Leave the repair and renovation of condominiums and apartments in Higashikurume City, Tokyo to Kakeru Koumuten Co., Ltd.!
Large-Scale Repairs for Condominiums, Apartments, and Buildings in Higashikurume City
To owners, management associations, and management companies considering large-scale repairs for condominiums, apartments, and buildings in Higashikurume City, Tokyo.
Kakeru Koumuten Co., Ltd. is an exterior repair company that handles everything from the installation of temporary scaffolding to substrate repairs, exterior wall painting, tile repairs, sealing, waterproofing for rooftops and balconies, and roofing work, all managed and performed by our own team. In Higashikurume City, we have undertaken numerous large-scale repairs and exterior renovations for apartments, condominiums, and commercial facilities.
- On-site surveys and estimates are completely free (multiple estimates are welcome)
- All management from temporary scaffolding to exterior and roofing work is handled in-house
- For exterior wall color considerations, color simulations and trial painting are available
- Consultations for partial repairs or emergency measures for leaks are also possible
- Cost Estimate / For condominiums, the cost per unit is 750,000 to 1,500,000 yen (approximately 70% fall within this range according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, with the most common being 1,000,000 to 1,250,000 yen. This amount excludes consumption tax and common temporary costs). For wooden apartments, the estimate is 2,000,000 to 4,000,000 yen per building.
- Estimated Cycle / 12 to 15 years. However, the determining factor is not the number of years but the condition of deterioration.
- Particularly Relevant in Higashikurume City / The city is noted in Tokyo’s documents for having many large-scale housing complexes, such as the Hibarigaoka Housing Complex (which began occupancy in 1959, UR). The landscape is not confirmed by the city’s unique landscape plan, and notifications based on Tokyo’s landscape plan and the district plans of 10 areas within the city are involved. The Kurokawa and Ochiai Rivers have designated flood inundation areas as of February 2024.
- Available Funds / There are no subsidies for the overall construction costs of large-scale repairs in Higashikurume City or Tokyo. If requirements are met, property tax reductions (one-third in Higashikurume City; the national application deadline is for work completed by March 31, 2027) and Tokyo’s condominium improvement construction assistance (interest subsidies) may be available.
- Tips for Success / At least three estimates. Compare not just the amounts but also the quantities, methods, and materials.
Large-scale repair work that can be handled in Higashikurume City
Large-scale repairs are not just “exterior wall painting” or “waterproofing,” but rather a comprehensive repair of the entire building’s deterioration while scaffolding is in place. At Kakeru Koumuten, we can handle all of the following work in-house, ensuring clear responsibility and coordination of the process.
| Type of Work | Main Details |
|---|---|
| Temporary Scaffolding Work | Installed by our own scaffolding team using our own scaffolding materials. We handle mesh sheets, protection, and fall prevention measures. |
| Substrate Repair Work | Crack repairs, injection of floating mortar and tiles, explosion (exposed rebar) repairs, resin mortar repairs for missing parts. |
| Exterior Wall Painting Work | High-pressure washing, three coats of paint from primer to topcoat, painting of auxiliary parts (iron parts, gutters, water cut-offs, etc.). We accommodate radical control type, fluorine, and inorganic paints. |
| Tile Repair Work | Replacement of damaged tiles, joint repairs, clear waterproofing of tile surfaces (such as Seven S). |
| Sealing Work | Re-sealing around sashes and exterior wall joints, additional sealing. |
| Waterproofing Work | Urethane waterproofing for rooftops, roof balconies, shared corridors, and stairs, PVC sheet waterproofing, and installation of long sheets. |
| Roof Work | Roof painting, roof overlay (cover method), re-roofing, and ridge cap replacement. We have sheet metal craftsmen on staff and can handle large roofs such as factories. |
| Iron and Metal Work | Surface treatment painting of steel staircases, handrails, and PS doors, replacement of coping and water cut-offs. |
| Drainage and Wastewater Work | Cleaning and renovation of roof drains (insertion of renovation drains), resolving gutter blockages. This work is particularly important for rooftops and balconies where rainwater tends to accumulate during heavy rain. |
| Others | Replacement of rain gutters, rooftop and exterior wall inspections using drones, leak investigations using thermal imaging, and preliminary surveys of asbestos-containing building materials. |
Scope of Major Repairs Determined by Building Diagnosis
It is not guaranteed that all of the above works will be carried out. The extent of the work will be determined based on the results of the building diagnosis. At Kakeru Koumuten, we conduct a free on-site survey to confirm the following and summarize it in a deterioration diagnosis report with photos, after which we will propose the scope of work.
| Diagnosis Area | Main Inspection Methods | Scope of Work Determined by Diagnosis Results |
|---|---|---|
| Exterior Wall (Painted Surface) | Visual inspection, checking the width of cracks and the condition of the paint film | Methods and quantities for crack repair, specifications for painting (whether to repaint or paint after removing the existing paint film) |
| Exterior Wall (Tile Surface) | Sounding inspection. High areas checked with a drone | Scope and estimated quantity for injection and replacement, whether clear waterproofing is necessary |
| Sealing | Checking for cracks, shrinkage, peeling, and hardening | Whether to replace or add to the existing sealant, scope of joints to be worked on |
| Rooftop, Balcony, Shared Corridor | Checking for blisters or breaks in the waterproof layer, puddles, and the condition of drains | Full renovation or partial repair, method (urethane waterproofing, PVC sheet waterproofing, long sheet), whether drain renovation is necessary |
| Leak Areas | Inspection using thermal imaging camera and drone | Identification of the cause and priority areas for repair |
| Metal Parts, Roof, Accessories | Checking for rust, corrosion, lifting, and cracks | Whether painting is sufficient or if material replacement or cover method is necessary |
| Site and Surroundings | Checking retaining walls, slopes, trees, delivery routes, and parking lots | Planning for scaffolding and scope of temporary construction |
Reasons Kakeru Koumuten is Chosen for Large-Scale Renovations in Higashikurume City
The reason why we can be entrusted with large-scale renovations in Higashi Kurume City is our “initiatives that cannot be imitated by other companies in large-scale renovation work”, which has received high praise from many customers.
1. Equipment Specialized for Exterior Renovations
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality exterior wall painting and waterproofing work for large-scale renovations. We have established five bases centered around Yokohama City for material storage and showrooms.
In-house Scaffolding Materials
We own the scaffolding materials necessary for temporary scaffolding required for large-scale renovations and can assemble the scaffolding ourselves.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can cut costs for scaffolding work and provide quick and flexible responses.
We own scaffolding materials for approximately 100 detached houses!
Storage of Materials in Our Large Warehouse
We store paints and substrate repair materials used for exterior renovations. By ordering a large quantity of materials at once, we can procure materials at a lower cost! Additionally, since we always have stock available, we can provide speedy responses even in emergencies!
In-house Waste Separation
In large-scale renovations, various waste materials such as leftover paint, metal, and wood are generated. By sorting and recycling waste materials in-house, Kakeru Koumuten Co., Ltd. contributes to cost reduction of waste disposal fees.
Showroom Dedicated to Exterior Renovations

In the showroom, you can not only have meetings but also check actual samples and colors of exterior materials. You can also perform color simulations for exterior wall painting and check thermal insulation properties using a thermal insulation testing machine!
2. Cost Reduction through In-House Management and Construction
One of Kakeru Koumuten’s major strengths is in-house management and construction.
By managing everything from inquiries to project completion in a unified system, we can keep costs down while ensuring high-quality large-scale repairs. Additionally, one representative will handle everything from the estimate to project completion. Since the person in charge does not change, whether it’s sales or construction management, smooth communication is possible.
We can handle everything from temporary scaffolding installation to exterior wall painting, substrate repairs, waterproofing work, and tile repairs with complete in-house construction! Those with specialized knowledge and experience will conduct inspections and actual construction for each process!
3. Various Permits and Skilled Workers
We have obtained construction business licenses and permits for industrial waste collection and transportation! We also have nationally certified sheet metal and painting skilled workers, and we are confident in our construction techniques. We can also handle large-scale roofing work for factories! We have qualified personnel for asbestos work supervisors and building material asbestos investigators, so we can handle and conduct preliminary investigations of asbestos-containing roofing materials.
4. Warranty and Aftercare

Most large-scale repair works, including “painting work,” “substrate repair work,” and “waterproofing work,” come with a warranty!
Aftercare maintenance is available annually, and we send out notification DM every year.
5. Flexible and Prompt Response
Our company is equipped to handle various troubles and situations related to apartments and condominiums.
We can also address exterior walls and rooftops that cannot be checked from high places using drones! During rain leak investigations, we can use a thermal imaging camera to help identify the cause of the leaks!
We will respond according to your wishes. We also accept emergency measures for sudden rain leaks! We will promptly respond to urgent requests or emergencies!
6. Staff Development
Our staff create various models for skill improvement and conduct practical training. Since different sites require various processing and techniques, we regularly provide skill enhancement education to ensure each staff member can respond appropriately. We also educate on points to be careful about and areas to check during each stage of large-scale repair work.
7. Consideration for Residents and Neighbors

During large-scale renovation work, we will not only notify residents and greet nearby residents, but also install a bulletin board at the entrance to display the construction schedule and notices! Additionally, we will thoroughly educate visitors on proper manners to minimize inconvenience to residents and neighbors.
8. Strict Quality Control

Each process will be inspected by a responsible person, and detailed construction photos will be taken. We will use film thickness inspection devices and check sheets to ensure there are no oversights in the inspections. During exterior wall painting and waterproofing work, we will check the quantity of used paint cans to confirm that the specified amount of paint is being used, and we will order paint in-house to prevent construction defects. Of course, we will also take photos of the used paint and report them.
9. Exterior Wall Painting Color Simulation
9-1 Self Color Simulation

The simulations we create can be done using actual photos of your apartment or building!You can also perform the simulation on your smartphone or computer. By simulating and then applying a two-tone color or changing the image, we hope to enhance the stylish appearance and contribute to an increase in occupancy rates! Of course, we can also arrange paint samples for actual color confirmation.
* Higashikurume City is not included in the list of landscape administrative organizations in Tokyo, and notifications based on Tokyo’s landscape plan (such as building confirmation applications) are involved 30 days prior. In the areas of the 10 district plans within the city, a separate notification may be required. Whether exterior wall repainting is subject to this depends on the location and scale of the building, so prior confirmation is necessary. Having a color simulation screen will help facilitate explanations at the community association or management committee meetings.
9-2 Confirm the Actual Color with a Sample Paint!
You can order samples of the paint you are considering and conduct a sample paint application on your exterior wall. By performing a sample paint, you can confirm the actual color and gloss!
9-3 Exterior Renovation Simulation
Exterior simulations for apartments and condominiums are also possible!
・Exterior wall color simulation (two-tone colors are also possible)
・Simulation for when metal siding is applied
・Simulation using accent materials such as cornices and louvers
・Simulation for roof painting and roof replacement work
With the exterior renovation simulation, you can minimize the risk of failure in image changes! We hope that renovating the appearance of your apartment or condominium will help increase occupancy rates.
Cost Estimates for Major Repairs in Higashikurume City
The cost of major repairs varies significantly depending on the size of the building, the degree of deterioration, the scope of work, and the materials used. First, please refer to the national average based on public statistics, then to our company’s estimates based on construction performance by scale, and finally to examples of unit prices for each construction.
The national average for condominiums is 750,000 to 1,500,000 yen per unit
According to a survey conducted by the Ministry of Land, Infrastructure, Transport and Tourism, which aggregated 818 construction cases (FY 2021), approximately 70% of the costs for major repairs are concentrated in the range of 750,000 to 1,500,000 yen per unit, with the most common price range being 1,000,000 to 1,250,000 yen. Note that the amounts in this survey do not include consumption tax and common temporary construction costs, so the conditions differ from the current total construction costs including tax.
| Construction Cost per Unit | Percentage | Construction Cost per Unit | Percentage |
|---|---|---|---|
| Up to 750,000 JPY | 15.1% | 1,250,000 to 1,500,000 JPY | 17.4% |
| 750,000 to 1,000,000 JPY | 24.7% | 1,500,000 to 2,000,000 JPY | 9.1% |
| 1,000,000 to 1,250,000 JPY | 27.0% (most common) | Over 2,000,000 JPY | 2.8% |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (200 companies, 818 cases) *Amounts do not include consumption tax or common temporary costs. Percentages do not total 100% due to rounding and non-responses.
Breakdown of Construction Costs (What the Money is Spent On)
| Category | Composition Ratio | Main Contents |
|---|---|---|
| Construction-related Work | 60.3% | About half for exterior walls, about one-third for waterproofing. Substrate repair, tiles, painting, waterproofing |
| Temporary Work | 22.8% | Scaffolding, mesh sheets, protective coverings, etc. (does not include common temporary costs) |
| Miscellaneous Expenses | 10.3% | Site management fees, general management fees, statutory welfare expenses, etc. (9.5%), insurance premiums for large-scale renovation defect insurance (0.8%) |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (Second survey of large-scale renovation work. Overall average is construction-related 59.0%, temporary work 22.3%, miscellaneous expenses 9.9%). *The total does not equal 100% because equipment-related work, exterior works, and others are included. This is an average value and not a criterion for judging the appropriateness of individual estimates.
Cost Estimates by Building Size (Scaffolding, Substrate Repair, Exterior Wall Painting, Waterproofing, Sealing Set)
| Type and Scale of Building | Estimated Cost | Estimated Construction Period |
|---|---|---|
| Wooden Apartment (2 stories, 6-10 units) | 2,000,000 – 4,000,000 JPY | 3 – 5 weeks |
| Steel Frame/RC Apartment (3 stories, 10-20 units) | 4,000,000 – 9,000,000 JPY | 1 – 2 months |
| Mixed-use Building/Small-scale Condominium (4-5 stories) | 5,000,000 – 15,000,000 JPY | 1.5 – 3 months |
| Medium-scale Condominium (30-50 units) | 20,000,000 – 50,000,000 JPY | 3 – 5 months |
| Large-scale Condominium (over 100 units) | Around 100,000,000 JPY – | 6 months – |
*The above estimates are based on Kakeru Koumuten’s construction records and may vary depending on the presence of roofing work, steel work, plumbing, etc. For condominiums, please also consider the amount calculated by multiplying the national statistics (750,000 – 1,500,000 JPY per unit) by the number of units.
Breakdown of Costs for Temporary Work, Substrate Repair, Exterior Walls, and Waterproofing
The estimate for large-scale repairs is broadly divided into “Temporary Work,” “Substrate Repair,” “Sealing,” “Exterior Wall Painting,” “Waterproofing,” and “Miscellaneous Expenses.” Before comparing total amounts, please check what is included in each item, how much, and at what cost.
| Item | What to Check in the Estimate |
|---|---|
| Building Prerequisites | Structure (wooden, steel frame, RC), number of stories, number of units, exterior wall area, and waterproofing area. Also confirm whether the area is based on drawings or actual measurements. |
| Common Temporary Work and Scaffolding | Area and unit price of scaffolding, contents of mesh sheets, protection, temporary toilets, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, temporary works such as scaffolding account for about 20% of construction costs (excluding common temporary work costs). |
| Substrate Repair | Quantities and unit prices for repair methods such as cracks, lifting, and spalling. Since these items are not finalized until scaffolding is set up, please confirm whether it is based on estimated quantities or actual settlement, and the settlement method if quantities increase or decrease. |
| Sealing | Whether it is replacement or additional sealing, length of work (m), material name. |
| Exterior Wall Painting | Painting area (㎡), manufacturer name, product name, grade of paint, number of coats, and scope of ancillary parts. |
| Waterproofing | Area for each part such as rooftops, balconies, and common corridors, construction method, material name, and whether drain renovations are included. |
| Inspection and Reporting | Whether inspections for each process, construction photos, completion reports, and warranty documents are included. |
| Miscellaneous Expenses | Contents and proportions of site management fees, general management fees, statutory welfare expenses, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, these average about 10% of construction costs, but vary depending on the scale and conditions of the building, so there is no uniform standard. |
| Tax Classification | Whether the amounts are tax-inclusive or tax-exclusive. Since companies may display this differently, be sure to standardize before comparing total amounts. |
Unit Price Examples for Repair Work
| Repair Method | Materials Used | Cost |
|---|---|---|
| Tile Replacement | Existing Similar Tiles | per piece / 2,000 JPY〜4,000 JPY |
| Repair of Tile and Mortar Lifting Areas | Epoxy Resin Injection | per square meter / 3,000 JPY〜5,000 JPY (Varies depending on the degree) |
| Tile Joint Mortar Repair | Mortar for Tile Joints | per square meter / 1,000 JPY〜2,000 JPY (Varies depending on the degree) |
| Concrete Spalling Repair | Rust Preventive for Rebar + Resin Mortar | per area / 1,000 JPY〜2,000 JPY (Varies depending on the degree) |
| Crack Repair | Filler or Polymer Cement | per meter / 100 JPY〜2,500 JPY (Varies depending on the degree) |
| Exterior Wall Painting (3 Coats) | Radical Control Silicone Paint | per square meter / 2,500 JPY〜3,500 JPY |
| Roof Top Urethane Waterproofing (Ventilation Buffer Method) | High Strength Urethane | per square meter / 6,500 JPY〜9,500 JPY |
| Sealing Replacement | Modified Silicone | per meter / 900 JPY〜1,500 JPY |
| Temporary Scaffolding | In-house Owned Scaffolding Materials (Wedge Type) | per square meter / 700 JPY〜1,000 JPY |
*Costs and warranty periods vary depending on shape, quantity, substrate condition, and type of materials. If you would like a detailed estimate, please feel free to contact us. Estimates are completely free.
Select Paint and Waterproofing Grades Based on “Years Until Next Repair”
“Good paint does not equal the right choice.” The best way to choose is to align when the next major repair will be with the lifespan of the materials to minimize waste.
| Grade | Estimated Lifespan | Suitable Cases |
|---|---|---|
| Silicone / Radical Control Type | 10-16 years | Buildings that are cycled every 12-15 years. A good choice balancing cost and performance. Lifespan varies by product, so choose specifications that match the cycle. |
| Fluorine | 16-20 years | Buildings that want to set the next repair after 15 years, high-rise or complex-shaped buildings with high scaffolding costs. |
| Inorganic | 18-22 years | Buildings that want to suppress dirt adhesion. Effective for suppressing moss and algae on north-facing or tree-surrounded surfaces. |
| Urethane Waterproofing (Rooftop) | 8-15 years | Complex-shaped rooftops, when wanting to renovate using the existing waterproof layer. Mid-term inspections and repairs, such as re-coating the top coat, are prerequisites. |
| Vinyl Sheet Waterproofing | 20-25 years | Rooftops with a large area and simple shape. Short construction period. |
| Asphalt Waterproofing | 15-20 years | Rooftops planned for long cycles. The cost per instance increases. |
*The estimated lifespan is a general guideline and may vary depending on sunlight, location, and substrate condition. Choosing paints with anti-algae and anti-mold properties can improve durability in shaded and humid areas.
Guidelines for Repair Reserve Funds and Options When Insufficient
The Ministry of Land, Infrastructure, Transport and Tourism guidelines indicate the estimated repair reserve fund on a monthly basis per unit area. Additional charges are necessary if there is a mechanical parking lot.
| Building Size (Less than 20 Stories) | Monthly Estimate (Average) | Range Covering Two-Thirds of Cases | Conversion for 70㎡ |
|---|---|---|---|
| Less than 5,000㎡ | 335 JPY/㎡ | 235-430 JPY/㎡ | Approximately 16,500-30,100 JPY |
| 5,000-10,000㎡ | 252 JPY/㎡ | 170-320 JPY/㎡ | Approximately 11,900-22,400 JPY |
| 10,000-20,000㎡ | 271 JPY/㎡ | 200-330 JPY/㎡ | Approximately 14,000-23,100 JPY |
| Over 20,000㎡ | 255 JPY/㎡ | 190-325 JPY/㎡ | Approximately 13,300-22,750 JPY |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines on Repair Reserve Funds for Condominiums” (Reiwa 6, June revision, PDF) / National average is 13,378 JPY per unit (Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums)
In the Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums, 36.6% of management associations responded that “the repair reserve fund is insufficient compared to the plan.” There are four main options when insufficient.
| Options | Considerations and Cautions |
|---|---|
| ① Adjusting the Construction Schedule | Based on the deterioration diagnosis, postpone less urgent construction to the next time. However, it is essential to distinguish between construction that can be postponed and that which cannot, as delaying waterproofing and tile fall prevention measures can ultimately be more costly. |
| ② Reviewing the Scope and Specifications of Work | Revising paint grades, changing from full renovation to partial renovation, etc. Please consider this separately from “apparent cost reductions” that skip processes. |
| ③ Utilizing Subsidies and Tax Systems | Subsidies for energy-saving renovations, etc. (to be discussed later). The reduction of fixed asset tax is a system that lowers the tax amount for each unit owner, and does not directly increase the repair funds of the management association. |
| ④ Increasing Reserve Funds, Borrowing, and One-Time Payments | In addition to considering an increase in repair reserve funds at the general meeting, the Housing Finance Agency’s condominium common area renovation loans require no collateral. Interest rates can be lowered by obtaining management plan certification. |
Subsidies, Tax Systems, and Loans to Check for Large-Scale Renovations in Higashikurume City
In Higashikurume City, Tokyo, there are no subsidies confirmed that cover the entire construction cost of large-scale renovations. Potential options include the Tokyo Metropolitan Government’s condominium improvement construction subsidy (interest subsidy), the Tokyo “Stay in Tokyo” condominium subsidy, national energy-saving subsidies, and reductions in fixed asset tax. The available options can be broadly categorized into the following four types. The eligibility and application status of these systems may change even during the fiscal year, so please be sure to confirm with our company or the respective offices before contracting or starting construction. (As of October 15, 2026)
| Type | Details |
|---|---|
| ① Support for Investigation and Consultation | Support for the management plan certification system and management status reporting system in Higashi-Kurume City (contact through the Urban Planning Division), the comprehensive consultation desk for condominium management in Tokyo, condominium management advisors, and telephone consultations at the Condominium Management Center. This can be used in the preliminary stages before large-scale repairs. The city’s condominium policy page does not confirm the dispatch of advisors or specialized consultations. |
| ② Construction Subsidies by Purpose | Subsidies for “Tokyo Stay Condominiums” from Tokyo, and insulation and renewable energy projects for owners of entire rental buildings in Tokyo. These can be incorporated into large-scale repairs. |
| ③ Tax Incentives | Reduction of property tax under the condominium longevity promotion tax system (the reduction rate in Higashi-Kurume City is one-third). |
| ④ Public Loans and Interest Subsidies | Loans for the renovation of common areas in condominiums from the Japan Housing Finance Agency, and interest subsidies from Tokyo (subsidies for condominium improvement work). As far as can be confirmed, there are no city loan arrangements or interest subsidies available. |
① Condominium Longevity Promotion Tax System (Property Tax Reduction)
If large-scale repairs (including exterior painting, floor waterproofing, and roof waterproofing) that contribute to the longevity of certain qualifying condominiums are carried out, the property tax amount for the building in the following fiscal year will be reduced. The reduction rate is determined by the municipality within the national range (one-sixth to one-half). The reduction rate in Higashi-Kurume City is one-third (up to the tax amount equivalent to 100㎡ per unit), and urban planning tax is not included.
| Main Requirements | Built over 20 years ago, with a total of 10 or more units, and must have a residential exclusive part (for mixed-use buildings, the residential part must be more than half) / All three works: exterior wall painting, floor waterproofing, and roof waterproofing must have been completed / Must meet one of the following: ① Certified management plan condominium (proof of increase in repair reserve fund is required) ② Condominium that has received advice and guidance from the city and has proof of implementation of a long-term repair plan |
|---|---|
| Reduction Rate | Higashikurume City is one-third. The target is the fixed asset tax amount for up to 100㎡ per unit, while land and urban planning taxes are excluded. The 23 wards of Tokyo are set at one-half, which is different from Higashikurume City. |
| Construction Implementation Deadline | From April 1, 2023, to March 31, 2027, it is a condition that large-scale repair work is completed (City page updated on July 7, 2026). |
| Application | Applications must be made within three months of the completion date of the work. The main documents listed on the city’s page include the application form, large-scale repair certificate, past work certificate, and documents showing the total number of units. For certified condominiums, a copy of the certification notice and proof of increase in the repair reserve fund are required, and for condominiums that received advice and guidance, a certificate proving the implementation of the advice and guidance is also required. The department to which applications should be submitted is not specified on the city’s page (For general inquiries about the system, contact the Tax Division, Property Tax Section, Citizen’s Department at 042-470-7727; for certification and advice/guidance, contact the Urban Planning Division, Planning Coordination Section at 042-470-7762). The Tokyo Metropolitan Tax Bureau’s page is based on buildings in the 23 wards of Tokyo, so please follow the city’s guidance for buildings in Higashikurume City. |
| Points to Note | The application is limited to once, and cannot be combined with other reduction measures such as seismic, barrier-free, or energy-saving renovations. Simply obtaining a management plan certification does not qualify; there are requirements such as increasing the repair reserve fund. A review of the long-term repair plan is also necessary, so it is recommended to prepare at least one year before the construction. |
② City and Tokyo Contact Points (Management Associations should start here)
The contact point for the certification of management plans and reporting of management status for condominiums is Higashikurume City Urban Construction Department, Urban Planning Division, Planning Coordination Section (Phone 042-470-7762). Reporting of management status is a Tokyo Metropolitan system, applicable to condominiums with six or more units built before Showa 58.
| Contact & System | Details |
|---|---|
| Management Plan Certification System Contact (Higashikurume City) | Urban Planning Division, Planning Coordination Section (Phone: 042-470-7762). Applications are made through the Public Interest Incorporated Foundation, Condominium Management Center’s “Management Plan Certification Procedure Support Service,” and there is a usage fee (the amount is not listed on the city’s page). Change applications are free. The city has the “Higashikurume City Condominium Management Proper Promotion Plan,” and as of October 7, 2026, there are 5 certified buildings (some are not publicly disclosed) as stated on the city’s page. |
| Condominium Management Status Reporting System (Tokyo) | Applicable to condominium buildings with 6 or more units constructed before 1983, and the applicable condominiums will receive reporting forms and guidance from Tokyo Metropolitan Government sequentially. The reporter is a representative of the management association, and submissions can be made online or at the city’s office. The city’s office is the Urban Planning Division, Planning Coordination Section (Phone: 042-470-7762), and the method of submission is through the Comprehensive Consultation Office for Condominiums (Phone: 03-6427-4900). The timing for submissions is not listed on the city’s page. |
| Tokyo’s Condominium Management Advisor & Comprehensive Consultation Office | The Comprehensive Consultation Office for Condominiums can be reached at Phone: 03-6427-4900 (free. Monday to Friday and the first Saturday & third Sunday from 9 AM to 5 PM, until 7 PM on Wednesdays). The cost for management advisors, as of April 2024, is 16,500 yen for Course A and 25,300 yen for Course B (both including tax). Applications for dispatch can be made to the Tokyo Disaster Prevention and Urban Development Center, Urban Development Promotion Section (Phone: 03-5989-1453). The Condominium Management Center’s phone consultations are for management & regulations at 03-3222-1517 and for buildings & facilities at 03-3222-1519. |
| Consultation on Fixed Asset Tax (Higashikurume City) | For general inquiries, contact the Citizens’ Department, Tax Division, Building Asset Tax Section (Phone: 042-470-7727). For inquiries regarding management plan certification and advice & guidance, contact the Urban Planning Division, Planning Coordination Section (Phone: 042-470-7762), as indicated on the city’s page. The department for reduction applications is not clearly stated on the city’s page, so please confirm with the Tax Division before construction. |
| Consultation on Landscape & District Planning | For notifications regarding Tokyo’s landscape plan, contact the Tokyo Metropolitan Bureau of Urban Development, Green Space and Landscape Division, Streetscape Landscape Section (Phone: 03-5388-3265). For notifications regarding district planning, contact the Urban Planning Division, Land Use Planning Section (Phone: 042-470-7782) (for details, see the next section). |
Source: Higashikurume City “Condominium Management Plan Certification System”/Higashikurume City “Condominium Management Status Reporting System”/Higashikurume City “Condominium” Policy List/Higashikurume City “Reduction Measures for Newly Built Houses” (including longevity reduction)/Tokyo Metropolitan Government “Condominium Comprehensive Consultation Desk”/Tokyo Metropolitan Government “Condominium Management Advisor System” *Please note that the status of the systems and their reception may change.
③ Management Plan Certification System (Entry for Tax and Interest Benefits)
This is a national system certified by cities that have established management optimization promotion plans. By receiving certification, you can meet one of the requirements for lower interest rates on the Housing Finance Agency’s “Flat 35” and condominium common area renovation loans, as well as the longevity promotion tax system (certification alone does not guarantee tax reduction). The certification criteria consist of 17 items in accordance with national guidelines. Main criteria include holding general meetings at least once a year, establishing management regulations, segregated accounting for management fees and repair reserves, ensuring that arrears do not exceed 10% of the total, and “having a long-term repair plan that includes two or more large-scale repair works and is created or reviewed within 7 years, with a planning period of over 30 years.”
*Certification is subject to renewal every 5 years, and approval from the general meeting is required for application. For the longevity promotion tax system, certification must be valid on both the assessment date (January 1) and at the time of declaration. The city’s contact point is the Urban Planning Division, Planning Coordination Section. Please check the city’s website for details on procedures and certification criteria.
④ National Energy Conservation Support | Housing Energy Conservation 2026 Campaign
Changes for Fiscal Year 2026The “Child-Rearing Green Housing Support Project” for Fiscal Year 2025 has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Additionally, the “Long-Term Excellent Housing Renovation Promotion Project” will end in Fiscal Year 7 and will not be implemented in Fiscal Year 8. Please be careful not to base your financial plans on outdated information.
Mirai Eco Housing 2026 Project
| Target | Renovations of existing homes built before December 31, 2016, regardless of whether they are single-family or multi-family residences. Management associations and management corporations can also become joint contractors (i.e., can be used for common area renovations). Rental properties are also eligible. |
|---|---|
| Required Work | Insulation renovations of openings, insulation renovations of the structure (floor, walls, ceiling), and installation of eco-friendly housing equipment are mandatory combinations. |
| Subsidy Limit | Depending on the age of the building and the energy-saving performance achieved, 400,000 to 1,000,000 yen per unit (1,000,000 yen for homes built before 1991 that meet the mandatory standards). |
| Period | Subsidy applications are generally made by registered contractors (construction contractors) after the completion of work (the ordering party cannot apply themselves). Reservations for subsidy applications must be made by November 16, 2026, at the latest, and applications must be submitted by December 31, 2026, at the latest (will end once the budget limit is reached). |
Advanced Window Renovation 2026 Project
| Target | Renovations to high-performance thermal insulation windows, including the installation of interior windows, replacement of exterior windows, and glass replacement in existing homes (single-family and multi-family). Subsidy rates are set separately for “low-rise” and “mid-to-high-rise” multi-family residences. |
|---|---|
| Bulk Application for Multi-Family Residences | From May 29, 2026, applications for “bulk subsidy applications for multi-family residences (including reservations)” have begun. The application process is handled by registered contractors (window renovation contractors), and management associations cannot apply themselves, but they can apply for all units collectively, making it a system that works well with large-scale repairs for window and entrance door renovations. |
| Subsidy Limit | For residences, 1,000,000 yen per unit (changed from 2,000,000 yen in FY2025). For non-residential buildings over 240 square meters, 10,000,000 yen per building. |
| Period | Work started after November 28, 2025. Subsidy applications are made after the completion and handover of the work, with reservations due by November 16, 2026, at the latest, and applications due by December 31, 2026, at the latest (will end once the budget limit is reached). |
⑤ Subsidies and Support in Tokyo and Higashikurume City
| Tokyo Apartment Improvement Project Subsidy (Interest Subsidy) | The management associations of fire-resistant condominiums in Tokyo can utilize the Housing Finance Agency’s “Condominium Common Area Renovation Loan,” with the Tokyo Metropolitan Government providing an interest subsidy that lowers the agency’s interest rate by 1% (the interest subsidy period is up to 20 years). The second phase for the fiscal year 2026 runs from October 1, 2026, to February 19, 2027, and applications will close when the number of applications reaches 2,500 units or the budget amount is met (first-come, first-served basis for in-person and mail applications). Buildings constructed under the old seismic standards (before May 31, 1981) require a seismic diagnosis. The contact point is the Tokyo Metropolitan Housing Policy Headquarters, Condominium Division (phone 03-5320-7532). |
|---|---|
| Tokyo Rental Housing Insulation and Renewable Energy Promotion Project | This program targets owners of entire rental housing buildings. High-performance insulation windows (up to 300,000 JPY/unit), high-performance insulation doors (up to 270,000 JPY/unit), and insulation material renovations for walls and floors (up to 600,000 JPY/unit) are subsidized at a rate of two-thirds, with energy performance diagnosis and labeling capped at 1,200,000 JPY/building. Solar power generation and storage batteries are also eligible, and when installing solar panels on the flat roofs of existing rental housing, there is an additional waterproofing cost (180,000 JPY/kW). Pre-application for subsidies is from May 29, 2026, to March 31, 2027, and will end when the total application amount reaches the cap. The construction must be carried out by businesses registered with the Tokyo Environmental Public Corporation “Cool-Net Tokyo.” |
| Tokyo Stay Apartment (Fiscal Year 2026) | This program is aimed at registered condominium management associations, providing subsidies for disaster preparedness stockpiling, storage facilities, emergency power sources, elevator entrapment prevention, and flood countermeasures. The subsidy rate and maximum amount are specified for each project. Applications are accepted from June 5, 2026, to January 15, 2027, but some projects may have earlier deadlines. There is no mention of remaining budget. The contact point is the reception office (phone 03-5989-1547), and for general inquiries about the system, contact the Condominium Division (phone 03-5320-5007). |
* In Higashikurume City, there appears to be no subsidies specifically targeting the costs of large-scale repairs such as exterior painting or waterproofing. The city’s condominium policy page does not mention advisor dispatch, subsidies, or seminars. The city’s construction page lists subsidies for seismic diagnosis and retrofitting of wooden houses, as well as for the seismic reinforcement of buildings along designated emergency transport routes, but it is unclear whether the common areas of condominiums are included, as well as the amounts and requirements. There is also no confirmation of subsidies for asbestos investigation and removal. The Tokyo “Rental Housing Insulation and Renewable Energy Promotion Project” targets owners of entire rental housing buildings, and condominium management associations are not mentioned as eligible. Please be sure to check the conditions before signing a contract.
- Tokyo: Subsidies for Repairs of Condominiums (Official)
- Tokyo: Stay in Tokyo Condominiums Reiwa 8 (Official)
- Tokyo: Insulation and Renewable Energy Promotion Project for Rental Housing (Official)
- Cool Network Tokyo: Reiwa 8 Insulation and Renewable Energy Promotion Project for Rental Housing
- Higashikurume City: Condominiums (Official)
- Higashikurume City: Construction (Including Earthquake Resistance Subsidies, Official)
⑥ Financing System (Housing Finance Agency Condominium Sumairu Loan)
If the management association borrows funds for large-scale repairs, they can utilize the Housing Finance Agency’s “Condominium Common Area Renovation Loan (Condominium Sumairu Loan).”
| Eligible Works | Large-scale repairs, earthquake resistance renovations, flood prevention measures, energy-saving measures, balcony repairs, safety measures for elevators and parking lots, asbestos measures, costs for diagnosis and design by specialists. |
|---|---|
| Collateral | No collateral required (Joint guarantee by the condominium management center, etc.) |
| Repayment Period | Generally 1 to 10 years, 1 to 20 years for specific works, up to 35 years for earthquake, flood, and energy-saving works after obtaining management plan certification. |
| Interest Rate Reduction | ① Holding of Sumairu Bonds ② Obtaining Management Plan Certification ③ Implementation of earthquake, flood, and energy-saving works, each reducing by 0.2% per year (up to 0.6% per year). |
| Main Requirements | Improvement of management regulations, resolution at the general meeting, repair reserve fund delinquency rate generally within 10%. Applications accepted year-round. |
Source: Housing Finance Agency “Condominium Sumairu Loan” (Official)
Cases Where Fire Insurance Can Be Used and Cases Where It Should Not Be Used
Damage caused by “accidental incidents” such as the scattering of rooftop waterproof sheets, caps, and fences due to typhoons and strong winds, hail damage, and lightning strikes may be covered by fire insurance. It is important to separate and record damage from accidents and aging deterioration during the deterioration diagnosis.
On the other hand, aging deterioration itself is not covered. There have been numerous troubles nationwide caused by contractors who solicit, “You can repair it without any out-of-pocket expenses with insurance money,” and the National Consumer Affairs Center has repeatedly issued warnings. False claims can lead to insurance fraud charges. Please confirm the eligibility of your claim directly with your management association or owner to the insurance company or agency. Kakeru Koumuten Co., Ltd. will not provide such guidance.
Building Conditions and Repair Points in Higashikurume City
Higashikurume City is located in the central part of the Musashino Plateau, with an elevation of approximately 40 to 70 meters, on mostly flat land. The Kurokawa River and the Ochiai River flow east through the center of the city, and the Minamisawa Spring Group is the only one selected as “One of the Top 100 Waters of the Heisei Era” in Tokyo. According to Tokyo’s materials, the city is described as a “bedtown of Tokyo,” with many large housing complexes, primarily inhabited by families. The city was established in 1970. However, this information pertains to the entire city. Your building’s age and deterioration status will be individually confirmed through an on-site survey.
(January 1, Reiwa 8 – Basic Resident Register)
(January 1, Reiwa 8 – Basic Resident Register)
(October 1, Reiwa 7)
(January 1, Reiwa 8 – City Statistics)
Source: Higashikurume City “Statistics Higashikurume (Reiwa 7 Edition)”/Tokyo “Higashikurume City” (Tama and Islands Introduction Page) ※Population and household numbers are based on the Basic Resident Register and differ from the census population.
Organizing the City and Buildings of Higashikurume from a Repair Perspective
The table below summarizes only the items that can be confirmed from public materials published by the city, the metropolitan government, and the UR Urban Development Corporation. Individual building circumstances cannot be determined from the overall city figures.
| Item | Verifiable Information | Perspective When Considering Repairs |
|---|---|---|
| History of the Town | The city was established in Showa 45 (1970) according to city statistics (no specific date provided). The Tokyo Metropolitan Government’s materials describe it as a “bedtown of Tokyo,” with many large housing complexes primarily inhabited by families. There are no publicly available documents regarding the construction years for different development periods within the confirmed range. | Since the timing of development can vary by area, the construction years of buildings can differ even within the same city. The construction year for each building will be confirmed individually. |
| Housing Complexes and Apartments | The UR Urban Development Corporation’s “Hibarigaoka Housing Complex” is a large-scale complex that began occupancy in Showa 34 (1959), with 2,714 housing units reported (spanning Nishitokyo City, with no specific aggregation date provided). After more than 40 years since construction, a redevelopment project was initiated in March Heisei 11 (1999), and the rebuilding has been progressing sequentially (the information on UR’s page mainly covers up to around 2015, and current progress has not been confirmed). The UR rental “Takiyama” (Takiyama 6-1) is a reinforced concrete structure with 1,060 units, displaying “57 years of management.” According to city statistics, there are 7,584 public rental housing units (FY Reiwa 5), and households living in public, urban development, and public corporation rentals account for 14.8% (2020 national census). | Repairs for housing complexes are determined by the management association for condominiums and by the business entity for rentals. There may be clusters of buildings constructed around the same time, and the scope of renovations will be assessed through deterioration diagnosis. |
| Condominiums | The city’s condominium policy page includes registration examination criteria for management optimization support organizations, management optimization promotion plans, management status reporting systems, and management plan certification systems. As of October 7, Reiwa 8, five buildings have been certified (some are not publicly disclosed). The number of condominium buildings, units, and their construction years within the city has not been confirmed. | Management associations with older buildings should expedite the review of long-term repair plans and reserve funds to expand options such as property tax reductions and considerations for management plan certification. |
| Aging Population and Living Conditions | The percentage of the population aged 65 and over is 28.97% (as of January 1, Reiwa 8, according to city statistics). | In buildings with many long-term residents or elderly tenants, consideration for living conditions during construction is essential. Information about the construction schedule, laundry and ventilation times, and safety in stairways and corridors will be carefully communicated through general meetings and postings. |
| Rental Apartments and Vacant Houses | Households living in private rentals account for 22.6%, while homeowners make up 58.8% (2020 national census, city statistics). There are no public descriptions specifically regarding wooden apartments or the number of vacant houses that have been confirmed. | In rental apartments, it is crucial to inform tenants and create schedules that accommodate the status of vacancies. The condition of each building will be verified through on-site surveys. |
| Topography and Rivers/Spring Water | The city is located in the central part of the Musashino Plateau, at an elevation of approximately 40 to 70 meters, gradually declining from the western Yanagikubo Plateau to the east. It is situated above the Kanto loam layer, with spring water emerging around 50 meters in elevation; the Minamisawa spring group was selected as one of the “100 Famous Waters of Heisei” in June Heisei 20 (2008). The Kurokawa River (first-class river, total length 17.3 km) and the Ochiai River (same, 3.4 km) flow through the area. | In low-lying areas near rivers or springs, there may be water-related impacts. The placement of scaffolding and transportation of materials will be determined by confirming the building’s location and surrounding conditions on-site. |
| Assumptions Regarding Floods, Landslides, and Earthquakes | The city’s flood hazard map (2024 edition, updated on October 27, Reiwa 6) indicates potential flooding from the maximum expected rainfall (total rainfall of 657mm over 24 hours, maximum rainfall of 156mm in 1 hour). As of February 15, Reiwa 6, parts of the Kurokawa River and the Ochiai River have been designated as flood inundation areas. The red frame indicates external water flooding, while the other areas represent predicted inundation zones from both external and internal water, with a note stating, “This is a prediction, and the flooding situation may vary.” There are 15 landslide warning areas (yellow zones) and 9 special warning areas (red zones) within the city. The assumptions regarding liquefaction and earthquake damage have not been confirmed. | Please check the city’s hazard map for assumptions regarding the location of your building. We will include the condition of drainage and waterproofing layers on rooftops and balconies in our inspection items. |
| Roads and Delivery | We have not confirmed any official descriptions regarding the width trends of city roads or parking and delivery routes. The Tokyo Metropolitan Police Department’s page lists Higashikurume City and Nishitokyo City under the jurisdiction of the Tanashi Police Station (it is not specified whether this includes the entire city). | The type of road (city road or metropolitan road) determines the window for occupancy permits. The layout of scaffolding and delivery will be confirmed on-site for each project. |
| Scenery and City Rules | Higashikurume City is not included in the list of Tokyo’s landscape administrative organizations, and notifications based on Tokyo’s landscape plan are involved. There are 10 district plans within the city (Yanagikubo, Higashikurume Station West Exit, Higashikurume Station East Exit, Higashikurume Station East Exit Second, Ueno-hara, Hibari-ga-oka, along the Koganei-Kurume Line Chuo Town, Minamisawa 5-chome, along the Kurume-Higashimurayama Line Yanagikubo, along the Higashikurume Station Kamiyama Line Shinbo Town), and if construction activities are to be carried out within these areas, prior notification to the mayor is required. We have not confirmed the scenic districts and building agreements. | Whether repainting the exterior walls requires notification depends on the location and size of the building. Early confirmation is necessary (please see the table below). |
| Preliminary Coordination with Neighbors | The city has a page regarding regulations on land development, etc. It has not been confirmed whether large-scale repairs or exterior wall renovations are included. | If you are concerned about applicability, please check with the city’s Urban Planning Division (phone 042-470-7782). Providing prior explanations to neighbors is important at any site. |
Four Factors to Consider for Large-Scale Repairs Unique to Higashikurume City
We have organized four factors to keep in mind for large-scale repairs based on the history of Higashikurume City and the city’s rules. The circumstances for each building vary, so individual confirmation will be made through on-site surveys.
① Different Decision-Making Bodies for Large-Scale Complexes and Condominiums vs. Rentals
There are large-scale UR rental complexes in the city, and the Hibari-ga-oka complex began occupancy in Showa 34 (1959). For condominiums, the management association makes repair decisions, while for rentals, the business entity does. In older buildings, substrate repairs and the deterioration of tiles and waterproofing tend to become severe, so early building diagnosis is beneficial. Based on the diagnosis, we will organize the repairs to be done this time and those that can be postponed to the next time.
② Notifications for Tokyo’s Landscape Plan and 10 District Plans
The city is not included in the list of Tokyo’s landscape administrative organizations, and notifications related to Tokyo’s landscape plan are involved. In the areas of the 10 district plans within the city, notification to the mayor is required. Confirm whether it is applicable during the investigation stage, and incorporate color considerations and notification preparations into the process.
③ Flat Plateaus with Rivers and Spring Water, and Drainage from Rooftops and Balconies
The Kurome River and the Ochiai River were designated as flood inundation risk areas in February of Reiwa 6, and the hazard map indicates inundation from both external and internal water. The assumptions for each building vary depending on its location. On rooftops and balconies, if roof drains or gutters become clogged during heavy rain, it can lead to puddles and leaks. We recommend conducting inspections and cleaning of the drains, and including repairs in the work items based on their condition.
④ How to distinguish between roads for scaffolding and windows
If the road for scaffolding is a city road, the contact point is the Management Division, Management Coordination Section; if it is a prefectural road, it is the Northern Tama North Construction Office. The police jurisdiction is under the Tanashi Police Station. Our own scaffolding team will assess the site and plan the layout of the scaffolding suitable for the type and width of the road.
Source: Higashikurume City “Statistics Higashikurume (Reiwa 7 Edition)”/Higashikurume City “Rivers and Spring Water”/UR Urban Development Corporation “Initiatives for Redevelopment in Hibarigaoka Housing Complex”/UR Rental Housing “Taki-yama”/Higashikurume City “Disaster Prevention Map / Flood Hazard Map”/Higashikurume City “District Plan”/Tokyo Metropolitan Police Department “Tanashi Police Station”/Tokyo Metropolitan Bureau of Construction “Northern Tama North Construction Office”
When landscape procedures may be required (for buildings)
When carrying out exterior wall repainting and other work within Higashikurume City, the notifications related to landscape and other matters are as follows, according to materials from the city and Tokyo Metropolitan Government.
| Area and Scale | Applicable Actions | Procedure |
|---|---|---|
| Target Area of Tokyo’s Landscape Plan Higashikurume City is not listed as a landscape administrative organization in Tokyo |
New construction, extension, renovation, as well as large-scale repairs or renovations involving changes to the appearance, and color changes (for large buildings) | Notification to Tokyo Metropolitan Government (30 days prior to building confirmation application, or 30 days prior to commencement if there are no relevant legal procedures). For scale requirements, please confirm with the Tokyo Metropolitan Bureau of Urban Development, Green Space and Landscape Division, Streetscape Landscape Section (Phone: 03-5388-3265) |
| District Planning Area 10 districts within the city |
When conducting construction activities within the area. Main restrictions are stipulated in the “Ordinance on Restrictions of Buildings in the Higashikurume City District Planning Area,” and details for each district are described in the planning documents and operational standards. There is no confirmation regarding the color of exterior walls | Prior Notification to the Mayor of Higashikurume City. Urban Planning Division, Land Use Planning Section (Phone: 042-470-7782). Please confirm with the counter whether the area applies and if exterior wall renovations are included |
| Scenic Districts and Building Agreements | It is not possible to confirm the existence of scenic districts and building agreements within the city from the city’s page | If you are concerned about applicability, please confirm with the Urban Planning Division |
Source: Tokyo Metropolitan Government “Landscape Formation through Notification System” / Higashikurume City “District Planning” *The scale requirements of Tokyo’s landscape plan have not been confirmed, so numerical values are not included in the text. The list of landscape administrative organizations is based on the Tokyo Metropolitan Government’s page.
Points of Discussion When Advancing Construction in Higashikurume City
| Issue | Current Situation in Higashikurume City and Kakeru Koumuten’s Response |
|---|---|
| Exterior Wall Color and Landscape Procedures | Depending on the location and scale of the building, it may be subject to the Tokyo Metropolitan Landscape Plan notification and the district plan notification. We will confirm whether it is subject during the investigation phase, decide on the color through color simulation and trial painting, and assist in preparing the necessary documents for notification. |
| Rainwater Drainage and Drains | During heavy rain, drainage from rooftops and balconies is crucial. We will check the roof drains, gutters, and balcony drainage outlets during the investigation, and if there are blockages or damage to the waterproof layer, we will include them in our proposal. |
| Road Occupation for Scaffolding and Temporary Fencing | If scaffolding, temporary fencing, or morning glories are placed on the road, permission from the road administrator and a road usage permit from the police are required. The city road can be contacted through the Urban Construction Department, Management Division, Management Coordination Section (phone 042-470-7764), and the application documents for occupation can be downloaded from the city’s page. The handling of scaffolding and temporary fencing, standard processing periods, and the consultation process with the police station are not detailed on the city page and have not been confirmed. The metropolitan road is managed by the Northern Tama North Construction Office of the Tokyo Metropolitan Bureau of Construction (which oversees 10 cities including Higashikurume City), and the contact for road management is (road occupation phone 042-540-9530・9531). The police jurisdiction for Higashikurume City is listed under the Tanashi Police Station (phone 042-467-0110) on the Tokyo Metropolitan Police page, where road usage permits are handled. The contact for national roads has not been confirmed. Our own scaffolding team will assess the site and plan the scaffolding layout according to the road conditions. |
| Narrow Site and Material Delivery | There is no official description from the city regarding the width of city roads or delivery routes. At narrow sites, our own scaffolding team will assess the site and plan the delivery route and scaffolding layout. Vehicles on the side where scaffolding will be placed will need to be temporarily moved, so arrangements for the relocation will be made together 2 to 3 months before construction starts. |
| Noisy Work and Neighbors | Whether the work such as dismantling scaffolding or chipping falls under the specific construction work notification of the Noise Regulation Act and Vibration Regulation Act depends on the nature of the work. The notification window and deadline for Higashikurume City have not been confirmed, so we will check with the city according to the construction content. We will ensure to greet the neighbors and strictly adhere to the working hours. |
| Buildings with Operating Tenants | For buildings where the first floor is a store or office and the upper floors are residential, consideration for business hours and access is necessary. We recommend prior explanations through the management association or tenants, and we ensure thorough greetings, posting of the construction schedule, and adherence to working hours. |
| Plans for Older Buildings and Housing Complexes | For older buildings, understanding the condition of the substrate, tiles, and waterproof layer through building diagnostics is the starting point. Based on a deterioration diagnosis report with photos, we will sort and propose repairs to be done this time, work that can be summarized while scaffolding is up, and work that can be postponed to the next time. In housing complexes, we will assess the condition of each building and organize the scope and timing of repairs in conjunction with the results of the diagnostics. |
※Kakeru Koumuten Co., Ltd. has established five bases centered around Yokohama City and will visit Higashikurume City.
Signs of Deterioration and Timing for Major Repairs
Generally, major repairs are recommended every 12 to 15 years. According to a survey by the Ministry of Land, Infrastructure, Transport and Tourism, the actual repair cycle is most commonly 13 years, with about 70% of cases falling within 12 to 15 years, and the cycle tends to shorten with each occurrence. However, the actual judgment should be based on the condition of deterioration rather than just the number of years, so if you observe any of the symptoms listed below, we recommend an early on-site inspection.
| Area | Dangerous Signs of Deterioration if Left Unattended | Main Countermeasures |
|---|---|---|
| Exterior Wall (Painted Surface) | Chalking (white powder on hands), fading, cracks wider than 0.3mm, blistering or peeling of the paint film | Substrate repair + exterior wall painting |
| Exterior Wall (Tile Surface) | Tile lifting or falling off, missing grout, efflorescence, hollow sounds when tapped | Injection for lifting, replacement, clear waterproofing |
| Sealing | Cracks in joints, shrinkage, peeling, hardening | Re-sealing |
| Roof and Balcony | Bloating or breaking of the waterproof layer, puddles, clogged drains, leaks to lower floors | Urethane waterproofing, sheet waterproofing, drain renovation |
| Metal Parts and Steel Stairs | Rust, peeling paint, corrosion of treads | Grinding + rust prevention + painting, material replacement |
| Roof | Lifting of ridge cap, cracked or warped slate, moss, misaligned tiles | Roof painting, roof overlay (cover method), re-roofing |
| Concrete | Spalling (exposed rebar with rust stains), water leakage from cracks | Spalling repair + resin mortar filling |
| Common Corridor and Stair Floor | Lifting or peeling of long sheets, opening at edges, exposed substrate | Replacement of long sheets + substrate waterproofing |
Estimated Repair Cycles by Area (Ministry of Land, Infrastructure, Transport and Tourism Guidelines)
| Area/Work | Estimated Cycle | Area/Work | Estimated Cycle |
|---|---|---|---|
| Exterior Wall Painting (Repainting) | 12 to 15 years | Re-sealing | 12 to 15 years |
| Exterior Wall Painting (Existing Removal + Painting) | 24 to 30 years | Metal Parts Painting | 5 to 7 years |
| Roof Waterproofing (Repair) | 12 to 15 years | Water Supply Pipe (Rehabilitation/Replacement) | 19 to 23 years / 30 to 40 years |
| Roof Waterproofing (Removal + New Installation) | 24 to 30 years | Drain Pipe (Rehabilitation/Replacement) | 19 to 23 years / 30 to 40 years |
※The above are reference examples from the guidelines and are not uniform construction deadlines. Actual cycles are set according to the specifications, location conditions, and deterioration status of the building.
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Creating Long-Term Repair Plans” (Reiwa 6, June revision, PDF) / Ministry of Land, Infrastructure, Transport and Tourism “Survey on the Actual Conditions of Large-Scale Renovation Works for Condominiums in FY2021”
Examples of Large-Scale Renovation Work
This is an example of exterior renovation work on a mixed-use building undertaken by Kakeru Koumuten Co., Ltd. The building had leaks occurring in several places, and we combined clear waterproofing for the tile exterior wall with rooftop waterproofing for the renovation.
Exterior Renovation Work for Mixed-Use Building (Tile Wall Waterproofing + Roof Waterproofing)
| Work Details | Partial replacement of damaged tiles / Painting of ancillary parts (pipes, water drainage) / Roof waterproofing work (urethane waterproofing) / Wall tile waterproofing (Seven S) / Sealing work around sashes / Repair of wall tile mortar joints / Removal of ivy |
|---|---|
| New Materials Used | Wall tiles: Kunishiro tiles / Painting of ancillary parts: Radical silicone paint / Roof waterproofing: High-strength urethane (Sarasene A) / Wall tile waterproofing: Seven S |
| Price Range | 4,000,000 to 4,100,000 yen |
| Construction Period | 45 days |
| Location | Not disclosed |
| Background to the Work | Due to leaks occurring from several areas such as the exterior walls and roof, we proposed waterproofing for the entire exterior wall. Seven S is a clear waterproofing material for tile walls, which is slightly more expensive but highly waterproof, making it recommended for cases where leaks are occurring from multiple areas of the exterior wall. |
Customer Feedback
Flow from On-Site Survey to Completion of Work
From the initial inquiry to the completion of the work and aftercare, a single representative will consistently handle your case. For management associations, a resolution at the general meeting is required, so it is advisable to start the process 1 to 1.5 years before the desired start date to proceed with ample time.
- Inquiry (Free) Please contact us via phone, form, or LINE. If you have estimates from other companies, just presenting those is also fine.
- On-site Investigation & Building Diagnosis (Free) We will conduct a survey of the exterior walls, check for cracks, sealing, and the waterproof layer, and if necessary, investigate the rooftop, high places, and leak areas using drones or thermal imaging. For properties in Higashikurume City, we will also check the road width, distance from neighboring properties, delivery routes, parking, and drainage conditions of rooftops and balconies.
- Investigation Report & Estimate Submission We will provide a deterioration diagnosis report with photos and an estimate detailing quantities, methods, and materials for each work item. Multiple plans can also be proposed.
- Plan Decision & Contract Confirm colors through color simulations, paint samples, and trial painting. For management associations, we will assist in preparing materials for the general meeting. In Higashikurume City, for buildings requiring notifications under Tokyo’s landscape plan or district plan, we will explain the procedures and color considerations as well.
- Notification to Residents & Neighbors We will distribute construction notifications, conduct greetings to neighbors, and set up a bulletin board at the entrance (with a schedule and laundry information). If temporary relocation of parking is necessary, adjustments will be made at this stage.
- Temporary Scaffold Installation & Various Works Our in-house scaffold team will set up the scaffolding, followed by high-pressure washing → substrate repair → sealing → exterior wall painting & tile repair → waterproofing → ironwork & ancillary work in that order. A responsible person will inspect each stage and take construction photos.
- Completion Inspection, Scaffold Dismantling & Handover We will confirm the finish in the presence of the customer and provide construction photos, a report on the paint used, and a warranty certificate.
- Aftercare We will send annual DM notifications, allowing for yearly inspections. Simple repairs such as partial sealing are provided free of charge.
Resident Communication, Additional Work Approval, Inspection Reports
Equally important as the construction itself is “when, what, and with what materials we report”. At Kakeru Koumuten, we will provide materials and reports in the following four scenarios.
| Scenario | Materials Provided / Actions Taken |
|---|---|
| Before Construction Building Diagnosis |
We will provide a deterioration diagnosis report with photos. This document summarizes the deteriorated areas and the rationale for the proposed scope of work. |
| Before Construction to During Construction Notification to Residents & Neighbors |
We will distribute construction notifications, conduct greetings to neighbors, and provide information on the schedule and laundry through the entrance bulletin board. |
| During Construction Approval for Additional Work |
Deterioration discovered after scaffolding is set up will be addressed by presenting photos, quantities, and costs for approval before proceeding with the work. |
| During Construction to Completion Inspection Report |
A responsible person will inspect each stage and take construction photos. At completion, we will confirm the finish in the presence of the customer and provide construction photos, a report on the paint used, and a warranty certificate. |
* For management associations, it is smooth to decide in advance who will approve additional work (such as the chairman or the repair committee) and the approximate amount that will require approval before signing the contract.
How will life be during construction? Impact on residents
Large-scale repairs are principally carried out while residents remain in their homes. However, there will be restrictions on daily life while scaffolding is in place. Most troubles can be prevented by providing prior notice, so Kakeru Koumuten Co., Ltd. thoroughly explains and posts information before construction begins.
| What will be affected | What will actually happen / Our response |
|---|---|
| Laundry | On days of high-pressure washing, painting, and waterproofing, outdoor drying will not be possible. We will inform you via bulletin board and each unit’s mailbox about “which side will be worked on today” and will secure as many days as possible for drying. |
| Window opening and closing | In addition to washing and painting days, there may be times when windows cannot be opened during other processes such as protection, drying, and waterproofing. We will provide information for each process, so please check the postings and notifications. We will arrange the schedule to avoid continuous closures. |
| Balcony | During floor waterproofing and handrail painting, we ask for temporary relocation of personal items, plants, and air conditioning outdoor units. The timing will be notified in advance for each unit. |
| Noise and Odor | The period of substrate repair (breaking and drilling) will generate the most noise. Work hours are generally from 8 AM to 5 PM, and we will accommodate requests such as refraining from work on Sundays and holidays. Low-odor paint options are also available. |
| Security and Privacy | Scaffolding can become a potential entry point. We can take measures such as blocking sightlines with mesh sheets and installing locks and sensor lights on the scaffolding’s access stairs at night. We also thoroughly educate visitors on proper manners. |
| Parking | Vehicles on the side where scaffolding will be installed will need to be temporarily relocated. Since securing a new parking location may take time, we will begin securing a new location together 2 to 3 months before construction starts. |
| Pets, Small Children, and Working from Home | If you have sensitivities to noise, please inform us in advance, and we may be able to adjust the work schedule accordingly. Please feel free to let us know. |
| Rented Rooms | We can assist owners in creating notification documents for residents. If you are concerned about the impact of construction on occupancy rates, we can also propose an image change with color simulations. |
How to Choose a Large-Scale Repair Contractor and Ordering Method
There are many large-scale repair contractors that cover Higashikurume City, and you may be unsure which contractor to choose. When requesting renovations for apartments, condominiums, or buildings, please confirm the following four points.
● Have extensive experience in large-scale repairs
● Confirm the presence of warranties and aftercare services
● Obtain estimates from multiple contractors (at least 3 companies)
● Confirm whether they are self-managed
Have extensive experience in large-scale repairs
Large-scale repair contractors often have websites that showcase their exterior renovation achievements. If they provide detailed explanations of repair contents with photos, it offers reassurance as a reference when you actually request work.
Using ratings from Google and review sites can be effective when comparing large-scale repair contractors! Be cautious if there are many negative reviews. If there are few reviews, also check the contractor’s track record, the content of their explanations, and their management system.
Large-scale repair work involves not only the construction itself but also the potential for troubles with residents and nearby neighbors. Therefore, it is necessary to post updates on the progress of the work and information about laundry on bulletin boards to prevent issues before they arise. Kakeru Koumuten Co., Ltd. specializes in exterior work, and we receive many requests for exterior renovations of apartments and condominiums.
Check for warranties and aftercare services
When choosing a large-scale repair company, check for the presence of warranties. If any issues such as leaks occur after the work is completed, having a leak warranty from the contractor ensures that repairs can be made at no cost, providing peace of mind! Companies that offer warranty periods are often confident in their work, making this a key criterion for selecting a contractor.
Warranty periods vary by contractor and the nature of the work, but typically range from 1 to 10 years. Emergency repairs or partial fixes often do not come with a leak warranty. Some contractors also offer aftercare services separate from warranties, so be sure to check for warranties and aftercare services.
Kakeru Koumuten Co., Ltd. sends out annual direct mail for aftercare maintenance, allowing for yearly inspections. We also provide simple repairs such as partial sealing free of charge.
Obtain estimates from multiple contractors (at least 3 companies)
When requesting large-scale repairs, be sure to obtain estimates from multiple contractors. It is important to get estimates from at least 3 companies and compare their quotes and reports! Even for the same work, costs can vary between contractors, and warranties and aftercare services may differ. Additionally, obtaining multiple estimates makes price negotiations easier.
When comparing estimates, consider not only the cost but also the “items in the estimate,” “methods and materials for substrate repairs and exterior painting,” and “confirmation of the process.” Make detailed comparisons to make informed decisions! If the quality of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making decisions based solely on price. Especially since substrate repair work can be difficult to assess from appearance alone, ensure that the repair methods are appropriate for the condition of the substrate!
Check this on the estimate (checklist)
| Verification Items | Points to Consider |
|---|---|
| Are there many “lump sum” notations? | Are the quantities and unit prices clearly stated? With “Exterior Wall Repair Lump Sum,” comparisons and verifications cannot be made. |
| Do the quantities match actual measurements? | Are there quantities recorded that are far from the drawings or actual measurements? This is the area where inflation is most likely to occur. |
| Proportion of miscellaneous expenses | Details and proportions of site management costs, general management costs, statutory welfare costs, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the 3rd year of Reiwa, the average is about 10% of the construction cost (excluding common temporary costs), but it varies depending on the size and conditions of the building, so there is no uniform standard. |
| Are the names of materials written? | Are the manufacturer names, product names, grades, and number of coats for paints and waterproofing materials specified? |
| Treatment of quantities for substrate repairs | This is an item that cannot be accurately measured until scaffolding is set up. Is it clearly stated whether it is “estimated quantity” or “actual quantity settlement,” and are there agreements for increases or decreases? |
| Warranty and after-inspection | Warranty period for each construction, frequency of inspections, and scope of free support. |
| Company backing | Types of construction industry licenses, track record of similar scale and structure, presence of qualified personnel. |
Check if it is managed in-house
Large-scale repair work includes various tasks such as “substrate repair work,” “exterior wall painting,” “waterproofing work,” and “pipe replacement,” and the plan details will change based on the actual deterioration condition and customer preferences.
If a contractor completely outsources to subcontractors, they may lack knowledge and experience, leading to proposals for repairs in irrelevant areas or unnecessary work. If you investigate and then request a subcontractor, it may incur additional time and costs. By having knowledge and experience and managing in-house, responsible construction can be performed at a reduced cost.
Moreover, contractors that outsource may also have delayed responses in case of any troubles during construction. It is safer to avoid having a company that has not actually met with the customer manage the construction. Kakeru Koumuten performs everything from temporary scaffolding installation to exterior wall painting and waterproofing work in-house, managed by knowledgeable and experienced personnel!
There are three ordering methods. The choice affects the approach.
Especially for management associations, it is necessary to decide “how to request” before “which company to hire.” The main ordering methods are the following three.
| Method | Procedure | Advantages | Disadvantages |
|---|---|---|---|
| Responsibility Construction Method | The construction company handles everything from investigation, design, construction, to management. | No additional fees for design consulting (investigation and design costs may be included in the construction costs) / Single point of contact reduces the burden on the management association / Responsibility is clear / May shorten the period until ordering. | Specifications can easily be left to the construction company, making it difficult to compare side by side / Third-party checks are hard to implement, requiring the management association to verify price, specifications, and construction status. |
| Design Supervision Method | A design office or consultant conducts the investigation and design, while a separate company handles the construction. | Allows for comparison of construction companies under the same conditions / Independent supervision during construction. | Consulting fees are required separately / Attention needed for risks of conflicts of interest and collusion / Tends to prolong the duration. |
| Management Company Prime Contract Method | The management company acts as the prime contractor, with subcontractors performing the construction. | Easy coordination with daily management / Minimal effort required from the management association. | Can become expensive due to intermediate margins / Competition principles may not be effective. |
Collusion and Inappropriate Consulting Issues in Large-Scale Renovations and Self-Defense Measures
Latest 2026 In the large-scale renovation industry, inappropriate orders linked between design consultants and construction companies have long been a problem. The Ministry of Land, Infrastructure, Transport and Tourism issued warnings and notifications to management associations in January 2017 and April 2023, and on September 28, 2026, the Japan Fair Trade Commission announced that it had issued exclusion orders to 38 companies and a total of 1.63788 billion yen in payment orders to 37 companies regarding large-scale renovation work commissioned by condominium management associations to design consulting firms in the Kanto region (two design consulting firms were also subject to exclusion orders).
※This content is based on the Japan Fair Trade Commission’s announcement (September 28, 2026).
Three Typical Methods
① Dummy Estimates
A predetermined company is chosen to receive the order, while other companies only submit formal high estimates, creating a “fixed race.” It appears to the management association that “proper competitive estimates were obtained.”
② Collusion with Design Supervisors
While consultants contract at extremely low design management fees, they receive kickbacks from the high construction costs of partner construction companies. Design management fees that are too low are a warning sign.
③ Back Margin
A certain percentage of the contract amount is kicked back, which is then added to the construction costs as an expense. As a result, the management association ends up paying extra.
Source: Yokohama City “What is collusion in large-scale repair work for condominiums?” / Ministry of Land, Infrastructure, Transport and Tourism “On the Proper Ordering of Large-Scale Repair Work for Condominiums” (Notification dated April 3, Reiwa 5, PDF)
Self-Defense Measures for Management Associations
- Obtain independent estimates from multiple companies
- Consult with neutral third parties such as condominium management specialists or architects
- Document the vendor selection process in meeting minutes to ensure transparency
- Confirm the reasons for unusually low design management fees with the consultant
- Include a penalty clause in the contract for cases of collusion discovery
- Avoid concentrating information with a single consultant and verify specifications by the management association itself
Contact Points for Third-Party Consultation
If you are unsure about reading estimates or how to proceed with vendor selection, consulting a third party separate from the construction company can also be effective. The main contact points available for management associations in Higashi Kurume City are as follows.
| Contact Point | Details |
|---|---|
| Higashi Kurume City Urban Development Department Urban Planning Division Planning Coordination Section | Phone 042-470-7762. This is the contact point for inquiries regarding management plan certification, reporting management status, and advice and guidance. The city does not appear to have services for bidding agency or ordering support for large-scale repairs, nor for dispatching advisors or specialized consultations, as far as confirmed. |
| Tokyo Metropolitan Comprehensive Consultation Center for Condominium Sales | Phone 03-6427-4900 (free). They handle consultations including preparations for large-scale repairs. For inquiries regarding ordering large-scale repairs, the contact point is the Condominium Division (Phone 03-5320-5004). |
| Smile Dial (Housing Renovation and Dispute Resolution Support Center) | Phone 03-3556-5147 (Monday to Friday 10:00 AM to 5:00 PM, excluding holidays and year-end/New Year). They provide consultations regarding ordering large-scale repairs, and the estimate check service is free. |
| Condominium Management Center | Phone 03-3222-1519 (Monday to Friday 9:30 AM to 5:00 PM, excluding holidays and year-end/New Year). They handle consultations regarding the maintenance and management of buildings and facilities. The contact point for inquiries about the management plan certification support system is Phone 03-6261-1274. |
| Condominium Management Plan Certification System Consultation Dial | Phone 03-5801-0858. Condominium management specialists will answer questions regarding certification standards and application procedures. |
Source: Higashikurume City “Condominium Management Plan Certification System”/Higashikurume City “Condominium” Policy List/Tokyo Metropolitan Government “Comprehensive Consultation Desk for Condominiums”/Tokyo Metropolitan Government “Consultation Desk for Ordering Large-Scale Renovation Work”/Ministry of Land, Infrastructure, Transport and Tourism “Consultation Desk for Ordering Large-Scale Renovation Work”/Condominium Management Plan Certification System Consultation Dial
Frequently Asked Questions about Large-Scale Repairs in Higashikurume City
- How much does large-scale repair in Higashikurume City cost?
- For condominiums, according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% of cases fall within the range of 750,000 to 1,500,000 yen (excluding consumption tax and common temporary construction costs), with the most common range being 1,000,000 to 1,250,000 yen. Based on our company’s construction records, the cost for a two-story wooden apartment is estimated at 2,000,000 to 4,000,000 yen, for a three-story steel or RC apartment at 4,000,000 to 9,000,000 yen, and for small condominiums or mixed-use buildings at 5,000,000 to 15,000,000 yen. The cost varies depending on the condition of the substrate and whether waterproofing and roofing work is required, so we will provide an estimate through a free on-site survey.
- How often should large-scale repairs be conducted?
- Generally, a cycle of 12 to 15 years is recommended, and the actual cycle is most commonly 13 years according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey, with about 70% falling within the 12 to 15-year range. However, the decision should be based on the condition of deterioration rather than just the number of years. If deterioration of sealing, lifting of tiles, or rupture of the waterproof layer is observed, it is advisable to carry out repairs without waiting for the cycle, as this can ultimately reduce costs. We will confirm and assess the age and condition of your building during the on-site survey.
- How long does the construction period take? Can residents stay during the work?
- For apartments, the estimated duration is 3 weeks to 2 months, for small condominiums or buildings 1.5 to 3 months, and for condominiums with over 50 units, about 4 to 6 months. Residents can remain in their homes during the construction. However, while scaffolding is in place, there may be restrictions on drying laundry outside and opening windows, so we take thorough measures to minimize the impact on daily life, including distributing advance notices, providing information on the schedule and laundry through bulletin boards, and strictly adhering to working hours.
- How long should I expect from starting the planning to the completion of the construction?
- For management associations, it typically takes about 1 to 1.5 years for the establishment of the repair committee, building diagnosis, contractor selection, and general meeting resolution, followed by 3 to 6 months for the construction. Overall, it is advisable to plan for about 2 years to proceed with some leeway. If you are using subsidies or tax incentives, please also factor in the time required for obtaining management plan certification (procedures for municipal certification).
- Are there any subsidies available for large-scale repairs in Higashikurume City?
- As of now, there do not appear to be any subsidies for large-scale repair work for condominium buildings in Higashikurume City or Tokyo. Potential options include the Tokyo Metropolitan Government’s subsidy for condominium improvement work (interest subsidies for management associations using loans from the Japan Housing Finance Agency), the Tokyo “Stay in Tokyo” condominium subsidy, and reductions in fixed property tax (one-third in Higashikurume City). The city’s condominium policy page does not mention advisor dispatch or subsidies. If the work includes windows and insulation, there may also be eligibility for “Advanced Window Renovation 2026” and “Future Eco Housing 2026.” The application timing and applicants vary by program, so please check the eligibility conditions and application procedures for each program before contracting and starting construction.
- I heard that fixed property tax can be reduced with large-scale repairs. Is that true?
- It is true if the requirements are met. Under the Long-Term Condominium Promotion Tax System, if a condominium that meets certain criteria, such as being over 20 years old and having more than 10 units, conducts large-scale repairs that contribute to its longevity (including exterior painting, floor waterproofing, and roof waterproofing), the fixed property tax amount for the following year will be reduced. The reduction rate in Higashikurume City is one-third, applicable to tax amounts for up to 100 square meters per unit (in the 23 wards of Tokyo, it is one-half). The eligible work must be completed between April 1, 2023, and March 31, 2027, and applications must be submitted within three months of completion. The department to which applications should be submitted is not clearly stated on the city’s page, so please confirm with the Tax Division of the Citizens’ Department (phone 042-470-7727) before the construction. For certified management plan condominiums, raising the repair reserve fund to the certification standards is also a requirement, which may take time to prepare, so we recommend starting the process more than a year before construction.
- Are there any changes to subsidies starting from the fiscal year 2026?
- There are four main options. ① Postpone low-urgency repairs based on a deterioration diagnosis for the next time, ② Review the scope and specifications of the work, ③ Check for support systems such as subsidies, ④ Consider increasing the repair reserve fund or financing from the Japan Housing Finance Agency. The agency’s renovation loans for common areas of condominiums do not require collateral, and interest rates can be reduced by up to 0.6% per year by obtaining management plan certification and implementing energy-saving or earthquake-resistant work. Please note that postponing waterproofing and tile peeling measures often ends up being more expensive, so please consult us for decisions on separating these issues.
- What should I do if the repair reserve fund is insufficient?
- Yes, it can be done. In Higashikurume City, there are sites with limited road widths and buildings that are close to neighboring properties. Kakeru Koumuten Co., Ltd. owns its own scaffolding materials and has its own scaffolding team, allowing us to plan the delivery route and scaffolding layout after checking the site. This is an area where additional costs can easily arise after seeing the site, so it is important to confirm the delivery route during the estimation stage.
- What happens to the residents’ parking during construction?
- Vehicles on the side where scaffolding will be erected will need to be temporarily moved. In buildings where there is limited parking space on the premises, it may take time to secure an alternative parking location. Kakeru Koumuten Co., Ltd. will coordinate with you about the availability of nearby parking starting 2 to 3 months before construction begins.
- Can I freely decide the color of the exterior walls?
- Higashikurume City is not listed as a landscape administrative organization of Tokyo, and notifications regarding the landscape will be based on Tokyo’s landscape plan. Notifications must be submitted 30 days prior to applications for building confirmation (or 30 days prior to commencement if there are no related legal procedures), and whether repainting the exterior walls is subject to this depends on the location and scale of the building. The scale requirements can be confirmed with the Tokyo Metropolitan Bureau of Urban Development, Greenery and Landscape Division, Streetscape Landscape Section (Phone: 03-5388-3265). In the areas of the city’s 10 district plans, prior notification to the mayor is required, and the Urban Planning Division, Land Use Planning Section (Phone: 042-470-7782) is the contact point. We will also investigate this during our survey. Sharing a color simulation to visualize the completed image can facilitate discussions.
- Why is the north-facing exterior wall particularly covered in moss and algae?
- The north side receives less sunlight throughout the day, and when shadows from trees or neighboring buildings overlap, moisture can accumulate, making it easier for algae, moss, and mold to thrive. This is more likely to occur in locations close to trees. By thoroughly removing it with high-pressure washing and choosing paint with anti-algae and anti-mold properties, recurrence can be minimized. Additionally, we recommend checking for blockages in roof drains and gutters caused by fallen leaves, as these often lead to puddles on the roof and leaks.
- Which method should I choose: responsibility construction method or design management method?
- In smaller buildings, the burden of consulting fees tends to be heavier, so we believe that the responsibility construction method is often more suitable for small to medium-sized buildings. The design management method allows for comparison of construction companies under the same conditions since a third party creates the specifications; however, it incurs separate consulting fees and requires caution regarding conflicts of interest and collusion risks. Even with the responsibility construction method, verifying price, specifications, and construction status is essential. Kakeru Koumuten Co., Ltd. provides estimates that clearly outline quantities, methods, and materials for each construction item, allowing you to compare them on the same level as other companies.
- How can I detect collusion in large-scale repairs?
- There are three typical methods. ① Pre-selecting a contractor and having other companies submit only formal high estimates, known as “dummy estimates,” ② A consultant contracts at an extremely low design management fee and receives kickbacks from affiliated contractors, ③ Adding a portion of the contract amount as a back margin to the construction costs. Countermeasures include obtaining independent estimates, consulting a neutral third party, documenting the selection process in meeting minutes, and including penalty clauses in contracts.
- How many companies should I get estimates from?
- 最低3社をおすすめします。多すぎると比較しきれず、少なすぎると競争が働きません。大切なのは社数よりも「同じ土俵を作ってから比べること」です。共通の仕様書や数量表を作って同一条件で依頼し、「一式」表記を認めず内訳明細を必須にすると、金額差が範囲の違いなのか単価の違いなのかがはっきりします。
- What is the difference if we have our own scaffolding?
- In large-scale repair work, temporary construction accounts for about 20% of the total cost (according to the Ministry of Land, Infrastructure, Transport and Tourism’s fiscal year 2021 survey). By not outsourcing scaffolding work, we can easily reduce costs in this area, and our in-house scaffolding team can flexibly respond to sudden changes in the schedule or additional work. Kakeru Koumuten Co., Ltd. owns scaffolding materials for approximately 100 single-family homes and plans according to the site, even in areas with limited road width.
- I’m in the middle of getting multiple estimates; can I just have a look at the estimate?
- Of course, that’s possible. If you bring estimates from other companies, we will check for free whether the items, quantities, methods, and materials are appropriate and provide you with an estimate under the same conditions. We welcome multiple estimates.
- Can I request just emergency repairs for a leak?
- Yes. As a preliminary step before large-scale repairs, we also accept requests for emergency repairs or partial repairs for leaks. We will identify the cause using thermal imaging and drones and propose the minimum necessary repairs.
- Can you handle roofing or exterior wall materials that contain asbestos?
- Yes, we can. We have qualified personnel such as asbestos work supervisors and building material asbestos surveyors, and we handle everything from the legally required preliminary surveys to the cover method and removal of asbestos-containing roofing materials. We have not confirmed any municipal subsidies for asbestos surveys and removals in Higashikurume City. The availability of subsidies may change from year to year, so please check with the municipal office. We will also provide guidance based on the survey results.
- What happens if large-scale repairs are not done?
- There are risks such as personal injury from falling exterior wall tiles, structural deterioration due to corrosion of rebar, leaks, and a decrease in asset value. Furthermore, for buildings subject to periodic reporting under Article 12 of the Building Standards Act, investigations through full tapping and other methods are required under certain conditions, such as if more than 10 years have passed since completion or exterior wall renovations for tiled or mortar-finished walls. The scale of the joint housing subject to this requirement and the timing of the report can be confirmed in the list of “Buildings and Equipment Subject to Periodic Reporting and Reporting Timing” published by Tokyo. The applicable uses and scales may be revised, so please check with the Tama Building Guidance Office of Tokyo (phone 042-548-2029) for the latest information. Even if not subject to statutory inspections, regular inspections and maintenance are essential, so please consult us if you are unsure about your judgment.
- How much does large-scale repair for an apartment (about 10 units) cost?
- For a wooden two-story building with 6 to 10 units, the estimate is around 2 million to 4 million yen, and for a three-story steel or RC building with 10 to 20 units, it is around 4 million to 9 million yen based on our company’s track record (including scaffolding, substrate repairs, exterior wall painting, sealing, and waterproofing). It is common to carry out repairs for apartments every 10 to 15 years. For owners, there is an increasing trend to change the appearance through color simulations during repairs to improve occupancy rates.
If you are looking for a large-scale repair contractor in Higashikurume City, contact Kakeru Koumuten Co., Ltd.
We handle many exterior wall renovations and large-scale repairs for condominiums and apartments in Higashikurume City. We are happy to assist not only with large-scale repair work but also with partial repairs and leak repairs. “I want it to last long with one renovation” “I want to keep costs down as much as possible” “I want to improve insulation performance because the indoors are hot” We will propose the best solutions for your specific requests and future repair plans.
From temporary scaffolding work to roofing and exterior wall painting, all work is performed by our own team. We are confident that we will not lose in terms of cost, quality, and scheduling compared to other companies, so we welcome multiple estimates!
On-site surveys, estimates, and color simulations are all free of charge
Please feel free to contact us via the inquiry form, phone, or LINE.
It’s perfectly fine to just present estimates from other companies.
Large-Scale Repair Work Service Area
Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and all of Tokyo.
Kaminohara / Gakuencho / Kanayamacho / Koyama / Saiwaicho / Shimosato / Shinkawacho / Shinpocho / Asama-cho / Daimoncho / Takiyama / Chuo-cho / Nobidome / Hachiman-cho / Hikawa-dai / Higashihoncho / Hibari-ga-oka Danchi / Honcho / Maezawa / Minamisawa / Minamicho / Yanagikubo / Yayoi
・When should large-scale renovations be carried out? An explanation of the optimal timing and the risks of postponement!
・Estimates are essential when conducting large-scale renovations! Key points for comparison and precautions!
・5 common troubles in large-scale renovations of condominiums! A thorough explanation of causes and prevention measures!
・What is waterproofing work in large-scale renovations? A thorough explanation of its role, signs of deterioration, and precautions!
・Not enough funds for large-scale renovations… An explanation of how to deal with funding shortages and preparations you can do right now!
・What is substrate repair, which is important in large-scale renovations? A thorough explanation of its necessity, signs of deterioration, and types of work!
・What is sealing work in large-scale renovations? An introduction to its role, methods, and tips for avoiding mistakes!
・What is tile repair, which is important in large-scale renovations? An explanation of signs of deterioration, types of work, and cost averages!
・What is exterior wall painting, which is important in large-scale renovations? A thorough explanation of its necessity, signs of deterioration, and cost averages!
・For exterior renovations in Higashikurume City, Tokyo, trust Kakeru Koumuten!
・For roof renovations in Higashikurume City, Tokyo, trust Kakeru Koumuten!
・For exterior wall painting in Higashikurume City, Tokyo, trust Kakeru Koumuten!
We welcome inquiries via LINE as well◎
We are also updating our Instagram regularly◎ Please follow us◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!



