Leave the installation of solar panels in Shinjuku, Tokyo to Kakeru Koumuten Co., Ltd.!
For solar panel and battery installation in
Shinjuku, Tokyo,
Kakeru Koumuten is at your service!
Kakeru Koumuten is a company specializing in exterior renovations.
As a company strong in roofing work, we are entrusted withsolar panel and battery installation considering roofing and waterproofing!
“How to Choose a Solar Panel Contractor in Shinjuku, Tokyo”
“Costs for Solar Panel and Battery Installation”
“Subsidies Available for Solar System Installation in Shinjuku, Tokyo”
We will also explain the above three points!
Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure a satisfactory solar panel installation, we recommend obtainingthree estimates!
Table of Contents (tap to open/close)
- Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Shinjuku, Tokyo
- Roof Inspection Before Installing Solar Panels
- Possible Subsidies and Grants Available in Shinjuku, Tokyo
- Price List for Solar Panel and Storage Battery Installation
- Breakdown of Installation Capacity, Equipment, and Construction Costs
- Self-Estimate and Profit Simulation for Solar Power Generation
- Customer Testimonials
- Case Studies of Solar Panel Installations
- How to Choose a Solar Panel Installer in Shinjuku, Tokyo
- Benefits of Introducing Solar Equipment
- Points to Consider When Introducing Solar Power Generation
- How to Choose Solar Panels
- Frequently Asked Questions About Solar and Storage Battery Installation in Shinjuku, Tokyo
- If You Are Looking for a Solar Panel Installer in Shinjuku, Tokyo, Contact Kakeru Koumuten
- Characteristics of Shinjuku, Tokyo and Key Points for Solar Installation
- Service Area in Shinjuku, Tokyo
Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Shinjuku, Tokyo
Regarding why our company is entrusted with solar panel installation by customers in Shinjuku, Tokyo,
“Our Unique Strengths in Solar Panel Installation That Cannot Be Imitated by Other Companies”
have received high praise from many customers.
so we would appreciate it if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from any number of companies!
1. We Can Also Handle Exterior Renovations Besides Solar Panel Installation!


Troubles such as leaks that occur during solar panel installation may be caused by insufficient confirmation of the roof and waterproofing at the installation site.
Even if one is knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside their expertise, so caution is necessary.
It is reassuring to have knowledge about the roof to avoid maintenance and troubles after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!
2.Facilities Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar and exterior renovation work.
We have established five bases for material storage and showrooms.
In-house Scaffolding Materials


To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding according to construction conditions, allowing us to assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs for scaffolding work.
We have scaffolding materials for approximately 50 single-family homes!
Even if there is a height difference on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.
Storage of Materials in Our Large In-house Warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you can purchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we can respond quickly in emergencies!
In-house sorting and transportation of waste materials
The installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut down on waste disposal costs.
Exterior renovation dedicated showroom


In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on the roofing materials!
Simulations for potential earnings and installation costs when introducing solar panels are also available!
Since roofing and exterior wall work often accompany each other, we also provide samples of roofing materials and models that explain the structure in detail!
3.All work performed by our own team
One of Kakeru Koumuten’s major strengths is its complete in-house construction.
By having Kakeru Koumuten handle everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will assist you from the estimate to the completion of the work.
Since the person in charge does not change, whether it’s the sales representative or the construction management representative, smooth communication is possible.
We can provide consistent in-house construction from temporary scaffolding installation, exterior wall painting, to roof renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry licenses and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists on staff, and we are confident in our construction techniques.
We are capable of handling large-scale roofing projects such as factories!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty for solar panel installation work, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, it may not be possible to provide a warranty unless a roof renovation is performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary depending on the warranty details.)
Aftercare is available every year, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roofing troubles and situations.
Even if you cannot access the roof at high places, we can respond using a drone!
During leak investigations, we can also conduct inspections using a thermal imaging camera.
If the power generation of the solar panels decreases due to dirt or other factors, we can also provide cleaning of the solar panels with a specialized brush.
We will respond according to your wishes.
7. Human Resource Development
To improve skills, we create various roof models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct technical training to ensure that each staff member can handle various cases.
8. Creation of Easy-to-Understand Materials and Simulations
Kakeru Koumuten provides “estimates”, “layout diagrams”, and “power generation simulations”, as well as “solar installation guidebooks” and “profit and loss simulations” that take into account loan interest rates and electricity costs.
Profit and loss simulations can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar installations will receive materials that clearly summarize important points and disadvantages!
We encourage you to obtain comparative estimates and compare them with other companies’ plans!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.
| 1. Types of Roofing Materials and Age | The fixing method varies depending on the roofing materials such as slate, tiles, metal roofs, and flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first. |
| 2. Condition of Substrate and Waterproof Sheet | If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of leaks. |
| 3. Orientation, Slope, and Shadows of the Roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect the power generation. We will create a layout diagram from the drawings and the site, and you can confirm it with a power generation simulation. |
| 4. Shape of the Roof and Usable Area | The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. Since the number of panels that can be installed varies depending on the size of the panels, we will compare based on the total output of the roof. |
| 5. Fixing Method and Waterproofing Details | We will check whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please confirm the waterproof treatment method for the fixing parts during the estimate. |
| 6. Weight of the Roof | The roof will become heavier due to the panels. After investigating the existing roof, substrate, and load-bearing capacity, switching to lighter roofing materials may be an option if necessary. |
| 7. Installation Location of Equipment and Wiring | We will confirm the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect costs. |
| 8. Ease of Scaffolding Setup and Delivery Routes | If there is a height difference on the site, planning for scaffolding and the delivery routes for equipment and materials may require some ingenuity. The width of the front road and any steps on the site will also be confirmed during the site survey. |
Fixing Methods and Confirmation Points by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets to the roof material and substrate with screws) | Waterproofing treatment of fixed parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first. |
| Tile Roof | Fixed with brackets and methods suitable for the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) | Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lightweight roofing materials before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a frame | Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work. |
If you renovate the roof 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!
▶ Click here for roof renovations in Shinjuku, Tokyo
PossibleSubsidies and Grants
If you are introducing solar panels or storage batteries in Shinjuku, Tokyo, there is a possibility that the systems from the “National Government,” “Tokyo Metropolitan Government,” and your local “Shinjuku Ward” may apply.
The following information is based on the official pages of each system as of October 7, 2026. The acceptance status may change based on the budget, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Period for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Tokyo “Residential Solar Power Generation Promotion Project” | Individuals, corporations, or management associations installing unused solar power systems (output less than 50kW, JET certification, etc.) in residential properties within Tokyo. The generated power must be used in the residential part. Pre-application is required | Existing homes: 15,000 JPY per kW for 3.75kW or less (maximum 450,000 JPY), 12,000 JPY/kW for over 3.75kW to less than 50kW New homes: 12,000 JPY/kW for 3.6kW or less (maximum 360,000 JPY), 10,000 JPY/kW for over 3.6kW |
For fiscal year 2026, pre-applications are being accepted from May 29 (will end once the budget is reached). From the pre-application for fiscal year 2026, submission of certificates issued by financial institutions during the performance report is mandatory |
| Tokyo “Battery Storage Promotion Project” | Owners of eligible devices (battery storage registered with SII, excluding national and local governments). Must be installed between April 1, 2026, and March 30, 2031. If pre-applying after October 1, 2026, only products registered with the national SII for fiscal year 2026 are eligible | Battery storage package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household) Additional for participating in DR demonstration (100,000 JPY per unit; 150,000 JPY per unit if energy management devices are installed) Expansion of battery storage unit: 60,000 JPY/kWh (maximum 720,000 JPY per household) |
For fiscal year 2026, pre-applications are being accepted from May 29. Grant applications and performance reports will be accepted from June 30 |
| Shinjuku Ward “Energy Conservation and Renewable Energy Equipment Subsidy Program (Solar Power Generation System & Battery Storage)” | Devices installed in individual residences are eligible. For battery storage, it must be constantly connected to a solar power generation system or Enefarm. Application must be made after installation is complete | Solar power generation: 100,000 JPY per kW (maximum 300,000 JPY) Battery storage: 10,000 JPY per kWh of storage capacity (maximum 100,000 JPY) |
For fiscal year 2026, applications are accepted in phases: Phase 2 from August 17, 2026, to October 16, 2026; Phase 3 from November 2, 2026, to December 25, 2026; Phase 4 from January 12, 2027, to March 12, 2027. Phase 2 has approximately 24% of the budget allocated for grant decisions (updated September 14, 2026) |
| National “DR Home Battery Project” (Fiscal Year 2025 Supplement) | Newly introducing home battery systems that can be utilized for DR (demand response) with registered products | Calculated based on a standard amount of 34,500 JPY per initial effective capacity of 1kWh (subsidy rate within 3/10; maximum 600,000 JPY per application) | The budget was reached on May 29, 2026, and the public offering has ended (the official site states there are no plans to reopen the public offering, and applications cannot be made at this time) |
| National “Mirai Eco Housing 2026 Project” (Renovation) | Battery storage is one of the eligible facilities, but it must be combined with essential works such as insulation renovations of windows (openings) and the structure; applications cannot be made for battery storage installation alone. Solar panels are not included as eligible facilities | 蓄電池:96,000円/戸 | Ends as soon as the budget limit is reached. As of October 5, 2026, the application amount for renovations is displayed as 8% of the budget on the official website. Please check the application status on the official website. |
The Tokyo solar power and storage battery subsidy program requires prior application. For storage batteries applied for after October 1, 2026, only products registered with the national SII will be eligible, and the requirements for equipment will change. The subsidy for Shinjuku Ward is a system where applications are made after installation is completed, and the application periods for the 2026 fiscal year are divided by term. Eligibility conditions, application procedures, and the possibility of combining different programs vary by system, and applying does not guarantee that subsidies will be granted, so please confirm before contracting or starting construction.
Kakeru Koumuten Co., Ltd. will provide guidance on eligibility conditions and application periods for each program after confirming them.
National Subsidy “DR Home Storage Battery Project (Support Project for Introducing Home Storage Systems for DR Resource Implementation)”
The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.
This program targets those who are newly introducing registered storage systems that can be utilized for demand response (DR). In the 2025 fiscal year supplementary project, the subsidy amount was determined based on a standard amount of 34,500 yen per initial effective capacity of 1kWh, with a subsidy rate of up to 30% and a maximum of 600,000 yen per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.
However, the supplementary funds for the 2025 fiscal year reached the budget on May 29, 2026, and the public offering has ended. The official website also states that there are no plans to reopen the public offering, and applications cannot be made at this time. Please check the official website for future public offerings.
Additionally, there are currently no subsidies confirmed for the installation of solar panels on existing homes.
👉 Click here for the DR Home Storage Battery Project official website
Tokyo “Promotion Project for Introducing Solar Power Generation in Homes”
This subsidy is for those who are installing unused solar power generation systems in residential homes within Tokyo. The simultaneous installation of storage batteries is not a condition.
● Existing homes: For systems below 3.75kW, 150,000 yen per kW (maximum 450,000 yen); for systems over 3.75kW and below 50kW, 120,000 yen per kW.
● New homes: For systems below 3.6kW, 120,000 yen per kW (maximum 360,000 yen); for systems over 3.6kW and below 50kW, 100,000 yen per kW.
● Additional amounts for the installation of rooftop structures and waterproofing work are also available.
The target is for unused panels that have obtained JET certification or similar, installed in residential homes in Tokyo, with an output of less than 50kW, and used in the living area. The process involves making a prior application and then applying for the grant after installation. Starting from the 2026 fiscal year’s prior application, submission of a certificate issued by a financial institution during the performance report is now mandatory.
According to the official page of Tokyo, pre-registration is being accepted from May 29, Reiwa 8. It will end once the budget is reached, so please check the official page for the registration status.
👉 Here is the official page of Tokyo (Cool Net Tokyo)
Tokyo’s “Household Battery Installation Promotion Project”
This is a subsidy for the installation costs of battery systems aimed at increasing self-consumption of electricity generated by solar power and improving energy independence during emergencies.
●Battery package: 100,000 JPY per kWh (up to 1,200,000 JPY per household)
●Additional for participating in DR demonstration: 100,000 JPY per unit (150,000 JPY per unit if energy management equipment is installed)
●Expansion of battery unit: 60,000 JPY per kWh (up to 720,000 JPY per household)
Eligible applicants are owners of the subsidized equipment (excluding national and local governments), and the installation must be completed between April 1, Reiwa 8 and March 30, Reiwa 11. If pre-registration is done after October 1, Reiwa 8, only products registered in the national SII for Reiwa 8 will be eligible.
The official page of Tokyo states that pre-registration is being accepted from May 29, Reiwa 8. For detailed information such as conditions for combination with solar power generation, please check the official page.
👉 Here is the official page of Tokyo (Cool Net Tokyo)
Shinjuku Ward “Energy Conservation and Renewable Energy Equipment Subsidy System (Solar Power Generation System and Battery)”
This is a subsidy for individuals who have installed solar power generation systems or batteries in their homes within the ward. Applications are to be made after the installation of the equipment is completed, not before the construction.
●Solar power generation: 100,000 JPY per kW of output (up to 300,000 JPY)
●Battery: 10,000 JPY per kWh of storage capacity (up to 100,000 JPY)
Batteries must be continuously connected to a solar power generation system or Enefarm, among other conditions. It is also stated that while it is possible to combine with subsidies from the national government and Tokyo, if the total amount of subsidies exceeds the eligible expenses, it will be reduced.
Applications are divided by term, and for the Reiwa 8 fiscal year, the second term is from August 17 to October 16, the third term is from November 2 to December 25, and the fourth term is from January 12, Reiwa 9 to March 12. According to the official page of Shinjuku Ward (updated September 14, Reiwa 8), the allocation decision for the second term is about 24% of the budget. The application for the second term is until October 16, so if you are considering it, please check the registration status on the official page early.
👉 Here is the official page of Shinjuku Ward
Solar Panel Installation & Battery Installation Price List

⇧Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here

⇧Service Menu | For Costs of Solar Panel Removal and Water Heater Removal, Click Here
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and batteries should be checked separately for “Equipment Costs (Device Costs)” and “Construction Costs.”
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.
Considerations for Installation Capacity (kW) and Battery Capacity (kWh)
The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatt). Battery capacity is compared in kWh (kilowatt-hour), which represents the amount of electricity that can be stored.
The amount of kW that can be placed on the roof varies for each house based on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.
On our pricing page, we list solar panels as approximately 800,000 JPY to 1,200,000 JPY for 3-5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just approximate amounts and can vary based on wiring length, scaffolding range, existing roofing materials, and panel layout.)
▶ Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here
Items to Confirm in the Estimate (Cost Confirmation)
When comparing estimates, it’s common to compare different capacities and equipment. Please check if the following items are clearly stated in each company’s estimate!
| 1. Solar Panels | Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW). |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also confirm whether it is a type that controls with a battery. |
| 3. Battery | Manufacturer, model number, capacity (kWh), range of use during power outages (entire house or specific circuits), installation location. |
| 4. Mounting Frame and Hardware | Name of hardware suitable for roofing material and method of fixation (whether it involves drilling holes or clamping). |
| 5. Wiring and Electrical Work | Wiring route and length, work around the distribution board, presence of a monitor to check power generation. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment at fixation points, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Applications | Extent of support for applications to the power company, feed-in tariff (FIT) certification applications, and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If roof work and exterior painting are done simultaneously, check that the same scope and quantity are not double-counted. |
| 9. Removal and Disposal | Whether the removal of existing solar water heaters and old panels, as well as disposal costs for waste materials, are included. |
| 10. Tax Classification and Warranty | Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, and details and duration of manufacturer and workmanship warranties. |
If the capacities differ, both the price and power generation will change. Kakeru Koumuten Co., Ltd. welcome comparisons, so if you bring estimates from other companies, we will explain the differences item by item!
Self-Estimate and Profit Simulation for Solar Power Generation
With the simulator above,
you can obtain a rough estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the battery, you can get a rough estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.
Customer Feedback
Case Studies of Solar Panel Installations


| Construction Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh class |
| Base Mounting Hardware Used |
| Niigata Manufacturing/Aluminum Catch Type Hardware |
| Fixing Method & Waterproofing Arrangement |
| Fixed by catching the horizontal metal roof with catch type hardware (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY Estimated recovery period for construction costs: about 8 to 9 years (self-consumption) *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system. |
| Construction Period |
| Approximately 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the installation of solar panels and storage batteries. I heard that grants are available, and I would like to know how much will be provided. |
Our Proposal
We visited to provide a quote and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the quote!
How to Choose a Solar Panel Installation Contractor in Shinjuku, Tokyo
There are many solar panel installation contractors available in Shinjuku, Tokyo, and you may be unsure which one to choose.
Therefore, when requesting solar panel installation and battery storage installation work, let’s confirm the following 4 points.
● Not only knowledge of solar panels but also extensive knowledge of roofs
● Confirm the presence of warranties and aftercare services
● Obtain estimates from multiple contractors (3 companies as a guideline)
● Check if they provide support for subsidy applications
By confirming the above 4 points, you will be able to choose a reliable contractor.
Knowledge of roofs as well as solar panels
Defective installation of solar panels may be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge of solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing
・Solar panels installed on a severely deteriorated roof causing leaks
・Solar panels installed on a roof with a short durability period, requiring remodeling for removal and reinstallation within a few years
・Incorrect handling due to misjudgment of the type of waterproofing, resulting in leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.
▶ Go to “Roof Verification Before Installing Solar Panels” in this article
Confirm the presence of warranties and aftercare services
When choosing a solar installation contractor, let’s confirm the presence of warranties. It is important to check not only the duration of the warranty but also the coverage, disclaimers, and cost conditions.
Solar panels and battery storage units come with manufacturer warranties, but also check for the presence of a workmanship warranty in case leaks occur after installation!
For contractors that offer a workmanship warranty, if leaks occur after installation, they may cover it under warranty as long as it falls within the warranty period and conditions.
Additionally, some contractors offer aftercare services separate from warranties, so make sure to check if the contractor you are considering has aftercare services.
Since abnormalities or damages on the roof may not be visible, you might not notice them yourself.
By conducting inspections of hidden areas through aftercare maintenance, you can more easily prevent major repairs or breakdowns by detecting abnormalities early!
Kakeru Koumuten Co., Ltd. offers a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty without performing roof renovations.)
We also provide aftercare maintenance and send out annual DM!
After confirming the DM, we will visit for aftercare maintenance if you wish!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting solar panel installation, let’s obtain estimates from multiple contractors.
Even for the same manufacturer and the same construction details, costs may vary, and warranties and after-services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request from your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates, please check the following:
“Check the items in the estimate”
“Type of solar panels”
“Warranties and after-services”
Make sure to compare these details carefully! If the rank of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid judging solely based on price!
▶ Go to “Breakdown of Installation Capacity, Equipment, and Construction Costs” in this article
Check if they provide support for subsidy applications
There may be subsidies available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
Since there are systems like the Tokyo subsidy that require prior application, it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the Tokyo subsidy, prior application is required) before proceeding with the construction!
For the Tokyo subsidy, after installation, you will need to submit a grant application and performance report, which will be reviewed before the grant is issued! (The flow of procedures varies by system)
▶ Go to “Subsidies and Grants Available in Shinjuku, Tokyo” in this article
Benefits of Introducing Solar Equipment
The benefits of introducing solar panels are as follows!
Benefit 1: Economic Benefits
The biggest advantage of introducing solar panels is the economic benefit!
The selling price of electricity has decreased compared to 10 years ago, but by consuming the electricity generated, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity costs rise, the ability to cover your consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!
Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the 5th year, it is often more advantageous to use it at home (self-consumption) rather than selling it, making the combination with a storage battery a viable option.
👉 Ministry of Economy, Trade and Industry | For purchase prices and periods, click here
Advantage 2 Subsidies can be utilized!
The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In the case of Shinjuku Ward, there is a possibility of being eligible for the national, Tokyo Metropolitan, and Shinjuku Ward systems. The Shinjuku Ward subsidy for the 2026 fiscal year has quarterly applications (please check the application status for each system).
Advantage 3 Environmentally friendly!
Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices like power conditioners may have operational noise.)
Advantage 4 Heat insulation effects are expected!!
By installing panels on the roof or rooftop, they block direct sunlight to the roof.
Especially in summer, it can help reduce the temperature rise of the roof, providing a heat insulation effect!
(Note that this does not improve the building’s insulation performance itself.)
Benefit 5: Electricity can be used even during power outages!!
If a storage battery is installed, it is possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation functionality, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)
What points should be noted when introducing solar power generation?
Next, we will explain the “three points to note” when installing solar panels!
Point 1: Maintenance costs can be incurred
A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing the solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It would be reassuring to ask for a simulation considering maintenance costs before introducing solar panels!
Point 2: The risk of leaks increases depending on the roofing material
The fixing methods for slate roofs and tile roofs vary by construction method, but in methods that fix hardware to the roofing material or substrate with screws, waterproofing treatment at the fixed points is crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will perform thorough waterproofing, but if you are concerned about making holes, replacing the roofing material with a metal roof and fixing the solar panels using the catch method is also an option. (The catch method has compatibility conditions between the roofing material and hardware, and it cannot be used with all metal roofs.)
Catch-type base hardware for horizontal metal roofs
Point 3 The Roof Becomes Heavier
Installing solar panels will make the roof heavier. After investigating the existing roof, substrate, and load capacity, replacing with a lightweight roof may be one of the options if necessary.
How to Choose Solar Panels?
There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “This manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!
How to Choose 1: Compare Based on Total Output of the Roof
When installing solar panels on the roof, it is important to know how much power can be generated in a limited area, and generating more power is always better!
The size and output of solar panels vary by manufacturer.
A 350W output panel and a 400W output panel may seem that the higher output panel is better at first glance.
However, if the size of the panel does not fit well on the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed” due to the difference in panel size, even on the same roof.
400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of one panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation (kWh) will vary depending on conditions such as roof orientation, slope, and shading.
How to Choose 2: Compare Based on Degradation Rate of Solar Panels
Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation itself.
By considering the degradation rate as well as the initial output, you can choose solar panels without regrets!
How to Choose 3: Compare Based on Warranty Period
There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding output warranties, some manufacturers offer a 30-year warranty, while others offer a 10-year warranty, so it varies!
Longer warranties are better, so be sure to check the warranty period and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Power and Storage Battery Installation in Shinjuku, Tokyo
We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Shinjuku, Tokyo. (Tap to open answers)
How much does it cost to install solar panels and storage batteries in Shinjuku, Tokyo?
The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (4.3kW solar panel + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
Estimates by capacity are published on the solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!
Are there any subsidies available for solar and storage battery installation in Shinjuku, Tokyo?
As of October 7, 2026, Tokyo’s “Promotion Project for Solar Power Generation in Households” (for existing homes, 15,000 yen per kW for systems under 3.75kW, with a maximum of 450,000 yen) and “Promotion Project for Storage Battery Installation in Households” (100,000 yen per kWh for storage batteries, with a maximum of 1.2 million yen per household) are accepting pre-applications starting May 29, 2026, as listed on the official page of Tokyo (Cool Net Tokyo). Shinjuku Ward has a subsidy system for energy-saving and energy-creating equipment (for solar power generation, 100,000 yen per kW with a maximum of 300,000 yen, and for storage batteries, 10,000 yen per kWh with a maximum of 100,000 yen), with the second phase of the 2026 fiscal year accepting applications until October 16, the third phase from November 2 to December 25, and the fourth phase from January 12 to March 12, 2027, as stated on Shinjuku Ward’s official page. The national DR household storage battery project has ended its public recruitment.
Since the application status may change, please refer to the subsidy and grant section and consult with us before signing a contract.
Can I apply for subsidies after the construction is completed?
This varies by program. Tokyo’s subsidies require pre-application, while Shinjuku Ward’s subsidy allows applications after installation is complete. Conditions such as whether you can contract and start construction before applying differ by program, so please confirm before signing a contract.
The order of procedures varies by program, so please check before contracting and starting construction.
Can solar panels be installed on a slate roof? I’m worried about leaks.
Installation on a slate roof is possible, but it requires confirmation of the roofing material and substrate condition. The fixing method varies by construction method, and when fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is crucial.
Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the roof condition before installation and suggest methods such as roof overlay or replacement if deterioration is advanced.
The roof is old. Should I do a roof renovation first?
It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, the cost of removing and reinstalling the solar panels will be incurred separately. If the remaining lifespan of the roof is short, renovating with durable roofing materials before installation may reduce total costs.
After confirming the condition of the roof during the on-site survey, please consult us about the installation process!
Is it better to install a storage battery together with solar panels?
If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.
Additionally, the Tokyo Metropolitan Government’s subsidy for storage batteries (100,000 yen per kWh for Reiwa 8, with a maximum of 1.2 million yen per household) aims to increase self-consumption of electricity generated by solar power. In Shinjuku Ward, storage batteries are also included in the subsidy (conditions include being constantly connected to a solar power generation system or EneFarm). You can compare “solar only” and “solar + storage battery” through a financial simulation.
How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and on-site survey, and provide you with the installation capacity and power generation simulation.
Shinjuku Ward consists of the northern Toshima Plateau, the southern Yodobashi Plateau, and the lowlands in between, making it a region where the shape and orientation of roofs, as well as the shadows cast by surrounding buildings, differ from house to house. You can check the expected power generation through the power generation simulation.
How long will the construction period be?
For the above construction example (4.3 kW solar panels + storage battery), it took about 3 days. The duration may vary if roof work is done simultaneously or depending on the shape and installation capacity of the roof.
Please note that additional time is required for applications for subsidies and power companies, so consult us as soon as possible.
What is the current selling price (FIT)?
For residential use (less than 10 kW), the selling price will be 24 yen/kWh for the first 4 years and 8.3 yen/kWh from the 5th to the 10th year for certifications after October 2025, and the same price will apply for the 2026 fiscal year.
The idea is to recover initial costs quickly in the first 4 years and focus on self-consumption thereafter. Kakeru Koumuten provides a financial simulation that considers loan interest rates and electricity costs.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-service maintenance notifications via DM and visits customers who wish to have inspections. We can also clean solar panels with specialized brushes if power generation decreases due to dirt.
It can be difficult to check areas on the roof by yourself, so please feel free to consult us if you have any concerns.
Can you also handle renovations for roofs that already have solar panels installed?
Yes, we can. Kakeru Koumuten can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them all in one process. The removed panels can be stored in our own warehouse.
For information on costs, please see the solar panel removal and hot water heater removal pricing page.
If you are looking for a solar panel installation contractor in Shinjuku, Tokyo, please consult Kakeru Koumuten
Our company handles a wide range of exterior renovations, including solar panels, roofing work, and exterior wall work in Shinjuku, Tokyo.
We receive requests from many customers, including renovation companies and real estate agencies, who contact us!
Kakeru Koumuten promises “high-quality renovations at low cost”, and we have received positive feedback from many customers.
We continue to update our annual construction performance records and will strive to improve quality to satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and exterior cover methods.
We are also happy to handle small jobs like partial repairs and rain gutter cleaning!
In urgent cases such as water leakage work, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!
“I want to know recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide optimal solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and will propose the best construction plan!
We are confident that we will not lose in terms of cost, quality, and organization compared to other companies in exterior work!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if our company is inferior to others, you are free to decline!
Characteristics of Shinjuku, Tokyo and Points for Solar Work
The area of Shinjuku is 18.22 square kilometers. The terrain is divided into the northern Toshima Plateau, the southern Yodobashi Plateau, and the low-lying area in between, with half of the land use designated for residential purposes. Below are the characteristics of the terrain in Shinjuku, Tokyo, and points to be careful of when installing solar panels and storage batteries. (Tap to open)
View the characteristics of Shinjuku, Tokyo and points for solar work
■ A region with undulations between plateaus and lowlands. Check scaffolding, delivery, and shadows for each site
The highest point in the ward is Hakone Mountain in Toyama Park (elevation 44.6m), with an average elevation of about 30m on the plateau, and the lowest area is near Iidabashi (elevation 4.2m). Due to the undulating terrain, residential areas are mixed with commercial and business facilities around train stations and along main roads, resulting in varying shadow effects from adjacent buildings, space for scaffolding, and equipment delivery routes for each property. At Kakeru Koumuten, our own scaffolding team plans the scaffolding according to the site, creates layout diagrams from drawings and site surveys, and you can confirm this through power generation simulations.
■ Check the flood, internal water, and storm surge hazard maps. Pay attention to the installation location of equipment
The Shinjuku Ward flood hazard map indicates the inundation areas and water depths due to flooding (external water), rainwater discharge (internal water), and storm surges, based on the assumed maximum rainfall (total rainfall of 690mm and maximum hourly rainfall of 153mm). Depending on where the power conditioner and storage battery are installed, separate from the panels on the roof, the impact during flooding may vary. Please check the inundation assumptions for your residence on the ward’s hazard map and consult with us regarding the installation location and height, in conjunction with the installation conditions of the manufacturer you will be using.
■ Roof types and ages vary from house to house. Check the roof and waterproofing before installation
Even within the same ward, roof types, ages, and site shapes vary from house to house. At Kakeru Koumuten, we will check the type and condition of the roof and the situation of the site before installation, and propose methods for fixing, waterproofing arrangements, and scaffolding planning.
■ The annual sunshine hours at the Tokyo Observatory are about 1,927 hours
According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours at the Tokyo Observatory are about 1,927 hours, with January (about 193 hours) having the most and June during the rainy season (about 124 hours) having the least. (This is a reference value, not an observation value within Shinjuku Ward.)
The power generation in Shinjuku Ward also varies due to shadows from surrounding buildings, so conducting annual power generation simulations and selecting the capacity of the storage battery to match the times of high electricity usage are key points.
Our company handles many exterior construction and solar projects in Shinjuku Ward, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us for any sudden troubles!
Service Area in Shinjuku Ward, Tokyo
Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.
List of Areas in Shinjuku Ward, Tokyo
Aizumicho, Shinjuku Ward / Akagikitamachi, Shinjuku Ward / Akagimotomachi, Shinjuku Ward / Agabacho, Shinjuku Ward / Arakicho, Shinjuku Ward / Ichigaya Kagawa-cho, Shinjuku Ward / Ichigaya Kōrō-cho, Shinjuku Ward / Ichigaya Satohara-cho, Shinjuku Ward / Ichigaya Sauen-cho, Shinjuku Ward / Ichigaya Takashō-cho, Shinjuku Ward / Ichigaya Tamachi, Shinjuku Ward / Ichigaya Daichi-cho, Shinjuku Ward / Ichigaya Chōnenji-cho, Shinjuku Ward / Ichigaya Nakano-cho, Shinjuku Ward / Ichigaya Hachiman-cho, Shinjuku Ward / Ichigaya Funakawara-cho, Shinjuku Ward / Ichigaya Motomura-cho, Shinjuku Ward / Ichigaya Yakuōji-cho, Shinjuku Ward / Ichigaya Yanagicho, Shinjuku Ward / Ichigaya Yamanobori-cho, Shinjuku Ward / Iwatokucho, Shinjuku Ward / Enokicho, Shinjuku Ward / Okubo, Shinjuku Ward / Kaidai-cho, Shinjuku Ward / Kagurakawagashi, Shinjuku Ward / Kagurazaka, Shinjuku Ward / Kasumigaoka-cho, Shinjuku Ward / Katamachi, Shinjuku Ward / Kabukicho, Shinjuku Ward / Kamiochiai, Shinjuku Ward / Kawadacho, Shinjuku Ward / Kikui-cho, Shinjuku Ward / Kitashinjuku, Shinjuku Ward / Kitamachi, Shinjuku Ward / Kitayamanobori-cho, Shinjuku Ward / Saikucho, Shinjuku Ward / Samon-cho, Shinjuku Ward / Shinano-cho, Shinjuku Ward / Shimochiai, Shinjuku Ward / Shimomiyahicho, Shinjuku Ward / Shirogane-cho, Shinjuku Ward / Shinogawacho, Shinjuku Ward / Shinjuku, Shinjuku Ward / Suido-cho, Shinjuku Ward / Sugacho, Shinjuku Ward / Sumiyoshi-cho, Shinjuku Ward / Daikyo-cho, Shinjuku Ward / Takadanobaba, Shinjuku Ward / Tansu-cho, Shinjuku Ward / Tsukijicho, Shinjuku Ward / Tsukudo-cho, Shinjuku Ward / Chikudo Hachiman-cho, Shinjuku Ward / Tenjin-cho, Shinjuku Ward / Tozuka-cho, Shinjuku Ward / Fukuchicho, Shinjuku Ward / Benten-cho, Shinjuku Ward / Minami Enokicho, Shinjuku Ward / Minami-machi, Shinjuku Ward / Minami Motomachi, Shinjuku Ward / Minami Yamanobori-cho, Shinjuku Ward / Yamabuki-cho, Shinjuku Ward / Yaraicho, Shinjuku Ward / Yokodera-cho, Shinjuku Ward / Yochō-cho, Shinjuku Ward / Yotsuya, Shinjuku Ward / Yotsuya Sakamachi, Shinjuku Ward / Yotsuya San’ei-cho, Shinjuku Ward / Yotsuya Honshio-cho, Shinjuku Ward / Wakaba, Shinjuku Ward / Wakamatsu-cho, Shinjuku Ward / Wakamiya-cho, Shinjuku Ward / Waseda Tsurumaki-cho, Shinjuku Ward / Waseda Minami-machi, Shinjuku Ward / Waseda-cho
・Exterior wall painting in Shinjuku, Tokyo, is entrusted to Kakeru Koumuten!
・Roof renovations in Shinjuku, Tokyo, are entrusted to Kakeru Koumuten!
・Exterior renovations in Shinjuku, Tokyo, are entrusted to Kakeru Koumuten!
・Kakeru Koumuten Co., Ltd. construction achievements
・Kakeru Koumuten Co., Ltd. aftercare services
・Kakeru Koumuten Co., Ltd. construction menu and price list
・Kakeru Koumuten Co., Ltd. staff blog and announcements
・Explaining the importance of comparative estimates and key points!
・Top 12 solar power generation manufacturers! Features and selection tips included!
・What are the installation costs for solar power generation? Comprehensive tips to reduce costs!
・What are the best locations for solar power installation? Key points for site selection included!
・Here is the introduction to solar power generation estimates!
We welcome inquiries via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!





