Leave Your Solar Panel Installation Work in Nishitama District, Tokyo to Kakeru Koumuten Co., Ltd.!
For solar panel and storage battery installation in
Nishitama District, Tokyo,
trust Kakeru Koumuten!
Kakeru Koumuten is a company specializing in exterior renovations.
As a strong company in roofing work, we are entrusted withsolar panel and storage battery installations that consider roofing and waterproofing!
“How to Choose a Solar Panel Contractor in Nishitama District, Tokyo”
“Costs for Solar Panel and Storage Battery Installation”
“Subsidies Available for Solar System Installation in Nishitama District, Tokyo”
We will also explain the above three points!
Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtainingquotes from about three companies!
Table of Contents (tap to open/close)
- Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Nishitama District, Tokyo
- Roof Inspection Before Installing Solar Panels
- Possible Subsidies and Grants Available in Nishitama District, Tokyo
- Price List for Solar Panel and Storage Battery Installation
- Breakdown of Installation Capacity, Equipment, and Construction Costs
- Self-Estimate and Profit Simulation for Solar Power Generation
- Customer Testimonials
- Case Studies of Solar Panel Installations
- How to Choose a Solar Panel Installation Company in Nishitama District, Tokyo
- Benefits of Introducing Solar Equipment
- Points to Consider When Introducing Solar Power Generation
- How to Choose Solar Panels
- Frequently Asked Questions About Solar and Storage Battery Installation in Nishitama District, Tokyo
- If You Are Looking for a Solar Panel Installation Company in Nishitama District, Tokyo, Contact Kakeru Koumuten
- Characteristics of Nishitama District, Tokyo and Points for Solar Construction
- Service Area in Nishitama District, Tokyo
Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Nishitama District, Tokyo
Here are the reasons why our company is entrusted with solar panel installation by customers in Nishitama District, Tokyo.
“Our Unique Strengths in Solar Panel Installation That Cannot Be Imitated by Other Companies”
have received high praise from many customers.
We would be grateful if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from any number of companies!
1. We Also Handle Exterior Renovations Beyond Solar Panel Installation!


Problems such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It’s reassuring to have someone knowledgeable about the roof to avoid maintenance issues and troubles after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!
2.Facilities Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases for material storage and showrooms.
In-house Scaffolding Materials


To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding according to the construction conditions and can assemble scaffolding in-house.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can also cut costs for scaffolding work.
We own scaffolding materials for approximately 50 single-family homes!
Even if there are height differences on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.
Storage of Materials in Our Large In-house Warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, sowe can respond quickly in emergencies!
In-house sorting and transportation of waste materials
The installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.
Exterior renovation dedicated showroom


In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on the roofing materials!
We can also provide simulations of the revenue and installation costs when introducing solar panels!
Since roofing and exterior wall work often accompany projects, we also have samples of roofing materials and models that show the structure, allowing us to provide detailed explanations!
3.All work performed by our own team
One of Kakeru Koumuten’s major strengths is its complete in-house construction.
By having Kakeru Koumuten handle everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will assist you from the estimate to the completion of the work.
Since the same person will handle sales and construction management, smooth communication is possible.
We can provide consistent in-house construction from temporary scaffolding installation to exterior wall painting and roof renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry permits as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists, and we are confident in our construction techniques.
We are capable of handling large-scale roofing projects such as factories!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty for solar panel installation work, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary based on the warranty details.)
Aftercare is available every year, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roofing troubles and situations.
Even if you cannot access the roof at high altitudes, we can utilize drones to assist!
During leak investigations, we can also conduct inspections using a thermal imaging camera.
If the power generation of your solar panels decreases due to dirt or other factors, we can provide cleaning services using specialized brushes.
We will respond according to your preferences.
7. Human Resource Development
To improve skills, we create various roofing models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly provide technical training so that each staff member can handle various cases.
8. Creation of Easy-to-Understand Materials and Simulations
Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
We compile easy-to-understand materials that include points to consider and disadvantages for customers who may not be familiar with solar construction!
We encourage you to obtain comparative estimates and review plans from other companies!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.
| 1. Types of Roofing Materials and Age | The fixing method varies depending on the roofing materials such as slate, tiles, metal roofs, and flat roofs (rooftop waterproofing). If the remaining lifespan of the roofing material is short, we may suggest a roof renovation first. |
| 2. Condition of the Substrate and Waterproof Sheet | If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it will affect the fixing strength of the fittings and waterproofing. We will also check for any signs of leaks. |
| 3. Orientation, Slope, and Shadows of the Roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect the amount of electricity generated. We will create a layout diagram from the drawings and the site, and you can check it with a generation simulation. |
| 4. Shape of the Roof and Usable Area | The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we will compare based on the total output of the roof. |
| 5. Fixing Method and Waterproofing Details | We will confirm whether the method involves drilling holes in the roofing material for fixing or using fittings to secure the roofing material. The fixing method varies by technique, so please check the waterproofing treatment method for the fixing parts during the estimate. |
| 6. Weight of the Roof | The roof will become heavier due to the panels being added. After investigating the existing roof, substrate, and load-bearing capacity, switching to lighter roofing materials may be an option if necessary. |
| 7. Installation Location of Equipment and Wiring | We will check the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring also affects the cost. |
| 8. Ease of Scaffolding Setup and Delivery Routes | If there is a height difference on the site, careful planning for scaffolding and delivery routes for equipment and materials may be necessary. We will also check the width of the front road and any steps on the site during the on-site survey. |
Fixing Methods and Checkpoints by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets to the roof material and substrate with screws) | Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is significant, consider roof overlay (cover method) or replacement first. |
| Tile Roof | Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will secure to the substrate) | Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lightweight roofing materials before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a framework | Type and deterioration status of the waterproof layer, waterproofing around the framework. Consider in conjunction with the timing of waterproofing work. |
If you perform roof renovations 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels, so please consult us according to the condition of your roof!
▶ Click here for roof renovations in Nishitama District, Tokyo
PossibleSubsidies and Grants
If you are introducing solar panels or storage batteries in Nishitama District, Tokyo, there is a possibility that the systems of the “national government,” “Tokyo,” and your local municipality may apply. In Nishitama District, there are municipal subsidies in Hinode Town, while Mizuho Town, Hinohara Village, and Okutama Town do not have unique solar or storage battery subsidies listed on their official pages.
The following is based on the content checked on the official pages of each system as of October 7, 2026. The application status may change depending on the budget, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Timing for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Tokyo “Residential Solar Power Generation Promotion Project” | Individuals, corporations, or management associations installing a new unused solar power system (output less than 50kW, JET certification, etc.) in residential properties within Tokyo. The generated power must be used in the residential part. Pre-application is required. | Existing homes: 15,000 JPY per kW for 3.75 kW or less (maximum 450,000 JPY), 12,000 JPY per kW for over 3.75 kW up to less than 50 kW. New homes: 12,000 JPY per kW for 3.6 kW or less (maximum 360,000 JPY), 10,000 JPY per kW for over 3.6 kW. |
For the fiscal year 2026, pre-applications are being accepted from May 29 (will end once the budget is reached). From the pre-application for the fiscal year 2026, submission of a certificate issued by a financial institution during the performance report is mandatory. |
| Tokyo “Residential Storage Battery Installation Promotion Project” | Owners of eligible devices (storage batteries registered with SII, excluding national and local public entities). Installation must occur between April 1, 2026, and March 30, 2031. If pre-applying after October 1, 2026, only products registered with the national SII for the fiscal year 2026 are eligible. | Storage battery package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household). Additional amount for participating in DR demonstration (100,000 JPY per unit; 150,000 JPY per unit if energy management equipment is installed). Expansion of storage battery unit: 60,000 JPY per kWh (maximum 720,000 JPY per household). |
For the fiscal year 2026, pre-applications are being accepted from May 29. Grant application and performance report will be accepted from June 30. |
| Hinode Town “Eco Housing Promotion Equipment Installation Subsidy” (Fiscal Year 2026) | Those who installed or renovated eco housing equipment such as solar power generation and storage batteries between April 1, 2025, and March 31, 2026, are eligible. A list of equipment is available with images on the town’s official page. Equipment previously subsidized under this program is not eligible. Application requires a copy of the grant decision and confirmation notice from the Tokyo Environmental Public Corporation. | The town’s official page states “under consideration,” and it is noted that details will be published by late October. | From November 2, 2026 (Monday) to December 28, 2026 (Monday). Applications are made in the following fiscal year, and equipment installed by March 31, 2026, is eligible for the fiscal year 2026. |
| National “DR Home Storage Battery Project” (Fiscal Year 2025 Supplement) | Newly introducing home storage systems that can be utilized for DR (demand response) with registered products. | Calculated based on a standard amount of 34,500 JPY per kWh of initial effective capacity (subsidy rate within 3/10, maximum 600,000 JPY per application). | The budget was reached on May 29, 2026, and the public recruitment has ended (the official site states there are no plans to reopen public recruitment, and applications cannot be made at this time). |
| National “Mirai Eco Housing 2026 Project” (Renovation) | Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovation of windows (openings) and structures; applications cannot be made for just the installation of storage batteries. Solar panels are not included as eligible facilities. | 蓄電池:96,000円/戸 | Ends once the budget limit is reached. As of October 5, 2026, the application amount for renovations is displayed as 8% of the budget on the official website. Please check the reception status on the official website. |
The Tokyo solar power and storage battery subsidies require prior application. For storage batteries applied for after October 1, 2026, only products registered with the national SII will be eligible, and the equipment requirements will change. The subsidy for Hinode Town applies to equipment installed by March 31, 2026, for the fiscal year 2026, with the application period set from November 2, 2026, to December 28, 2026. The subsidy program in Mizuho Town ended at the end of March 2019. Eligibility conditions, application procedures, and the possibility of combining with other programs vary by program, and applying does not guarantee approval, so please confirm before contracting or starting work.
Kakeru Koumuten Co., Ltd. will guide you on the eligibility conditions and application periods for each program after confirming them.
National Subsidy “DR Home Storage Battery Project (Support Project for Home Storage Systems for DR Resource Introduction)”
The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.
This program targets those who are introducing new storage systems of registered products that can be utilized for demand response (DR), and in the fiscal year 2025 supplementary project, the subsidy amount was determined based on a standard amount of 34,500 yen per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum of 600,000 yen per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.
However, the supplementary project for fiscal year 2025 reached the budget limit for grant applications on May 29, 2026, and the public recruitment has ended. The official website also states that there are no plans to reopen the public recruitment, and applications are currently not possible. Please check the official website for future public recruitment.
Furthermore, there are currently no subsidies confirmed for the installation of solar panels for existing homes.
👉 Click here for the official website of the DR Home Storage Battery Project
Tokyo “Promotion Project for the Introduction of Solar Power Generation in Homes”
This subsidy is for those who install unused solar power generation systems in residential homes in Tokyo. The simultaneous installation of storage batteries is not a condition.
●Existing homes: For 3.75 kW or less, 150,000 yen per kW (maximum 450,000 yen); for over 3.75 kW and under 50 kW, 120,000 yen per kW.
●New homes: For 3.6 kW or less, 120,000 yen per kW (maximum 360,000 yen); for over 3.6 kW and under 50 kW, 100,000 yen per kW.
●Additional amounts for rooftop frame installation and waterproofing work are also available.
The target is to install unused panels with an output of less than 50 kW that have obtained JET certification, in residential homes in Tokyo, for use in the living area. The process involves prior application, followed by a grant application after installation. Starting from the fiscal year 2026’s prior application, submission of certificates issued by financial institutions during the performance report has become mandatory.
The official page of Tokyo states that pre-registration is being accepted from May 29, Reiwa 8. It will end once the budget is reached, so please check the official page for the registration status.
👉 Here is the official page of Tokyo (Cool Net Tokyo)
Tokyo “Household Battery Installation Promotion Project”
This is a subsidy for the installation costs of battery systems aimed at increasing self-consumption of electricity generated by solar power and improving energy independence during emergencies.
●Battery Package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household)
●Additional for DR demonstration participation: 100,000 JPY per unit (150,000 JPY per unit if energy management equipment is installed)
●Battery Unit Expansion: 60,000 JPY per kWh (maximum 720,000 JPY per household)
Eligible applicants are owners of the subsidized equipment (excluding national and local governments), and the installation must be completed between April 1, Reiwa 8, and March 30, Reiwa 11. If pre-registration is done after October 1, Reiwa 8, only products registered in the SII for Reiwa 8 will be eligible.
The official page of Tokyo states that pre-registration is being accepted from May 29, Reiwa 8. For detailed information, including conditions for combination with solar power generation, please check the official page.
👉 Here is the official page of Tokyo (Cool Net Tokyo)
Hinode Town “Subsidy for Installation Costs of Eco-Housing Promotion Equipment” (Reiwa 8)
Hinode Town has published on its official page that it will provide subsidies to residents who install eco-housing equipment such as solar power generation and battery systems, aiming to reduce and efficiently utilize the total energy consumption in the town. Equipment that has previously utilized this subsidy program is not eligible. A list of eligible equipment is available with images on the town’s official page.
●Application Period: From November 2, Reiwa 8 (Monday) to December 28, Reiwa 8 (Monday)
●Eligible Installation Period: Equipment installed or renovated between April 1, Reiwa 7, and March 31, Reiwa 8
●Main Required Documents: Application form, personal identification documents, copies of receipts, copies of contracts and itemized statements, before-and-after installation photos, product specifications, and copies of the Tokyo Environmental Public Corporation’s subsidy grant decision and confirmation notice, etc.
The subsidy amount is stated as “under consideration” on the town’s official page, and it is scheduled to be published by late October. Since the application is made in the following fiscal year after installation, please check with the town regarding the treatment of installations planned after October 7, 2026 (Collaboration Promotion Division, Environmental Policy Section 042-588-5068).
👉 Here is the Hinode Town “Subsidy for Installation Costs of Eco-Housing Promotion Equipment (Reiwa 8)”
Additionally, Hinode Town has a “Living Environment Improvement Project” (which covers repairs and renovations of houses, repainting of exterior walls and roofs, etc., with 5% of the estimated or paid amount (excluding tax), limited to one time per household with a maximum of 100,000 JPY, from June 1, Reiwa 8, to February 26, Reiwa 9, on a first-come, first-served basis), but solar power generation and battery systems are not explicitly included as eligible.
👉 Here is the Hinode Town “Living Environment Improvement Project”
Subsidy Programs in Mizuho Town, Hinohara Village, and Okutama Town
Mizuho Town: The town’s official page “End of the Subsidy Program for Purchase of Residential Renewable Energy and Energy-Saving Equipment” states that this program ended on March 31, 2019.
👉 Click here for Mizuho Town’s official page
Hinohara Village: The village’s official page “Subsidies for the Introduction of Renewable Energy Equipment” does not list any unique subsidies for solar power generation or storage batteries, but provides information on national and Tokyo metropolitan programs. As of April 1, 2026, the list of subsidy programs does not include solar power generation or storage batteries.
👉 Click here for Hinohara Village’s official page Click here for Hinohara Village’s list of subsidy programs
Okutama Town: The town’s official page on subsidy information (for migration and settlement support subsidies, settlement promotion support funds, and vacant house utilization promotion project grants) does not list any subsidies for residential solar power generation or storage batteries.
👉 Click here for Okutama Town’s subsidy information
Programs may change, so please check the latest information from each town and the programs from Tokyo and the national government before signing a contract.
Price List for Solar Panel Installation and Storage Battery Installation

⇧Construction Menu | Click here for costs related to solar panel removal and water heater removal
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and storage batteries should be confirmed separately as “Equipment Costs (Device Costs)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.
Considerations for Installation Capacity (kW) and Storage Battery Capacity (kWh)
The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Storage batteries are compared based on the amount of electricity they can store, represented in kWh (kilowatt-hours).
The amount of kW that can be installed on a roof varies for each house based on the roof’s shape, orientation, and size. Kakeru Koumuten Co., Ltd. will create a layout diagram from the drawings and on-site survey to present the installation capacity.
On our pricing page, we list the estimated costs for solar panels as 800,000 JPY to 1,200,000 JPY for 3-5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just estimated amounts and may vary based on wiring length, scaffolding range, existing roofing materials, panel layout, etc.)
▶ Installation Menu | Costs for Solar Panel and Storage Battery Installation
Items to Confirm in the Quotation (Cost Verification)
When comparing prices in competitive quotations, it is common to compare different capacities and equipment. Please check if the following items are clearly stated in each company’s quotation!
| 1. Solar Panels | Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified. |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls the battery in conjunction. |
| 3. Storage Battery | Manufacturer, model number, capacity (kWh), range available during power outages (whole house or specific circuits), installation location. |
| 4. Mounting Frame and Hardware | Name of the hardware suitable for the roofing material and the method of fixation (whether it is a method that drills holes or a method that grips and secures). |
| 5. Wiring and Electrical Work | Wiring route and length, work around the distribution board, presence of a monitor to check the power generation amount. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment at the fixed parts, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Application | How much support is included for applications to the power company, certification application for selling electricity (FIT), and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If it is simultaneous with roof work or exterior painting, check that the same scope and quantity are not counted twice. |
| 9. Removal and Disposal | Whether the removal of existing solar thermal water heaters or old panels and disposal costs for waste materials are included. |
| 10. Tax Classification and Warranty | Whether it is tax-inclusive or tax-excluded, conditions under which additional costs may arise, details and duration of manufacturer warranty and workmanship warranty. |
If the capacity is different, both the amount and power generation will change. Kakeru Koumuten Co., Ltd. welcome competitive estimates, so if you bring estimates from other companies, we will explain the differences for each item!
Self-Estimate and Profit Simulation for Solar Power Generation
With the simulator above,
you can obtain an approximate estimate and a profit simulation up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can obtain an approximate estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.
Customer Voices
Case Studies of Solar Panel Installations


| Construction Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh |
| Base Mounting Hardware Used |
| Niigata Manufactured Aluminum Catch Type Hardware |
| Fixing Method & Waterproofing Details |
| Fixed using catch type hardware gripping the horizontal metal roof (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY Estimated recovery period for construction costs: about 8 to 9 years (self-consumption) *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system. |
| Construction Period |
| Approximately 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the introduction of solar panels and storage batteries. I heard that grants are available, and I would like to know how much will be provided. |
Our Proposal
We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the estimate!
How to Choose a Solar Panel Installation Contractor in Nishitama District, Tokyo
There are many solar panel installation contractors that serve the Nishitama District of Tokyo, and you may be unsure which contractor to choose.
Therefore, when requesting solar panel installation and battery storage installation work, let’s confirm the following 4 points.
● Have extensive knowledge not only about solar energy but also about roofs
● Confirm the existence of warranties and aftercare services
● Obtain estimates from multiple contractors (3 companies as a guideline)
● Check if they provide support for subsidy applications
By confirming the above 4 points, you will be able to choose a reliable contractor.
Have knowledge not only about solar panels but also about roofs
Improper installation of solar panels can be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing
・Solar panels were installed on a severely deteriorated roof, leading to leaks
・Solar panels were installed on a roof with a short lifespan, necessitating a renovation to remove and reinstall the solar panels within a few years
・Misjudging the type of waterproofing led to incorrect treatment, resulting in leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unforeseen troubles.
▶ Go to “Roof Verification Before Installing Solar Panels” in this article
Confirm the existence of warranties and aftercare services
When choosing a solar installation contractor, let’s confirm the existence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.
While the solar panels and battery storage units come with manufacturer warranties, also check for the existence of a workmanship warranty in case leaks occur after installation!
For contractors that offer a workmanship warranty, if leaks occur after installation within the warranty period and conditions, they may cover the repairs under the warranty.
Additionally, some contractors offer aftercare services separate from warranties, so be sure to check if the contractor you are considering has aftercare services.
Since abnormalities or damages on the roof may not be visible, you might not notice them yourself.
By conducting inspections of hidden areas during aftercare maintenance, you can more easily detect abnormalities early and prevent major repairs or failures!
At Kakeru Koumuten Co., Ltd., the installation of solar panels comes with a warranty for leaks as part of our workmanship warranty. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty without performing roof renovations.)
We also conduct aftercare maintenance and send out annual DM!
After confirming the DM, if you wish, we will visit for aftercare maintenance!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting solar panel installation, let’s obtain estimates from multiple contractors.
Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates, please check:
“Verification of estimate items”
“Types of solar panels”
“Warranties and after-services”
and make detailed comparisons for your judgment! Avoid making decisions based solely on cost, as using lower-grade materials or skipping processes can reduce costs!
▶ To “Breakdown of installation capacity, equipment, and construction costs” in this article
Check if they provide support for subsidy applications
There may be subsidies available for solar panel installation and battery installation, but if the order of procedures is incorrect or there are deficiencies in the documents, the grant may not be awarded.
Since there are systems like Tokyo’s subsidies that require prior application, it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for Tokyo’s subsidies, prior application is required) before proceeding with the construction!
For Tokyo’s subsidies, after installation, you will need to submit a grant application and performance report, which will be reviewed before the grant is awarded! (The flow of procedures varies by system)
▶ To “Subsidies and grants that may be applicable in Nishitama District, Tokyo” in this article
Benefits of Introducing Solar Equipment
The benefits of introducing solar panels are as follows!
Benefit 1: Economic Benefits
The biggest advantage of introducing solar panels is the economic benefit!
The selling price of electricity has decreased compared to ten years ago, but by consuming the generated electricity, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity prices rise, the ability to cover your consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!
Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the fifth year, it is generally more advantageous to use it at home (self-consume) rather than selling it, making the combination with a storage battery a viable option.
👉 Ministry of Economy, Trade and Industry | For purchase prices and periods, click here
Advantage 2 Subsidies can be utilized!
Subsidy conditions and amounts vary by prefecture and municipality, but if you meet the criteria, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In Nishitama District, there is a possibility of being eligible for national and Tokyo Metropolitan programs, and Hinode Town also has local subsidies. The Hinode Town subsidy has an application period from November 2 to December 28, Reiwa 8, and applications are made in the following fiscal year after installation (please check the official page for details).
Advantage 3 Environmentally friendly!
Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices like power conditioners may have operational noise.)
Advantage 4 Heat insulation effects can be expected!!
By installing panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, this can help reduce the temperature of the roof, providing a heat insulation effect!
(Note that this does not improve the building’s insulation performance itself.)
Benefit 5 Electricity can be used even during power outages!!
If a storage battery is installed, it becomes possible to use electricity even during emergencies like power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capabilities, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)
What points should be noted when introducing solar power generation?
Next, we will explain the “three points to note” when installing solar panels!
Point 1 Maintenance costs can be incurred
A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof renovation 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It would be reassuring to ask for a simulation considering maintenance costs before introducing solar panels!
Point 2 The risk of leaks increases depending on the roofing material
The fixing methods for slate roofs and tile roofs vary by construction method, but when fixing materials or substrates with screws, waterproofing of the fixed parts becomes crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and fix the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and the fixtures, and it cannot be used with all metal roofs.)
Catch-type base fixture exclusively for horizontal metal roofs
Point 3 The Roof Becomes Heavier
Installing solar panels will make the roof heavier. After investigating the existing roof, substrate, and load capacity, one option may be to replace it with a lighter roof if necessary.
How to Choose Solar Panels?
There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!
Choosing Method 1 Compare Based on Total Output of the Roof
When installing solar panels on the roof, it is important to consider how much electricity can be generated in a limited area, and it is always better to generate more power!
Solar panels come in various sizes and outputs depending on the manufacturer.
A 350W output panel and a 400W output panel may seem like the higher output panel is better at first glance.
However, if the size of the panel does not fit well with the roof, the number of panels that can be installed on the same roof may differ due to the size difference, such as “20 panels of 350W can be installed” and “15 panels of 400W can be installed.”
400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual electricity generation amount (kWh) will vary depending on conditions such as the roof’s orientation, slope, and shading.
Choosing Method 2 Compare Based on Degradation Rate of Solar Panels
Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or electricity generation amount.
By not deciding solely based on initial output and considering the degradation rate, you can choose solar panels without regrets!
Choosing Method 3 Compare Based on Warranty Period
There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding output warranties, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies!
A longer warranty is always better, so be sure to check the warranty period and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Power and Storage Battery Installation in Nishitama District, Tokyo
We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Nishitama District, Tokyo. (Tap to open the answers)
How much does it cost to install solar panels and storage batteries in Nishitama District, Tokyo?
The cost varies depending on the installation capacity, equipment, and condition of the roof. In the above construction example (4.3kW solar panel + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
Guidelines for costs based on capacity are published on our solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and site survey and provide a free estimate!
Are there any subsidies available for solar and storage battery installation in Nishitama District, Tokyo?
As of October 7, 2026, Tokyo’s “Promotion Project for Solar Power Generation in Households” (for existing homes, 15,000 yen per kW for systems under 3.75kW, with a maximum of 450,000 yen) and “Promotion Project for Storage Battery Installation in Households” (100,000 yen per kWh for storage batteries, with a maximum of 1.2 million yen per household) are accepting pre-applications starting May 29, 2026, as listed on the official page of Tokyo (Cool Net Tokyo). In Hinode Town, there is a subsidy for the installation costs of eco-friendly housing promotion equipment (the application period for the 2026 fiscal year is from November 2 to December 28, and equipment installed by March 31, 2026, is eligible), as stated on the official page of Hinode Town. The subsidy for residential renewable energy and energy-saving equipment in Mizuho Town ended at the end of March 2019, and there are no specific subsidies for solar power and storage batteries listed on the official pages of Hinohara Village and Okutama Town. The national DR household storage battery project has ended its public recruitment.
Since the application status may change, please refer to the subsidy and grant section and consult with us before signing a contract.
Can I apply for subsidies even after the construction is completed?
This varies by program. Tokyo’s subsidies require pre-application, while the subsidy in Hinode Town allows applications in the following fiscal year (for the 2026 fiscal year, equipment installed by March 31, 2026, is eligible). Conditions such as whether you can contract and start construction before applying may differ by program, so please confirm before signing a contract.
The order of procedures varies by program, so please confirm before signing a contract and starting construction.
Can solar panels be installed on a slate roof? I’m worried about leaks.
Installation on a slate roof is possible, but it requires checking the condition of the roofing material and substrate. The method of securing the panels varies by construction method, and when using brackets to secure them to the roofing material and substrate, waterproofing of the fixed parts is crucial.
Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation and may suggest performing a roof overlay (cover method) or replacement if deterioration is advanced.
My roof is old. Should I do a roof renovation first?
It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, there will be additional costs for dismantling and reinstalling the solar panels. If the remaining lifespan of the roof is short, renovating with durable roofing materials before installation may help reduce overall costs.
After confirming the condition of the roof during the on-site survey, please consult us about the installation process!
Is it better to install a storage battery together with solar panels?
If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.
Additionally, the Tokyo Metropolitan Government’s subsidy for storage batteries (for Reiwa 8, it is 100,000 yen per kWh, with a maximum of 1.2 million yen per household) aims to increase self-consumption of electricity generated by solar power. You can compare “solar only” and “solar + storage battery” through a financial simulation.
How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and on-site survey, and we will provide you with the installation capacity and power generation simulation.
The Nishitama District consists of four towns and villages with different terrains, from Mizuho Town to Hinohara Village and Okutama Town, where over 90% of the area is forested. The shape and orientation of the roof, as well as the shadows cast by surrounding buildings, will differ for each house. You can check the expected power generation through the power generation simulation.
How long will the construction period be?
In the above construction example (solar panel 4.3 kW + storage battery), it took about 3 days. This may vary if roof work is done simultaneously or depending on the shape of the roof and installation capacity.
Please note that additional time is required for subsidies and applications to the power company, so please consult us as soon as possible.
What is the current selling price (FIT)?
For residential use (under 10 kW), from the certification after October 2025, the first four years will be 24 yen/kWh, and from the fifth to the tenth year, it will be 8.3 yen/kWh, and the same price will apply for the 2026 fiscal year.
The idea is to recover the initial costs quickly in the first four years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity costs.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-maintenance notices via DM and visits customers who wish to have inspections. We can also clean solar panels using a specialized brush if the power generation decreases due to dirt.
Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.
Can you also handle renovations for roofs that already have solar panels installed?
Yes, we can. Kakeru Koumuten can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them all in one go. The removed panels can be stored in our warehouse.
For costs, please refer to the solar panel removal and hot water heater removal pricing page.
If you are looking for a solar panel installation company in Nishitama District, Tokyo, please consult Kakeru Koumuten
Our company handles a wide range of exterior renovations, including solar panels, roof work, and exterior wall work in Nishitama District, Tokyo.
We receive requests from many customers, including renovation companies and real estate agencies!
Kakeru Koumuten promises “high-quality renovations at low costs”, and we have received great feedback from numerous customers.
We continue to update our construction achievements every year, and we will strive to improve quality to satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay and re-roofing work but also partial roof repairs, exterior painting, and exterior cover installations.
We are also happy to handle small jobs like partial repairs and rain gutter cleaning!
In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult with us!
“I want to know about recommended solar panels”, “I want to keep costs as low as possible”, “I just want an estimate for now”, we will provide optimal solutions for specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and propose the best construction plan!
We are confident that we will not be outdone by other companies in terms of cost, quality, and organization for exterior work!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if our company is found to be inferior to others, you are free to decline!
Characteristics of Nishitama District, Tokyo and Points for Solar Work
Nishitama District consists of four towns and villages: Mizuho Town, Hinode Town, Hinohara Village, and Okutama Town, located in the western part of Tokyo. Even within the same district, the terrain and surrounding environment vary greatly by town and village, which also changes the points to be careful about when installing solar panels and storage batteries. Below are the characteristics of each town and village in Nishitama District, Tokyo, and points to be careful about during installation. (Tap to open)
View characteristics of Nishitama District, Tokyo and points for solar work
■ Mizuho Town: The Sayama Hills spread to the east, and tea fields extend to the north. The hazard map was revised in June of Reiwa 8
Mizuho Town has an area of 16.85 square kilometers, approximately 5.76 kilometers east to west and 6.115 kilometers north to south, with the Sayama Hills located in the eastern part of the town and tea fields spreading to the north of the town center, as stated on the town’s official page. In residential areas close to the hills, the shadows cast by surrounding trees vary from house to house. The town’s disaster prevention hazard map was revised in June of Reiwa 8, and in addition to maps for flooding and landslides, new maps for internal water and landslide disasters were created. Since the placement of power conditioners and storage batteries can affect their impact during flooding depending on where they are installed indoors or outdoors, please confirm the assumptions about your residence’s location and consult us about the installation site.
■ Hinode Town: A long and narrow town from east to west. Check site conditions and delivery routes on-site for each district
Hinode Town has an administrative area of 28.07 square kilometers, approximately 12.0 kilometers east to west and 2.5 kilometers north to south, giving it a long and narrow shape, as stated on the town’s official page. Within the town, there may be differences in elevation and the width of the front roads depending on the district, so it is necessary to check the scaffolding setup and the delivery routes for panels and storage batteries on-site. Kakeru Koumuten Co., Ltd. plans scaffolding tailored to the site with its own scaffolding team, creates layout diagrams from blueprints and on-site surveys, and allows you to confirm through power generation simulations.
■ Hinohara Village: 93% of the area is forested. Settlements are scattered along the river, and check the landslide disaster areas
Hinohara Village has a total area of 105.41 square kilometers, with 93% being forested, surrounded by steep mountains, and settlements are scattered along the Akigawa River from north to south, as stated on the village’s official page. The shadows cast by surrounding mountains and trees vary by location, and in narrow areas, special considerations may be needed for material delivery routes. The village’s landslide and flood hazard maps are published by district, showing landslide warning areas and special warning areas. Please confirm the area of your residence and consult us about the installation site.
■ Okutama Town: 94% of the town is forested. Consider winter cold and landslide disaster warning areas
Okutama Town has an area of 225.53 square kilometers, measuring 19.5 kilometers east to west and 17.5 kilometers north to south, and the town’s basic environmental plan states that 94% of the town’s area is covered by forests, with an annual precipitation of approximately 1,300 to 2,100 millimeters at the Okuguchi Observatory and an average temperature of about 12 to 13℃, with January’s average temperature at 1.5℃ (these values are from the observatory, not the entire town). Due to the location surrounded by mountains, the sunlight impact varies by location due to surrounding mountains and trees, so please check with a power generation simulation. For storage batteries, confirm the installation conditions (such as the usable temperature range) with the manufacturer’s specifications and consult about the installation location. Additionally, the Tokyo Metropolitan Government designated landslide warning areas on June 28, 2019, and maps have been created and distributed for each community, as stated on the town’s official page.
■ Roof types and ages vary from house to house. Check the roof and waterproofing before installation
Even within the same town, roof types, ages, and site shapes vary from house to house. The capacity and fixing methods that can be installed change depending on the shape and orientation of the roof and the materials used. At Kakeru Koumuten Co., Ltd., we will check the type and condition of the roof and the site situation before installation and propose fixing methods, waterproofing arrangements, and scaffolding plans.
■ The annual sunshine hours at the Tokyo Observatory are about 1,927 hours
According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours at the Tokyo Observatory are about 1,927 hours, with January (about 193 hours) having the most and June during the rainy season (about 124 hours) having the least. (This is a reference value, not the observation values within Nishitama District.)
The power generation in Nishitama District can also change due to the shadows of surrounding buildings, mountains, and trees, so conducting a year-round power generation simulation and selecting the capacity of the storage battery to match the times of high electricity usage is essential.
Our company handles many exterior construction and solar power projects in Nishitama District, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!
Service Area in Nishitama District, Tokyo
Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and all of Tokyo.
List of Areas in Nishitama District, Tokyo
● Mizuho Town
Ishihata, Mizuho Town / Komagatake Fujisan, Mizuho Town / Takane, Mizuho Town / Tonogaya, Mizuho Town / Nagaoka Shimooshioka, Mizuho Town / Nagaoka Nagasebe, Mizuho Town / Nagaoka Fujihashi, Mizuho Town / Nagaoka, Mizuho Town / Nihonki, Mizuho Town / Hakonegasaki, Mizuho Town / Hakonegasaki Nishimatsubara, Mizuho Town / Hakonegasaki Higashimatsubara, Mizuho Town / Fujisan Kurihara Shinden, Mizuho Town / Minamihei, Mizuho Town / Musashi, Mizuho Town / Musashino, Mizuho Town
● Hinode Town
Okuno, Hinode Town / Hirai, Hinode Town
● Hibara Village
Ozawa, Hibara Village / Kazuma, Hibara Village / Kobe, Hibara Village / Kamimoto, Hibara Village / Kurakake, Hibara Village / Shimomoto, Hibara Village / Nango, Hibara Village / Hizato, Hibara Village / Fujiwara, Hibara Village / Hitosato, Hibara Village / Mitosato, Hibara Village / Honjuku
●Yamakita Town
Yamakita Town Umizawa / Yamakita Town Umezawa / Yamakita Town Ootanba / Yamakita Town Kawai / Yamakita Town Kawano / Yamakita Town Kawachi / Yamakita Town Kodanba / Yamakita Town Sakae / Yamakita Town Shiramaru / Yamakita Town Tanazawa / Yamakita Town Dansaburo / Yamakita Town Tomeura / Yamakita Town Hibara / Yamakita Town Hara / Yamakita Town Hikawa
・Trust Kakeru Koumuten for exterior wall painting in Nishitama District, Tokyo!
・Trust Kakeru Koumuten for roof renovations in Nishitama District, Tokyo!
・Trust Kakeru Koumuten for exterior renovations in Nishitama District, Tokyo!
・Kakeru Koumuten Co., Ltd. project achievements
・Kakeru Koumuten Co., Ltd. aftercare services
・Kakeru Koumuten Co., Ltd. service menu and price list
・Kakeru Koumuten Co., Ltd. staff blog and announcements
・Explaining the importance of comparative estimates and key points!
・Top 12 solar power generation manufacturers! Features and selection tips included!
・What are the installation costs for solar power generation? Comprehensive tips to reduce costs!
・What are the best locations for solar power installation? Key points for site selection included!
・Find out more about solar power generation estimates here!
We welcome consultations via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!