Hello!
We are Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior wall painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This time, the construction work involves setting up temporary scaffolding inside the waste incineration facility’s hopper and performing painting work with lubricating paint!
What is the hopper of an incinerator..
The hopper of an incinerator is simply described as a “convenient passageway or inlet for feeding waste and fuel into the incinerator”.
The hopper is designed to withstand high temperatures and may also be equipped with devices to adjust the amount and speed of input. Additionally, various safety measures are implemented to ensure the safety of workers and those around them.
In short, it can be understood as a convenient entrance or passageway for putting items into the incinerator.
On this page, we will explain the actual results of the work carried out by Kakeru Koumuten!
Construction Data
| Construction Location |
| Hino City, Tokyo |
| Construction Details |
| Installation of temporary scaffolding and painting work (lubricating paint) |
| Background to the Construction |
|
“We received a request stating, ‘I would like you to apply a lubricating paint so that the waste falls smoothly into the incinerator’s hopper (the area where waste is dropped). Since the number of days we can stop the incinerator is limited, we were looking for a company that can quickly proceed with the construction from scaffold installation to painting work in-house.'” |
| Materials Used |
| Graphite lubricating paint Slip Plate (No.3) |
| Price Range |
| 400,000 – 500,000 |
| Construction Period |
| 3 days |
| Completion Month |
| January 2024 |
Procedure for Installing Temporary Scaffolding at the Factory
1. Wearing and Checking Protective Clothing
First, we put on protective clothing before entering the incinerator!
Since combustion occurs at high temperatures in the incinerator, workers need to wear protective clothing as a barrier to protect themselves from dust and harmful substances in the air!
The mask will be a specialized gas mask!
One person will be on lookout, and three will be working, making a total of four people on site.
After putting on the protective clothing, we will also wear full harnesses and begin work!
2. Before Bringing in Scaffolding Materials for the Incinerator (Hopper)
When bringing in scaffolding materials into the factory, we will cover the floor with cloth to prevent damage from the scaffolding materials!
Before entering the hopper, we will create a hazard prediction activity sheet (KY) and display it in a visible location!
We will confirm with the staff before starting work and check for potential risks of accidents that may occur during the work.
Inside the factory’s incinerator, the machine noise is very loud, and since we are wearing masks and protective clothing, communication can be difficult.
We will decide on hand signals and use loud voices as much as possible to proceed with the work!
The lookout will stop the work or give warnings if there are any third-party confirmations or situations that could lead to accidents.
3. Delivery of Scaffolding Materials
This is the inside of the incinerator as seen from the entrance! We will transport scaffolding materials from here!
Since this is usually where garbage is burned, it was still a bit hot.
We are wearing protective clothing and it is difficult to breathe with masks, so we will take breaks frequently while transporting materials!
4. Wedge-type Scaffolding Assembly
We will install scaffolding inside the hopper. This time, the area where we will apply the lubricant is on a slope, so we will also set up scaffolding on the slope like we do for roof scaffolding.
5. Installation of Planks
We will apply the lubricant and complete the work!
The graphite lubricant used is expensive as it can withstand high temperatures!
After cleaning, we will cover it up and apply two coats!
The color will be colorless and transparent!
Flexible Response with a Complete In-house System
Our in-house construction allows for speedy responses and cost savings!
1. In-House Scaffolding Materials


We have a temporary scaffolding material storage site in Aoba-ku and Asahi-ku, Yokohama.
By owning our scaffolding materials and assembling the scaffolding ourselves, we can achieve flexible and rapid construction.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs associated with scaffolding construction.
Even for small-scale projects that require temporary scaffolding for partial rain gutter replacements, we can set up scaffolding in-house and perform rain gutter repairs
1 day for scaffolding assembly
1 day for rain gutter repair
1 day for scaffolding dismantling
Typically, this would take a total of 3 days,
but with our company, we can complete the work in just 1 day!
2. In-House Material Storage

We store exterior materials and paints.
By ordering a large quantity of materials at once, we can procure materials at lower prices!
Additionally, we always have stock available, allowing for speedy responses in emergencies!
We can also store solar panels and other items in the warehouse without exposing them to rain!
3. In-House Waste Separation
In exterior renovations, various waste materials such as paint, wood, and metal are generated.
While most contractors dispose of them all together, significant cost savings on waste disposal can be achieved by sorting and recycling the materials.
Leave temporary scaffolding work for factories to Kakeru Koumuten Co., Ltd.!
Our company is an exterior renovation firm based in Aoba-ku, Yokohama, but we have many successful projects not only in Yokohama but also in Kanagawa Prefecture, Tokyo, Chiba Prefecture, and beyond.
We are grateful to receive many requests for temporary scaffolding only.
Since both scaffolding and painting work can be handled by our own team, there is no need to arrange multiple contractors for special projects like this one, allowing us to complete everything with just Kakeru Koumuten.
We can respond quickly and flexibly to projects that require a short construction period or are urgent.
Nighttime and holiday work is also possible!
We are happy to handle partial work such as scaffolding, roof work, exterior wall painting, and other repair work.
If you have any concerns like “I just want to know the estimate for the work” or “I want the work to be finished quickly,” please feel free to contact us!
Summary
That concludes our track record of temporary scaffolding installation and painting work within factories!
If you are unsure which contractor to hire for special work, please consult Kakeru Koumuten!
Estimates and inspections are, of course, free! If you have any issues with roofs, rain gutters, exterior walls, or exteriors, please consult Kakeru Koumuten Co., Ltd. in Aoba-ku, Yokohama!
Kakeru Koumuten is a renovation company strong in exterior renovations, and we conduct complete in-house work from temporary scaffolding to roof and exterior wall painting.
We are confident that in terms of “cost, quality, and good planning”, we do not fall behind compared to other companies!
We are confident in our exterior renovations, so we welcome competitive estimates!
We offer comprehensive construction guarantees and aftercare maintenance, and we have received positive feedback for our appropriate proposals that match our customers’ future life plans and cost performance!
“I’m glad I asked them!” We take every request seriously to ensure you feel this way.
We look forward to your inquiries. Thank you very much.
Helpful information about exterior renovations can be found here!
・Aoba-ku, Kawasaki City | Exterior Painting | We performed exterior painting with premium inorganic materials!
・Totsuka-ku, Yokohama City | Cap Flashing Work | We replaced the cap flashing due to leak prevention measures!
・Aoba-ku, Kawasaki City | Rain Gutter Replacement | We replaced the rain gutter that was deformed due to natural disasters!
・Popular Colors for Exterior Painting! We introduce recommended color combinations!
・DIY Painting Plan! A must-see for those who want to try DIY roof and exterior wall painting! We only set up the scaffolding!
・What are the average costs for roof remodeling? Types of construction and how to choose a contractor!
・Latest Edition | Grants, subsidies, and reduction systems available for renovations!
・How much does it cost for roof work? We introduce the average costs!
・What are the average costs for rain gutter repair and cleaning? Tips on timing, fire insurance, and choosing a contractor!
・Renovation Store in Kanagawa Prefecture, Yokohama | What is Roof Overlay (Roof Cover Method)?
・Exterior wall cleaning without the need for temporary scaffolding!
LINE consultations are also very welcome◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!