Hello!
This is Yamanaka from Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of exterior renovations in Meguro-ku, Tokyo.
There are several types of exterior renovations, and this project involves the roof overlay (cover method) using Galtect!
We implemented measures against leaks caused by the roof work!
On this page, we will explain the actual results of the work carried out by Kakeru Koumuten!
Thank you very much for choosing Kakeru Koumuten Co., Ltd. from among many contractors.
目次
Roof Overlay Construction Procedure
1. Dismantling Existing Roof Ridge Flashing
We will dismantle the unnecessary existing roofing materials (ridge flashing, snow guards) for the
2. Installing Roofing (Waterproof Sheet)
The roofing used in
It is made of modified asphalt roofing material, which is said to have double the durability of regular asphalt roofing.
With a primary waterproofing role, if the roofing is solid, there will be no leaks!
We will securely attach it to prevent it from blowing away.
3.Accessory Processing (Karakusa and Keraba)

Before the main roofing work of
The accessories used are genuine Galtect accessories made of SGL copper plate!
4. Main Construction (Aiji Industry/Super Galtect)

After processing the accessories, we will install the Galtect main body up to the ridge!
Once the installation reaches the ridge, we will set up a material called a “kanban” that is necessary to secure the ridge cap. There are types of kanban made of cedar and resin, and this time we used resin purlins! [/chat]
5. Ridge Cap Processing and Sealing

Next, we will process and install the ridge cap. We will firmly apply sealing on the inside of the joints. For the wall edges, we will process and install a component called a rain guard sheet metal.
The nails and screws used for securing are made of stainless steel, which is resistant to rust![/chat]
6. Cleaning


Rain Gutter Replacement Construction Steps
1. Dismantling Existing Eaves Gutter
2. Installing New Eaves Brackets
It is important to note that due to the fascia (where the eaves brackets were attached) and building distortions, even if the slope is set with the brackets, there may be backflow. It is essential to check the slope with a level against the fascia before attaching the brackets!
3. Installing the Eaves Gutter
4. Connecting the downspout
5. Water flow test, cleaning, and completion!
That’s all!
The eaves gutter used is Panasonic/PC50. The color is black!
It has a steel plate inside, providing strength.
About the roofing material
The roofing material used is Aijii Industry’s Super Galtect.
Super Galtect comes with a manufacturer warranty of 15 years for the coating and 25 years for perforation.
Our company also provides a 10-year construction warranty!
It is made of SGL steel plate, which is resistant to rust.
Insulation material is densely applied from edge to edge of the roofing material, creating a metal plate that integrates steel plate and insulation.
When installed, insulation is applied even to the parts where the roofing materials overlap, and the surface is coated with a high heat-insulating paint, allowing for a cool summer and warm winter.
Additionally, it has soundproofing properties, reducing the sound of rain.
Being lighter than other roofing materials, it also minimizes the sway during earthquakes, providing earthquake resistance.
It excels in finish, durability, insulation, soundproofing, and wind resistance, and our company’s construction results show that Aijii Industry’s Super Galtect is the most popular and highly regarded!
Color
■Shade Black

■Shade Brown

■Shade Blue

■Shade Moss Green

■Shade Charcoal

You can choose from these 5 colors!
This time, the cover work was completed very well in Shade Brown!
The customer was very satisfied, and I was also very happy!
Thank you very much!
Please check out other roofing work achievements here!
What is the Roof Overlay (Cover Method)?
The roof overlay method involves leaving the current roof almost as it is and placing a new roof on top of it, effectively covering it.
Literally, it is a method of covering a roof with another roof. Therefore, the roof becomes double-layered. Since the roof is installed in layers, it is also referred to as “layered roofing.”
Advantages of the Overlay Method
Since a “new roof” is placed over the “current roof,” demolition work is almost unnecessary, meaning very little waste is generated.
This is the biggest feature and leads to various advantages.
The only part that requires demolition and waste disposal is the ridge cap, so compared to a full roof replacement, the cost is lower.
In 2004, regulations regarding the concentration of asbestos in raw materials were changed (for more details, please visit the Ministry of Health, Labour and Welfare website).
Some building materials used in structures built before 2004 contain asbestos. Asbestos-containing materials are difficult to demolish due to their high environmental impact, resulting in high costs for both demolition and waste disposal. The roof overlay method, which generates almost no waste, is ideal for such roofs.
Some may wonder, “Is it safe to live in a building that uses asbestos-containing materials?” but rest assured. As long as they are not broken or crushed, they will not disperse into the air.
If you are unsure about the type of roof on your home, please feel free to consult with us.
Additionally, the construction can be completed in a shorter time frame compared to painting or full roof replacement. A shorter construction period means lower labor costs, which in turn leads to lower overall costs.
This also reduces the psychological anxiety of having to live in an unusual environment.
When scaffolding is set up, there may be inconveniences such as difficulty entering and exiting or opening windows. Being able to return to normal life in a short period is a significant advantage.
Our company specializes in roofing work, but the roof overlay method is the most frequently performed service we offer. We are very grateful that we continuously have projects for roof overlay work without interruption.
| Roof Material |
|
|---|---|
| Manufacturer Warranty | Coating 15 years, Red rust 20 years, Perforation 25 years |
| Expected Durability | About 40 years |
| Color Used This Time |
Shade Black
|
For roof renovations in Tokyo, trust Kakeru Koumuten Co., Ltd.!
Our company has a wealth of experience in roof renovations in Tokyo.
We are happy to assist with everything from roof overlay work, roof replacement, roof repair, to partial roof repairs such as leak fixes.
If you have any questions or concerns like “I just want to know the estimate for roof renovation” or “I want to know about roofing materials,” please feel free to contact us!
Summary
Estimates and inspections are, of course, free! If you have any issues with roofs, rain gutters, exterior walls, or exterior structures, please consult Kakeru Koumuten Co., Ltd. in Aoba-ku, Yokohama!
Kakeru Koumuten is a remodeling company strong in exterior renovations, and we carry out complete in-house construction from temporary scaffolding to roofing and exterior wall painting.
We are confident that in terms of “cost, quality, and efficiency”, we do not fall behind compared to other companies!
We are confident in our exterior renovations, so we welcome competitive estimates!
We offer comprehensive construction guarantees and aftercare maintenance, and we have received positive feedback for our appropriate proposals that align with cost performance and our customers’ future life plans!
“I’m glad I chose you!” We take every request seriously to ensure you feel this way.
We also have information on roofing costs and pricing plans for roof overlay methods, so please take a look if you are interested!
We look forward to your inquiries. Thank you very much.
Helpful information about exterior renovations can be found here!
・Ota Ward, Tokyo | Exterior Painting | Eaves Replacement | Exterior Renovation Completed!
・Ota Ward, Tokyo | Roof Repair | Roof Overlay Using Ridgeway Completed!
・Machida City, Tokyo | Roof Repair | Roof Re-roofing Work Due to Leaks Completed!
・Machida City, Tokyo | Roof Repair | Roof Overlay Method Using Ridgeway Completed!
・DIY Painting Plan! Perfect for Those Who Want to Try DIY Roof and Exterior Wall Painting! We Only Set Up Scaffolding!
・Roof Overlay Costs | Kakeru Koumuten’s Roof Construction Plan!
・Exterior Painting Costs | Kakeru Koumuten’s Exterior Painting Plan!
・Leak Repair Costs | Kakeru Koumuten’s Leak Repair Plan!
・Roof Ridge Cap Replacement | Cost of Surface Plaster | Kakeru Koumuten’s Construction Plan!
・Latest Edition | Grants, Subsidies, and Reduction Systems Available for Renovations!
・What are the Market Prices for Rain Gutter Repairs and Cleaning? Tips on Timing, Fire Insurance, and Choosing Contractors!
・Renovation Store in Yokohama, Kanagawa | What is Roof Overlay (Roof Cover Method)?
LINEConsultations via LINE are also very welcome◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!



