Leave the repairs and renovations of condominiums and apartments in Shibuya, Tokyo to Kakeru Koumuten Co., Ltd.!
Large-Scale Repairs for Condominiums, Apartments, and Buildings in Shibuya, Tokyo
To owners, management associations, and management companies considering large-scale repairs for condominiums, apartments, and buildings in Shibuya, Tokyo.
Kakeru Koumuten Co., Ltd. is a company that handles everything from the installation of temporary scaffolding, substrate repairs, exterior painting, tile repairs, sealing, waterproofing for rooftops and balconies, to roofing work, all managed and performed by our own team. We have undertaken numerous large-scale repairs and exterior renovations for apartments, condominiums, and commercial facilities in Shibuya.
- On-site surveys and estimates are completely free (we welcome competitive estimates)
- All management from temporary scaffolding to exterior and roofing work is handled in-house
- Our own scaffolding team handles sites in Shibuya, from condominiums to apartments
- Consultations for partial repairs or emergency measures for leaks are also possible
- Estimated Costs / For condominiums, the cost is approximately 750,000 to 1,500,000 yen per unit (about 70% fall within this range according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, with the most common range being 1,000,000 to 1,250,000 yen. This amount excludes consumption tax and common temporary costs). For wooden apartments, the estimate is 2,000,000 to 4,000,000 yen per building.
- Estimated Cycle / 12 to 15 years. However, the determining factor is not the number of years but the condition of deterioration.
- Particularly Relevant in Shibuya / Approximately 80% of residences are multi-family dwellings (according to the 2018 Housing and Land Statistics Survey, 86.1%), with 778 non-wooden multi-family dwellings built before the earthquake resistance standards in the district (according to district materials from 2016). The terrain, with the Shibuya River valley and plateau intermingling, necessitates confirming flooding assumptions for slopes, steps, and valleys. In densely built wooden areas and narrow roads, transport routes and scaffolding plans are essential. Additionally, if the color changes for exterior walls exceed a certain scale, it will require notification under the landscape plan.
- Available Funds / While we have not confirmed subsidies specifically for construction costs, if requirements are met, there is a half reduction special provision for fixed asset tax (Tokyo’s 23 wards are subject to metropolitan tax. Construction must be completed by March 31, 2027, and declared within three months after completion), Shibuya’s dispatch of condominium management specialists (free), and subsidies for creating long-term repair plans (half, with a cap of 200,000 yen), as well as national and Tokyo metropolitan subsidies if windows and insulation are included, and interest subsidies from Tokyo (applications for the second phase of fiscal year 2026 are accepted until February 19, 2027), and public financing may be available.
- Tips for Success / At least three competitive estimates. Compare not only the amounts but also the quantities, methods, and materials.
Large-scale repair work available in Shibuya, Tokyo
Large-scale repairs are not just “exterior painting” or “waterproofing,” but a comprehensive repair of the entire building while scaffolding is in place. At Kakeru Koumuten, we can handle all of the following work in-house, ensuring clear responsibility and coordination of the process.
| Type of Work | Main Details |
|---|---|
| Temporary Scaffolding Work | Installed by our own scaffolding team using our own scaffolding materials. We handle mesh sheets, protection, and fall prevention measures. |
| Substrate Repair Work | Crack repairs, injection of floating mortar and tiles, explosion (exposed rebar) repairs, resin mortar repairs for missing parts. |
| Exterior Wall Painting Work | High-pressure washing, three coats of paint from primer to topcoat, painting of auxiliary parts (iron parts, gutters, water cut-offs, etc.). We accommodate radical control type, fluorine, and inorganic paints. |
| Tile Repair Work | Replacement of broken tiles, joint repairs, clear waterproofing of tile surfaces (such as Seven S). |
| Sealing Work | Re-sealing around sashes and exterior wall joints, additional sealing. |
| Waterproofing Work | Urethane waterproofing for rooftops, roof balconies, shared corridors, and stairs, PVC sheet waterproofing, and installation of long sheets. |
| Roof Work | Roof painting, roof overlay (cover method), re-roofing, and ridge cap replacement. We have sheet metal craftsmen on staff and can handle large roofs such as factories. |
| Iron and Hardware Work | Surface painting of steel stairs, handrails, and PS doors, replacement of coping and water cut-offs. |
| Drainage and Wastewater Work | Cleaning and renovation of roof drains (inserting renovation drains), resolving gutter clogs. Drainage issues can cause puddles and leaks, making this work particularly important for buildings with rooftops. |
| Others | Replacement of rain gutters, rooftop and exterior wall inspections using drones, leak investigations using thermography, and preliminary investigations of asbestos-containing materials. |
Scope of Major Repairs Determined by Building Diagnosis
It is not always necessary to carry out all of the above works. The extent of the work will be determined based on the results of the building diagnosis. At Kakeru Koumuten, we conduct a free on-site survey to confirm the following and compile a deterioration diagnosis report with photos, after which we will propose the scope of work.
| Diagnosis Area | Main Investigation Method | Scope of Work Determined by Diagnosis Results |
|---|---|---|
| Exterior Wall (Painted Surface) | Visual inspection, checking the width of cracks and the condition of the paint film | Method and quantity of crack repairs, specifications for painting (whether repainting or painting after removing the existing paint film) |
| Exterior Wall (Tile Surface) | Sounding investigation. High areas checked with a drone | Scope and estimated quantity for injection and replacement, whether clear waterproofing is necessary |
| Sealing | Checking for cracks, shrinkage, peeling, and hardening | Whether to replace or add to the existing seal, scope of joints to be worked on |
| Rooftop, Balcony, Common Corridor | Checking for blisters or breaks in the waterproof layer, puddles, and the condition of drains | Full renovation or partial repair, method (urethane waterproofing, PVC sheet waterproofing, long sheet), whether drain renovation is necessary |
| Leak Areas | Investigation using thermal imaging camera and drone | Identification of the cause and priority areas for repair |
| Metal Parts, Roof, Accessories | Checking for rust, corrosion, lifting, and cracking | Whether painting is sufficient or if material replacement or overlay installation is necessary |
| Site and Surroundings | Checking retaining walls, slopes, trees, access routes, and parking | Planning for scaffolding and the scope of temporary work |
Reasons Kakeru Koumuten is Chosen for Large-Scale Renovations in Shibuya, Tokyo
The reason why we can be entrusted with large-scale renovations in Shibuya Ward is that we have “initiatives that other companies cannot imitate in large-scale renovation work”, which has received high praise from many customers.
1. Equipment Specialized for Exterior Renovations
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality exterior wall painting and waterproofing work for large-scale renovations. We have established five bases centered around Yokohama City for material storage and showrooms.
In-house Scaffolding Materials
We own the scaffolding materials necessary for temporary scaffolding required for large-scale renovations and can assemble the scaffolding ourselves.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can cut costs related to scaffolding work and provide quick and flexible responses.
We have approximately enough scaffolding materials for 100 single-family homes!
Storage of Materials in Our Large Warehouse
We store paints and substrate repair materials used for exterior renovations. By ordering a large quantity of materials at once, we can purchase materials at a lower cost! Additionally, we always have stock available, allowing us to provide swift responses in emergencies!
In-house Waste Separation
In large-scale renovations, various waste materials such as leftover paint, metal, and wood are generated. Kakeru Koumuten reduces waste disposal costs by sorting and recycling waste materials in-house.
Showroom Dedicated to Exterior Renovations

In the showroom, you can not only have meetings, but also check actual samples and colors of exterior materials. Color simulations for exterior wall painting and heat insulation tests using heat insulation testing equipment are also available!
2. Cost Reduction through In-House Management and Construction
One of Kakeru Koumuten’s major strengths is in-house management and construction.
By managing everything from inquiries to project completion in a unified system, we can keep costs down and provide high-quality large-scale repairs. Additionally, one representative will handle everything from the estimate to project completion. Since the person in charge does not change, whether it’s sales or construction management, smooth communication is possible.
We can handle everything from temporary scaffolding installation to exterior wall painting, substrate repair, waterproofing work, and tile repairs with complete in-house construction! Those with specialized knowledge and experience conduct inspections and actual construction for each process!
3. Obtaining Various Permits and Skilled Workers
We have obtained construction industry permits and permits for industrial waste collection and transportation! We also have nationally certified sheet metal and painting skilled workers, and we are confident in our construction techniques. We can also handle large-scale roofing work for factories and other facilities! We have qualified personnel for asbestos work supervisors and building materials containing asbestos inspectors, so we can handle materials containing asbestos and conduct preliminary surveys.
4. Warranty and Aftercare

Most large-scale repair works, including “painting work,” “substrate repair work,” and “waterproofing work,” come with a warranty!
Aftercare maintenance is available every year, and we send out notification DM annually.
5. Flexible and Prompt Response
Our company is equipped to handle various troubles and situations related to apartments and condominiums.
We can also address exterior walls and rooftops that cannot be checked from high places using drones! During rain leak investigations, we can use a thermal imaging camera to help identify the cause of leaks!
We will respond according to your wishes. We also accept emergency measures for sudden rain leaks! We will respond quickly to urgent requests or emergencies!
6. Human Resource Development
Our staff create various models for skill improvement and conduct practical training. Since various processing and techniques are required at the site, we regularly provide skill enhancement education to ensure each staff member can respond appropriately. We also educate on points to be careful about and areas to check during each stage of large-scale repair work.
7. Consideration for Residents and Neighbors

During large-scale renovation work, we will not only notify residents and greet nearby residents, but also install a bulletin board at the entrance to display the construction schedule and notices! Additionally, we will thoroughly educate entrants on proper manners to minimize any inconvenience to residents and neighbors.
8. Strict Quality Control

Each process will be inspected by a responsible person, and detailed construction photos will be taken. We will use film thickness inspection machines and check sheets to ensure that there are no oversights in the inspections. During exterior wall painting and waterproofing work, we will check the number of used paint cans to confirm that the specified amount of paint is being used, and by ordering paint in-house, we will prevent construction defects. Of course, we will also take photos of the used paint and report them.
9. Exterior Wall Painting Color Simulation
9-1 Self Color Simulation

The simulations we create can be done using actual photos of your apartment or building!Simulations can also be done on your smartphone or computer. By simulating and then applying a two-tone color or changing the image, we hope to enhance the stylish appearance and contribute to increased occupancy rates! Of course, we can also arrange paint samples for actual color confirmation.
* In Shibuya Ward, the entire area is subject to landscape planning, and changes in the color of exterior walls and other elements exceeding a certain scale will require notification under the landscape plan (the applicable scale varies by district). When deciding on colors, it is also necessary to check for the existence of district plans. Having a color simulation screen will help facilitate smooth explanations to the general meeting, neighbors, owners, and residents.
9-2 Confirm the actual color with a test paint!
You can order samples of the paint you are considering and conduct test painting on your exterior walls. By performing a test paint, you can confirm the actual color and gloss!
9-3 Exterior Renovation Simulation
Exterior simulations for apartments and condominiums are also possible!
・Exterior wall color simulation (two-tone colors are also possible)
・Simulation for applying metal siding
・Simulation using accent materials such as cornices and louvers
・Simulation for roof painting and roof replacement work
With the exterior renovation simulation, you can minimize the risk of failure in image change! We hope that renovating the appearance of your apartment or condominium will help increase occupancy rates.
Cost Estimates for Major Repairs in Shibuya Ward, Tokyo
The cost of major repairs varies significantly depending on the size of the building, its deterioration status, the scope of work, and the materials used. First, refer to the national average based on public statistics, then to our company’s estimates based on construction results by scale, and finally to unit price examples for each project.
The national average for condominiums is 750,000 to 1,500,000 yen per unit
According to a survey conducted by the Ministry of Land, Infrastructure, Transport and Tourism, which compiled 818 construction cases (FY 2021), approximately 70% of the costs for major repairs are concentrated in the range of 750,000 to 1,500,000 yen per unit, with the most common price range being 1,000,000 to 1,250,000 yen. Note that the amounts in this survey do not include consumption tax and common temporary costs, so they differ from the current total construction costs including tax.
| Construction Cost per Unit | Percentage | Construction Cost per Unit | Percentage |
|---|---|---|---|
| Up to 750,000 JPY | 15.1% | 1,250,000 to 1,500,000 JPY | 17.4% |
| 750,000 to 1,000,000 JPY | 24.7% | 1,500,000 to 2,000,000 JPY | 9.1% |
| 1,000,000 to 1,250,000 JPY | 27.0% (most common) | Over 2,000,000 JPY | 2.8% |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (200 companies, 818 cases) *Amounts do not include consumption tax or common temporary costs. Percentages may not total 100% due to rounding and non-responses.
Breakdown of Construction Costs (What the Money is Spent On)
| Category | Composition Ratio | Main Contents |
|---|---|---|
| Construction-related Work | 60.3% | About half for exterior walls, about one-third for waterproofing. Substrate repairs, tiles, painting, waterproofing |
| Temporary Work | 22.8% | Scaffolding, mesh sheets, protective coverings, etc. (does not include common temporary costs) |
| Miscellaneous Expenses | 10.3% | Site management fees, general management fees, statutory welfare expenses, etc. (9.5%), insurance premiums for large-scale renovation defect insurance (0.8%) |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (Second survey of large-scale renovation work. Overall average is construction-related 59.0%, temporary 22.3%, miscellaneous expenses 9.9%). *The total does not equal 100% because it includes equipment-related work, exterior structures, and others. This is an average value and not a criterion for judging the appropriateness of individual estimates.
Cost Estimates by Building Size (Scaffolding, Substrate Repairs, Exterior Wall Painting, Waterproofing, Sealing Set)
| Type and Scale of Building | Estimated Cost | Estimated Duration |
|---|---|---|
| Wooden Apartment (2 stories, 6-10 units) | 2,000,000 – 4,000,000 JPY | 3 – 5 weeks |
| Steel Frame/RC Apartment (3 stories, 10-20 units) | 4,000,000 – 9,000,000 JPY | 1 – 2 months |
| Mixed-Use Building/Small Apartment (4-5 stories) | 5,000,000 – 15,000,000 JPY | 1.5 – 3 months |
| Medium-Sized Apartment (30-50 units) | 20,000,000 – 50,000,000 JPY | 3 – 5 months |
| Large Apartment (100 units or more) | Around 100,000,000 JPY or more | 6 months or more |
*The above estimates are based on Kakeru Koumuten’s construction records and may vary depending on the presence of roofing work, steel work, plumbing, etc. For apartments, please also use the amount calculated by multiplying the national statistics (750,000 – 1,500,000 JPY per unit) by the number of units as a reference.
Breakdown of Costs for Temporary Works, Substrate Repairs, Exterior Walls, and Waterproofing
The estimate for large-scale repairs is broadly divided into “Temporary Works,” “Substrate Repairs,” “Sealing,” “Exterior Painting,” “Waterproofing,” and “Miscellaneous Expenses.” Before comparing total amounts, please check what each item includes, how much, and at what cost.
| Item | What to Check in the Estimate |
|---|---|
| Building Prerequisites | Structure (wooden, steel frame, RC), number of stories, number of units, exterior wall area, and waterproofing area. Also confirm whether the area is based on drawings or actual measurements. |
| Common Temporary Works and Scaffolding | Area and unit price of scaffolding, mesh sheets, protective measures, temporary toilets, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the 3rd year of Reiwa, temporary works such as scaffolding account for about 20% of construction costs (excluding common temporary costs). |
| Substrate Repairs | Quantities and unit prices for repair methods such as cracks, bulging, and spalling. Since these items are not confirmed until scaffolding is erected, please check whether the quantities are estimated or settled based on actual numbers, and the settlement method if quantities increase or decrease. |
| Sealing | Whether it is a replacement or additional sealing, length of work (m), and material name. |
| Exterior Painting | Painting area (㎡), manufacturer name, product name, grade of paint, number of coats, and scope of ancillary parts. |
| Waterproofing | Area for each part such as rooftop, balcony, and common corridor, construction method, material name, and whether drain repairs are included. |
| Inspection and Reporting | Inspections for each phase, construction photos, and whether a completion report and warranty are included. |
| Miscellaneous Expenses | Details and proportions of site management costs, general management costs, and statutory welfare costs. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the 3rd year of Reiwa, these average about 10% of construction costs, but vary based on the scale and conditions of the building, so there is no uniform standard. |
| Tax Classification | Whether the amounts are tax-inclusive or tax-exclusive. Since companies display this differently, be sure to standardize before comparing total amounts. |
Examples of Unit Prices for Repair Work
| Repair Method | Materials Used | Cost |
|---|---|---|
| Tile Replacement | Existing Similar Tiles | per piece / 2,000 JPY〜4,000 JPY |
| Repair of Tile and Mortar Lifting Areas | Epoxy Resin Injection | per square meter / 3,000 JPY〜5,000 JPY (Varies depending on the degree) |
| Tile Joint Mortar Repair | Mortar for Tile Joints | per square meter / 1,000 JPY〜2,000 JPY (Varies depending on the degree) |
| Repair of Concrete Spalling Areas | Rust Prevention for Rebar + Resin Mortar | per area / 1,000 JPY〜2,000 JPY (Varies depending on the degree) |
| Crack Repair | Filler or Polymer Cement | per meter / 100 JPY〜2,500 JPY (Varies depending on the degree) |
| Exterior Wall Painting (3 Coats) | Radical Control Silicone Paint | per square meter / 2,500 JPY〜3,500 JPY |
| Roof Top Urethane Waterproofing (Ventilated Buffer Method) | High Strength Urethane | per square meter / 6,500 JPY〜9,500 JPY |
| Seal Replacement | Modified Silicone | per meter / 900 JPY〜1,500 JPY |
| Temporary Scaffolding | In-house Owned Scaffolding Materials (Wedge Type) | per square meter / 700 JPY〜1,000 JPY |
*Costs and warranty periods vary based on shape, quantity, substrate condition, and type of materials. If you would like a detailed estimate, please feel free to contact us. Estimates are completely free.
Select Paint and Waterproofing Grades Based on “Years Until Next Repair”
“Good paint does not equal the right choice.” The best way to choose is to align when the next major repair will be with the lifespan of the materials, minimizing waste.
| Grade | Estimated Lifespan | Suitable Cases |
|---|---|---|
| Silicone / Radical Control Type | 10-16 years | Buildings that are cycled every 12-15 years. A good balance of cost and performance. The lifespan varies by product, so choose specifications that match the cycle. |
| Fluorine | 16-20 years | Buildings that want to set the next repair after 15 years, high-rise or complex-shaped buildings where scaffolding costs are high. |
| Inorganic | 18-22 years | Buildings that want to suppress dirt adhesion. Effective for suppressing moss and algae on the north side or poorly sunlit areas. |
| Urethane Waterproofing (Rooftop) | 8-15 years | Complex-shaped rooftops, when wanting to renovate while utilizing the existing waterproof layer. Mid-term inspections and repairs, such as re-coating the top coat, are prerequisites. |
| PVC Sheet Waterproofing | 20-25 years | Rooftops with a large area and simple shape. Short construction time. |
| Asphalt Waterproofing | 15-20 years | Rooftops planned for long cycles. The cost per instance increases. |
* The estimated lifespan is a general guideline and may vary depending on sunlight, location, and substrate condition. Choosing paints with anti-algae and anti-mold properties can improve durability in shaded and humid areas.
Guidelines for Repair Reserve Funds and Options When Insufficient
The Ministry of Land, Infrastructure, Transport and Tourism guidelines indicate the estimated repair reserve fund on a monthly basis per exclusive area. Additional charges are necessary if there is a mechanical parking lot.
| Building Size (Less than 20 Floors) | Monthly Estimate (Average) | Range Covering Two-Thirds of Cases | Conversion for 70㎡ |
|---|---|---|---|
| Building Floor Area Less than 5,000㎡ | 335 JPY/㎡ | 235-430 JPY/㎡ | Approximately 16,500-30,100 JPY |
| 5,000-10,000㎡ | 252 JPY/㎡ | 170-320 JPY/㎡ | Approximately 11,900-22,400 JPY |
| 10,000-20,000㎡ | 271 JPY/㎡ | 200-330 JPY/㎡ | Approximately 14,000-23,100 JPY |
| 20,000㎡ or More | 255 JPY/㎡ | 190-325 JPY/㎡ | Approximately 13,300-22,750 JPY |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines on Repair Reserve Funds for Condominiums” (Reiwa 6, June Revision, PDF) / National average is 13,378 JPY per unit per month (Reiwa 5 Fiscal Year Comprehensive Survey on Condominiums)
In the Reiwa 5 Fiscal Year Comprehensive Survey on Condominiums, 36.6% of management associations responded that “the repair reserve fund is insufficient compared to the plan.” There are four main options when there is a shortfall.
| Options | Considerations and Cautions |
|---|---|
| ① Adjusting the Construction Schedule | Based on deterioration diagnosis, postpone less urgent construction to the next time. However, it is essential to distinguish between construction that can be postponed and that which cannot, as delaying waterproofing and tile detachment measures will ultimately be more costly. |
| ② Reviewing the Scope and Specifications of Work | Reviewing paint grades, changing from full renovation to partial renovation, etc. Please consider this separately from “apparent reductions” that skip processes. |
| ③ Utilizing Subsidies and Tax Systems | Subsidies for energy-saving renovations, etc. (described later). The reduction of fixed property tax is a system that lowers the tax amount for each individual owner, and does not directly increase the repair funds of the management association. |
| ④ Increasing Reserve Funds, Borrowing, and One-Time Payments | In addition to considering increasing the repair reserve fund at the general meeting, the Housing Finance Agency’s condominium common area renovation loan requires no collateral. Interest rates can be lowered by obtaining management plan certification. |
Subsidies, Tax Systems, and Loans to Check for Large-Scale Renovations in Shibuya, Tokyo
On the official website of Shibuya City and Tokyo, there is no confirmed system that subsidizes the construction costs of general exterior painting or waterproofing for large-scale renovations of condominiums and apartments. Shibuya City’s “Housing Simple Renovation Support Project” targets individuals living in the area, and the common areas of collective housing are generally excluded. The main types available are broadly categorized into five. The eligibility and application status of the system may change even during the fiscal year, so be sure to check with our company or each contact point before contracting or starting work. (As of October 9, 2026)
| Type | Details |
|---|---|
| ① Tax Incentives | Reduction of property tax under the condominium longevity promotion tax system (In the 23 wards of Tokyo, property tax is a metropolitan tax, and the reduction rate is 50%. Applications must be submitted to the metropolitan tax office within three months after the completion of the work.) |
| ② Management Plan Certification System | A certification system that serves as an entry point for tax incentives and lower loan interest rates. For condominiums in Shibuya Ward, the contact point is Shibuya Ward (Housing Policy Division, Living Environment Improvement Section). |
| ③ Consultation and Survey Costs for Condominium Management | Dispatch of condominium management consultants in Shibuya Ward (free), and subsidies for creating long-term repair plans. This does not include subsidies for large-scale repair construction costs. |
| ④ Construction Subsidies by Purpose | Energy conservation (windows, insulation), earthquake resistance, greening, etc. Check and use items from national, Tokyo, and Shibuya Ward projects that can be incorporated into large-scale repairs. |
| ⑤ Loans and Interest Subsidies | Loans for the renovation of common areas of condominiums from the Japan Housing Finance Agency, and interest subsidies from Tokyo (subsidies for condominium improvement work). |
① Condominium Longevity Promotion Tax System (Property Tax Reduction)
If large-scale repairs (such as exterior wall painting, floor waterproofing, and roof waterproofing) that contribute to the longevity of certain qualifying condominiums are conducted as a single project, the property tax amount for the following fiscal year will be reduced (up to 100 square meters per unit; urban planning tax is not included). The reduction rate is determined by local ordinances. In the 23 wards of Tokyo, property tax is a metropolitan tax, and according to the Tokyo Metropolitan Bureau of Taxation, the property tax amount for the fiscal year following the year of completion will be reduced by 50%.
| Main Requirements of the National System | For buildings over 20 years old and with a total of 10 or more units, the floor area of the residential exclusive part must be more than half of the total exclusive area / At least one instance of exterior wall painting, floor waterproofing, and roof waterproofing must have been completed in the past / The condominium must have received management plan certification, and the amount of the repair reserve fund (average amount for the entire planning period) must have been raised from below the certification standard to above the standard after September 1, 2021, or the management association must have received administrative advice and guidance based on the Condominium Management Improvement Act, resulting in the long-term repair plan meeting national standards. |
|---|---|
| Implementation Deadline of the National System | From April 1, 2023, to March 31, 2027 (the Tokyo Metropolitan Tax Office’s notice indicates the same period). |
| Treatment in Tokyo (Shibuya Ward) | The reduction rate is 50%. The declaration deadline is within 3 months from the completion date of the work, and the declaration should be made at the metropolitan tax office located at the property. The metropolitan tax office in Shibuya is the Shibuya Metropolitan Tax Office (4-3-15 Sendagaya, Shibuya Ward, Tokyo, Phone: 03-5422-8780. The property tax division is on the 5th floor). Please check the jurisdiction area for property tax (buildings) with the Tokyo Metropolitan Tax Office’s notice. Declarations can also be made via eLTAX, and if the administrator compiles and submits the documents, it can replace the declarations of each owner. |
| Main Submission Documents | Property tax reduction declaration form, certificate of large-scale repairs (issued by an architect or housing defect liability insurance corporation), proof of past work (issued by an architect or condominium management specialist). For certified management plan condominiums, a copy of the certification notification (change certification notification) and a certificate of repair reserve fund increase are required, and for condominiums that have received administrative advice and guidance, a certificate of implementation of the advice and guidance is necessary. Additional documents may be requested. |
| Points to Note | Obtaining management plan certification and reviewing the long-term repair plan takes time, so it is recommended to prepare at least one year before the construction. The property tax reduction for seismic, barrier-free, and energy-saving renovations cannot be used in the same fiscal year. The treatment after April 2027 has not been confirmed on the official page. |
- Tokyo Metropolitan Bureau of Taxation: Condominium Long-Term Life Promotion Tax System (Reduction of Fixed Asset Tax) (Official)
- Tokyo Metropolitan Bureau of Taxation: Shibuya Tax Office (Official)
- Ministry of Land, Infrastructure, Transport and Tourism: Condominium Long-Term Life Promotion Tax System (Official)
- Ministry of Land, Infrastructure, Transport and Tourism: Reductions in Fixed Asset Tax for Large-Scale Repairs of Condominiums (PDF)
- Ministry of Land, Infrastructure, Transport and Tourism: Is Your Condominium Being Regularly Maintained? (PDF)
② Management Plan Certification System (Entry for Tax and Interest Rate Benefits)
Receiving certification leads to interest rate benefits for loans and bonds from the Japan Housing Finance Agency, and fulfills one of the requirements for the Long-Term Life Promotion Tax System (certification alone does not guarantee tax reduction). The certification by Tokyo Metropolitan Government is conducted in rural areas, while condominiums in the 23 wards are certified through each ward’s certification window. The main criteria include holding meetings at least once a year, establishing management regulations, separate accounting for management fees and repair reserves, having overdue repair reserves of three months or less within 10% of the total, and “creating and reviewing a long-term repair plan that includes two or more large-scale repair works within 30 years and within 7 years”, among others.
| Application Process | The window for Shibuya Ward is the Housing Policy Division, Living Environment Improvement Section. According to the ward’s guidance, applications should be made through the procedure support service of the Public Interest Incorporated Foundation Condominium Management Center (preliminary confirmation), and direct applications to the ward are not accepted except for change certifications. Prior consultation with the ward is required. The application fee for the ward will be free from April 1, Reiwa 8, but fees for the procedure support service and examination fees will apply separately. Please check the ward’s page for the latest procedures. |
|---|---|
| Notification System and Promotion Plan | The Tokyo Metropolitan Condominium Management Notification System targets condominiums with six or more units built before December 31, 1983, and submissions are made to the Housing Policy Division, Living Environment Improvement Section of Shibuya Ward. Information on the Shibuya Ward Condominium Management Proper Promotion Plan is available on the opinion publication procedure page (published April 1, Reiwa 8), but the timing for formulation and implementation could not be confirmed on the ward’s page. |
| Consultation Window | Shibuya Ward Housing Policy Division, Living Environment Improvement Section 03-3463-3548 / Comprehensive Consultation Window for Condominiums (Tokyo Disaster Prevention and Building City Planning Center) 03-6427-4900 (Weekdays 9 AM – 5 PM) |
③ Consultation and Subsidy for Investigation Costs for Condominium Management (Shibuya Ward)
The official website of Shibuya Ward offers free dispatch of condominium management consultants and subsidies for creating long-term repair plans. You can consult a third party about revising long-term repair plans or how to proceed with large-scale repairs before placing an order. The contact point for both is the Housing Policy Division (03-3463-3548).
| Dispatch of Condominium Management Consultants | This is available for management associations in the ward that show signs of mismanagement or associations that are over 20 years old and have not conducted large-scale repairs. It is free for 2 hours per session, up to 4 times a year. Applications must be submitted at least 3 weeks before the desired dispatch date. Deterioration surveys, creation of repair plans, comparison of estimates, and introduction of contractors are not included. Applications after February of Reiwa 9 may not be accepted. |
|---|---|
| Subsidy for Creating Long-Term Repair Plans | This is available for condominium management associations in the ward that are over 5 years old, with a subsidy of half of the pre-tax expenses, up to 200,000 yen. Conditions include not having received the same subsidy within the past 10 years. Applications must be submitted at least one month before starting the creation or revision of the plan, and contracts will be made after the subsidy decision. Completion reports are due by the end of February of Reiwa 9. Applications after November of Reiwa 8 may not be accepted. This subsidy is for costs related to the creation of plans, not for the construction itself. |
*The Ministry of Land, Infrastructure, Transport and Tourism has provided information on consultation points for management associations and points to consider when placing orders following the announcement by the Japan Fair Trade Commission on September 28, Reiwa 8 (please refer to the chapter on collusion and inappropriate consulting issues below).
- Shibuya Ward: Dispatch of Condominium Management Consultants (Official)
- Shibuya Ward: Subsidy for Creating Long-Term Repair Plans for Condominiums (Official)
- Ministry of Land, Infrastructure, Transport and Tourism: Information on Consultation Points Regarding Large-Scale Repair Work for Condominiums (Official)
④ National Energy Saving Support | Housing Energy Saving 2026 Campaign
Changes for Fiscal Year 2026The “Childcare Green Housing Support Project” for Fiscal Year 2025 has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Additionally, the “Long-Term Excellent Housing Renovation Promotion Project” will end in Fiscal Year 7, and will not be implemented in Fiscal Year 8. Please be careful not to base your financial plans on outdated information.
Mirai Eco Housing 2026 Project
| Target | Renovations of existing homes built before December 31, 2016, regardless of whether they are single-family or multi-family homes. Management associations and management corporations can also become joint contractors (i.e., can be used for common area renovations). Rental housing is also eligible. |
|---|---|
| Required Work | Insulation renovations of openings, insulation renovations of the structure (floor, walls, ceiling), and installation of eco-friendly housing equipment are mandatory combinations. |
| Subsidy Limit | Depending on the age of the building and the energy-saving performance achieved, 400,000 to 1,000,000 yen per unit (1,000,000 yen if the house is built before 1991 and meets the mandatory standards). |
| Period | Projects that have started construction after signing a construction contract on or after November 28, 2025, and by December 31, 2026, at the latest, are eligible. Grant applications are generally made by registered contractors (construction contractors) after the completion of the work (the ordering party cannot apply themselves). Reservations for grant applications must be made by November 16, 2026, at the latest, and grant applications must be submitted by December 31, 2026, at the latest (will end once the budget limit is reached). |
Advanced Window Renovation 2026 Project
| Target | Renovations to high-performance windows, including the installation of interior windows, replacement of exterior windows, and glass replacement in existing homes (single-family and multi-family). Subsidy rates are set for “low-rise” and “mid-to-high-rise” multi-family homes. |
|---|---|
| Bulk Application for Multi-Family Homes | For multi-family homes, there is a method for “bulk application” that allows for all units to be applied for together. The application process is handled by registered contractors (window renovation contractors), and management associations cannot apply themselves, but this system works well with window and entrance door renovations that coincide with large-scale repairs. |
| Subsidy Limit | For residential properties, 1,000,000 yen per unit (changed from 2,000,000 yen in Fiscal Year 2025). For non-residential properties over 240 square meters, 10,000,000 yen per building. |
| Period | Projects that have started construction on or after November 28, 2025, and by December 31, 2026, at the latest, are eligible. Grant applications are made after the completion and handover of the work, with reservations due by November 16, 2026, at the latest, and grant applications due by December 31, 2026, at the latest (will end once the budget limit is reached). |
⑤ Subsidies and Grants in Shibuya Ward, Tokyo (Energy Saving, Earthquake Resistance, Greening, etc.)
| Tokyo Energy Efficiency Renovation Promotion Project for Existing Homes (Fiscal Year 2026) | The renovation of high-insulation windows, doors, insulation materials, and bathtubs is eligible, and the target group includes management associations of condominium buildings. For management associations with 50 or more renovated units, the subsidy amount will be 120% of the total unit price. The maximum subsidy for windows and doors is 2 million yen per unit, and for insulation materials, it is one-third of the expenses up to 1 million yen per unit. Pre-application started on May 29, 2026. Contracts and construction will take place after the pre-application is accepted. It was not confirmed on the official page whether construction of common areas is eligible. Please check the official page and contact (03-6737-5300) for conditions regarding registered businesses and budget status. |
|---|---|
| Tokyo Rental Housing Insulation and Renewable Energy Concentration Promotion Project (Fiscal Year 2026) | This project targets owners of existing rental housing units leased under ordinary rental agreements, and construction must be performed by registered contractors of Cool Net Tokyo. Pre-application is from May 29, 2026, to March 31, 2027, and will end when the total application amount reaches the limit. The subsidy rate is two-thirds, with a maximum of 300,000 yen per unit for high-insulation windows and 600,000 yen per unit for insulation renovations. No mention was found regarding management associations of condominium buildings, as this project is aimed at owners of rental apartments and rental condominiums. |
| Shibuya Ward Greening Promotion Project Subsidy | Condominium management associations are also included as eligible. For sites under 300 square meters that are not subject to greening obligations under the ordinance, a subsidy is available for new greening (landscaping, hedges, walls, rooftops) of 3.0 square meters or more, with a subsidy rate of one-half, up to 200,000 yen. Applications are accepted from April 1, 2026, to March 15, 2027, and prior consultation is required. Construction will commence after the grant decision (Environmental Policy Division, Environmental Policy Section 03-3463-2749). |
| Shibuya Ward Support for Earthquake Resistance of Condominium Buildings | This primarily targets condominiums built before June 1, 1981 (old earthquake resistance), and includes free dispatch of earthquake resistance promotion advisors and subsidies for diagnosis and renovations. The subsidy rate, limits, and application period could not be confirmed in the ward’s pamphlet, so please check with the Wooden Density and Earthquake Resistance Division, Promotion Section (03-3463-2647). |
| Shibuya Ward Simple Renovation Support Project | This system provides a subsidy of 20% (up to 100,000 yen) of the tax-excluded construction costs for simple renovations of residences by contractors with whom the ward has agreements. However, the target is individuals who are registered residents of Shibuya Ward and are owners residing in the eligible housing, and common areas of apartment buildings are generally excluded (the installation of delivery boxes in certified management plan condominiums is an exception). It cannot be used for subsidies for large-scale repair construction. Since it is limited to contracted businesses within the ward, Kakeru Koumuten Co., Ltd. may not be an eligible contractor (Housing Policy Division, Living Environment Maintenance Section 03-3463-3548). |
| Tokyo Subsidy for Renovation Costs of Special Nursing Homes (Fiscal Year 2026) | This is a Tokyo project supporting renovations of elderly facilities. It cannot be used for large-scale repairs of condominiums or apartments and is aimed at those who own and operate facilities such as special nursing homes. Please check the conditions and eligibility on Tokyo’s explanatory video and official page. |
* Subsidies specifically for general exterior painting or waterproofing were not confirmed on the official websites of Shibuya Ward or Tokyo. Subsidies related to asbestos investigation and removal, disaster prevention and security, debt guarantee fees, and loan mediation were also not found within the confirmed scope. Owners of rental apartments may find that the Tokyo rental housing project can be used for window and insulation renovations. Please note that application statuses may change, so be sure to check the official page before applying.
- Tokyo: Energy-saving renovation promotion project for existing homes (official)
- Tokyo: Insulation and renewable energy concentration promotion project for rental housing (official)
- Tokyo: Announcement of the start of the insulation and renewable energy concentration promotion project for rental housing (official)
- Tokyo: Explanation video on subsidies for renovations of special nursing homes, etc.
- Shibuya Ward: Greenery promotion project subsidy (official)
- Shibuya Ward: Earthquake resistance support project for general condominiums (official)
- Shibuya Ward: Housing simple renovation support project (official)
- Shibuya Ward: Flyer for the housing simple renovation support project (PDF)
⑥ Financing System (Housing Finance Agency Condominium Sumairu Loan)
If the management association borrows funds for large-scale repairs, it can utilize the Housing Finance Agency’s “Condominium Common Area Renovation Loan (Condominium Sumairu Loan).”
| Target Work | Large-scale repairs, seismic retrofitting, flood prevention measures, energy-saving measures, balcony repairs, safety measures for elevators and parking lots, asbestos measures, diagnosis and design costs by experts, etc. |
|---|---|
| Collateral | No collateral required (joint guarantee by the condominium management center, etc.) |
| Repayment Period | Generally 1 to 10 years, 1 to 20 years for specific works, up to 35 years for seismic, flood, and energy-saving works after obtaining management plan certification |
| Interest Rate Reduction | ① Holding of Sumairu Bonds ② Obtaining management plan certification ③ Implementation of seismic, flood, and energy-saving works, each reducing by 0.2% per year (up to 0.6% per year) |
| Main Requirements | Improvement of management regulations, resolution at the general meeting, the delinquency rate of repair reserve funds must be within 10%. Applications are accepted year-round |
Source: Housing Finance Agency “Condominium Sumairu Loan” (Official)
Tokyo Metropolitan Condominium Improvement Work Subsidy (Interest Subsidy)
| Details | This is a system where the Tokyo Metropolitan Government subsidizes the interest on the Housing Finance Agency’s “Condominium Common Area Renovation Loan.” The difference from the interest rate, which is 1% lower than the Agency’s rate (if the interest is less than 1%, it effectively becomes 0%), is subsidized, and the subsidy period is up to 20 years for the loan repayment period. |
|---|---|
| Eligibility | Management associations of fire-resistant condominium buildings in Tokyo that utilize the Agency’s loans and debt guarantees from the condominium management center, etc. Repairs and renovations of common areas are eligible (installation work for solar power generation equipment may also be eligible for loans; please check the conditions with the Housing Finance Agency). Condominiums built before the seismic standards of May 31, 1981, must undergo seismic diagnosis, and those requiring management status reporting must have completed the report and update. |
| Limit | The limit is the smallest amount among the loan reservation amount, the construction costs eligible for the loan, the amount after deducting subsidies from the construction costs, and 2 million yen per unit (6 million yen if accompanied by seismic retrofitting) multiplied by the number of units. |
| Application for Reiwa Year 8 | Applications are in two phases; the first phase (May 13 to September 30) has ended. The second phase is accepting applications from October 1, 2026, to February 19, 2027. Each phase has 2,500 units available on a first-come, first-served basis. After loan approval, applications and grant decisions must be received before the monetary loan agreement. Contact: Tokyo Metropolitan Housing Policy Headquarters, Private Housing Department, Condominium Section 03-5320-7532 |
Cases Where Fire Insurance Can Be Used and Cases Where It Should Not Be Used
Damage caused by “accidental incidents” such as the scattering of rooftop waterproof sheets, caps, and fences due to typhoons or strong winds, hail damage, and lightning strikes may be covered by fire insurance. It is important to clearly document the distinction between damage caused by accidents and normal wear and tear during deterioration diagnosis.
On the other hand, normal wear and tear itself is not covered. There have been numerous incidents nationwide where contractors have misled customers by claiming, “You can repair without any out-of-pocket expenses with insurance,” and the National Consumer Affairs Center has repeatedly issued warnings. False claims may lead to insurance fraud charges. Please confirm the eligibility of claims directly with your management association or property owner with the insurance company or agent. Kakeru Koumuten Co., Ltd. will not provide such guidance.
Building Conditions and Repair Points in Shibuya, Tokyo
Shibuya City covers an area of approximately 15.11㎢ and is located in the eastern part of the Musashino Plateau. The Shibuya River creates a valley in the center of the city, surrounded by plateaus, resulting in a terrain with many slopes and steps. The population, which bottomed out at 182,882 in Heisei 9, has begun to increase, surpassing 230,000 in Reiwa 8. The majority of housing consists of multi-family dwellings, with a mix of older condominiums and newer buildings around the station. The figures below are based solely on publicly available data.
(As of September 1, Reiwa 8)
(As of September 1, Reiwa 8)
(Official “Geography” of the City)
(2018 Housing and Land Statistical Survey)
(Number of districts listed in the city as of October 2026)
Source: Shibuya Ward “Resident Registration Population”/Shibuya Ward “Geography”/Shibuya Ward Housing Master Plan Document (PDF)/Shibuya Ward “District Planning” *The ratio of collective housing is based on the value from Heisei 30, as the value for Reiwa 5 could not be confirmed. The number of district plans is the count of districts listed in the ward’s list.
Shibuya Ward is a “ward where the population has decreased and then returned,” with distinct layers of building ages
The population of Shibuya Ward decreased from 243,266 people as of January 1, 1979, to 182,882 in Heisei 9, and then began to increase, reaching 195,911 in Heisei 22, 217,008 in Heisei 27, 229,671 in Reiwa 2, and 230,880 in Reiwa 8 (since Heisei 25, foreign residents have been included in the population due to the amendment of the Basic Resident Register Law in July Heisei 24). According to the ward’s housing master plan document, collective housing accounts for 86.1% of residences (Heisei 30). Since the number of apartment buildings by age could not be confirmed in the ward’s survey, the table below serves as a guideline based on population and age. Actual building ages may vary by structure.
| Period | Population Movement (Shibuya Ward, January 1 of each year) | Estimated Age of Building (as of 2026) | Major Repairs in Next Renovation |
|---|---|---|---|
| Until Showa 55 (1980) Corresponds to the old seismic standards (before May 1981) |
Showa 54: 243,266 people → Showa 60: 232,531 people | Over 46 years old | After the 3rd repair. Replacement of water supply and drainage pipes, replacement of steel staircases and handrails, seismic diagnosis will be the main points of discussion |
| Showa 56 to Heisei 2 (1981 to 1990) This period corresponds to a decline in population |
Showa 60: 232,531 people → Heisei 2: 207,822 people | 36 to 45 years old | Around the 3rd repair. Measures against tile lifting and falling, renovation of sashes and entrance doors will become more significant |
| Heisei 3 to 12 (1991 to 2000) The population reached its lowest point in Heisei 9 |
Heisei 2: 207,822 people → Heisei 9: 182,882 people → Heisei 12: 187,948 people | 26 to 35 years old | 2nd and 3rd repairs. Complete renovation of rooftop waterproofing, replacement of long sheet flooring in common corridors will be the focus |
| After Heisei 13 (2001) Population has increased since then |
Heisei 22: 195,911 people → Heisei 27: 217,008 people → Reiwa 2: 229,671 people | 25 years old or younger | 1st and 2nd repairs. Re-caulking and exterior wall painting will be the main tasks, and for high-rise buildings around the station, scaffolding and temporary plans will affect costs |
Source: Shibuya Ward “Annual Population Transition” ※The estimated age of buildings is calculated from the year of the Gregorian calendar and is not based on construction period statistics. The age of buildings cannot be determined solely by population movement.
Four Factors Influencing Buildings and Construction in Shibuya Ward
Based on public materials, we have organized four characteristics that are linked to large-scale repairs. Shibuya Ward has a complex terrain of plateaus and valleys, with many slopes and steps, so the issues vary depending on the location of the site even within the same ward.
① Climate | Temperature Differences, Heat Waves, Heavy Rain
According to the Japan Meteorological Agency’s observations in Tokyo (not the values from Shibuya Ward), the highest annual temperature from 2021 to 2025 (the highest daily temperature of that year) ranged from 36.8 to 38.5℃, and the lowest annual temperature (the lowest daily temperature of that year) ranged from −3.5 to −1.0℃ (the highest in 2025 was 38.5℃ in August). The annual precipitation varied significantly, with the highest in 2021 at 2,052.5mm and the lowest in 2025 at 1,152.5mm. Due to the high temperatures in summer and the cold in winter, the exterior walls, sealing, and waterproof layers undergo repeated expansion and contraction every year.We recommend inspecting the waterproof layers, sealing, and drains before any issues arise.
② Topography and Hazards | Plateaus and Valleys, Floods, Landslide Disasters
Shibuya Ward is located in the eastern part of the Musashino Plateau, with the Shibuya River creating a valley in the center. The plateau consists of Kanto loam, while the lowlands are alluvial deposits, with Yodobashi Plateau at an elevation of 30 to 60m. The ward’s flood hazard map (revised in April of Reiwa 8) assumes a maximum rainfall of 153mm per hour and a total rainfall of 690mm over 24 hours, including external and internal water from the Kanda River and Shibuya River basins. The regional disaster prevention plan (flood and wind disaster section) identifies key areas for rainwater drainage as Ebisu, around Shibuya Station, and Yoyogi/Honmachi, with approximately 4,000㎥ of rainwater storage facilities (completed in Reiwa 2) at the east exit of Shibuya Station. There are 11 areas designated as landslide warning zones (yellow) and 9 special warning zones (red) by Tokyo Metropolis, with 12 locations identified as dangerous for steep slope collapses. Please check the values for the assumed maximum flooding depth on the ward’s map. Please confirm which assumption your site falls under using the ward’s hazard map.
③ Types of Buildings | Apartment Complexes, Commercial Buildings, Densely Built Wooden Areas
Since apartment complexes account for 86.1% of residences (as of 2018), large-scale repairs for both condominium management associations and owners of rental apartments and condominiums are important themes. In the land use zoning (March 2012), the second-class medium and high-rise residential areas account for 24.4%, and commercial areas account for 21.4%. Honmachi 2-6 Chome is designated as a specific improvement area for fire prevention, where wooden houses are densely located (74.1ha), and older wooden structures are concentrated in the northern and southern parts of the ward. Public housing includes 15 Tokyo Metropolitan housing complexes with 2,410 units, 8 UR rental complexes with 848 units, and 10 Tokyo Metropolitan Housing Supply Corporation complexes with 338 units (as revised in March 2019 under the ward’s public housing longevity plan). The management of these complexes differs from that of condominiums, and individual building circumstances cannot be determined.
④ Town Rules | Scenic Plans and District Plans
Shibuya Ward is entirely designated as a scenic plan area and transitioned to a scenic administrative organization in June 2012. The specific scenic formation districts include Omotesando, Daikanyama/Old Yamanote Line, around Shinjuku Gyoen, and the center of Shibuya Station. According to the ward’s notification guidelines, in general areas, any change in color exceeding 50㎡ for roofs, exterior walls, ancillary facilities, and landscaping requires notification, and repairs or renovations that change the appearance are subject to notification if the area exceeds half of the previous appearance. There is no explicit treatment for repairs without color changes in the guidelines, so please confirm at the counter. Notifications should ideally be made at least 30 days before starting work, and prior consultation is required for building construction. Standards differ for specific districts. The district plans list 24 districts in the ward. Scenic districts are regulated based on Tokyo Metropolis ordinances, so please check with the ward office regarding the presence of building agreements.
Source: Japan Meteorological Agency “Past Weather Data (Tokyo)” / Shibuya City “Geography” / Shibuya City “Flood Hazard Map” / Shibuya City Regional Disaster Prevention Plan (Wind and Flood Damage Edition) / Shibuya City Earthquake Renovation Promotion Plan (Reiwa 3 March Revision) / Shibuya City “Area by Zoning” / Tokyo Metropolis Non-combustible Special Zone (Shibuya City) / Shibuya City Public Housing Long-term Life Plan / Shibuya City “Landscape Plan Notification Guidelines”・Guidelines (PDF) / Shibuya City “District Planning” / Shibuya City “Scenic District” ※The weather data is based on observations from Tokyo (Chiyoda Ward). The assumed flooding depth is based on the premise of maximum expected rainfall and does not represent actual damage.
Key Points to Consider When Proceeding with Construction in Shibuya Ward
| Key Point | Actual Conditions in Shibuya Ward and Kakeru Koumuten’s Response |
|---|---|
| Notification and Preliminary Consultation for Landscape Planning | If the color changes of exterior walls exceed a certain scale, they will be subject to landscape planning notification (according to the district’s notification guidelines). We will incorporate the notification (ideally 30 days before starting) and necessary preliminary consultations into the schedule. Please confirm the treatment of non-color-changing repainting and specific district standards at the counter (Urban Planning Division, Land Use Review Section) in advance. |
| Sites with Slopes, Steps, and Valleys | In terrains where plateaus and valleys are intertwined, there are buildings with height differences between the road and the site. We will check the foundation for scaffolding, support for the base plates, and the routes for lifting and transporting materials on-site. For sites in valleys, please also check the expected flooding on the district’s hazard map. |
| Areas with Wooden Structures and Narrow Roads | In areas with high building density, the distance between neighboring buildings may be close. The district has regulations for widening narrow roads. We will plan the scaffolding setup, protection measures, debris control, and the range for vehicle access by inspecting the site. |
| Buildings with Commercial Tenants | The land use area is 21.4% commercial (as of March 2012), and there are buildings that house stores and offices. We will proceed with considerations for business hours, securing entrances and exits, pedestrian safety measures, and adjusting work hours in consultation with tenants. |
| Parking During Construction | Vehicles on the side where scaffolding will be erected will need to be temporarily relocated. The number of parking spaces and availability can vary significantly by building, and it may take time to secure alternative parking. We will coordinate the availability of nearby monthly parking lots and other arrangements starting 2 to 3 months before construction begins. |
| Old Seismic Buildings | There are old seismic apartment buildings within the district. The necessity for seismic diagnosis and seismic retrofitting is a separate consideration from large-scale repairs, but it may be possible to plan alongside the opportunity when scaffolding is set up. Please check the district’s seismic support in advance. |
Source: Shibuya Ward “Guidelines for Landscape Planning Notifications”/Shibuya Ward “Flood Hazard Map”/Shibuya Ward “Narrow Road Widening Improvement”/Shibuya Ward “Area by Land Use”/Shibuya Ward “Earthquake Resistance Support Project for General Condominiums”
* We accept consultations for the entire Shibuya Ward.
Deterioration Symptoms and Timing Requiring Major Repairs
Generally, major repairs are estimated to occur in a 12 to 15-year cycle. According to the Ministry of Land, Infrastructure, Transport and Tourism’s actual survey, the actual repair cycle is most commonly 13 years, with about 70% falling within the 12 to 15-year range, and the cycle tends to shorten with each occurrence. However, the actual judgment is based on the deterioration condition rather than the number of years, so if you observe symptoms like those below, we recommend an early on-site inspection.
| Location | Signs of Deterioration That Are Dangerous If Left Unattended | Main Countermeasures |
|---|---|---|
| Exterior Wall (Painted Surface) | Chalking (white powder on hands), fading, cracks wider than 0.3mm, blistering or peeling of paint | Substrate repair + exterior wall painting |
| Exterior Wall (Tile Surface) | Tile lifting or falling off, chipping of joints, efflorescence, hollow sounds when tapped | Injection for lifting, replacement, clear waterproofing |
| Sealing | Cracks in joints, shrinkage, peeling, hardening | Re-sealing |
| Rooftop/Balcony | Bloating or breaking of waterproof layer, puddles, clogged drains, rain leakage to lower floors | Urethane waterproofing, sheet waterproofing, drain renovation |
| Metal Parts/Steel Stairs | Rust, peeling paint, corrosion of treads | Grinding + rust prevention + painting, component replacement |
| Roof | Lifting of ridge cap, cracking or warping of slate, moss, shifting of tiles | Roof painting, roof overlay (cover method), re-roofing |
| Concrete | Spalling (exposed rebar with rust stains), water leakage from cracks | Spalling repair + resin mortar filling |
| Common Hallway/Stair Floor | Lifting or peeling of long sheet, opening at edges, exposure of substrate | Replacement of long sheet + substrate waterproofing |
Estimated Repair Cycles by Location (Ministry of Land, Infrastructure, Transport and Tourism Guidelines)
| Location/Work | Estimated Cycle | Location/Work | Estimated Cycle |
|---|---|---|---|
| Exterior Wall Painting (Repainting) | 12-15 years | Re-sealing | 12-15 years |
| Exterior Wall Painting (Existing Removal + Painting) | 24-30 years | Metal Parts Painting | 5-7 years |
| Rooftop Waterproofing (Repair/Renovation) | 12-15 years | Water Supply Pipe (Rehabilitation/Replacement) | 19-23 years/30-40 years |
| Rooftop Waterproofing (Removal/New Installation) | 24-30 years | Drain Pipe (Rehabilitation/Replacement) | 19-23 years/30-40 years |
* The above are reference examples from the guidelines and are not uniform construction deadlines. Actual cycles will be set according to the building’s specifications, location conditions, and deterioration status.
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Creating Long-Term Repair Plans” (Revised June 2024, PDF) / Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021”
Examples of Large-Scale Renovation Work
This is an example of exterior renovation work on a mixed-use building undertaken by Kakeru Koumuten. The building had leaks occurring in several places, and we combined clear waterproofing for the tile exterior walls with waterproofing for the rooftop for the renovation.
Exterior Renovation Work for Mixed-Use Building (Tile Wall Waterproofing + Roof Waterproofing)
| Work Details | Partial tile replacement / Painting of ancillary parts (pipes, water drainage) / Roof waterproofing work (urethane waterproofing) / Wall tile waterproofing (Seven S) / Sealing work around windows / Repair of wall tile mortar joints / Ivy removal |
|---|---|
| New Materials Used | Wall tiles: Kunishiro Tiles / Ancillary part painting: Radical silicone paint / Roof waterproofing: High-strength urethane (Sarasene A) / Wall tile waterproofing: Seven S |
| Price Range | 4,000,000 – 4,100,000 JPY |
| Construction Period | 45 days |
| Location | Not disclosed |
| Background Leading to Construction | Due to rain leaks occurring from several areas including the exterior walls and roof, we proposed waterproofing for the entire exterior wall. Seven S is a clear waterproofing material for tile walls, and while the cost is somewhat high, it is highly waterproof, making it recommended for cases where rain leaks are occurring from multiple areas of the exterior wall. |
Customer Feedback
Flow from On-Site Survey to Completion of Work
From the initial inquiry to project completion and aftercare, a single representative will consistently assist you. For management associations, a resolution at the general meeting is required, so starting the process 1 to 1.5 years before the desired construction start date allows for a smoother progression.
- Inquiry (Free) Please contact us via phone, form, or LINE. If you have estimates from other companies, just presenting those is fine.
- On-site Investigation & Building Diagnosis (Free) We will conduct a survey of the exterior walls, check for cracks, sealing, and waterproof layers, and if necessary, investigate the rooftop, high places, and leak areas using drones or thermal imaging. For properties in Shibuya Ward, we will also check the site conditions, trees, slopes, steps, expected flooding in valleys, road width, delivery routes, and parking.
- Investigation Report & Estimate Submission We will provide a deterioration diagnosis report with photos and an estimate detailing quantities, methods, and materials for each work item. Multiple plan proposals are also possible.
- Plan Decision & Contract Confirm colors using color simulations, paint samples, and trial painting. For management associations, we will assist in preparing materials for the general meeting. In areas subject to landscape planning notifications, color standards, and district plans, we will also explain the color considerations.
- Notification to Residents & Neighbors We will distribute construction notifications, visit neighbors to greet them, and set up a bulletin board in the entrance (with a schedule and laundry information). If temporary relocation of parking is necessary, adjustments will be made at this stage.
- Temporary Scaffold Installation & Various Works Our in-house scaffold team will set up the scaffolding, followed by high-pressure washing → substrate repair → sealing → exterior wall painting & tile repair → waterproofing → iron parts & ancillary work in that order. A supervisor will inspect and take construction photos for each stage.
- Completion Inspection, Scaffold Dismantling & Handover We will confirm the finish in the presence of the customer and provide construction photos, a report on the paint used, and a warranty certificate.
- Aftercare We will send annual DM notifications, allowing for yearly inspections. Simple repairs such as partial sealing are provided free of charge.
Resident Communication, Additional Work Approval, Inspection Reports
Equally important as the construction itself is “when, what, and with what materials to report”. At Kakeru Koumuten, we provide materials and reports in the following four situations.
| Situation | Materials Provided & Actions Taken |
|---|---|
| Before Construction Building Diagnosis |
We will provide a deterioration diagnosis report with photos. This document summarizes the deterioration areas and the rationale for the proposed scope of work. |
| Before Construction to During Construction Notification to Residents & Neighbors |
We will distribute construction notifications, visit neighbors to greet them, and provide information on the schedule and laundry through the entrance bulletin board. |
| During Construction Approval for Additional Work |
Any deterioration discovered after scaffolding is set up will be addressed by presenting photos, quantities, and costs for approval before proceeding with the work. |
| During Construction to Completion Inspection Report |
A supervisor will inspect each stage and take construction photos. Upon completion, we will confirm the finish in the presence of the customer and provide construction photos, a report on the paint used, and a warranty certificate. |
*For management associations, it is smooth to decide in advance who will approve additional work (such as the chairman or repair committee) and the approximate amount requiring approval before the contract.
What Will Life Be Like During Construction? Impact on Residents
Large-scale repairs are principally carried out while residents remain in their homes. However, there will be restrictions on daily life while scaffolding is in place. Most troubles can be prevented by providing prior notice, so Kakeru Koumuten Co., Ltd. thoroughly explains and posts information before construction begins.
| Impacts | What Actually Happens / Our Company’s Response |
|---|---|
| Laundry | On days of high-pressure washing, painting, and waterproofing, outdoor drying will not be possible. We will inform you via bulletin boards and each unit’s mailbox about “which side will be worked on today” and will ensure as many days as possible for drying. |
| Window Opening and Closing | In addition to washing and painting days, there may be times when windows cannot be opened during other processes such as protection, drying, and waterproofing. We will provide information for each process, so please check the postings and notifications. We will schedule the work to avoid consecutive closures. |
| Balcony | During floor waterproofing and railing painting, we ask for temporary relocation of personal items, plants, and air conditioning outdoor units. The timing will be notified in advance for each unit. |
| Noise and Odor | The period of substrate repair (breaking and drilling) will produce the most noise. Work hours are generally from 8 AM to 5 PM, and we will accommodate requests such as refraining from work on Sundays and holidays. Low-odor paint options are also available. |
| Security and Privacy | Scaffolding can become an access route. We can take measures such as blocking sightlines with mesh sheets and installing locks and sensor lights on the scaffolding’s access stairs at night. We also ensure proper etiquette training for visitors. |
| Parking | Vehicles on the side where scaffolding will be erected will need to be temporarily relocated. Since securing a new parking location may take time, we will work together to secure a new location 2 to 3 months before construction starts. |
| Pets, Small Children, and Working from Home | If you have sensitivities to noise, please inform us in advance, and we may be able to adjust the work schedule accordingly. Please feel free to let us know. |
| Rented Rooms | We can assist property owners in creating notification documents for residents. If there are concerns about the impact of construction on occupancy rates, we can also propose a color simulation for an image change. |
How to Choose a Large-Scale Repair Contractor and Ordering Methods
There are many large-scale repair contractors that cover Shibuya Ward, Tokyo, and you may be unsure which one to choose. When requesting renovations for apartments, condominiums, or buildings, please check the following four points.
● Extensive experience in large-scale repairs
● Confirm the presence of warranties and aftercare services
● Obtain estimates from multiple contractors (at least 3 companies)
● Confirm whether they are self-managed
Extensive Experience in Large-Scale Repairs
Large-scale repair contractors often have websites that showcase their exterior renovation achievements. If they provide detailed explanations of repair work with photos, it can give you peace of mind as a reference when you actually request work.
Using Google and review sites to evaluate large-scale repair contractors can also be effective! Be cautious if there are many negative reviews. If there are few reviews, also check their track record, explanation content, and management system.
Large-scale repair work involves not only the construction itself but also the potential for troubles with residents and nearby neighbors. Therefore, it is necessary to post updates on the progress of the work and information about laundry on bulletin boards to prevent issues before they arise. Kakeru Koumuten Co., Ltd. specializes in exterior work, and we receive many requests for exterior renovations of apartments and condominiums.
Check for Warranty and Aftercare Services
When choosing a large-scale repair company, let’s confirm the availability of warranties. If any issues such as leaks occur after the construction, having a leak warranty from the contractor ensures that repairs can be made at no cost, providing peace of mind! Companies that offer warranty periods are often confident in their work, making this a key criterion for selecting a contractor.
Warranty periods vary by contractor and the nature of the work, but typically range from 1 to 10 years. Emergency repairs or partial fixes often do not come with a leak warranty. Some contractors also offer aftercare services separate from warranties, so be sure to check for warranties and aftercare services.
At Kakeru Koumuten Co., Ltd., we send out annual direct mail for aftercare maintenance, allowing for yearly inspections. We also provide free assistance for simple repairs such as partial sealing.
Obtain Estimates from Multiple Contractors (at least 3)
When requesting large-scale repairs, be sure to obtain estimates from multiple contractors. It is important to get estimates from at least three companies and compare their quotes and reports! Even for the same work, costs can vary between contractors, and warranties and aftercare services may differ as well. Additionally, obtaining multiple estimates makes price negotiations easier.
When comparing estimates, consider not only the cost but also the “items in the estimate,” “methods and materials for substrate repairs and exterior wall painting,” and “confirmation of the process” to make an informed decision! If the quality of the auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making decisions based solely on price. Particularly, substrate repair work can be difficult to assess from appearance alone, so ensure that the repair methods are suitable for the condition of the substrate!
Check These Points on the Estimate (Checklist)
| Confirmation Items | Points to Consider |
|---|---|
| Is there an excessive use of “one set” notation? | Are the quantities and unit prices clearly stated? With “Exterior Wall Repair One Set,” comparisons and verifications cannot be made. |
| Do the quantities match the actual measurements? | Are there quantities recorded that are far from the drawings or actual measurements? This is the area where inflation is most likely to occur. |
| Proportion of miscellaneous expenses | Contents and proportions of site management costs, general management costs, statutory welfare costs, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, the average is about 10% of construction costs (excluding common temporary costs), but it varies depending on the scale and conditions of the building, so there is no uniform standard. |
| Are the names of materials written down? | Are the manufacturer names, product names, grades, and number of coats for paints and waterproofing materials listed? |
| Treatment of quantities for substrate repairs | This is an item that cannot be accurately measured until scaffolding is set up. It is crucial to state whether it is “estimated quantity” or “actual quantity settlement,” and the agreements for increases or decreases. |
| Guarantees and after-inspections | Warranty period for each construction, frequency of inspections, and scope of free support. |
| Company backing | Types of construction industry licenses, track record of similar scale and structure, presence of qualified personnel. |
Confirm whether it is managed in-house
Large-scale repair work includes various tasks such as “substrate repair work,” “exterior wall painting,” “waterproofing work,” and “pipe replacement,” and the plan content changes depending on the actual state of deterioration and customer preferences.
There are cases where contractors that completely outsource to subcontractors lack knowledge and experience, leading to proposals for repairs in irrelevant areas or meaningless work. If you request a subcontractor after investigation, it may incur additional time and costs. By having knowledge and experience and managing in-house, responsible construction that keeps costs down becomes possible.
Moreover, contractors that outsource to subcontractors may also be slow to respond in case of any troubles during construction. It is safer to avoid having a company that has not actually met with the customer manage the construction. Kakeru Koumuten performs everything from temporary scaffolding setup to exterior wall painting and waterproofing work in-house, with knowledgeable and experienced personnel managing the construction!
There are three ordering methods. The choice affects the approach.
Especially for management associations, it is necessary to decide “how to request” before “which company to hire.” The main ordering methods are the following three.
| Method | Procedure | Advantages | Disadvantages |
|---|---|---|---|
| Responsibility Construction Method | The construction company handles everything from investigation, design, construction to management. | No additional costs for commissioning design consultants (investigation and design costs may be included in the construction costs) / Single point of contact reduces the burden on the management association / Clear accountability / May shorten the period until ordering. | Specifications are often left to the construction company, making it difficult to compare side by side / Third-party checks are hard to implement, requiring the management association to verify price, specifications, and construction status. |
| Design Supervision Method | A design office or consultant conducts investigation and design, while a separate company handles construction. | Allows comparison of construction companies under the same conditions / Independent supervision during construction. | Consultant fees are required separately / Attention needed to risks of conflicts of interest and collusion / Tends to prolong the duration. |
| Management Company Prime Contract Method | The management company acts as the prime contractor, with subcontractors performing the construction. | Easy coordination with daily management / Minimal effort required from the management association. | Intermediate margins can lead to higher costs / Competition principles are less likely to be effective. |
Collusion and Inappropriate Consulting Issues in Large-Scale Renovation and Self-Defense Measures
Latest 2026 In the large-scale renovation industry, inappropriate orders linked between design consultants and construction companies have long been a concern. The Ministry of Land, Infrastructure, Transport and Tourism issued warnings and notifications to management associations in January 2017 and April 2023, and on September 28, 2026, the Japan Fair Trade Commission announced that it had issued exclusion orders to 38 companies and a total of 1.63788 billion yen in payment orders to 37 companies regarding large-scale renovation work commissioned by condominium management associations to design consulting firms in the Kanto region (two design consulting firms were also subject to exclusion orders).
※Based on the announcement by the Japan Fair Trade Commission (September 28, 2026).
Three Typical Methods
① Dummy Estimates
Prior to placing an order, companies are predetermined, and other companies only provide high estimates in a formal manner, creating a “fixed race.” This gives the impression to the management association that they have properly obtained competitive estimates.
② Collusion with Design Supervisors
Consultants contract at extremely low design supervision fees while receiving kickbacks from the high construction costs of their partner construction companies. Be cautious of design supervision fees that are too low.
③ Back Margin
A certain percentage of the contract amount is given as a kickback, which is then added to the construction costs as an expense. As a result, the management association ends up paying extra.
Self-Defense Measures for Management Associations
- Obtain independent estimates from multiple companies
- Consult with neutral third parties such as condominium management professionals or architects
- Document the vendor selection process in meeting minutes to ensure transparency
- Confirm the reasons for unusually low consulting fees
- Include a penalty clause in the contract for cases of collusion
- Avoid concentrating information with a single consultant and verify specifications by the management association itself
Frequently Asked Questions about Large-Scale Renovations in Shibuya, Tokyo
- How much does a large-scale renovation in Shibuya, Tokyo cost?
- For condominiums, according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% fall within the range of 750,000 to 1,500,000 yen (excluding consumption tax and common temporary construction costs), with the most common range being 1,000,000 to 1,250,000 yen. Based on our company’s construction records, the estimated costs are 2,000,000 to 4,000,000 yen for wooden two-story apartments, 4,000,000 to 9,000,000 yen for three-story steel and RC apartments, and 5,000,000 to 15,000,000 yen for small-scale condominiums and mixed-use buildings. The costs vary depending on the condition of the substrate and whether waterproofing and roofing work are needed, so we will provide a free on-site estimate.
- How often should large-scale renovations be conducted?
- Generally, a cycle of 12 to 15 years is recommended, and the actual cycle is most commonly 13 years according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey, with about 70% falling within the 12 to 15-year range. However, the decision should be based on the condition of the building rather than just the number of years. If deterioration of sealing, tile lifting, or breakage of the waterproof layer is observed, it is advisable to conduct repairs without waiting for the cycle, as this can ultimately reduce costs. In Shibuya, there are 778 non-wooden collective residences built before May 1981, according to a survey conducted by the ward in 2016, with nearly half being owner-occupied and half being rental. For older buildings, there tends to be a greater emphasis on tile repairs, replacement of iron parts, and updating of water supply and drainage pipes.
- How long does the construction period take? Can residents stay during the work?
- For apartments, the work typically takes 3 weeks to 2 months, for small-scale condominiums and buildings it takes about 1.5 to 3 months, and for condominiums with over 50 units, it takes approximately 4 to 6 months. Residents can remain in their homes during the construction. However, while scaffolding is in place, there may be restrictions on drying laundry outside and opening windows, so we ensure to minimize the impact on daily life by distributing notices before construction, providing information on the schedule and laundry via bulletin boards, and strictly adhering to working hours.
- How long should I expect from starting the planning to completing the construction?
- For management associations, it typically takes about 1 to 1.5 years for establishing the repair committee, conducting building diagnostics, selecting contractors, and passing resolutions at general meetings, followed by 3 to 6 months for the construction itself. Overall, it is advisable to plan for about 2 years to proceed comfortably. If you are utilizing subsidies or tax incentives, please factor in the time required for obtaining management plan certification (resolutions at general meetings, pre-confirmation, and certification application).
- Are there any subsidies available for large-scale renovations in Shibuya, Tokyo?
- As of October 9, 2026, there are no confirmed systems on the official websites of Shibuya Ward and Tokyo that subsidize the construction costs of large-scale renovations such as exterior wall painting. Shibuya Ward’s “Housing Simple Renovation Support Project” targets individual residences within the ward, and common areas of collective housing are generally excluded. However, for owner-occupied condominiums, if certain conditions are met, a reduction in fixed property tax can be applied under the “Condominium Longevity Promotion Tax System” (in the 23 wards of Tokyo, this is a metropolitan tax with a reduction rate of 50%). One of the requirements for this tax system is obtaining management plan certification, which is handled by Shibuya Ward (Housing Policy Division). Shibuya Ward also has a system that provides free dispatch of condominium management consultants and subsidizes half of the costs related to creating long-term repair plans (up to 200,000 yen), with applications required one month prior to the start of creation or review. Tokyo also offers “Condominium Improvement Construction Subsidy” to cover interest on institutional loans (the second phase for fiscal year 2026 is accepting applications until February 19, 2027). If the construction includes windows and insulation, it may be eligible for the national “Advanced Window Renovation 2026,” “Future Eco Housing 2026,” or Tokyo’s existing housing energy-saving renovation promotion project. If the work involves greening of rooftops or walls, you can also check for subsidies under Shibuya Ward’s greening promotion project. The timing and applicants for each system vary, so please confirm the eligibility conditions and application procedures for each system before contracting and starting construction.
- I heard that property taxes can be reduced through large-scale renovations. Is that true?
- If the requirements are met, a reduction will be applied. Under the condominium longevity promotion tax system, if a condominium built for over 20 years and with a total of more than 10 units conducts large-scale repairs (such as exterior wall painting, floor waterproofing, and roof waterproofing as a single project) that contribute to longevity, the fixed asset tax for the building will be reduced by up to 100 square meters per unit in the following fiscal year. The reduction rate is determined by local ordinances, and in the 23 wards of Tokyo (where fixed asset tax is a metropolitan tax), it is half. The eligible projects are those completed between April 1, 2023, and March 31, 2027, and the application should be submitted to the metropolitan tax office in the property’s location (Shibuya Ward has the Shibuya Metropolitan Tax Office. Please check with the Tokyo Metropolitan Bureau of Taxation for jurisdiction). The application deadline is within three months after the completion of the work. For certified management plan condominiums, there are additional requirements such as raising the repair reserve fund, so it is recommended to start preparations more than a year in advance.
- Are there any changes to subsidies starting from the 2026 fiscal year?
- Yes. The national “Child-Rearing Green Housing Support Project” has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Since management associations and management association corporations can also become joint contractors, it can be used for insulation renovations of common areas. Additionally, the “Long-Term Excellent Housing Renovation Promotion Project” will end in the 2025 fiscal year and will not be implemented in the 2026 fiscal year. The “Advanced Window Renovation 2026 Project” has a method for collective applications for apartment buildings (the application process is handled by registered contractors). Please be careful not to base your financial plans on outdated information.
- What should I do if the repair reserve fund is insufficient?
- There are mainly four options. ① Postpone low-urgency repairs based on deterioration diagnosis to the next time, ② Review the scope and specifications of the work, ③ Check for support systems such as subsidies, ④ Consider increasing the repair reserve fund or loans from the Japan Housing Finance Agency. The agency’s loan for apartment common area renovations does not require collateral, and the interest rate can be reduced by up to 0.6% per year by obtaining management plan certification and implementing energy-saving or seismic work. Please note that postponing waterproofing and tile peeling measures often ends up being more expensive, so please consult us for decisions on separation.
- Can scaffolding be set up even if there is a height difference on the site or if the front road is narrow?
- Yes, it can. Shibuya Ward has a terrain with plateaus and valleys, with sites that have slopes and steps, as well as areas with wooden buildings and narrow roads (the ward has regulations for the widening of narrow roads). The conditions of the site and the delivery route vary by building. Kakeru Koumuten Co., Ltd. owns its own scaffolding materials and has its own scaffolding team, allowing us to plan support for the boards, layout, and delivery routes after checking the site. This is an area where additional costs are likely to arise after seeing the site, so it is important to confirm the delivery route during the estimation stage.
- What happens to the parking for residents during construction?
- Vehicles on the side where scaffolding will be erected will need to be temporarily moved. The number of parking spaces and availability varies by building, and securing a relocation spot may take time depending on the availability of nearby parking. Kakeru Koumuten Co., Ltd. will coordinate with you regarding the availability of nearby coin parking and monthly parking starting 2 to 3 months before construction begins.
- Can I freely decide the color of the exterior walls?
- Shibuya Ward is an area under a landscape planning zone. According to the ward’s notification guidelines, changes in color that exceed 50 square meters for roofs, exterior walls, ancillary facilities, and exterior structures in general areas are subject to notification. Repairs or renovations that change the appearance are subject to notification if the area exceeds half of the previous appearance. There is no explicit mention in the guidelines regarding repairs without changing the color. Notifications should ideally be made at least 30 days before starting work, and prior consultation is required for construction of buildings. The standards differ in specific landscape formation districts (Omotesando, Daikanyama, the old Yamate Street, around Shinjuku Gyoen, and the center of Shibuya Station). Additionally, there are 24 district plans within the ward. Whether a notification is necessary depends on the location of the building and the scope of the work, so please check in advance with the Shibuya Ward Urban Planning Division, Land Use Review Section (03-3463-2637). We will also investigate this during our survey. Sharing a color simulation to convey the completed image can facilitate discussions at general meetings and with neighbors.
- Why is the north-facing exterior wall particularly covered in moss and algae?
- This is because areas with poor sunlight and trapped moisture are prone to the growth of algae, moss, and mold. In addition to the north side, areas that do not receive sunlight due to neighboring buildings or trees are also likely to be affected. After thoroughly cleaning with high-pressure washing, choosing paint with anti-algae and anti-mold properties can help suppress recurrence. It is also recommended to check for blockages in roof drains and gutters caused by leaves and mud, as these can lead to water pooling on the roof and cause leaks.
- What should you choose, the responsibility construction method or the design supervision method?
- In cases with fewer units, the burden of consulting fees tends to be heavier, so I believe that the responsibility construction method is often more suitable for small to medium-sized buildings. On the other hand, for large buildings with many units, the design supervision method allows a third party to standardize specifications, providing significant benefits for comparison under the same conditions. While the design supervision method enables comparison of construction companies under the same conditions since a third party creates the specifications, it incurs separate consulting fees and requires caution regarding conflicts of interest and collusion risks. Even with the responsibility construction method, verification of price, specifications, and construction status is essential. Kakeru Koumuten Co., Ltd. provides estimates that clearly state quantities, methods, and materials for each construction item, allowing you to compare with other companies on the same level.
- How can you detect collusion in large-scale repairs?
- There are three typical methods. 1) Pre-selecting the contractor and having other companies submit only formal high estimates, known as “dummy estimates.” 2) A consultant contracts at an extremely low design supervision fee and receives kickbacks from partner companies, creating a cozy relationship. 3) Adding a portion of the contract amount as a back margin to the construction costs. Countermeasures include obtaining independent estimates, consulting with a neutral third party, keeping minutes of the selection process, and including penalty clauses in contracts. On September 28, 2026, the Japan Fair Trade Commission announced exclusion orders and payment orders for large-scale repair work.
- How many companies should I get estimates from?
- We recommend at least three companies. If there are too many, it becomes difficult to compare, and if there are too few, competition does not occur. What is important is not the number of companies but to “create the same level for comparison.” By creating a common specification sheet and quantity table and requesting under the same conditions, and by making detailed breakdowns mandatory instead of allowing “one set” notation, it becomes clear whether the price differences are due to differences in scope or unit prices.
- What is the difference if you have your own scaffolding?
- In large-scale repair construction costs, temporary construction accounts for about 20% (according to the Ministry of Land, Infrastructure, Transport and Tourism’s FY2021 survey). By not outsourcing scaffolding work, it is easier to control costs in this area, and our in-house scaffolding team can flexibly respond to sudden changes in the schedule or additional work. Kakeru Koumuten Co., Ltd. owns scaffolding materials for approximately 100 single-family homes and plans according to the site, even in areas with height differences or narrow front roads.
- I’m in the middle of getting estimates, but can I just have you look at the estimate?
- Of course, that’s possible. If you bring in estimates from other companies, we will check for free whether the items, quantities, methods, and materials are appropriate and provide an estimate under the same conditions. We welcome competitive estimates.
- Can I request just emergency measures for a leak?
- Yes. As a preliminary step to large-scale repairs, we also accept requests for emergency measures or partial repairs for leaks. We will identify the cause using thermal imaging and drones and propose the minimum necessary repairs.
- Can you handle roofing or exterior wall materials that contain asbestos?
- Yes, we can. We have qualified personnel who are asbestos work supervisors and building material inspectors, and we can handle everything from the legally required preliminary surveys to the cover method and removal of asbestos-containing roofing materials. The official page of Shibuya Ward does not show any subsidies for asbestos surveys and removals. Please check with the Shibuya Ward contact point for the latest information.
- What happens if you do not carry out large-scale repairs?
- There are risks such as personal injury from falling exterior tiles, structural deterioration due to corrosion of rebar, leaks, and a decrease in asset value. Furthermore, for buildings subject to periodic reporting under Article 12 of the Building Standards Act, inspections through full tapping and other methods are required under certain conditions, such as when more than ten years have passed since completion or exterior wall renovations. The periodic reporting for buildings in Shibuya Ward is handled by the Shibuya Ward Building Division, Equipment Section. Conditions such as the number of floors and floor area of apartment buildings can be checked on the list of buildings subject to periodic reporting by Tokyo Metropolitan Government. Mixed-use buildings including stores, restaurants, hospitals, and hotels may also be subject to reporting depending on their use and scale, so individual confirmation is necessary. Even if not subject to statutory inspections, regular inspections and maintenance are essential, so please consult us if you are unsure about your judgment.
- How much does large-scale repair for an apartment (about 10 units) cost?
- Wooden two-story buildings with 6 to 10 units range from 2,000,000 to 4,000,000 yen, while steel and RC three-story buildings with 10 to 20 units range from 4,000,000 to 9,000,000 yen, based on our company’s track record (including scaffolding, substrate repairs, exterior wall painting, sealing, and waterproofing). It is common for apartments to undergo renovations every 10 to 15 years. For property owners, there is an increasing trend to change the exterior appearance with color simulations during repairs, aiming to improve occupancy rates.
If you are looking for a large-scale repair contractor in Shibuya, Tokyo, contact Kakeru Koumuten
Our company handles exterior wall renovations and large-scale repairs for condominiums and apartments throughout Kanagawa Prefecture and Tokyo, including Shibuya. We are happy to assist not only with large-scale repair work but also with partial repairs and leak repairs. “I want it to last long with one renovation” “I want to keep costs down as much as possible” “I want to improve insulation performance because the indoors are hot” We will propose the best solutions for your specific requests and future repair plans.
From temporary scaffolding work to roofing and exterior wall painting, all work is performed by our own team. We are confident that we will not be outdone in terms of cost, quality, and efficiency compared to other companies, so we welcome competitive estimates!
On-site surveys, estimates, and color simulations are all free of charge
Please feel free to consult us via the inquiry form, phone, or LINE.
It is also fine to just present estimates from other companies.
Large-scale repair work service area
Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and Tokyo.
Uehara / Uguisudani-cho / Udagawacho / Ebisu Nishi / Ebisu Minami / Ebisu / Oyama-cho / Kamiyama-cho / Sakuragaoka-cho / Sasazuka / Sarugakucho / Shibuya / Shoto / Shinsen-cho / Jingumae / Jinnan / Sendagaya / Daikanyama-cho / Tomigaya / Dogenzaka / Minamidai-cho / Nishihara / Hatagaya / Hachiyama-cho / Hatsudai / Higashi / Hiroo / Honmachi / Maruyama-cho / Moto-Yoyogi-cho / Yoyogi Kamizono-cho / Yoyogi
・When should large-scale renovations be carried out? An explanation of the optimal timing and risks of postponement!
・Estimates are essential for large-scale renovations! Key points for comparison and precautions!
・5 common troubles in large-scale renovations of condominiums! Thorough explanation of causes and prevention measures!
・What is waterproofing work in large-scale renovations? A thorough explanation of its role, signs of deterioration, and precautions!
・Not enough funds for large-scale renovations… An explanation of how to deal with funding shortages and preparations you can do right now!
・What is substrate repair in large-scale renovations? A thorough explanation of its necessity, signs of deterioration, and types of work!
・What is sealing work in large-scale renovations? An introduction to its role, methods, and tips for avoiding mistakes!
・What is tile repair in large-scale renovations? An explanation of signs of deterioration, types of work, and cost averages!
・What is exterior wall painting in large-scale renovations? A thorough explanation of its necessity, signs of deterioration, and cost averages!
・For exterior renovations in Shibuya, Tokyo, trust Kakeru Koumuten!
・For roof renovations in Shibuya, Tokyo, trust Kakeru Koumuten!
・For exterior wall painting in Shibuya, Tokyo, trust Kakeru Koumuten!
We welcome consultations via LINE as well◎
We are also updating our Instagram regularly◎ Please follow us!
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!



