Trust Kakeru Koumuten Co., Ltd. for Solar Panel Installation in Akiruno City, Tokyo!
For solar panel and storage battery installation in
Akiruno City, Tokyo,
trust Kakeru Koumuten!
Kakeru Koumuten is a specialized exterior renovation company based in Aoba Ward, Yokohama City.
As a company strong in roofing work, we are entrusted with solar panel and storage battery installations that consider roofing and waterproofing!
“How to Choose a Solar Panel Contractor in Akiruno City”
“Costs for Solar Panel and Storage Battery Installation”
“Subsidies Available for Solar System Installation in Akiruno City”
We will also explain the above three points!
Installing solar panels carries risks such as “the occurrence of leaks” and other troubles.
To avoid regrets, we recommend obtaining around three estimates!
Table of Contents (tap to open/close)
- Reasons why Kakeru Koumuten is chosen for solar panel installation in Akiruno City, Tokyo
- Roof inspection before solar panel installation
- Possible subsidies and grants available in Akiruno City
- Pricing for solar panel and storage battery installation
- Breakdown of installation capacity, equipment, and construction costs
- Self-estimation and financial simulator for solar power generation
- Customer testimonials
- Case studies of solar panel installations
- How to choose a solar panel installation company in Akiruno City, Tokyo
- Benefits of introducing solar equipment
- Points to be aware of when introducing solar power generation
- How to choose solar panels
- Frequently asked questions about solar and storage battery installation in Akiruno City
- If you are looking for a solar panel installation company in Akiruno City, contact Kakeru Koumuten
- Characteristics of Akiruno City, Tokyo and points for solar construction
- Service area in Akiruno City, Tokyo
Reasons why Kakeru Koumuten is chosen for solar panel installation in Akiruno City, Tokyo
Regarding why our company is entrusted with solar panel installation by customers in Akiruno City, Tokyo,
One reason is that “Kakeru Koumuten serves Kanagawa and Tokyo as its service areas”,
and we have “strengths in solar panel installation that cannot be imitated by other companies”, which has received high praise from many customers.
so we would appreciate it if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from any number of companies!
1. We can also handle exterior renovations other than solar panel installation!

Troubles such as leaks that occur with solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It is reassuring to have knowledge about the roof to avoid maintenance and troubles after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!
2.Equipment Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases centered around Yokohama City, Kanagawa Prefecture for material storage and showrooms.
In-house Ownership of Scaffolding Materials


To ensure safety during work on the roof, we own the necessary scaffolding materials for temporary scaffolding based on construction conditions, allowing us to assemble scaffolding ourselves.
By conducting scaffolding work with our own scaffolding team instead of outsourcing, we can also cut costs related to scaffolding work.
We have enough scaffolding materials for approximately 50 single-family homes!
In Akiruno City, our own scaffolding team will plan the scaffolding according to the site conditions.
Storage of materials in our large warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, we canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we canrespond quickly in emergencies!
Sorting and transporting waste materials in-house
The installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut down on waste disposal costs.
Exterior remodeling dedicated showroom


In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on the roofing materials!
It is also possible to simulate the revenue and installation costs when introducing solar panels!
Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that show the structure, allowing for detailed explanations!
3.All Work Performed by Our Own Team
One of Kakeru Koumuten’s major strengths is all work performed by our own team.
By having a consistent system from inquiry to project completion, Kakeru Koumuten can provide high-quality roofing renovations at reduced costs.
Additionally, one representative will handle everything from the estimate to project completion.
Since the same person will be in charge, whether in sales or project management, smooth communication is possible.
We can perform consistent in-house work from temporary scaffolding installation to exterior wall painting and roofing renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry permits and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting technicians, and we are confident in our construction skills.
We are capable of handling large-scale roofing projects such as factories!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty, our solar panel installation work comes with our own workmanship warranty (leakage warranty)!
(The workmanship warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovation is performed. The workmanship warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary based on the warranty details.)
Aftercare maintenance is available annually, and we send out notification DM every year.
If you have any questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roof troubles and situations.
Even if we cannot access the roof at high altitudes, we can respond using a drone!
During leakage investigations, we can also conduct inspections using a thermal imaging camera.
If the power generation of the solar panels decreases due to dirt, we can also provide cleaning with a specialized brush.
We will respond according to the customer’s wishes.
7. Human Resource Development
We create various roof models for skill improvement and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct technical training to ensure that each staff member can handle various cases.
8. Creation of Easy-to-Understand Materials and Simulations
At Kakeru Koumuten Co., Ltd., in addition to “estimates”, “layout diagrams”, and “power generation simulations”, we also provide a “solar panel installation guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar panel installations will find our materials easy to understand, including important points and disadvantages!
We encourage you to obtain comparative estimates and review plans from other companies!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 to 30 years.
Confirming “whether it is okay to install them directly on the current roof” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten Co., Ltd., which specializes in roofing work, has summarized the items to check before installation.
| 1. Type of roofing material and age | The method of securing varies depending on the roofing material, such as slate, tiles, metal roofs, or flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest a roof renovation first. |
| 2. Condition of the substrate and waterproof sheet | If the sheathing or roofing (waterproof sheet) beneath the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of leaks. |
| 3. Orientation, slope, and shadows of the roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect power generation. We will create a layout diagram from the drawings and on-site, and you can confirm it with the power generation simulation. |
| 4. Shape of the roof and installable area | The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. The number of panels that can be installed varies depending on the size of the panels, so we will compare based on the total output of the roof. |
| 5. Fixing method and waterproofing details | We will confirm whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please confirm the waterproofing treatment of the fixed parts during the estimate. |
| 6. Weight of the roof | The roof will become heavier due to the panels. After investigating the existing roof, substrate, and load-bearing capacity, replacing with lighter roofing materials may also be an option if necessary. |
| 7. Location of equipment installation and wiring | We will check the installation locations for the power conditioner and storage batteries, as well as the wiring route to the distribution board. The length of the wiring will also affect costs. |
Fixing Methods and Checkpoints by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets to the roof material and substrate with screws) | Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first. |
| Tile Roof | Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) | Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lightweight roofing materials before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a frame | Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work. |
If you perform roof renovations 10 to 20 years after installation, there will be additional costs for removing and re-installing solar panels. If the roof is deteriorating, renovating to high-durability roofing materials before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and re-installation of solar panels in-house, so please consult us according to the condition of your roof!
▶ Click here for roof renovations in Akiruno City, Tokyo
PossibleSubsidies and Grants
If you are introducing solar panels or storage batteries in Akiruno City, Tokyo, there is a possibility that you may be eligible for programs from “the national government,” “Tokyo,” and “Akiruno City.”
The following information is based on the official pages of each program as of October 7, 2026. The application status may change depending on the budget and application period, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Timing for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Tokyo Metropolitan Government “Reiwa 8 Year Household Solar Power Generation Promotion Project” (Cool Net Tokyo) | New installation of certified solar modules on residential properties or their premises in Tokyo, with systems under 50kW. Pre-application before installation is required. | Existing homes: 150,000 JPY/kW for up to 3.75kW (maximum 450,000 JPY), 120,000 JPY/kW for over 3.75kW New homes: 120,000 JPY/kW for up to 3.6kW (maximum 360,000 JPY), 100,000 JPY/kW for over 3.6kW (Additional costs for mounting, waterproofing, and renovation defect insurance, etc.) |
Pre-application: From May 29, 2026 Grant application and performance report: From June 30, 2026 to March 30, 2029 |
| Tokyo Metropolitan Government “Reiwa 8 Year Household Storage Battery Promotion Project” (Cool Net Tokyo) | New installation of storage batteries in residential properties in Tokyo, with SII registered equipment. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries alone. Pre-applications after October 1, 2026 will only be eligible for SII registered products for Reiwa 8. | Storage battery package: 100,000 JPY/kWh (maximum 1,200,000 JPY per household) Storage battery unit expansion: 60,000 JPY/kWh (maximum 720,000 JPY per household) (Additional incentives for participating in DR demonstrations, etc.) |
Pre-application: From May 29, 2026 Grant application and performance report: From June 30, 2026 |
| Akiruno City Residential Solar Power Generation and Storage Battery Subsidy | According to the city’s official page, the subsidy program for energy-saving equipment installation has ended as of the 29th fiscal year, and it is currently not being implemented. | No unique subsidies from the city. | The city provides information on programs such as those from Tokyo (Cool Net Tokyo). Please check the above Tokyo subsidies. |
| National “DR Household Storage Battery Project” (Reiwa 7 Year Supplement) | New installation of household storage systems that can be utilized for DR (demand response) with registered products. | Calculated based on an initial effective capacity of 34,500 JPY per 1kWh (subsidy rate within 30% and maximum 600,000 JPY per application). | The budget was reached on May 29, 2026, and the public recruitment has ended (applications are currently not accepted). |
| National “Mirai Eco Housing 2026 Project” (Renovation) | Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovations of windows (openings) and structures; applications cannot be made for storage battery installation alone. Solar panels are not included as eligible facilities. | Storage battery: 96,000 JPY per household. | Ends as soon as the budget limit is reached. Please check the official site for application status. |
In Tokyo, a pre-application before installation is required for subsidies, and starting construction beforehand may result in ineligibility. You must meet the necessary conditions and requirements for the eligible equipment, and applying does not guarantee approval. Currently, Akiruno City does not have its own subsidies for residential solar power generation or storage batteries. Since the procedures vary by program, please confirm before contracting or starting construction.
Kakeru Koumuten Co., Ltd. will provide guidance on eligibility after confirming the conditions for each program.
Tokyo “Reiwa 8 Fiscal Year Household Solar Power Generation Promotion Project”
In Tokyo, subsidies are provided for those installing solar power generation systems in residential homes through Cool Net Tokyo. The eligible systems are those using certified solar modules installed newly in residential homes or on their premises, with a capacity of less than 50 kW. A pre-application before installation is required.
For existing homes, the subsidy amount is 150,000 yen/kW for up to 3.75 kW (maximum 450,000 yen), and 120,000 yen/kW for amounts exceeding 3.75 kW. Additionally, there are supplementary items such as installation of mounting frames, waterproofing work, and renovation defect insurance. The pre-application period is from May 29, 2026, and the application for grants and performance reports is accepted from June 30, 2026, until March 30, 2029. Please check the official page for details on eligible equipment, conditions, and budget status.
👉 Cool Net Tokyo | Official page for solar power generation
Tokyo “Reiwa 8 Fiscal Year Household Storage Battery Promotion Project”
Tokyo is also providing subsidies for newly installed storage batteries in residential homes. The subsidy amount is 100,000 yen per 1 kWh of storage battery package (maximum 1,200,000 yen per household), and for additional storage battery units, it is 60,000 yen per 1 kWh (maximum 720,000 yen per household), with additional amounts for participation in DR demonstrations.
The eligible equipment must be registered with SII (Environmental Collaboration Initiative). If you apply for pre-application after October 1, 2026, only equipment listed in the Reiwa 8 fiscal year SII registered products will be eligible. This program is intended for simultaneous installation with solar power, but applications can also be made for storage batteries alone. The application for grants and performance reports has been accepted since June 30, 2026.
👉 Cool Net Tokyo | Official page for storage batteries
About Akiruno City’s Subsidies
According to the official page of Akiruno City, the subsidy program for the installation of energy-saving equipment ended with the 2017 fiscal year and is currently not being implemented. As of October 7, 2026, no city-specific subsidies for residential solar power generation or storage batteries were confirmed.
On the city’s zero-carbon city page, information is provided about Tokyo’s “Cool Net Tokyo” subsidies and grants, as well as the “Tokyo Solar Roof Ledger” (a service to check the suitability of your home’s roof for solar power generation). When introducing solar panels or storage batteries in Akiruno City, the above-mentioned Tokyo subsidies will be the main focus.
👉 Akiruno City Official Page (Efforts towards Zero Carbon City)
National Subsidy “DR Home Battery Project (Support Project for the Introduction of Home Storage Systems for DR Resource Implementation)”
The government has been implementing the “DR Home Battery Project” to support the installation of home storage batteries.
This program is aimed at those who are newly introducing registered storage systems that can be utilized for demand response (DR). In the fiscal year 2025 supplementary budget, the subsidy amount is determined based on a standard amount of 34,500 JPY per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum of 600,000 JPY per application. There are also conditions such as that contracts or orders made before the grant decision are not eligible.
However, the supplementary budget for fiscal year 2025 reached its application budget on May 29, 2026, and the public recruitment has ended (the previous fiscal year’s supplementary budget also ended on July 2, 2025). Applications are currently not possible, so please check the official website for future public recruitment.
Additionally, there are currently no subsidies confirmed for the installation of solar panels specifically for existing homes.
👉 Click here for the official site of the DR Home Battery Project
Solar Panel Installation & Battery Installation Price List

⇧Service Menu | Click here for costs related to Solar Panel Installation & Battery Installation

⇧Service Menu | Click here for costs related to Solar Panel Removal & Water Heater Dismantling
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and storage batteries should be confirmed by separating them into “Equipment Costs (Device Costs)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.
Understanding Installation Capacity (kW) and Storage Battery Capacity (kWh)
The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Storage batteries are compared based on the amount of electricity they can store, represented in kWh (kilowatt-hours).
The amount of kW that can be placed on the roof varies for each house depending on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.
On our pricing page, we list solar panels as approximately 800,000 JPY to 1,200,000 JPY for 3-5 kW and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just estimated amounts and can vary based on wiring length, scaffold range, existing roofing materials, panel layout, etc.)
▶ Construction Menu | Costs for Solar Panel Installation and Storage Battery Installation
Items to Confirm in the Quotation (Cost Confirmation)
When comparing estimates, it is common to compare different capacities and equipment by only looking at the amounts. Please check if the following items are clearly stated in each company’s estimate!
| 1. Solar Panels | Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified. |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls the battery together. |
| 3. Storage Battery | Manufacturer, model number, capacity (kWh), range available during power outages (whole house or specific circuits), installation location. |
| 4. Mounting Frame and Fittings | Name of fittings suitable for roofing materials and method of securing them (whether it is a method that drills holes or a method that clamps and secures). |
| 5. Wiring and Electrical Work | Wiring route and length, work around the distribution board, presence of a monitor to check power generation. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment at fixed points, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Applications | Extent of support for applications to the power company, certification application for selling electricity (FIT), and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If roof work and exterior wall painting are done simultaneously, check that the same scope and quantity are not counted twice. |
| 9. Removal and Disposal | Whether the removal of existing solar thermal water heaters and old panels, as well as disposal costs for waste materials, are included. |
| 10. Tax Classification and Warranty | Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, details and duration of manufacturer warranty and workmanship warranty. |
If the capacities differ, both the price and power generation will change. Kakeru Koumuten Co., Ltd. welcome comparisons, so if you bring estimates from other companies, we will explain the differences for each item!
Self-Estimate and Profit and Loss Simulator for Solar Power Generation
With the simulator above,
you can obtain a rough estimate and a profit and loss simulation up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can obtain a rough estimate and profit and loss simulation!
*The simulation results are estimates. Actual profit and loss may vary based on conditions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.
Customer Voices
Case Studies of Solar Panel Installation


| Construction Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh |
| Base Mounting Hardware Used |
| Niigata Manufactured / Aluminum Catch-Type Hardware |
| Fixing Method & Waterproofing Arrangement |
| Fixed using catch-type hardware gripping the horizontal metal roof (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the subsidy being granted, the actual burden amount is approximately 1,000,000 JPY Estimated recovery period for construction costs: about 8 to 9 years (self-consumption) *The subsidy amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system. |
| Construction Period |
| Approximately 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the installation of solar panels and storage batteries. I heard that subsidies are available, and I would like to know how much will be granted. |
Our Proposal
We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of subsidies, so we explained it to the customer along with the estimate!
How to Choose a Solar Panel Installation Contractor in Akiruno City, Tokyo
There are many solar panel installation contractors available in Akiruno City, Tokyo, and you may be unsure which contractor to choose.
Therefore,when requesting solar panel installation or battery storage installation work, make sure to check the following four points.
● Have extensive knowledge not only about solar panels but also about roofs
● Confirm the existence of warranties and aftercare services
● Obtain estimates from multiple contractors (three companies is a guideline)
● Check if they provide support for subsidy applications
By confirming the above four points, you will be able to choose a reliable contractor.
Knowledge of roofs as well as solar panels
Improper installation of solar panels can be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing
・Solar panels were installed on a severely deteriorated roof, leading to leaks
・Solar panels were installed on a roof with a short lifespan, requiring renovations to detach and reattach the solar panels within a few years
・Misjudging the type of waterproofing led to incorrect treatment and subsequent leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.
▶ Go to “Roof Verification Before Installing Solar Panels” in this article
Confirm the existence of warranties and aftercare services
When choosing a solar installation contractor, make sure to check for warranties. It is important to confirm not only the duration of the warranty but also the scope, exclusions, and cost conditions.
While solar panels and battery storage units come with manufacturer warranties, also check for the existence of installation warranties in case leaks occur after installation!
For contractors that offer installation warranties, if leaks occur after installation, they may be able to respond under the warranty, provided it falls within the warranty period and conditions.
Additionally, some contractors offer after-sales service separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Changes or damage on the roof may occur in areas that are not visible, so there is a possibility that customers may not notice them.
By conducting inspections during after-sales maintenance, we can detect abnormalities early, making it easier to prevent major repairs or breakdowns!
Kakeru Koumuten Co., Ltd. provides a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovation is performed.)
We also conduct after-sales maintenance and send out DM every year!
Please check the DM, and if you wish, we will visit you for after-sales maintenance!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting solar panel installation, be sure to obtain estimates from multiple contractors.
Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-sales services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request from your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates, please check carefully the following:
“Check the estimate items”
“Type of solar panels”
“Warranties and after-sales services”
Make sure to compare these details carefully! If the rank of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making decisions based solely on price!
▶ Go to “Breakdown of installation capacity, equipment, and construction costs” in this article
Check if they provide support for subsidy applications
Subsidies may be available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
There are systems that require personal applications and cannot be handled by the contractor, as well as systems that require pre-application before installation, so it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for Tokyo subsidies, a pre-application is required before installation) before proceeding with the construction!
In the case of subsidies in Tokyo, the process involves submitting a grant application and performance report after the completion of the work, which will be granted after a review! (The procedure may vary depending on the system.)
▶ Go to “Subsidies and Grants that May Be Applicable in Akiruno City” within this article
Benefits of Introducing Solar Power Equipment
The benefits of introducing solar panels are the following 5 points!
Benefit 1: Economic Benefits
The biggest benefit of introducing solar panels is the economic advantage!
Although the selling price of electricity has decreased compared to 10 years ago, you can benefit by reducing the electricity you buy from the utility by consuming the electricity you generate yourself!
As electricity prices rise, the ability to cover your consumption with solar power becomes increasingly attractive!
If you plan to use the generated electricity at night, the installation of a storage battery is essential!
Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year” for certifications after October 2025, and the same price will apply in the 2026 fiscal year. After the 5th year, it is likely to be more advantageous to use it at home (self-consumption) rather than selling it, making the combination with a storage battery a viable option.
👉 Ministry of the Environment | For purchase prices, periods, etc., click here
Benefit 2: You Can Utilize Subsidies!
The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the requirements, you may be able to utilize subsidies!
The reduction of the actual burden amount due to subsidies is a significant advantage!
In the case of Akiruno City, there may be applicable programs from the national government and Tokyo Metropolitan Government (currently, there are no unique subsidies for residential solar power and storage batteries from the city).
Benefit 3: Environmentally Friendly!
Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices such as power conditioners may have operational noise.)
Benefit 4: Expect Heat Insulation Effects!!
By installing the panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, it can help reduce the temperature rise of the roof, providing expected heat insulation effects!
(Note that this does not improve the building’s insulation performance itself.)
Benefit 5 Electricity can be used even during power outages!!
If a storage battery is installed, it becomes possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation functionality, you may be able to use electricity from a dedicated outlet during daytime generation.
(Note that the devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)
What points should be noted when introducing solar power generation?
Next, we will explain the “three points to note” when installing solar panels!
Point 1 Maintenance costs can be incurred
A maintenance cost that is particularly easy to overlook is the roof where solar panels are installed.
If you perform roof remodeling after 10 to 20 years, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorating, it is reassuring to remodel it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It would be reassuring to request a simulation considering maintenance costs before introducing solar panels!
Point 2 The risk of leaks increases depending on the roofing material
The fixing methods for slate roofs and tile roofs vary by construction method, but in methods where fixtures are secured to the roofing material or substrate with screws, waterproofing of the fixed parts is crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and fixtures, and it cannot be used with all metal roofs.)
Catch-type base metal fittings for horizontal metal roofs
Note 3: The roof will become heavier
Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing it with a lighter roof may also be an option if necessary.
How to Choose Solar Panels?
There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!
How to Choose 1: Compare based on total roof output
When installing solar panels on the roof, it is important to consider how much power can be generated in a limited area, and generating more power is always better!
Solar panels come in various sizes and outputs depending on the manufacturer.
For example, a 350W output panel and a 400W output panel may seem that the higher output panel is better at first glance.
However, if the size of the panels does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” resulting in different numbers of panels that can be installed on the same roof due to the size difference.
400W × 15 panels = 6kW (total output of the roof)
350W × 20 panels = 7kW (total output of the roof)
As shown above, even if the output of one panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation amount (kWh) will vary depending on conditions such as roof orientation, slope, and shading.
How to Choose 2: Compare based on degradation rate of solar panels
Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation amount.
Choosing solar panels while considering the degradation rate, rather than just the initial output, will help avoid regrets!
How to Choose 3: Compare based on warranty period
There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding the output warranty, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies!
Since a longer warranty is generally better, let’s check the warranty periods and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Power and Storage Battery Installation in Akiruno City
We have compiled common questions from customers considering the installation of solar panels and storage batteries in Akiruno City. (Tap to open the answers)
How much does it cost to install solar panels and storage batteries in Akiruno City, Tokyo?
The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
For cost estimates by capacity, please refer to our solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and site survey and provide a free estimate!
Are there any subsidies available for solar power and storage battery installation in Akiruno City?
As of October 7, 2026, Tokyo’s subsidies for solar power generation and storage batteries (Cool Net Tokyo) are accepting pre-applications. For storage batteries, only SII registered devices (products registered in Reiwa 8) will be eligible from pre-applications made after October 1, 2026. Akiruno City ended its own subsidy program for energy-saving equipment installation in the fiscal year 2017 and is not currently implementing it. The national DR household storage battery project has also closed its public recruitment.
Since the application status may change, please check the subsidy and grant section and consult with us before signing a contract.
Can I apply for subsidies even after the construction is completed?
For many programs, procedures are required before construction. Tokyo’s subsidies require pre-application before installation, and if you install it first, you will be excluded from eligibility. Procedures differ by program.
Please confirm the order of procedures before signing a contract or starting construction, as it varies by program.
Can solar panels be installed on a slate roof? I’m worried about leaks.
It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The fixing method varies by construction method, and if the method involves fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.
Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation and propose methods such as roof overlay (cover method) or re-roofing if deterioration is advanced.
My roof is old. Should I do a roof renovation first?
It depends on the condition of the roof. If a roof renovation is needed after 10 to 20 years of installation, the cost for removing and reinstalling solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with durable roofing materials before installation.
Please consult us on how to proceed with the installation after confirming the condition of the roof through a site survey!
Should I install a storage battery together with the solar panels?
If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more beneficial to use it in your home rather than selling it.
Additionally, the Tokyo Metropolitan Government’s subsidy for storage batteries is designed for simultaneous installation with solar panels, but applications can also be made for storage batteries alone. You can compare “solar panels only” and “solar panels + storage battery” through a financial simulation.
How many kW can be installed on my roof? Is it okay for north-facing roofs or those with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and site survey, and provide you with the installation capacity and power generation simulation.
In Akiruno City, the shading caused by surrounding buildings and trees varies from house to house. You can check the expected power generation through the power generation simulation.
How long will the construction period be?
In the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is performed simultaneously or depending on the shape of the roof and installation capacity.
Please note that additional time is required for applications for subsidies and power companies, so please consult us as soon as possible.
What is the current selling price (FIT)?
For residential use (less than 10 kW), the selling price from certifications after October 2025 will be 24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year, and the same price will apply for the 2026 fiscal year.
The idea is to recover initial costs quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that considers loan interest rates and electricity costs.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-maintenance notices via DM and visits customers who wish to have inspections. We can also clean solar panels using a specialized brush if power generation decreases due to dirt.
It can be difficult to check areas on the roof by yourself, so please feel free to consult us if you have any concerns.
Can you renovate a roof that already has solar panels installed?
Yes, we can. Since Kakeru Koumuten can remove and reinstall solar panels in-house, we will handle the entire process of removing the panels, performing the roof overlay (cover method) or re-roofing, and reinstalling them. The removed panels can be stored in our warehouse.
For information on costs, please see the solar panel removal and water heater removal pricing page.
If you are looking for a solar panel installation contractor in Akiruno City, please consult Kakeru Koumuten
Our company handles a wide range of exterior renovations, including solar panel installations, roof work, and exterior wall work in Akiruno City, Tokyo.
We receive requests from many customers, including renovation companies and real estate agencies, who have contacted us!
Kakeru Koumuten promises “high-quality renovations at low costs”, and we have received positive feedback from numerous customers.
We continue to update our annual construction performance, and we will strive to improve quality to satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and exterior cover installations.
We are happy to assist with small jobs such as partial repairs and rain gutter cleaning!
In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult with us!
“I want to know about recommended solar panels”, “I want to keep costs as low as possible”, “I just want an estimate for now”, we will provide optimal solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and propose the best construction plan!
We are confident that we will not lose in terms of cost, quality, and planning compared to other companies for exterior work!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if our company is found to be inferior to others, you are free to decline!
Characteristics of Akiruno City, Tokyo, and Points for Solar Work
Akiruno City, Tokyo, is located in the western part of Tokyo, with the Akikawa River flowing through the city. The official page of Akiruno City publishes hazard maps for landslides and flooding, indicating areas at risk of flooding from the Tama River, Akikawa River, and Hirai River, as well as landslide warning areas (debris flow, landslides, and cliff collapses).
Below are summarized points regarding the residential environment of Akiruno City and considerations when installing solar panels and storage batteries. (Tap to open)
View the characteristics of Akiruno City, Tokyo, and points for solar work
■ Check the installation locations for storage batteries and power converters against the hazard map assumptions
In the hazard map (landslide and flood) of Akiruno City, the inundation areas in the event of flooding of the Tamagawa, Akigawa, and Hirai rivers due to the maximum expected rainfall are indicated, along with the landslide warning areas (yellow zone) and special warning areas (red zone). In September 2024, the map will be revised into a new version divided into seven regions, and the flood inundation area maps for the Akigawa and Hirai river basins will be updated to the latest standards. When deciding on the installation location for storage batteries and power conditioners, it is advisable to check the inundation assumptions and designated warning areas for your residence on the hazard map and consider the height and position of the installation for peace of mind.
■ Tokyo’s annual sunshine hours are approximately 1,927 hours
According to the Japan Meteorological Agency’s average values (1991–2020), Tokyo’s annual sunshine hours are approximately 1,927 hours.
The power generation varies by season, so it is important to conduct annual power generation simulations and choose the capacity of the storage battery to match the times of high electricity usage.
■ Check for shadows from surrounding buildings and trees
In places where there are trees or buildings nearby, the way shadows fall varies from house to house depending on the roof’s orientation and height. Since solar panels generate less power when shaded, Kakeru Koumuten creates layout diagrams based on the drawings and the actual site conditions, allowing you to confirm through power generation simulations. Additionally, in areas close to trees, branches and fallen leaves may accumulate around the panels and rain gutters, so please consult us about inspections and cleaning after installation.
■ No municipal subsidies; Tokyo’s subsidies are the main focus
In Akiruno City, the subsidy program for the installation of energy-saving equipment ended in the fiscal year 2017. The Tokyo subsidy (Cool Net Tokyo) requires prior application before installation, so it is important to confirm the order of procedures before contracting and starting work.
■ In narrow front road areas, plan scaffolding and equipment delivery carefully
In areas with narrow front roads, sloped sites, or closely adjacent buildings, it may be necessary to devise plans for scaffolding and equipment delivery. Kakeru Koumuten will respond according to the site with our own scaffolding team and scaffolding materials.
■ Check the roof condition according to the building’s age
For buildings that have been around for many years, it is important to check the condition of the roofing materials and substrate before installing solar panels. Depending on the roof’s condition, installing them simultaneously with roof renovations can reduce future costs for removing and re-installing solar panels.
■ Tokyo’s subsidies require prior application before construction
Tokyo’s subsidies require prior application to Cool Net Tokyo before installation. It is essential to check the procedures and timelines for each program in advance, in conjunction with the timing of the construction.
Our company serves Kanagawa Prefecture and Tokyo, and we handle many exterior and solar construction projects in Akiruno City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!
Service Area in Akiruno City, Tokyo
Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.
List of Areas in Akiruno City, Tokyo
Akiro City Akikawa/Akiro City Akiru/Akiro City Ajiro/Akiro City Aburahira/Akiro City Amama/Akiro City Itsukaichi/Akiro City Ina/Akiro City Irino/Akiro City Kamino-dai/Akiro City Ushinuma/Akiro City Ogawa/Akiro City Ogawa Higashi/Akiro City Otsutsu/Akiro City Kamidaisuke/Akiro City Kirikake/Akiro City Kusabana/Akiro City Konakano/Akiro City Kominedai/Akiro City Kowada/Akiro City Sannai/Akiro City Shimonidaisuke/Akiro City Sugao/Akiro City Setooka/Akiro City Takao/Akiro City Tatenya/Akiro City Tatenya-dai/Akiro City Togura/Akiro City Tomohara/Akiro City Ninomiya/Akiro City Ninomiya Higashi/Akiro City Nobe/Akiro City Hara Komiya/Akiro City Hikida/Akiro City Hirazawa/Akiro City Hirazawa Nishi/Akiro City Hirazawa Higashi/Akiro City Fukazawa/Akiro City Fuchigami/Akiro City Yamada/Akiro City Yosawa/Akiro City Yokozawa
・Exterior wall painting in Akiruno City, Tokyo, is entrusted to Kakeru Koumuten!
・Roof renovation in Akiruno City, Tokyo, is entrusted to Kakeru Koumuten!
・Exterior renovation in Akiruno City, Tokyo, is entrusted to Kakeru Koumuten!
・Kakeru Koumuten Co., Ltd. construction achievements
・Kakeru Koumuten Co., Ltd. aftercare services
・Kakeru Koumuten Co., Ltd. construction menu and price list
・Kakeru Koumuten Co., Ltd. staff blog and announcements
・Explaining the importance of comparative estimates and key points!
・Top 12 solar power generation manufacturers! Features and selection tips included!
・What are the installation costs for solar power generation? Comprehensive tips to reduce costs!
・What are the best locations for solar power installation? Key points for selecting installation sites!
・Here is the introduction to solar power generation estimates!
We welcome inquiries via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!