For solar panel and storage battery installation in
Kiyose City, Tokyo,
trust Kakeru Koumuten!

Kakeru Koumuten is a company specializing in exterior renovations.
As a company strong in roofing work, we are entrusted withsolar panel and storage battery installations considering roofing and waterproofing!

“How to Choose a Solar Panel Contractor in Kiyose City, Tokyo”
“Costs for Solar Panel and Storage Battery Installation”
“Subsidies Available for Solar System Installation in Kiyose City, Tokyo”
We will also explain the above three points!

Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure a satisfactory solar panel installation, we recommend obtainingthree estimates!

Trust Kakeru Koumuten for solar panel and storage battery installation in Kiyose City, Tokyo
Table of Contents (tap to open/close)
  1. Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Kiyose City, Tokyo
  2. Roof Inspection Before Installing Solar Panels
  3. Possible Subsidies and Grants Available in Kiyose City, Tokyo
  4. Price List for Solar Panel and Storage Battery Installation
  5. Breakdown of Installation Capacity, Equipment, and Construction Costs
  6. Self-Estimate and Profit Simulation for Solar Power Generation
  7. Customer Testimonials
  8. Case Studies of Solar Panel Installations
  9. How to Choose a Solar Panel Installation Company in Kiyose City, Tokyo
  10. Benefits of Introducing Solar Equipment
  11. Points to Consider When Introducing Solar Power Generation
  12. How to Choose Solar Panels
  13. Frequently Asked Questions About Solar and Storage Battery Installation in Kiyose City, Tokyo
  14. If You’re Looking for a Solar Panel Installation Company in Kiyose City, Tokyo, Contact Kakeru Koumuten
  15. Characteristics of Kiyose City, Tokyo and Key Points for Solar Installation
  16. Service Area in Kiyose City, Tokyo

Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Kiyose City, Tokyo

Link Banner to Kakeru Koumuten's Strength Introduction Page

The reasons why our company is entrusted with solar panel installation by customers in Kiyose City, Tokyo
“Our Unique Strengths in Solar Panel Installation That Cannot Be Imitated by Other Companies”
have received high praise from many customers.

In solar panel installation projects in Kiyose City, Tokyo, we have absolute confidence in “Cost,” “Quality,” and “Plans”, so we would appreciate it if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We Also Handle Exterior Renovations Beyond Solar Panel Installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Issues such as leaks that occur with solar panel installations may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if one is knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside their expertise, so caution is necessary.
It is reassuring to have expertise in roofing to avoid maintenance and trouble after installation!

Kakeru Koumuten is strong in roofing work and can perform the removal and installation of solar panels in-house, allowing for quick responses to maintenance and urgent issues after solar panel installation!

2.Facilities Specialized in Exterior Renovation

Kakeru Koumuten has organized the following warehouses and material storage areas to provide low-cost, high-quality solar and exterior renovation work.
We have established five bases for material storage and showrooms.

In-house Ownership of Scaffolding Materials

Entrance of the material storage areaIn-house owned scaffolding materials
To ensure safety during work on the roof, we own the necessary scaffolding materials for temporary scaffolding based on construction conditions and can assemble scaffolding in-house.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can also cut costs related to scaffolding work.
We own scaffolding materials for approximately 50 detached houses!
Even in cases where there are height differences on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.

Storage of Materials in Our Large Warehouse

Exterior of the Material Warehouse Interior of the Warehouse Storing Materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, allowing us torespond quickly in emergencies!

Sorting and Transporting Waste Materials In-House

Waste Sorting SpaceThe installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.

Exterior Renovation Dedicated Showroom

Exterior Renovation Dedicated Showroom ExteriorShowroom Interior
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are attached to the roofing materials!
We can also provide simulations of the potential earnings and installation costs when introducing solar panels!

Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!

3.All Work Performed by Our Own Team

Diagram of Our System for Performing Scaffolding, Painting, and Roofing Renovations In-House

One of Kakeru Koumuten’s major strengths is its complete in-house construction.

By having a consistent system from inquiry to project completion, Kakeru Koumuten can keep costs down while providing high-quality roof renovations.
Additionally, one representative will handle everything from the estimate to project completion.
Since the same person will manage both sales and construction, smooth communication is possible.

We can provide consistent in-house construction from temporary scaffolding installation, exterior wall painting, to roof renovations!

4. Various Permits and Skilled Workers

Construction Industry LicenseDisplay of Permits and Qualifications Obtained by Kakeru Koumuten
We have obtained construction industry permits as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal and painting technicians, and we are confident in our construction skills.
We can handle large-scale roof projects such as those for factories!

5. Warranty and Aftercare

Link banner to Kakeru Koumuten's warranty information page

In addition to the manufacturer’s warranty for solar panel installation work, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions differ based on the warranty details.)
Aftercare is available annually, and we send out notification DM every year.
If you have questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Roof and solar panel inspection response

Our company is equipped to handle various roofing troubles and situations.

If you cannot access the roof at high altitudes, we can respond using a drone!
During leak investigations, we can also conduct inspections using a thermal imaging camera.

If the power generation of the solar panels decreases due to dirt, we can also provide cleaning with a specialized brush.
We will respond according to the customer’s wishes.

7. Human Resource Development

Training using models

To improve skills, we create various roof models and conduct practical training.
Since the construction methods change depending on the shape and slope of the roof, we regularly provide technical training so that each staff member can respond to various cases.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Easy-to-Understand Materials and Simulations

Examples of materials and simulations provided for solar panel installation

Kakeru Koumuten provides “estimates,” “layout diagrams,” and “power generation simulations,” as well as a “solar construction guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction will receive materials that clearly summarize important points and disadvantages!

We encourage you to obtain comparative estimates and compare them with other companies’ plans!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.

1. Types of Roofing Materials and Age The fixing method varies depending on the roofing materials such as slate, tiles, metal roofs, and flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first.
2. Condition of Substrate and Waterproof Sheet If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of leaks.
3. Orientation, Slope, and Shadows of the Roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, can affect the amount of power generated. We will create a layout diagram from the drawings and the site, and you can check it with a power generation simulation.
4. Roof Shape and Usable Area The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. The number of panels that can be installed varies depending on the size of the panels, so we will compare based on the total output of the roof.
5. Fixing Method and Waterproofing Details We will confirm whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please check the waterproofing treatment method for the fixing parts during the estimate.
6. Weight of the Roof The roof will become heavier due to the panels being added. After investigating the existing roof, substrate, and load-bearing capacity, switching to lighter roofing materials may be an option if necessary.
7. Installation Location of Equipment and Wiring We will check the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring also affects the cost.
8. Ease of Scaffolding Setup and Delivery Route If there is a height difference on the site, planning for scaffolding and the delivery route for equipment and materials may require some ingenuity. The width of the front road and the elevation differences on the site will also be checked during the on-site survey.

Fixing Methods and Checkpoints by Roofing Material

Roof Material Main Fixing Method Pre-Installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first.
Tile Roof Fixed with brackets and methods suitable for the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be a method to replace with lightweight roofing material before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, a method that does not drill holes may be available.
Flat Roof / Rooftop Fixed by installing a framework Type and deterioration status of the waterproof layer, waterproofing around the framework. Consider in conjunction with the timing of waterproofing work.
If you carry out roof renovations at the same time, you may be able to reduce future costs for the removal and reinstallation of solar panels!
If you plan to renovate the roof 10 to 20 years after installation, there will be additional costs for the removal and reinstallation of solar panels. If the roof is deteriorating, it may be more cost-effective in the long run to renovate to a highly durable roofing material before installation.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ Click here for roof renovations in Kiyose City, Tokyo

PotentialSubsidies and Grants in Kiyose City, Tokyo

If you are introducing solar panels or storage batteries in Kiyose City, Tokyo, there is a possibility that the systems from the “National Government,” “Tokyo Metropolitan Government,” and your residence’s “Kiyose City” may apply.
The following information is based on the official pages of each system as of October 7, 2026. The acceptance status may change depending on the budget, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Period for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Tokyo “Home Solar Power Generation Promotion Project” Individuals, corporations, or management associations installing a new unused solar power system (output under 50kW, JET certification, etc.) in residential properties within Tokyo. The generated power must be used in the residential part. Pre-application is required Existing homes: 15,000 JPY per kW for 3.75kW or less (maximum 450,000 JPY), 12,000 JPY/kW for over 3.75kW to under 50kW
New homes: 12,000 JPY/kW for 3.6kW or less (maximum 360,000 JPY), 10,000 JPY/kW for over 3.6kW
For the fiscal year 2026, pre-applications are being accepted from May 29 (will end once the budget is reached). From the pre-application for fiscal year 2026, submission of a certificate issued by a financial institution will be mandatory at the time of performance report.
Tokyo “Home Battery Installation Promotion Project” Owners of eligible devices (batteries registered with SII, excluding national and local governments). Must be installed between April 1, 2026, and March 30, 2031. If pre-applying after October 1, 2026, only products registered with the national SII for fiscal year 2026 are eligible Battery package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household)
Additional for participating in DR demonstration (100,000 JPY per unit; 150,000 JPY per unit if energy management equipment is installed)
Expansion of battery units: 60,000 JPY/kWh (maximum 720,000 JPY per household)
For the fiscal year 2026, pre-applications are being accepted from May 29. Grant applications and performance reports will be accepted from June 30.
Kiyose City “Subsidy for Solar Power Generation Equipment Installation” Individuals who are registered residents living in the city and have fully paid their resident tax for the previous year (or have been determined to be tax-exempt). Post-application after installation, only in-person submissions (no mail). The information published on the official page is for fiscal year 2024. Fiscal year 2024 content
Solar power generation: 30,000 JPY per kW (maximum 100,000 JPY)
Battery: 50,000 JPY
Home fuel cell: 50,000 JPY
For fiscal year 2024, the application amount nearly reached the budget limit, and the program ended once the budget was reached. The recruitment details for fiscal year 2026 have not been confirmed on the city’s official page as of October 7, 2026
National “DR Home Battery Project” (Fiscal Year 2025 Supplement) Newly introducing home battery systems that can be utilized for DR (demand response) with registered products. Calculated based on an initial effective capacity of 34,500 JPY per kWh (subsidy rate within 30% and maximum 600,000 JPY per application). The budget was reached on May 29, 2026, and the public recruitment has ended (there are no plans to reopen public recruitment as stated on the official site, and applications cannot be made at this time).
National “Mirai Eco Housing 2026 Project” (Renovation) Batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovations of windows (openings) and structures; applications cannot be made for battery installation alone. Solar panels are not included as eligible facilities Battery: 96,000 JPY per household Budget will end once the limit is reached. As of October 5, 2026, the application amount for renovations is displayed as 8% of the budget on the official website. Please check the official site for the current status of applications.
Note on subsidies: Please pay attention to the “order of procedures”!
The Tokyo solar power and storage battery subsidy requires prior application. For storage batteries applied for after October 1, 2026, only products registered with the national SII will be eligible, and the requirements for equipment will change. The subsidy in Kiyose City is a post-application system where applications are made after installation, and the details for the 2026 fiscal year have not been confirmed on the city’s official page. Eligibility conditions, application procedures, and the possibility of combining with other systems vary by program, and applying does not guarantee funding, so please confirm before contracting or starting work.
Kakeru Koumuten will provide guidance on eligibility and application periods for each program after confirming the details.

National Subsidy “DR Home Storage Battery Project (Support Project for the Introduction of Home Storage Systems for DR Resource Implementation)”

The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.

This program targets those who are introducing new registered storage systems that can be utilized for demand response (DR). In the 2025 fiscal year supplementary budget, the subsidy amount was determined based on a standard amount of 34,500 JPY per 1 kWh of initial effective capacity, with a subsidy rate of up to 30% and a maximum of 600,000 JPY per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.

However, the supplementary budget for the 2025 fiscal year reached the budget limit on May 29, 2026, and the public recruitment has ended. The official site also states that there are no plans to reopen public recruitment, and applications are currently not possible. Please check the official site for future public recruitment.

Additionally, there are currently no subsidies confirmed for the installation of solar panels on existing homes.
👉 Here is the official site for the DR Home Storage Battery Project

Tokyo “Promotion Project for the Introduction of Solar Power Generation in Homes”

This subsidy is for those installing unused solar power generation systems in residential homes within Tokyo. The simultaneous installation of storage batteries is not a requirement.

◎Subsidy Amount◎
● Existing homes: For systems under 3.75 kW, 150,000 JPY per kW (maximum 450,000 JPY); for systems over 3.75 kW and under 50 kW, 120,000 JPY per kW.
● New homes: For systems under 3.6 kW, 120,000 JPY per kW (maximum 360,000 JPY); for systems over 3.6 kW and under 50 kW, 100,000 JPY per kW.
● Additional amounts are available for the installation of rooftop frames and waterproofing work.

The target is for unused panels that have obtained JET certification and are installed in residential homes in Tokyo with an output of less than 50 kW for use in living areas. The process involves making a prior application and then applying for the grant after installation. From the 2026 fiscal year’s prior application, submission of a certificate issued by a financial institution will be mandatory at the time of performance reporting.

The official page of Tokyo states that prior applications have been accepted since May 29, 2026. It will end once the budget is reached, so please check the official page for the current status of applications.
👉 Here is the official page of Tokyo (Cool Network Tokyo)

Tokyo “Home Battery Installation Promotion Project”

This is a subsidy for the installation costs of battery systems aimed at increasing self-consumption of electricity generated by solar power and improving energy independence during emergencies.

◎Subsidy Amount◎
●Battery package: 100,000 JPY per kWh (up to 1,200,000 JPY per household)
●Additional for participating in DR demonstration: 100,000 JPY per unit (150,000 JPY per unit if energy management equipment is installed)
●Expansion of battery units: 60,000 JPY per kWh (up to 720,000 JPY per household)

Eligible applicants are owners of the subsidized equipment (excluding national and local governments), and installation must occur between April 1, 2026, and March 30, 2027. If applying in advance after October 1, 2026, only products registered in the national SII for the fiscal year 2026 will be eligible.

The official Tokyo page states that advance applications have been accepted since May 29, 2026. For detailed information, including conditions for combining with solar power generation, please check the official page.
👉 Click here for the official Tokyo (Cool Net Tokyo) page

Kiyose City “Subsidy for Solar Power Generation Equipment Installation” (Fiscal Year 2024 Content)

This subsidy is for individuals who are registered residents living in the city and have fully paid their resident tax for the previous year (or have received a non-taxable decision) when installing renewable energy and energy-saving equipment for residential use. Applications must be made after the equipment is installed, and submissions must be made in person at the Environmental Division (mail submissions are not accepted).

◎Subsidy Amount (Fiscal Year 2024 Content)◎
●Solar power generation: 30,000 JPY per kW (up to 100,000 JPY)
●Battery: 50,000 JPY
●Home fuel cell: 50,000 JPY

The official Kiyose City page states that applications will close once the budget is reached, regardless of the period. As of October 7, 2026, the details for the fiscal year 2026 have not been confirmed on the official page, so please check with the Kiyose City Environmental Division (042-497-2099) or the official page for the status and timing of implementation.

Conditions for eligible equipment and application methods may change.
👉 Click here for the official Kiyose City page

Solar Panel Installation & Battery Installation Price List

Solar Panel Installation and Storage Battery Installation Menu
⇧Service Menu | For Costs Related to Solar Panel and Storage Battery Installation, Click Here

Solar Panel Removal and Water Heater Removal Service Menu
⇧Service Menu | For Costs Related to Solar Panel Removal and Water Heater Removal, Click Here

Estimate Guidance

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and storage batteries should be confirmed by separating them into “Equipment Costs (Device Costs)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary greatly depending on the installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Storage Battery Capacity (kWh)

The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Storage batteries are compared based on the amount of electricity they can store, represented in kWh (kilowatt-hours).
The amount of kW that can be installed on the roof varies for each house depending on the roof shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams based on blueprints and on-site surveys to present the installation capacity.

On our pricing page, we list solar panels as approximately 800,000 JPY to 1,200,000 JPY for 3 to 5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6 to 10 kW. (These are just estimated amounts and may vary based on factors such as wiring length, scaffold range, existing roofing materials, and panel layout.)
▶ Installation Menu | Costs for Solar Panel Installation and Battery Installation

Items to Confirm in the Estimate (Cost Check)

When comparing estimates, it is common to compare different capacities and equipment. Please check if the following items are clearly stated in each company’s estimate!

1. Solar Panels Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also confirm if it is a type that controls the battery together.
3. Battery Manufacturer, model number, capacity (kWh), range usable during power outages (entire house or specific circuits), installation location.
4. Mounting Frame and Hardware Name of hardware suitable for roofing materials and method of fixing (whether it is a method that drills holes or a method that clamps and fixes).
5. Wiring and Electrical Work Wiring route and length, work around the distribution board, presence of a monitor to check power generation.
6. Roof Reinforcement and Waterproofing Details of waterproofing treatment for fixed parts, whether necessary roof repairs and substrate reinforcements are included.
7. Applications Extent of support included for applications to the power company, feed-in tariff (FIT) certification applications, and subsidy applications.
8. Scaffolding Range and quantity of scaffolding. If it is simultaneous with roofing work or exterior painting, check that the same range and quantity are not counted twice.
9. Removal and Disposal Whether removal of existing solar thermal water heaters or old panels, and disposal costs for waste materials are included.
10. Tax Classification and Warranty Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, details and duration of manufacturer warranty and workmanship warranty.
Tip for Comparison: Compare by aligning “Installation Capacity (kW)” and “Equipment Model Numbers”!
If the capacities differ, both the amount and power generation will change. Kakeru Koumuten Co., Ltd. welcome comparisons of estimates, so if you bring estimates from other companies, we can explain the differences item by item!

Self-Estimate and Profit Simulation for Solar Power Generation

Self-estimation and financial simulation for solar power generation

With the simulator above,
you can obtain an estimated quote and a financial simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can get an estimated quote and financial simulation!
*The simulation results are estimates. Actual financial results may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection and replacement.

Customer Feedback

Case Studies of Solar Panel Installations

BEFORE

Metal roof before solar panel installation

AFTER

Roof after solar panel installation

Construction Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh
Base Mounting Hardware Used
 Niigata Manufactured / Aluminum Catch Type Hardware
Fixing Method & Waterproofing Arrangement
 Fixed using catch type hardware to grip the horizontal metal roof (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 *Due to the grant, the actual burden amount is approximately 1,000,000 JPY
 Estimated recovery period for construction costs: about 8 to 9 years (self-consumption)

 *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system.
Construction Period
 Approximately 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that grants are available, and I would like to know how much will be provided.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Kiyose City, Tokyo

There are many solar panel installation contractors available in Kiyose City, Tokyo, and you may be unsure which contractor to choose.

Therefore, when requesting solar panel installation and storage battery installation work, let’s confirm the following 4 points.

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the existence of warranties and aftercare services

● Obtain estimates from multiple contractors (3 companies as a guideline)

● Check if they provide support for subsidy applications

By confirming the above 4 points, you will be able to choose a reliable contractor.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Have knowledge not only about solar panels but also about roofs

Defective installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles caused by insufficient checks of roofs and waterproofing

・Solar panels were installed on a deteriorated roof, resulting in leaks
・Solar panels were installed on a roof with a short lifespan, requiring renovations to detach and reattach the solar panels within a few years
・Misjudged the type of waterproofing and performed incorrect processing, leading to leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.

▶ Go to “Roof Check Before Installing Solar Panels” in this article

Confirm the existence of warranties and aftercare services

When choosing a solar installation contractor, make sure to check for warranties. It’s important to confirm not only the duration of the warranty but also the scope, exclusions, and cost conditions.

While the solar panels and storage batteries come with a manufacturer’s warranty, also check for the existence of a workmanship warranty in case leaks occur after installation!

For contractors that offer workmanship warranties, if leaks occur after installation within the warranty period and conditions, they may cover the repairs under the warranty.

Additionally, some contractors provide aftercare services separate from warranties, so be sure to check if the contractor you are considering has aftercare services.
Since abnormalities or damages on the roof may not be visible, you might not notice them yourself.
By conducting inspections of hidden areas during aftercare maintenance, you can more easily detect abnormalities early and prevent major repairs or failures!

At Kakeru Koumuten Co., Ltd., the installation of solar panels comes with a leak warranty as part of the workmanship warranty. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof remodeling is performed.)
We also conduct aftercare maintenance and send out annual DM!
After confirming the DM, if you wish, we will visit for aftercare maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting the installation of solar panels, let’s obtain estimates from multiple contractors.

Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-sales services may differ.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates,

“Check the estimate items”
“Type of solar panels”
“Warranties and after-sales services”

let’s carefully compare and make a judgment! If the rank of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making judgments based solely on price!

▶ Go to “Breakdown of installation capacity, equipment, and construction costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Check if they provide support for subsidy applications

There may be subsidies available for the installation of solar panels and storage batteries, but if the order of procedures is incorrect or if there are deficiencies in the documents, there is a possibility that they will not be granted.
Since there are systems like the Tokyo subsidy that require prior application, it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the Tokyo subsidy, prior application is required) before proceeding with the construction!

For the Tokyo subsidy, after installation, you will need to submit a grant application and performance report, and it will be granted after review! (The flow of procedures varies by system)

▶ Go to “Subsidies and grants that may be applicable in Kiyose City, Tokyo” in this article

Benefits of Introducing Solar Equipment

The benefits of introducing solar panels are the following 5 points!

Benefit 1: Economic Benefits

Household Budget Illustration

The biggest advantage of introducing solar panels is the economic benefit!
The selling price of electricity has decreased compared to 10 years ago, but by consuming the generated electricity, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity costs rise, the ability to cover your power consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!

Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the 5th year, it is likely to be more advantageous to use it at home (self-consume) rather than selling it, so combining it with a storage battery is also an option.
👉 Ministry of Economy, Trade and Industry | For purchase prices and periods, click here

Advantage 2 Subsidies can be utilized!

Illustration of a person happy to reduce costs

Subsidy conditions and amounts vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
Reducing the actual burden amount through subsidies is a significant advantage!
In Kiyose City, there is a possibility of being eligible for the programs from the national government, Tokyo, and Kiyose City. The subsidy application in Kiyose City is a post-application after installation, but the details for the Reiwa 8 fiscal year have not been confirmed on the official page (please check the application status for each program).

Advantage 3 Environmentally friendly!

Environmentally friendly solar power illustration

Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly power generation method (however, devices like power conditioners may have operational noise).

Advantage 4 Heat insulation effects are expected!!

Illustration of heat insulation by solar panels

By installing on the roof or rooftop, the panels block direct sunlight to the roof.
Especially in summer, it can help reduce the temperature of the roof, providing expected heat insulation effects!
(This does not improve the insulation performance of the building itself)

Benefit 5 Electricity can be used even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it is possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capability, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Illustration of a person explaining points to note

Point 1 Maintenance costs can be incurred

A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof remodeling after 10 to 20 years, there will be costs for removing and reinstalling the solar panels.
If the existing roof is deteriorating, it is reassuring to remodel it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.

It would be reassuring to consider maintenance costs in simulations before introducing solar panels!

Point 2 The risk of leaks may increase depending on the roofing material

The fixing methods for slate roofs and tile roofs vary by construction method, but in methods that fix hardware with screws to the roofing material or substrate, waterproofing of the fixed parts is crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, replacing the roofing material with a metal roof and fixing the solar panels using the catch method is also an option. (The catch method has compatibility conditions between the roofing material and hardware, and it cannot be used with all metal roofs)

Catch-type base metal fittings for horizontal metal roofsCatch-type base metal fittings for horizontal metal roofs

Note 3: The roof will become heavier

Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load capacity, switching to a lighter roof may also be an option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

Choosing Method 1: Compare by Total Output of the Roof

When installing solar panels on the roof, it is important to know how much power can be generated in a limited area, and the more power generated, the better!

Solar panels come in various sizes depending on the manufacturer, and their outputs differ.
A panel with an output of 350W and a panel with an output of 400W may seem that the higher output panel is better at first glance.
However, if the size of the panel does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” resulting in different numbers of panels that can be installed on the same roof due to size differences.

400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation (kWh) will vary depending on conditions such as roof orientation, slope, and shading.

Choosing Method 2: Compare by Degradation Rate of Solar Panels

Solar panels have a degradation rate, and their output gradually decreases over 10 or 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation itself.
Choosing solar panels by considering the degradation rate as well as initial output will help you avoid regrets!

Choosing Method 3: Compare by Warranty Period

There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
For output warranties, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies widely!
It’s always better to have a longer warranty, so let’s check the warranty periods and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar Power and Storage Battery Installation in Kiyose City, Tokyo

We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Kiyose City, Tokyo. (Tap to open the answers)

How much does it cost to install solar panels and storage batteries in Kiyose City, Tokyo?

The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

Guidelines for different capacities are available on the solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!

Are there any subsidies available for solar power and storage battery installation in Kiyose City, Tokyo?

As of October 7, 2026, Tokyo’s “Household Solar Power Generation Promotion Project” (for existing homes, 15,000 yen per kW for up to 3.75 kW, with a maximum of 450,000 yen) and “Household Storage Battery Promotion Project” (100,000 yen per kWh, with a maximum of 1.2 million yen per household) are accepting pre-applications starting May 29, 2026, as listed on the official Tokyo (Cool Net Tokyo) page. Kiyose City had a subsidy for solar power equipment installation (in fiscal year 2026, 30,000 yen per kW for solar power with a maximum of 100,000 yen, and 50,000 yen for storage batteries), but the details for fiscal year 2028 are not confirmed on Kiyose City’s official page. The national DR household storage battery project has ended its public recruitment.

Since the application status may change, please refer to the subsidy and grant section and consult with us before signing a contract.

Can I apply for subsidies after the construction is completed?

This depends on the system. Tokyo’s subsidies require pre-application, while Kiyose City’s grants allow for post-installation applications. Conditions such as whether you can sign a contract or start construction before applying vary by system, so please confirm before signing a contract.

The order of procedures varies by system, so please check before signing a contract or starting construction.

Can solar panels be installed on slate roofs? I’m worried about leaks.

It is possible to install on slate roofs, but it requires checking the condition of the roofing material and substrate. The fixing method varies by construction method, and when fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.

Kakeru Koumuten Co., Ltd. is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation. If deterioration is progressing, we can also suggest methods such as roof overlay (cover method) or complete replacement before installation.

My roof is old. Should I do a roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with durable roofing materials before installation.

Please consult us on how to proceed with the installation after confirming the condition of the roof through a site survey!

Should I install a storage battery together with the solar panels?

If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.

Additionally, the subsidy for storage batteries in Tokyo (for Reiwa 8, it is 100,000 yen per kWh, with a maximum of 1,200,000 yen per household) is a program aimed at increasing self-consumption of electricity generated by solar power. In the past subsidy program in Kiyose City (Reiwa 6), storage batteries were included as eligible (the details for Reiwa 8 have not been confirmed on the official page). You can compare “solar only” and “solar + storage battery” through a financial simulation.

How many kW can I install on my roof? Is it okay for north-facing roofs or roofs with shadows?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram based on the drawings and site survey, and provide you with the installation capacity and power generation simulation.

Kiyose City is located on a plateau that is high in the west and low in the east, with lowlands along the Yanase River. The shape and orientation of the roof, as well as the shadows cast by surrounding buildings, will differ for each house. You can check the expected power generation through the power generation simulation.

How long will the construction take?

For the above construction example (4.3 kW solar panels + storage battery), it took about 3 days. The duration may vary if roofing work is done simultaneously or depending on the shape and installation capacity of the roof.

Additionally, please note that there will be a separate period for applying for subsidies and to the power company, so please consult us early.

What is the current selling price (FIT)?

For residential use (less than 10 kW), the selling price for certifications after October 2025 will be 24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year, and the same price will apply in the 2026 fiscal year.

The idea is to recover initial costs more quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity costs.

Can you handle maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten sends out annual after-maintenance notices via DM and visits customers who request inspections. We can also clean solar panels with a special brush if the power generation decreases due to dirt.

The roof is a place that is difficult to check by yourself, so if you have any concerns, please feel free to consult us.

Can you also handle renovations for roofs that already have solar panels installed?

Yes, we can. Kakeru Koumuten Co., Ltd. can detach and reattach solar panels in-house, allowing us to perform roof overlay (cover method) or re-roofing after temporarily removing the panels, and then reinstall them. The removed panels can be stored in our own warehouse.

For costs, please refer to the solar panel detachment and water heater removal pricing page.

Get a free estimate for solar panels and storage batteries in Kiyose City, Tokyo here

Estimates are completely free. We welcome competitive estimates!

If you are looking for a solar panel installation contractor in Kiyose City, Tokyo, please consult Kakeru Koumuten

Our company handles a wide range of exterior renovations, including solar panel installations, roof work, and exterior wall work in Kiyose City, Tokyo.
We receive requests from many customers, including renovation companies and real estate companies!

Kakeru Koumuten Co., Ltd. promises “high-quality renovations at low costs”, and we have received positive feedback from many customers.
We continue to update our construction performance each year, and we will strive to improve quality to satisfy even more customers in the future.

Our company can perform all exterior renovations, not only roof overlay (cover method) and re-roofing but also partial roof repairs, exterior painting, and exterior wall cover methods.
We are happy to assist with small jobs like partial repairs and rain gutter cleaning!

In urgent cases like leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!

“I want to know recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide optimal solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and propose the best construction plan!

We are confident that we will not be outdone in terms of cost, quality, and organization compared to other companies in exterior work!
We welcome competitive estimates because we are confident!
Estimates are completely free, and if you find our company to be inferior to others, feel free to decline!

Characteristics of Kiyose City, Tokyo and Points of Solar Work

The area of Kiyose City is 10.23 square kilometers, with the highest elevation in the city at 65 meters and the lowest at 20 meters, as stated on the city’s official page. Overall, the area is flat, but it is higher in the west and lower in the east, with alluvial lowlands along the Yanase River in the northern part and loess plateaus in other areas. We have summarized the characteristics of the terrain in Kiyose City, Tokyo, and points to consider when installing solar panels and storage batteries below. (Tap to open)

View the characteristics of Kiyose City, Tokyo, and points for solar construction

■ Plateaus and lowlands, with a west-high and east-low terrain. Check the elevation differences and delivery routes for each site

The city is generally flat, but the terrain slopes down from west to east, and the ground and water flow differ between the lowlands along the river and the plateaus. Even within the same city, the width of the front road and the elevation differences of the sites vary from house to house, so we will confirm the scaffolding setup and delivery routes for panels and storage batteries on-site. At Kakeru Koumuten, our own scaffolding team plans the scaffolding according to the site, creates layout diagrams from blueprints and on-site surveys, and you can check the power generation simulation.

■ Check the flood and internal water hazard maps for the five rivers. Pay attention to the installation locations of equipment

Kiyose City’s flood hazard map is created based on the five rivers: Kurome River, Ochiai River, Yanase River, Sorihori River, and Narahashi River, considering the maximum possible rainfall (maximum hourly rainfall of 156 millimeters and total daily rainfall of 657 millimeters). Internal flooding (flooding caused by rain exceeding the drainage capacity of the sewer system) and the locations of ten landslide hazard areas and special caution areas in the city are also included in the same disaster prevention map. The impact of power conditioners and storage batteries, separate from the panels on the roof, may vary depending on where they are installed indoors or outdoors during flooding. Please check the assumptions for your residence on the city’s map and consult with us about the installation location and height in accordance with the manufacturer’s installation conditions.

■ The types of roofs and their ages vary from house to house. Check the roof and waterproofing before installation

Even within the same city, the types of roofs, their ages, and the shapes of the sites vary from house to house. The capacity and fixing methods that can be installed change depending on the shape and orientation of the roof and the materials used. At Kakeru Koumuten, we will check the type and condition of the roof and the situation of the site before installation, and propose fixing methods, waterproofing arrangements, and scaffolding plans.

■ The annual sunshine hours at the Tokyo Observatory are about 1,927 hours

According to the Japan Meteorological Agency’s average values (1991–2020), the annual sunshine hours at the Tokyo Observatory are about 1,927 hours, with January (about 193 hours) being the most and June during the rainy season (about 124 hours) being the least. (This is a reference value, not an observation value within Kiyose City.)
The power generation in Kiyose City can also be affected by the shadows of surrounding buildings and trees, so conducting an annual power generation simulation and selecting the capacity of storage batteries to match the times of high electricity usage are key points.

Our company handles many exterior construction and solar construction projects in Kiyose City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!

Service Area in Kiyose City, Tokyo

Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.

List of Areas in Kiyose City, Tokyo

Kiyose City Asahigaoka / Kiyose City Umezono / Kiyose City Kamikiyoto / Kiyose City Shimoyado / Kiyose City Shimokiyoto / Kiyose City Takeoka / Kiyose City Nakakiyoto / Kiyose City Nakazato / Kiyose City Noshiro / Kiyose City Matsuyama / Kiyose City Motomachi

We welcome inquiries via LINE as well◎

LINE

LINE

We are also updating our Instagram regularly◎ Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!