Leave Your Solar Panel Installation Work in Shibuya, Tokyo to Kakeru Koumuten Co., Ltd.!
For solar panel and storage battery installation in
Shibuya, Tokyo,
trust Kakeru Koumuten!
Kakeru Koumuten is a specialized exterior renovation company headquartered in Aoba Ward, Yokohama City.
As a company strong in roofing work, we are entrusted with solar panel installation and storage battery work that considers roofing and waterproofing!
“How to Choose a Solar Panel Contractor in Shibuya”
“Costs for Solar Panel and Storage Battery Installation”
“Subsidies Available for Solar System Installation in Shibuya”
We will also explain the above three points!
Installing solar panels carries risks such as “the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtaining estimates from about three companies!
Table of Contents (tap to open/close)
- Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Shibuya, Tokyo
- Roof Inspection Before Installing Solar Panels
- Subsidies and Grants That May Apply in Shibuya
- Price List for Solar Panel and Storage Battery Installation
- Breakdown of Installation Capacity, Equipment, and Construction Costs
- Self-Estimate and Profit Simulation for Solar Power Generation
- Customer Testimonials
- Case Studies of Solar Panel Installations
- How to Choose a Solar Panel Installation Company in Shibuya, Tokyo
- Benefits of Introducing Solar Equipment
- Points to Note When Introducing Solar Power Generation
- How to Choose Solar Panels
- Frequently Asked Questions About Solar and Storage Battery Installation in Shibuya
- If You’re Looking for a Solar Panel Installation Company in Shibuya, Contact Kakeru Koumuten
- Characteristics of Shibuya, Tokyo and Points for Solar Construction
- Service Area in Shibuya, Tokyo
Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Shibuya, Tokyo
The reasons why we are entrusted with solar panel installation by customers in Shibuya, Tokyo include
one reason being that “Kakeru Koumuten serves Kanagawa and Tokyo as its service areas”,
and we have unique strengths in solar panel installation that cannot be imitated by other companies, which have received high praise from many customers.
so we would appreciate it if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from any number of companies!
1. We Can Also Handle Exterior Renovations Besides Solar Panel Installation!

Problems such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if one is knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside their expertise, so caution is necessary.
It is reassuring to have expertise in roofing to avoid maintenance issues and troubles after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can perform the removal and installation of solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!
2.Facilities Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established 5 bases centered around Yokohama City, Kanagawa Prefecture for material storage and showrooms.
In-house Scaffolding Materials


To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding based on the construction conditions and can assemble the scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also reduce the costs of scaffolding work.
We own scaffolding materials for approximately 50 detached houses!
Even in Shibuya Ward, where plateaus and valleys are intertwined, our in-house scaffolding team will plan the scaffolding according to the site conditions.
Storage of Materials in Our Large In-house Warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we canrespond quickly in emergencies!
Sorting and Transporting Waste Materials In-House
The installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.
Exterior Remodeling Dedicated Showroom


In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are attached to the roofing materials!
It is also possible to simulate the revenue and installation costs when introducing solar panels!
Since roofing and exterior wall work often accompany each other, we also provide samples of roofing materials and models that explain the structure, allowing for detailed explanations!
3.All Work Performed by Our Own Team
One of Kakeru Koumuten’s major strengths is its complete in-house construction.
By having Kakeru Koumuten handle everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will assist you from the estimate to the completion of the work.
Since the担当者 such as sales and construction management do not change, smooth communication is possible.
We can provide consistent in-house construction from temporary scaffolding installation, exterior wall painting, to roof renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry licenses and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists, and we are confident in our construction techniques.
We can also handle large-scale roof projects such as factories!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty for solar panel installation, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless a roof renovation is performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary depending on the warranty details.)
Aftercare is available every year, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roofing troubles and situations.
If you are unable to access the roof due to height, we can utilize a drone to assist!
During leak investigations, we can also conduct surveys using a thermal imaging camera.
If the power generation of solar panels decreases due to dirt or other factors, we can provide cleaning with a specialized brush.
We will respond according to your wishes.
7. Human Resource Development
To improve skills, we create various roof models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly provide technical training so that each staff member can handle various cases.
8. Creation of Easy-to-Understand Materials and Simulations
Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar installation guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
We compile easy-to-understand materials that include important points and disadvantages for customers who may not be familiar with solar installations!
We encourage you to obtain comparative estimates and review plans from other companies!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 to 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.
| 1. Types of Roofing Materials and Age | The fixing method varies depending on the roofing material, such as slate, tiles, metal roofs, and flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest a roof renovation first. |
| 2. Condition of Substrate and Waterproof Sheet | If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of leaks. |
| 3. Orientation, Slope, and Shadows of the Roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect the power generation. We will create a layout diagram from the drawings and the site, and you can confirm it with a power generation simulation. |
| 4. Shape of the Roof and Usable Area | The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we will compare based on the total output of the roof. |
| 5. Fixing Method and Waterproofing Details | We will check whether the method involves drilling holes in the roofing material for fixing or using brackets to secure the roofing material. The fixing method varies by technique, so please confirm the waterproofing treatment of the fixing parts during the estimate. |
| 6. Weight of the Roof | The roof will become heavier due to the panels. After investigating the existing roof, substrate, and load-bearing capacity, switching to lighter roofing materials may also be an option if necessary. |
| 7. Installation Location of Equipment and Wiring | We will confirm the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect the cost. |
Fixing Methods and Checkpoints by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets to the roof material and substrate with screws) | Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first. |
| Tile Roof | Fixed with brackets and methods suitable for the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) | Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lightweight roofing materials before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a frame | Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work. |
If you renovate the roof 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!
▶ Click here for roof renovations in Shibuya, Tokyo
Potential Subsidies and Grants inShibuya, Tokyo
When introducing solar panels or storage batteries in Shibuya, Tokyo, there is a possibility of being eligible for programs from the national government, Tokyo Metropolitan Government, and Shibuya City.
The following information is based on the official pages of each program as of October 7, 2026. The application status may change depending on the budget and application period, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Timing for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Tokyo Metropolitan Government “Reiwa 8 Year Household Solar Power Generation Promotion Project” (Cool Net Tokyo) | New installation of certified solar modules in residential properties or their premises in Tokyo, with a system capacity of less than 50kW. Pre-application before installation is required. | Existing homes: 150,000 JPY/kW for 3.75kW or less (maximum 450,000 JPY), 120,000 JPY/kW for over 3.75kW New homes: 120,000 JPY/kW for 3.6kW or less (maximum 360,000 JPY), 100,000 JPY/kW for over 3.6kW (Additional costs for mounting frames, waterproofing work, and renovation defect insurance, etc.) |
Pre-application: From May 29, 2026 Grant application and performance report: From June 30, 2026 to March 30, 2029 |
| Tokyo Metropolitan Government “Reiwa 8 Year Household Storage Battery Promotion Project” (Cool Net Tokyo) | New installation of storage batteries in residential properties in Tokyo, with SII registered equipment. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries alone. Pre-applications after October 1, 2026 will only be eligible for SII registered products for Reiwa 8. | Storage battery package: 100,000 JPY/kWh (maximum 1,200,000 JPY per household) Storage battery unit expansion: 60,000 JPY/kWh (maximum 720,000 JPY per household) (Additional amounts for participation in DR demonstrations, etc.) |
Pre-application: From May 29, 2026 Grant application and performance report: From June 30, 2026 |
| Shibuya Ward “Renewable Energy Electricity Utilization Promotion Subsidy [For Households]” | Individuals registered as residents in the ward must switch to electricity derived 100% from renewable energy and continue using it for more than three months. The installation of solar panels and storage batteries themselves is not eligible. | 30,000 Hachipay points | From May 1, 2026 to February 28, 2027 (Ends as soon as the budget is exhausted) |
| National Government “DR Household Storage Battery Project” (Reiwa 7 Year Supplement) | New installation of household storage battery systems that can be utilized for DR (demand response) with registered products. | Calculated based on an initial effective capacity of 34,500 JPY per kWh (subsidy rate within 3/10; maximum 600,000 JPY per application). | The budget was reached on May 29, 2026, and the public recruitment has ended. (Currently, applications cannot be made.) |
| National Government “Mirai Eco Housing 2026 Project” (Renovation) | Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovations of windows (openings) and the structure; applications cannot be made for the installation of storage batteries alone. Solar panels are not included as eligible facilities. | Storage battery: 96,000 JPY per household | Ends as soon as the budget limit is reached. Please check the official website for application status. |
In Tokyo, a pre-application before installation is required for subsidies. If construction begins beforehand, it may not be eligible for Tokyo’s subsidies, and applying does not guarantee that funds will be granted. The official page for Shibuya Ward does not confirm any local grants for the installation of solar panels or storage batteries. Procedures and eligibility for each system vary, so please check before contracting or starting work.
At Kakeru Koumuten, we will guide you on the eligibility conditions for each system after confirming them.
Tokyo Metropolitan “Reiwa 8 Year Household Solar Power Generation Promotion Project”
Tokyo is providing subsidies for those installing solar power generation systems in residential homes through Cool Net Tokyo. The target is systems using certified solar modules that are newly installed in residential homes or their premises, with a capacity of less than 50kW. A pre-application before installation is required.
For existing homes, the subsidy amount is 150,000 yen/kW for systems up to 3.75kW (maximum 450,000 yen), and 120,000 yen/kW for systems exceeding 3.75kW. Additionally, there are supplementary items such as installation of mounting frames, waterproofing work, and renovation defect insurance. The pre-application period is from May 29, 2026, and the application for grants and performance reports is from June 30, 2026, to March 30, 2029. For details on eligible equipment and conditions, as well as budget status, please check the official page.
👉 Cool Net Tokyo | Official page for solar power generation is here
Tokyo Metropolitan “Reiwa 8 Year Household Storage Battery Promotion Project”
Tokyo is also providing subsidies for newly installed storage batteries in residential homes. The subsidy amount is 100,000 yen per kWh of storage battery package (maximum 1,200,000 yen per household), and 60,000 yen per kWh for additional storage battery units (maximum 720,000 yen per household), with additional amounts for participation in DR demonstrations.
The target is equipment registered with SII (Environmental Collaboration Initiative). If applying for pre-application after October 1, 2026, only equipment listed in the Reiwa 8 year SII registered product list will be eligible. This project is intended for simultaneous installation with solar power, but applications can also be made for storage batteries only. The acceptance of applications for grants and performance reports has already begun from June 30, 2026.
👉 Cool Net Tokyo | Official page for storage batteries is here
Shibuya Ward “Renewable Energy Power Utilization Promotion Subsidy [For Households]”
The subsidy related to renewable energy for households confirmed on the official page of Shibuya Ward is a system for switching electricity contracts. Individuals registered as residents in the ward must switch to electricity sourced 100% from renewable energy within the fiscal year and continue to use it for more than three months after the switch, with the subsidy amount being 38,000 Hachi Pay Points.
The application period is from May 1, 2026, to February 28, 2027, and will end as soon as the budget is exhausted. Applications must be made via smart application, and a continuation report must be submitted within three months from the switch (by February 28, 2027). This program does not target the installation of solar panels or storage batteries themselves, so please check it as a separate program from construction subsidies.
👉 Here is the official page of Shibuya Ward (Subsidy for Promoting Renewable Energy Electricity Use [for Households])
National Subsidy “DR Home Storage Battery Project (Support Project for Introducing Home Storage Systems for DR Resource Implementation)”
The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.
This program targets those who are newly introducing registered products’ storage systems that can be utilized for demand response (DR), and in the fiscal year 2025 supplementary budget, the subsidy amount is determined based on a standard amount of 34,500 yen per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum of 600,000 yen per application. There are also conditions such as those contracted or ordered before the grant decision being excluded.
However, the fiscal year 2025 supplementary budget reached the application amount on May 29, 2026, and the public recruitment has ended (the previous fiscal year 2024 supplementary budget also ended public recruitment on July 2, 2025). Applications are currently not possible, so please check the official site for future public recruitment.
Furthermore, there are currently no subsidies confirmed for the installation of solar panels for existing homes.
👉 Here is the official site for the DR Home Storage Battery Project
Solar Panel Installation & Storage Battery Installation Price List

⇧Service Menu|Click here for costs related to Solar Panel Removal and Water Heater Dismantling
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and storage batteries should be checked separately as “Equipment Costs (Device Costs)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, the grade of the equipment, and the condition of the roof.
Considerations for Installation Capacity (kW) and Storage Battery Capacity (kWh)
The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatt). Storage batteries are compared in terms of the amount of electricity they can store, expressed in kWh (kilowatt-hour).
The amount of kW that can be placed on the roof varies for each house based on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.
On our pricing page, we list solar panels as approximately 800,000 JPY to 1,200,000 JPY for 3 to 5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6 to 10 kW. (These are just estimated amounts and can vary based on wiring length, scaffolding range, existing roofing materials, panel layout, etc.)
▶ Service Menu|Click here for costs related to Solar Panel Installation and Storage Battery Installation
Items to Check on the Estimate (Cost Verification)
When comparing estimates, it is common to compare different capacities and equipment by only looking at the amounts. Please check if the following items are clearly stated in each company’s estimate!
| 1. Solar Panels | Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are listed. |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls in conjunction with a storage battery. |
| 3. Storage Battery | Manufacturer, model number, capacity (kWh), range usable during a power outage (whole house or specific circuits), installation location. |
| 4. Mounting Frame and Hardware | Name of the hardware suitable for the roofing material and the method of securing it (whether it is a method that drills holes or a method that clamps and secures). |
| 5. Wiring and Electrical Work | Wiring route and length, work around the distribution board, presence of a monitor to check power generation. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment at the fixed parts, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Application | How much support is included for applications to the power company, certification applications for selling electricity (FIT), and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If it is simultaneous with roof work or exterior painting, check that the same scope and quantity are not counted twice. |
| 9. Removal and Disposal | Whether the removal of existing solar thermal water heaters or old panels and the disposal costs of waste materials are included. |
| 10. Tax Classification and Warranty | Whether it is tax-inclusive or tax-excluded, conditions under which additional costs may arise, details and duration of manufacturer warranty and workmanship warranty. |
If the capacity is different, the price and power generation will also change. Kakeru Koumuten Co., Ltd. welcome multiple estimates, so if you bring estimates from other companies, we will explain the differences for each item!
Self-Estimate and Profit Simulation for Solar Power Generation
With the simulator above,
you can obtain an approximate estimate and a profit simulation up to 30 years later!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can obtain an approximate estimate and profit simulation!
*The simulation results are approximate. Actual profits will vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.
Customer Feedback
Case Studies of Solar Panel Installations


| Work Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh |
| Base Mounting Hardware Used |
| Niigata Manufactured / Aluminum Catch Type Hardware |
| Fixing Method & Waterproofing Arrangement |
| Fixed using catch type hardware gripping the horizontal metal roof (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY Estimated recovery period for construction costs: about 8 to 9 years (self-consumption) *The grant amount and recovery estimates are based on the system and calculations at the time of construction and may differ under the current system. |
| Construction Period |
| Approximately 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the installation of solar panels and storage batteries. I heard that grants are available, and I would like to know how much can be provided. |
Our Proposal
We visited to provide an estimate and created a layout diagram for the solar panels based on the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the estimate!
How to Choose a Solar Panel Installation Company in Shibuya, Tokyo
There are many solar panel installation contractors available in Shibuya, Tokyo, and you may be unsure which one to choose.
Therefore, when requesting solar panel installation and battery installation work, let’s check the following four points.
● Have extensive knowledge not only about solar panels but also about roofs
● Confirm the existence of warranties and aftercare maintenance
● Obtain estimates from multiple contractors (three companies as a guideline)
● Check if they provide support for subsidy applications
By confirming the above four points, you will be able to choose a reliable contractor.
Knowledge about roofs as well as solar panels
Improper installation of solar panels can be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing
・Solar panels were installed on a severely deteriorated roof, resulting in leaks
・Solar panels were installed on a roof with a short lifespan, necessitating a renovation for removal and reinstallation within a few years
・Misjudgment of the type of waterproofing led to incorrect processing, resulting in leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unforeseen troubles.
▶ Go to “Roof Verification Before Installing Solar Panels” in this article
Confirm the existence of warranties and aftercare maintenance
When choosing a solar installation contractor, let’s confirm the existence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.
Solar panels and batteries come with manufacturer warranties, but also check for the existence of workmanship warranties in case leaks occur after installation!
For contractors that offer workmanship warranties, if leaks occur after installation, they may be able to respond under the warranty, provided it is within the warranty period and conditions.
Additionally, some contractors offer after-service separate from the warranty, so be sure to check if the contractor you are considering has after-service.
Changes or damages on the roof may not be visible, so there is a possibility that customers may not notice them themselves.
By conducting inspections during after-maintenance, we can easily prevent major repairs or failures by discovering issues early!
Kakeru Koumuten Co., Ltd. provides a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty without performing roof renovation.)
We also conduct after-maintenance and send out DM every year!
Please check the DM, and if you wish, we will visit you for after-maintenance!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting solar panel installation, be sure to obtain estimates from multiple contractors.
Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request from your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates, please check the following:
“Check the estimate items”
“Type of solar panels”
“Warranties and after-services”
Make detailed comparisons and judgments! If the rank of auxiliary materials is low or if processes are skipped, costs can be reduced, so avoid judging solely based on price!
▶ Go to “Breakdown of Installation Capacity, Equipment, and Construction Costs” in this article
Check if they provide support for subsidy applications
There may be subsidies available for solar panel installation and battery installation, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
There are systems that require personal applications and cannot be applied for by the contractor, as well as systems that require prior application before installation, so it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for Tokyo’s subsidy, a prior application before installation is required) before proceeding with the construction!
In the case of subsidies in Tokyo, the process involves submitting a grant application and performance report after the completion of the work, which will be granted after a review! (The procedure varies depending on the system)
▶ Go to “Subsidies and Grants that May Be Applicable in Shibuya Ward” within this article
Benefits of Introducing Solar Power Equipment
The benefits of introducing solar panels are summarized in the following five points!
Benefit 1: Economic Advantage
The biggest advantage of introducing solar panels is the economic benefit!
Although the selling price of electricity has decreased compared to ten years ago, you can benefit by reducing the electricity you buy from power companies by consuming the electricity you generate!
As electricity costs rise, the ability to cover your consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!
Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the fifth year, it is generally more advantageous to use it at home (self-consumption), making the combination with a storage battery a viable option.
👉 For purchase prices and periods, visit the Agency for Natural Resources and Energy
Benefit 2 You Can Utilize Subsidies!
The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
The reduction of the actual burden amount through subsidies is a significant advantage!
In the case of Shibuya Ward, there may be national and Tokyo metropolitan systems that are applicable (the official page of Shibuya Ward does not confirm any unique grants for the installation of solar panels or storage batteries).
Benefit 3 Environmentally Friendly!
Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices such as power conditioners do have operational noise.)
Benefit 4 Expect Heat Shielding Effects!!
By installing the panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, it can help reduce the temperature rise of the roof, so heat shielding effects can be expected!
(Note that this does not improve the building’s insulation performance itself.)
Benefit 5 Electricity can be used even during power outages!!
If a storage battery is installed, it is possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capability, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)
What Points Should Be Noted When Introducing Solar Power Generation?
Next, we will explain the “3 Points to Note” when installing solar panels!
Point 1 Maintenance Costs are Incurred
A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorated, it is reassuring to renovate it with durable roofing materials before installing the solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It is reassuring to ask for a simulation that considers maintenance costs before introducing solar panels!
Point 2 The Risk of Leaks Increases Depending on the Roofing Material
The methods for securing slate roofs and tile roofs vary by construction method, but when using screws or other fasteners to secure the roofing materials and substrate, waterproofing at the fastening points becomes crucial.
In methods that involve making holes in the roof, there is inevitably a risk of leaks.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and the fasteners, and it cannot be used with all metal roofs.)
Catch-type base fastener for horizontal metal roofs
Note 3: The roof will become heavier
With the addition of solar panels, the roof will become heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing it with a lighter roof may also be an option if necessary.
How to Choose Solar Panels?
There are many manufacturers of solar panels, and their output and costs vary widely.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!
Choosing Method 1: Compare by Total Output of the Roof
When installing solar panels on the roof, it is important to consider how much electricity can be generated in a limited area, and the more electricity generated, the better!
Solar panels come in various sizes and outputs depending on the manufacturer.
For example, a 350W output panel and a 400W output panel may seem at first glance that the higher output panel is better.
However, if the size of the panel does not fit well with the roof, “20 panels of 350W can be installed, while only 15 panels of 400W can be installed,” meaning that the number of panels that can be installed may differ even on the same roof due to size differences.
400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above calculations are for total output (kW). The actual electricity generation (kWh) will vary based on conditions such as roof orientation, slope, and shading.
Choosing Method 2: Compare by Degradation Rate of Solar Panels
Solar panels have a degradation rate, and their output gradually decreases over 10 or 20 years.
The degree of output decline after long-term use varies by product. The manufacturer’s output warranty value is a standard figure for guarantees and does not indicate the actual degradation rate or power generation amount.
By considering the degradation rate along with the initial output, you can choose solar panels without regrets!
How to Choose 3: Compare by Warranty Period
There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Some manufacturers offer a 30-year warranty for output, while others provide a 10-year warranty, so it varies widely!
A longer warranty is always better, so be sure to check the warranty period and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Power and Storage Battery Installation in Shibuya Ward
We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Shibuya Ward. (Tap to open the answers)
How much does it cost to install solar panels and storage batteries in Shibuya Ward, Tokyo?
The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
Guidelines for different capacities are published on our solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!
Are there any subsidies available for solar power and storage battery installation in Shibuya Ward?
As of October 7, 2026, Tokyo’s subsidies for solar power generation and storage batteries (Cool Net Tokyo) are accepting pre-applications. For storage batteries, only SII registered devices (registered products for Reiwa 8) are eligible from pre-applications made after October 1, 2026. The national DR household storage battery project has ended its public recruitment.
Since the application status may change, please check the subsidy and grant section and consult with us before signing a contract.
Can I apply for subsidies even after the construction is completed?
In many programs, procedures are required before construction. Tokyo’s subsidies require pre-application before installation, and if you install first, you will be ineligible. The procedures differ by program.
The order of procedures varies by program, so please confirm before signing a contract or starting construction.
Can solar panels be installed on a slate roof? I’m worried about leaks.
It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The fixing method varies by construction method, and when fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.
Kakeru Koumuten Co., Ltd. is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation. If deterioration is progressing, we can also propose methods such as roof overlay (cover method) or complete replacement before installation.
My roof is old. Should I do a roof renovation first?
It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with durable roofing materials before installation.
Please consult us on how to proceed with the installation after checking the condition of the roof through a site survey!
Should I install a storage battery together with the solar panels?
If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it at home rather than selling it.
Additionally, the Tokyo Metropolitan Government’s storage battery subsidy is designed for simultaneous installation with solar panels, but you can also apply for the storage battery alone. You can compare “solar panels only” and “solar panels + storage battery” through a financial simulation.
How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and site survey, and provide you with the installation capacity and power generation simulation.
Even in residential areas of Shibuya Ward, the way shadows are cast by neighboring houses and surrounding buildings varies from one house to another. You can check the expected power generation through the power generation simulation.
How long will the construction take?
In the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary if roofing work is done simultaneously or depending on the shape of the roof and installation capacity.
Additionally, please note that there will be a separate period for applications for subsidies and power companies, so please consult us early.
What is the current selling price (FIT)?
For residential use (less than 10 kW), from the certification after October 2025, the first 4 years will be 24 yen/kWh, and from the 5th to the 10th year, it will be 8.3 yen/kWh, and the same price will apply for the 2026 fiscal year.
The idea is to recover initial costs more quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity costs.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-maintenance DM notifications and visits for inspections for customers who wish. We can also clean solar panels with a special brush if the power generation decreases due to dirt.
Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.
Can you also renovate roofs that already have solar panels installed?
It is possible. Kakeru Koumuten Co., Ltd. can detach and reattach solar panels in-house, allowing us to perform roof overlay (cover method) or re-roofing after removing the panels, and we will handle everything consistently until reinstallation. The removed panels can be stored in our own warehouse.
For costs, please refer to the solar panel detachment and water heater removal pricing page.
If you are looking for a solar panel installation contractor in Shibuya, please consult Kakeru Koumuten
Our company handles many exterior renovations, including solar panel installations, roof work, and exterior wall work in Shibuya, Tokyo.
We receive requests from many customers, including renovation companies and real estate agencies, who have contacted us!
Kakeru Koumuten promises “high-quality renovations at low costs”, and we have received positive feedback from numerous customers.
We continue to update our annual construction achievements, and we will strive to improve quality to satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay (cover method) and re-roofing but also partial roof repairs, exterior painting, and exterior wall cover methods.
We are also happy to handle small jobs such as partial repairs and rain gutter cleaning!
In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!
“I want to know about recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide optimal solutions for specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and propose the best construction plan!
We are confident that we will not be outdone by other companies in terms of cost, quality, and planning for exterior work!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if we are found to be inferior to other companies, you are free to decline!
Characteristics of Shibuya, Tokyo and Points for Solar Work
Shibuya, Tokyo is a ward located in the southwestern part of the 23 wards of Tokyo. According to the official page of Shibuya, the area is 15.11 km2, with about one-tenth occupied by green spaces such as Meiji Shrine, Yoyogi Park, and part of Shinjuku Gyoen. The terrain corresponds to the Musashino Plateau’s Yodobashi Hill, with valleys formed by the Shibuya River and others.
Below are summarized the residential environment of Shibuya and points to consider when installing solar panels and storage batteries. (Tap to open)
View the characteristics of Shibuya, Tokyo and points for solar work
■ In areas with complex terrain of plateaus and valleys, confirm the installation location of storage batteries and power conditioners along with flood risk
Shibuya Ward features a mix of plateaus and valleys such as the Shibuya River, resulting in varying elevation levels. On the ward’s Flood Hazard Map and Flood Records page, you can check flood risk assessments and past flood records. When deciding on the installation location for storage batteries and power conditioners, it is advisable to check the flood risk for your residence on the hazard map and consider the height and position of the installation for peace of mind.
■ Tokyo’s annual sunlight hours are approximately 1,927 hours
According to the Meteorological Agency’s average values (1991–2020), Tokyo receives about 1,927 hours of sunlight annually.
Since power generation varies by season, it is important to conduct annual power generation simulations and choose the capacity of storage batteries to match the times of high electricity usage.
■ In areas with closely spaced houses, check for shadows from neighboring homes and buildings
In locations where houses are closely built, the shadows cast by neighboring homes and surrounding buildings differ for each house based on the roof’s orientation and height. Since solar panels generate less power when shaded, Kakeru Koumuten creates layout diagrams based on blueprints and the actual site conditions, allowing you to verify through power generation simulations.
■ On slopes and narrow roads, plan scaffolding and equipment delivery carefully
In residential areas with elevation changes or narrow front roads, careful planning for scaffolding and equipment delivery may be necessary. Kakeru Koumuten will respond to site conditions with our own scaffolding team and equipment.
■ Check the roof’s condition according to its age
For homes that have been built for several years, it is important to check the condition of the roofing materials and substrate before installing solar panels. Depending on the roof’s condition, installing them simultaneously with roof renovations can help reduce future costs for removing and reinstalling solar panels.
■ Subsidies require prior application to Tokyo Metropolitan Government
Subsidies from the Tokyo Metropolitan Government require a prior application to Cool Net Tokyo before installation. The official page for Shibuya Ward does not confirm any local grants for solar panel and storage battery installations, so it is important to check the procedures and timelines of the Tokyo Metropolitan Government’s system in advance, in conjunction with the timing of the construction.
Our company serves Kanagawa Prefecture and Tokyo, and we handle many exterior and solar construction projects in Shibuya Ward, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us for any urgent issues!
Service Area in Shibuya Ward, Tokyo
Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.
List of Areas in Shibuya Ward, Tokyo
Uehara, Shibuya Ward / Uguisudani-cho, Shibuya Ward / Udagawacho, Shibuya Ward / Ebisu Nishi, Shibuya Ward / Ebisu Minami, Shibuya Ward / Ebisu, Shibuya Ward / Oyamacho, Shibuya Ward / Kamiyamacho, Shibuya Ward / Sakuragaokacho, Shibuya Ward / Sasazuka, Shibuya Ward / Sarugakucho, Shibuya Ward / Shibuya, Shibuya Ward / Shoto, Shibuya Ward / Shinsencho, Shibuya Ward / Jingumae, Shibuya Ward / Jinnan, Shibuya Ward / Sendagaya, Shibuya Ward / Daikanyama-cho, Shibuya Ward / Tomigaya, Shibuya Ward / Dogenzaka, Shibuya Ward / Minamidai, Shibuya Ward / Nishihara, Shibuya Ward / Hatagaya, Shibuya Ward / Hachiyama-cho, Shibuya Ward / Hatsudai, Shibuya Ward / Higashi, Shibuya Ward / Hiroo, Shibuya Ward / Honmachi, Shibuya Ward / Maruyama-cho, Shibuya Ward / Moto-Yoyogi-cho, Shibuya Ward / Yoyogi Kamizono-cho, Shibuya Ward / Yoyogi, Shibuya Ward
・Trust Kakeru Koumuten for exterior wall painting in Shibuya, Tokyo!
・Trust Kakeru Koumuten for roof renovations in Shibuya, Tokyo!
・Trust Kakeru Koumuten for exterior renovations in Shibuya, Tokyo!
・Kakeru Koumuten Co., Ltd. construction achievements
・Kakeru Koumuten Co., Ltd. after maintenance
・Kakeru Koumuten Co., Ltd. construction menu and price list
・Kakeru Koumuten Co., Ltd. staff blog and announcements
・Explaining the importance of comparison estimates and key points!
・Top 12 solar power generation manufacturers! Features and selection tips included!
・What are the installation costs for solar power generation? Tips for reducing costs thoroughly explained!
・What are the best locations for solar power installation? Key points for site selection included!
・Find out more about solar power generation estimates here!
We welcome consultations via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!