Hello!
I am Yamanaka from Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior painting, and exterior renovation located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of exterior renovation in Inagi City, Tokyo.
There are several types of exterior renovations, and this time the work involved a roof overlay (cover method) (Hiranbi 220)!
We implemented measures against leaks through the roofing work!
On this page, I will explain the actual achievements carried out by Kakeru Koumuten!
We received a request from Company A, a remodeling company we always work with!
Thank you very much for choosing Kakeru Koumuten Co., Ltd. from among many contractors this time.
目次
Roof Overlay (Cover Method) Construction Procedure
1. Demolition of Existing Roofing Materials

2. Installation of new sheathing

3. Installation of roofing (waterproof sheet)

It is made of a delayed adhesive modified asphalt roofing material, which is said to have double the durability of regular asphalt roofing.
As a primary waterproofing measure, if the roofing is properly installed, there will be no leaks!
We will ensure it is firmly attached so it won’t blow away.
4. Main construction (Inagaki Shouji/Hiranbi 220)

After processing the
Once we have installed it up to the ridge, we will place the necessary materials to secure the ridge board known as the kanban. There are two types of kanban: cedar and resin, and this time we used the resin type!
The resin type is expected to have three times the durability compared to cedar!
5. Ridge Board Processing & Sealing at Various Locations

We will process and install the ridge board
At the wall edge, we will process and install a component called the rain guard board.
The nails and screws used for fixing are made of stainless steel, which is resistant to rust!
6. Cleaning

We will clean up the debris that has fallen onto the balcony and rain gutters. We will conduct a thorough cleaning as nails and metal scraps can lead to injuries. [/chat]
About the Roofing Material
The roofing material used is Hiranbee 220 from Inagaki Shouji.
Hiranbee 220 comes with a 15-year paint warranty and a 25-year hole warranty from the manufacturer.
For re-roofing and overlaying, we also provide a 10-year construction warranty!
If there are any leaks within 10 years, we will make repairs free of charge.
It is made of Galvalume steel, which is also resistant to rust.
The molded panels have been treated with iris folds and wave processing to prevent distortion and enhance strength, as well as improve water drainage and aesthetic effects.
Additionally, it excels in finish, durability, sound insulation, and wind resistance, and is lightweight compared to other roofing materials, which reduces the sway during earthquakes, making it a good earthquake countermeasure.
In the overlay (cover) work we conducted this time, the roof becomes double-layered, which increases the weight, but Hiranbee is a lightweight roofing material, making it suitable for overlay (cover) work.
Color
Extreme – MAX Type
■ Gray Silver

■ Silver Black

■ Sepia

■ Moss Green

■ Bamboo Green

■ Midnight Blue

■ Jet Black

■ Dark Brown

■ Bright Red

Standard Type
■ Steel Black
■Marron Brown

■J Silver

This time, we completed the roofing work in Midnight Blue, and it turned out exceptionally well!
The customer was very satisfied, and I was also very happy!
Thank you very much!
Please check out other roofing work examples from here!
What is the Roof Overlay Method?
The roof overlay method involves leaving the current roof almost as it is and placing a new roof on top of it, effectively covering it.
Literally, it is a method of covering a roof with another roof. Therefore, the roof becomes double-layered. Since the roof is laid over, it is also referred to as “overlapping roofing.”
Advantages of the Overlay Method
Since a “new roof” is placed over the “current roof,” demolition work is almost unnecessary, meaning that very little waste material is produced.
This is its most significant feature, leading to various advantages.
The only parts that require demolition and waste disposal are typically the ridge cap, making it more cost-effective compared to complete roof replacement.
In 2004, regulations regarding the concentration of asbestos in raw materials were changed (for more details, please visit the Ministry of Health, Labour and Welfare’s website).
Some building materials used in structures built before 2004 contain asbestos. Asbestos-containing materials are challenging to demolish due to their high environmental impact, and the costs for demolition and waste disposal are also high. The overlay method, which produces almost no waste, is ideal for such roofs.
Some may wonder, “Is it safe to live in a building that uses asbestos-containing materials?” but rest assured. As long as there is no destruction or crushing, it will not disperse into the air.
If you are unsure about the type of roof on your home, please feel free to consult with us.
Additionally, the construction can be completed in a shorter period than painting or complete replacement. A shorter construction period means lower labor costs, which in turn makes the overall cost lower.
The psychological anxiety of having to live in an unusual environment is also reduced.
When scaffolding is set up, there may be inconveniences such as difficulty entering and exiting or opening windows. Being able to return to normal life in a short period is a significant advantage.
Our company specializes in roofing work, and the roof overlay method is the most frequently performed type of work we undertake. We are very grateful that we are continuously engaged in roof overlay method projects without interruption.
Procedure for Gutter Replacement Work
1. Existing Eaves Gutter Dismantling
2. Installation of New Eaves Brackets
Note that due to the fascia (where the eaves brackets were attached) or building distortion, even if we set the slope with the brackets, there may be backflow. It is important to check the slope with a level against the fascia before attaching the brackets!
3. Installation of Eaves Gutter
4. Connection to Downspout
5. Water Flow Test and Cleaning to Complete!
For the eaves gutter, we used Panasonic Iron Round 105.
It has strength due to the steel plate inside.
Color
■Milk White

■Shincha

■Black

This time, we replaced the rain gutter with Shincha!
| Roof Material | Inagaki Shouji/Hiranbi 220 |
|---|---|
| Manufacturer Warranty | Coating 15 years・Puncture 25 years |
| Expected Durability | 35 years |
| Color Used This Time | Midnight Blue![]() |
For exterior renovations in Tokyo, trust Kakeru Koumuten!
Our company has a wealth of experience in roofing and exterior painting renovations in Tokyo.
We are happy to assist with everything from roof overlays, roof replacements, exterior painting, waterproofing, to partial roof repairs for leaks.
If you have any questions or concerns such as “I just want to know the estimate for the roof renovation” or “I want to know about roofing materials,” please feel free to contact us!
Summary
Estimates and inspections are, of course, free! If you have any issues with roofs, rain gutters, exteriors, or exterior structures, please consult Kakeru Koumuten Co., Ltd. in Aoba-ku, Yokohama!
Kakeru Koumuten is a remodeling company strong in exterior renovations, and we conduct everything from temporary scaffolding to roofing and exterior painting completely in-house.
We are confident that our “cost, quality, and efficiency” in exterior renovation work are unmatched compared to other companies!
We take pride in our exterior renovations, so we welcome competitive estimates!
We offer comprehensive construction guarantees and aftercare maintenance, and we have received positive feedback for our proposals that align with cost performance and our customers’ future life plans!
“I’m glad I chose you!” is what we strive for, and we take every request seriously.
We also have information on roofing costs and pricing plans for roof overlay methods, so please take a look if you’re interested!
We look forward to your inquiries. Thank you very much.
Helpful information about exterior renovations can be found here!
・Ota Ward, Tokyo | Exterior Painting | Eaves Replacement | Exterior Renovation Completed!
・Ota Ward, Tokyo | Roof Repair | Roof Overlay Using Ridgeway Completed!
・Machida City, Tokyo | Roof Repair | Roof Re-roofing Work Due to Leaks Completed!
・Machida City, Tokyo | Roof Repair | Roof Overlay Method Using Ridgeway Completed!
・DIY Painting Plan! Perfect for Those Who Want to Try DIY Roof and Exterior Painting! We Only Set Up Scaffolding!
・Cost of Roof Overlay | Kakeru Koumuten’s Roof Construction Plan!
・Cost of Exterior Painting | Kakeru Koumuten’s Exterior Painting Plan!
・Cost of Leak Repairs | Kakeru Koumuten’s Leak Repair Plan!
・Roof Ridge Cap Replacement | Cost of Surface Plaster | Kakeru Koumuten’s Construction Plan!
・Latest Edition | Grants, Subsidies, and Reduction Systems Available for Renovations!
・What are the Market Prices for Rain Gutter Repair and Cleaning? Tips on Timing, Fire Insurance, and Choosing a Contractor!!
・Renovation Store in Kanagawa Prefecture, Yokohama | What is Roof Overlay (Roof Cover Method)?
LINE consultations are also very welcome◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!