediment disaster warning areas. Pay attention to the installation locations of equipment
The disaster prevention guidebook of Hino City includes a flood hazard map based on the assumption of the maximum possible rainfall for the Tamagawa and Asakawa rivers, which was updated in March 2023, as stated on the official page. Additionally, Tokyo designated 465 locations in the city as landslide hazard areas and 388 locations as special landslide hazard areas on March 15, 2018, according to the city’s official page. The placement of power conditioners and storage batteries, separate from the panels on the roof, may affect their impact during flooding depending on whether they are installed indoors or outdoors. Please check the hazard map for your area and consult with us regarding the installation location and height, in conjunction with the installation conditions of the manufacturer you are using.
■ Roof types and ages vary from house to house. Check the roof and waterproofing before installation
Even within the same city, roof types, ages, and site shapes vary from house to house. The capacity and fixing methods that can be installed change depending on the shape and orientation of the roof and the materials used. At Kakeru Koumuten, we will check the type and condition of the roof and the situation of the site before installation and propose fixing methods, waterproofing arrangements, and scaffolding plans.
■ The annual sunshine hours at the Tokyo Observatory is about 1,927 hours
According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours at the Tokyo Observatory is about 1,927 hours, with January (about 193 hours) having the most and June during the rainy season (about 124 hours) having the least. (This is a reference value, not based on observations in Hino City.)
The power generation in Hino City can also be affected by shadows from surrounding buildings and trees, so it is important to conduct annual power generation simulations and choose the capacity of the storage battery according to the times when electricity is used the most.
Our company handles a lot of exterior work and solar work in Hino City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!
Service Area in Hino City, Tokyo
Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.
List of Areas in Hino City, Tokyo
Asahigaoka, Hino City / Arai, Hino City / Ishida, Hino City / Oosakaue, Hino City / Ochikawa, Hino City / Ueda, Hino City / Kawabe Horinouchi, Hino City / Sakae Town, Hino City / Sakura Town, Hino City / Shimoda, Hino City / Shinmachi, Hino City / Shinmei, Hino City / Takahata, Hino City / Tamadaira, Hino City / Toyoda, Hino City / Nishihirayama, Hino City
・Trust Kakeru Koumuten for exterior wall painting in Hino City, Tokyo!
・Trust Kakeru Koumuten for roof renovations in Hino City, Tokyo!
・Trust Kakeru Koumuten for exterior renovations in Hino City, Tokyo!
・Kakeru Koumuten Co., Ltd. project achievements
・Kakeru Koumuten Co., Ltd. aftercare services
・Kakeru Koumuten Co., Ltd. service menu and price list
・Kakeru Koumuten Co., Ltd. staff blog and announcements
・Explaining the importance of comparative estimates and key points!
・Top 12 solar power generation manufacturers! Features and selection tips included!
・What are the installation costs for solar power generation? Comprehensive tips to reduce costs!
・What are the best locations for solar power installation? Key points for site selection included!
・Check out our solar power generation estimates here!
We welcome inquiries via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!





