【Mitaka City, Tokyo】Roof Renovation|We performed a roof replacement with瓦U to a standing seam roof!

BEFORE

AFTER

Hello!
We are Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior wall painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of an exterior renovation project in Mitaka City, Tokyo.
The current exterior renovation involves a roof overlay (cover method) construction (Type 32 Standing Seam)!

The existing roofing material is a discontinued tile U that is no longer in production.
Tile U may contain harmful substances, including asbestos, in some cases.
The tile U used in this project contains asbestos.

On this page, we will explain the actual results of the work performed by Kakeru Koumuten!

Thank you very much for choosing Kakeru Koumuten Co., Ltd. from among many contractors.

Roof Overlay Construction Data in Mitaka City, Tokyo

Construction Location Tokyo, Mitaka City Construction Details Temporary scaffolding installation  Roof replacement Background to the Construction

We received the following inquiry from a customer living in Mitaka City, Tokyo.
“I am getting estimates from several companies because I have a leak. I have been advised that a roof replacement is the only option, but it is quite expensive, so I would like to request a comparative estimate.”

・Proposal Details
The existing roofing material was asbestos-containing tile U. Tile U is currently discontinued, and partial replacement is not possible.
The condition of the roof was overall severely cracked, and as per other companies’ assessments, the only way to stop the leak was a roof replacement.
To allow the customer to consider their options carefully, we provided temporary measures for the leak.
Since there was a section with a gentle slope, we proposed standing seam roofing material suitable for low slopes!

They mentioned that our estimate was significantly lower than other companies, so they entrusted the work to us!
Since the final cost was lower than initially expected, we upgraded to roofing material with insulation and were entrusted with the construction!

New Materials Used

New Roofing Material: Sekino Kousan / Ritohira Lock Type 32 Flat Type with Insulation
Roofing: Tajima Roofing / Tadi Self
Ridge Base: Galvalume Steel Plate
Roofing Fasteners: Stainless Steel Screws

Price Range 1.9 to 2 million (including temporary scaffolding work) Construction Period 7 days Completion Month October 2024

Roof Replacement Construction Photos

1. Existing Roofing Material Dismantling

We will dismantle and remove the existing roofing material. ※Confirmation⇨ Since the tiles contain asbestos, we will double package them to prevent scattering before transporting them to the final disposal site in Chiba Prefecture.

2. New Sheathing Installation


After dismantling the existing roofing material, we will process and install new sheathing (structural plywood) to fit the dimensions![/chat]

3. Installing Roofing (Waterproof Sheet)

We will install the roofing sheet (waterproof sheet) on top of the substrate!The roofing used is Tajima Roofing/Tadi Self!
It is made of a delayed adhesive modified asphalt roofing material, which is said to have double the durability of regular asphalt roofing.
With the roofing serving as the primary waterproofing, if it is properly installed, there will be no leaks!
We will secure it firmly to prevent it from blowing away. [/chat]

4. Fabricating Accessories

Before the main roofing work, we will process and install accessories such as arabesques!
The material used for the accessories is galvalume steel sheet.

[/chat]

4. Main Construction (Sekino Kousan/Ritohira Lock Type 32)

After processing the

accessories, we will install the main body of the 32-type Tachi-Hira Lock! At the wall edges and ridge lines, we will raise the main body of the 32-type Tachi-Hira Lock to enhance waterproofing. While Tachi-Hira Lock has low thermal insulation and soundproofing properties, this time we used a version with insulation material!
For the purlin (ridge base), there are three types: cedar, resin, and Galvalume steel, and this time we used the Galvalume steel version!
The Galvalume steel version is expected to have three times the durability compared to cedar! Unlike resin and cedar, it does not crack, providing peace of mind!

Our original integrated waste board made of Galvalume steel for the ridge base is highly durable, has strong fixation, and excellent wind resistance! Even if rainwater enters from the ridge, it has a mechanism to discharge rainwater to the outside, thus demonstrating high waterproofing!

5. Rain Stop Processing

At the wall edges, we will process and install a component called rain stop sheet metal.
The nails and screws used for fixation are made of stainless steel, which is resistant to rust!

Packaged screws are less likely to come out compared to nails, securely fixing the ridge sheet metal to the purlin!

Although it is not visible after construction, installing a face plate on the inside of the ridge sheet metal enhances waterproofing!
It firmly protects the ridge, which is a critical point of the roof.

6. Cleaning

During and after the construction, we will clean the roof, as well as any debris that has fallen onto the balcony or rain gutters. We will thoroughly remove any nails or metal scraps that could cause injury. Additionally, we will wipe away any footprints left on the roof to keep it clean.

Roof Materials Used

The roof material used is Sekino Kousan’s Tachihei Lock 32 type.

For roof replacement and overlay, we provide a 10-year construction warranty!
If there are any leaks within 10 years, we will repair them free of charge.
It is made of Galvalume steel, which is resistant to rust.
We pursue the basic functions of the roof, such as water drainage and strength, and by applying ripples and ribs to the surface of the roofing material, we enhance the strength of the roof surface and prevent the phenomenon of board noise.

For roofs with a slope of 2.5 shaku or less, please be sure to choose a vertical roof like the Tachihei Lock 32 type! Horizontal roofs like Colonial or Galtect are not allowed for construction!

Moreover, since it is a molded integrated type of Tachihei roofing that does not require hanging pieces or fastening, it is constructed with a single long sheet of metal (long metal sheet) from the peak of the roof to the eaves, which means there are no horizontal seams in between, minimizing the risk of leaks by eliminating opportunities for rainwater to flow into the roofing material. It is recommended for houses with a gentle roof slope (angle).
Additionally, it is the lightest among metal roofs, and by reducing the weight of the roof, it is possible to make your house more earthquake-resistant through roof replacement.

Color

This time, we completed the roof work in durable dark brown, and it turned out very well!
The customer was extremely satisfied, and I was very happy as well!
Thank you very much!

Please check out other roofing work achievements here!

For roof renovations in Mitaka City, Tokyo, trust Kakeru Koumuten!

Our company is based in Yokohama, but we also have extensive experience in roof renovations in Mitaka City, Tokyo.
We are happy to assist with partial roof repairs, including roof cover work, roof replacement, and leak repairs.
If you have any questions or concerns, such as “I just want to know the estimate for roof renovation” or “I want to know about roofing materials,” please feel free to contact us!

Kakeru Koumuten Co., Ltd. is a remodeling company strong in exterior renovations, and we carry out everything from temporary scaffolding work to roof work and exterior painting completely in-house.
When it comes to exterior renovation work, we are confident that we do not fall short compared to other companies in terms of “cost, quality, and efficiency”!

We are confident in our exterior renovations, so we welcome competitive estimates!
We also offer comprehensive construction guarantees and aftercare maintenance, and we have received positive feedback for our cost performance and appropriate proposals that align with our customers’ future life plans!

We want you to think, “I’m glad I asked them!” Therefore, we take every request we receive seriously.

We also have information on roof construction costs and pricing plans for the roof overlay (cover method), so please take a look if you are interested!

We look forward to your inquiries. Thank you very much.

Helpful information about exterior renovations can be found here!

LINE consultations are also very welcome◎

We are also updating our Instagram regularly◎ Please follow us◎

For roofing, guttering, and exterior work and repairs in Kanagawa, contact Kakerukoumuten Co., Ltd..

AAA is a young company with an average age in the early 20s, but our technology is second to none.

One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!

We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!