For solar panel and battery installation in
Katsushika, Tokyo,
trust Kakeru Koumuten!

Kakeru Koumuten is a specialized exterior renovation company headquartered in Aoba Ward, Yokohama City.
As a company strong in roofing work, we are entrusted withsolar panel and battery installation considering roofing and waterproofing!

“How to Choose a Solar Panel Contractor in Katsushika”
“Costs for Solar Panel and Battery Installation”
“Subsidies Available for Solar System Installation in Katsushika”
We will also explain the above three points!

Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure a satisfactory solar panel installation, we recommend obtainingthree estimates!

For solar panel and battery installation in Katsushika, Tokyo, trust Kakeru Koumuten
Table of Contents (Tap to Open/Close)
  1. Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Katsushika, Tokyo
  2. Roof Inspection Before Installing Solar Panels
  3. Subsidies and Grants That May Be Applicable in Katsushika
  4. Price List for Solar Panel and Storage Battery Installation
  5. Breakdown of Installation Capacity, Equipment, and Construction Costs
  6. Self-Estimate and Profit Simulation for Solar Power Generation
  7. Customer Testimonials
  8. Case Studies of Solar Panel Installations
  9. How to Choose a Solar Panel Installation Company in Katsushika, Tokyo
  10. Benefits of Introducing Solar Equipment
  11. Points to Consider When Introducing Solar Power Generation
  12. How to Choose Solar Panels
  13. Frequently Asked Questions About Solar and Storage Battery Installation in Katsushika
  14. If You Are Looking for a Solar Panel Installation Company in Katsushika, Contact Kakeru Koumuten
  15. Characteristics of Katsushika, Tokyo and Key Points for Solar Installation
  16. Service Area in Katsushika, Tokyo

Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Katsushika, Tokyo

Link banner to Kakeru Koumuten's strengths introduction page

The reasons why we are entrusted with solar panel installation by customers in Katsushika, Tokyo include
One reason is that “Kakeru Koumuten covers Kanagawa and Tokyo as its service areas.” Additionally,
“We have strengths in solar panel installation that cannot be imitated by other companies,” which has received positive feedback from many customers.

We have absolute confidence in “cost,” “quality,” and “plans” for solar panel installation in Katsushika, so we would appreciate it if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We Also Handle Exterior Renovations Besides Solar Panel Installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Troubles such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It is reassuring to have knowledge about the roof to avoid maintenance and troubles after installation!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!

2.Facilities Specialized in Exterior Renovation

Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar construction and exterior renovation.
We have established five bases centered in Yokohama City, Kanagawa Prefecture for material storage and showrooms.

In-house Ownership of Scaffolding Materials

Entrance to the material storage areaCompany-owned scaffolding materials
To ensure safety during work on the roof, we own the necessary scaffolding materials for temporary scaffolding based on construction conditions and can assemble scaffolding ourselves.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can also cut costs on scaffolding work.
We have scaffolding materials for approximately 50 single-family homes!
Even in Katsushika Ward, surrounded by rivers, our in-house scaffolding team plans the scaffolding according to the site conditions.

Storage of materials in our large warehouse

Exterior of the material warehouse Interior of the warehouse storing materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, we canpurchase materials at a lower cost!
Additionally, we always have stock of roofing materials, so we canrespond quickly in emergencies!

Sorting and transporting waste materials in-house

Space for sorting waste materialsThe installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.

Exterior renovation dedicated showroom

Exterior renovation dedicated showroom appearanceShowroom interior
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on the roofing materials!
It is also possible to simulate the revenue and installation costs when introducing solar panels!

Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that show the structure, allowing for detailed explanations!

3.All Work Performed by Our Own Team

Diagram of the system for performing scaffolding, painting, and roof renovations by our own team

One of Kakeru Koumuten’s major strengths is all work performed by our own team.

By having a consistent system from inquiry to project completion, Kakeru Koumuten can provide high-quality roof renovations at reduced costs.
Additionally, one representative will handle everything from the estimate to project completion.
Since the person in charge does not change, whether it’s sales or construction management, smooth communication is possible.

We can perform consistent in-house work from temporary scaffolding installation to exterior wall painting and roof renovations!

4. Various Permits and Skilled Workers

Construction industry permit displayDisplay of permits and qualifications obtained by Kakeru Koumuten
We have obtained construction industry permits and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal and painting technicians on staff, and we are confident in our construction techniques.
We can also handle large-scale roofing work for factories and other facilities!

5. Warranty and Aftercare

Link banner to Kakeru Koumuten's warranty information page

In addition to the manufacturer’s warranty for solar panel installation work, we also provide our own workmanship warranty (leakage warranty)!
(The workmanship warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovation is performed. The workmanship warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary based on the warranty details.)
Aftercare maintenance is available annually, and we send out notification DM every year.
If you have any questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Roof and solar panel inspection response

Our company is equipped to handle various roof troubles and situations.

Even if you cannot access the roof at high places, we can respond using a drone!
During leak investigations, we can also conduct inspections using a thermal imaging camera.

If the power generation of the solar panels decreases due to dirt, we can also provide cleaning with a specialized brush.
We will respond according to your preferences.

7. Human Resource Development

Training session using models

To improve skills, we create various roof models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct skill enhancement education so that each staff member can handle various cases.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Clear Materials and Simulations

Materials and simulation examples provided for solar panel installation

At Kakeru Koumuten Co., Ltd., we provide not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar installation guidebook” and a “profit and loss simulation” that takes loan interest rates and electricity costs into account.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar installations can easily understand the important points and disadvantages, as we compile the information into clear materials!

We encourage you to obtain comparative estimates and review plans from other companies!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 to 30 years.
It is crucial to confirm before installation whether it is safe to place them directly on the current roof, as this is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten Co., Ltd., which specializes in roofing work, has summarized the items to check before installation.

1. Type of roofing material and age The method of securing the panels varies depending on the roofing material, such as slate, tiles, metal roofs, or flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest a roof renovation first.
2. Condition of the substrate and waterproof sheet If the sheathing or roofing (waterproof sheet) beneath the roofing material is damaged, it can affect the fastening strength and waterproofing. We will also check for any signs of leaks.
3. Orientation, slope, and shadows of the roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, can affect power generation. We will create a layout diagram from the drawings and the site, and you can verify it with the power generation simulation.
4. Shape of the roof and available installation area The number of panels that can be installed (installation capacity) is determined by the shape and size of the roof. The number of panels that can be installed varies depending on the size of the panels, so we will compare based on the total output of the roof.
5. Method of securing and waterproofing details We will confirm whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fastening method varies by technique, so please check the waterproofing treatment method for the fastening parts during the estimate.
6. Weight of the roof The roof will become heavier due to the added panels. After investigating the existing roof, substrate, and load-bearing capacity, replacing with lighter roofing materials may be an option if necessary.
7. Location of equipment installation and wiring We will check the installation locations for the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect costs.

Securing Methods and Checkpoints by Roofing Material

Roof Material Main Fixing Method Pre-Installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproofing treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is significant, consider roof overlay (cover method) or replacement first.
Tile Roof Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) Type and condition of the tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lighter roofing materials before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roofing material (depends on the combination of roofing material and brackets) Whether the roofing material and brackets are compatible, installation conditions from the roofing material manufacturer. If compatible, methods that do not drill holes may be available.
Flat Roof / Rooftop Fixed by installing a frame Type and deterioration status of the waterproof layer, waterproofing details around the frame. Consider in conjunction with the timing of waterproofing work.
If you carry out roof renovations at the same time, you may be able to reduce future costs for removing and reinstalling solar panels!
If you perform roof renovations 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, it may be more cost-effective in the long run to renovate to a highly durable roofing material before installation.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ Click here for roof renovations in Katsushika, Tokyo

PotentialSubsidies and Grants in Katsushika, Tokyo

If you are introducing solar panels or storage batteries in Katsushika, Tokyo, there is a possibility that you may be eligible for programs from the “National Government,” “Tokyo Metropolitan Government,” and “Katsushika Ward”.
The following information is based on the official pages of each program as of October 6, 2026. The application status may change depending on the budget and application period, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Period for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Tokyo “Reiwa 8 Year Household Solar Power Introduction Promotion Project” (Cool Net Tokyo) A system under 50kW with certified solar modules to be newly installed on residential properties within the city. Pre-application before installation is required. Existing homes: 150,000 JPY/kW for 3.75kW or less (maximum 450,000 JPY), 120,000 JPY/kW for over 3.75kW
New homes: 120,000 JPY/kW for 3.6kW or less (maximum 360,000 JPY), 100,000 JPY/kW for over 3.6kW
(Additional costs for mounting frames, waterproofing work, and renovation defect insurance, etc.)
Pre-application: From May 29, 2026
Grant application and performance report: From June 30, 2026 to March 30, 2029
Tokyo “Reiwa 8 Year Household Storage Battery Introduction Promotion Project” (Cool Net Tokyo) New installation of storage batteries in residential properties within the city, and must be SII registered equipment. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries alone. Pre-applications after October 1, 2026 will only be eligible for SII registered products for Reiwa 8. Storage battery package: 100,000 JPY/kWh (maximum 1,200,000 JPY per household)
Storage battery unit expansion: 60,000 JPY/kWh (maximum 720,000 JPY per household)
(Additional incentives for participation in DR demonstrations, etc.)
Pre-application: From May 29, 2026
Grant application and performance report: From June 30, 2026
Katsushika Ward “Reiwa 8 Year Katsushika Eco Subsidy (for Individual Homes)” Homes where the applicant resides within the ward are eligible. Solar power generation systems, storage batteries, HEMS, V2H, etc., are eligible for subsidies. Pre-consultation is required at least 4 weeks before the start of construction, and solar power systems that sell all generated electricity are not eligible. Subsidy amounts are specified for each equipment (please check the official page of the ward for the subsidy amount and limits for Reiwa 8). From April 1, 2026 to March 31, 2027 (must arrive by this date)
Budget and application status are not listed on the ward’s official page, so please confirm with the Environmental Division.
National “DR Household Storage Battery Project” (Reiwa 7 Year Supplement) New installation of household storage systems that can be utilized for DR (demand response) with registered products. Calculated based on a standard amount of 34,500 JPY per initial effective capacity of 1kWh (subsidy rate within 3/10; maximum 600,000 JPY per application). The budget was reached on May 29, 2026, and the public recruitment has ended (applications are currently not possible).
National “Mirai Eco Housing 2026 Project” (Renovation) Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovations for windows (openings) and structures; applications cannot be made for the installation of storage batteries alone. Solar panels are not included as eligible facilities. Storage battery: 96,000 JPY per household. Ends as soon as the budget limit is reached. Please check the official site for application status.
Please pay attention to the “order of procedures” for subsidies!
In Tokyo, a pre-application before installation is required for subsidies, and in Katsushika Ward, the Katsushika Eco Subsidy requires prior consultation at least 4 weeks before construction starts. If construction begins beforehand, it may become ineligible, and it is not guaranteed that applying will result in approval. The procedures and eligibility for each program differ, so please confirm before contracting and starting work.
Kakeru Koumuten Co., Ltd. will guide you on the eligibility conditions for each program after confirming them.

Tokyo “Reiwa 8 Year Household Solar Power Generation Promotion Project”

In Tokyo, through Cool Net Tokyo, subsidies are provided for those installing solar power generation systems in residential homes within the city. The target is systems using certified solar modules with a capacity of less than 50kW that are newly installed in residential properties or their premises within the city.Pre-application before installation is required.

For existing homes, the subsidy amount is150,000 yen/kW for up to 3.75kW (maximum 450,000 yen), and 120,000 yen/kW for exceeding 3.75kW. Additionally, there are supplementary items such as installation of mounting structures, waterproofing work, and renovation defect insurance. The pre-application period is from May 29, 2026, and the application for grants and performance reports is from June 30, 2026, to March 30, 2029. For details on eligible equipment and conditions, as well as budget status, please check the official page.
👉 Cool Net Tokyo | Official page for solar power generation is here

Tokyo “Reiwa 8 Year Household Storage Battery Promotion Project”

Tokyo is also providing subsidies for newly installed storage batteries in residential homes within the city. The subsidy amount is100,000 yen per kWh for storage battery packages (maximum 1,200,000 yen per household), and 60,000 yen per kWh for additional storage battery units (maximum 720,000 yen per household), with additional amounts for participation in DR demonstrations.

The target is equipment registered with SII (Environmental Collaboration Initiative).If you apply for pre-application after October 1, 2026, only equipment listed in the Reiwa 8 Year SII registered products will be eligible. This project is intended for simultaneous installation with solar power, but applications can also be made for storage batteries only. The acceptance of applications for grants and performance reports has already started from June 30, 2026.
👉 Cool Net Tokyo | Official page for storage batteries is here

Katsushika Ward “Reiwa 8 Year Katsushika Eco Subsidy (for individual residences)”

Katsushika Ward is implementing the “Katsushika Eco Subsidy,” which subsidizes the installation costs of solar power generation systems, storage batteries, HEMS, Ene-Farm, V2H, insulation renovations, etc., for residential homes where the applicant resides. It is necessary to apply for prior consultation at least 4 weeks before construction starts, and the application process is “Application for prior consultation (document review and mailing of response) → Construction → Completion report.”

The solar power generation system has conditions such as the contractor being the same as the applicant, and that systems selling all generated electricity are not eligible for subsidies. It is also a condition that the same type of equipment has not received subsidies for the past 10 years at the same building. The application period is from April 1, 2026, to March 31, 2027 (must arrive by this date). For details on the subsidy amount, upper limits, budget status, and the possibility of combining with other subsidies, please check the district’s guidelines.
👉 Click here for the official Katsushika Ward page (for individual residences)
👉 Click here for the Katsushika Ward | Solar Power Generation System page

National Subsidy “DR Home Battery Project (Support Project for Home Battery System Introduction for DR Resource Implementation)”

The national government has been implementing the “DR Home Battery Project” to support the installation of home batteries.

This program targets those who are introducing new registered battery systems that can be utilized for demand response (DR), and for the fiscal year 2025 supplementary budget, the subsidy amount is determined based on a standard amount of 34,500 JPY per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum of 600,000 JPY per application. There are also conditions such as those contracted or ordered before the grant decision being ineligible.

However, the fiscal year 2025 supplementary budget application amount reached the budget on May 29, 2026, and the public recruitment has ended (the previous fiscal year’s supplementary budget also ended public recruitment on July 2, 2025). Applications are currently not possible, so please check the official site for future public recruitment.

Additionally, there are currently no subsidies confirmed for the installation of solar panels on existing homes.
👉 Click here for the official site of the DR Home Battery Project

Solar Panel Installation & Battery Installation Price List

Solar Panel Installation & Battery Installation Service Menu
⇧ Service Menu | For costs related to solar panel installation and battery installation, click here

Solar Panel Removal and Hot Water Heater Dismantling Service Menu
⇧Service Menu | Click here for costs related to Solar Panel Removal and Hot Water Heater Dismantling

Estimate Guidance

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and storage batteries should be confirmed by separating them into “Equipment Costs (Device Costs)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Storage Battery Capacity (kWh)

The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Storage batteries are compared in terms of the amount of electricity they can store, expressed in kWh (kilowatt-hours).
The amount of kW that can be installed on a roof varies for each house based on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.

On our pricing page, we list solar panels at an estimated cost of 800,000 JPY to 1,200,000 JPY for 3-5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just estimated amounts and may vary based on wiring length, scaffolding range, existing roofing materials, and panel layout.)
▶ Service Menu | Click here for costs related to Solar Panel Installation and Storage Battery Installation

Items to Confirm in the Estimate (Cost Verification)

When comparing estimates, it is common to compare different capacities and equipment by only looking at the amounts. Please check if the following items are clearly stated in each company’s estimate!

1. Solar Panels Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are listed.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls with a battery.
3. Storage Battery Manufacturer, model number, capacity (kWh), range usable during power outages (entire house or specific circuits), installation location.
4. Mounting Frame and Hardware Name of hardware suitable for roofing material and method of securing (whether it is a method that drills holes or a method that clamps and secures).
5. Wiring and Electrical Work Wiring route and length, work around the distribution board, presence of a monitor to check power generation.
6. Roof Reinforcement and Waterproofing Details of waterproofing treatment at fixed points, whether necessary roof repairs and substrate reinforcements are included.
7. Application Extent of support for applications to the power company, certification application for selling electricity (FIT), and subsidy applications.
8. Scaffolding Scope and quantity of scaffolding. If roof work and exterior painting are done simultaneously, check that the same scope and quantity are not counted twice.
9. Removal and Disposal Whether the removal of existing solar water heaters and old panels, as well as disposal costs for waste materials, are included.
10. Tax Classification and Warranty Whether prices are inclusive or exclusive of tax, conditions under which additional costs may arise, details and duration of manufacturer warranty and workmanship warranty.
Tips for Comparison: “Installation Capacity (kW)” and “Equipment Model Number” should be aligned for comparison!
If the capacity differs, both the price and power generation will change. Kakeru Koumuten Co., Ltd. warmly welcomes competitive estimates, so if you bring estimates from other companies, we will explain the differences for each item!

Self-Estimate and Profit Simulation for Solar Power Generation

Self-Estimate and Profit Simulation for Solar Power Generation

With the simulator above,
you can obtain an approximate estimate and a profit simulation up to 30 years later!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can get an approximate estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on conditions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.

Customer Feedback

Case Studies of Solar Panel Installation

BEFORE

Metal roof before solar panel installation

AFTER

Roof after solar panel installation

Construction Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh range
Base Mounting Hardware Used
 Niigata Manufactured / Aluminum Catch Type Hardware
Fixing Method & Waterproofing Arrangement
 Fixed by catching the horizontal metal roof with catch type hardware (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 ※Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY
 Expected recovery period for construction costs: about 8 to 9 years (self-consumption)

 ※The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system.
Construction Period
 Approximately 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that grants are available, and I would like to know how much will be provided.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Katsushika, Tokyo

There are many solar panel installation contractors that serve Katsushika Ward, Tokyo, and you may be unsure which one to choose.

For this reason, when requesting solar panel installation and battery storage installation work, let’s check the following four points.

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the existence of warranties and after-sales maintenance

● Obtain estimates from multiple contractors (three companies as a guideline)

● Check if they provide support for subsidy applications

By confirming the above four points, you will be able to choose a reliable contractor.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Have knowledge not only about solar panels but also about roofs

Defective installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing

・Solar panels were installed on a severely deteriorated roof, resulting in leaks
・Solar panels were installed on a roof with a short lifespan, necessitating a renovation for removal and reinstallation within a few years
・Misjudging the type of waterproofing led to incorrect treatment and subsequent leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.

▶ Go to “Roof Verification Before Installing Solar Panels” in this article

Confirm the existence of warranties and after-sales maintenance

When choosing a solar installation contractor, let’s confirm the existence of warranties. It is important to check not only the duration of the warranty but also the scope, exclusions, and cost conditions.

While the solar panels and battery storage units come with manufacturer warranties, it is also important to check for the existence of a workmanship warranty in case leaks occur after installation!

For contractors that offer a workmanship warranty, if leaks occur after installation, they may be able to respond under the warranty, provided it falls within the warranty period and conditions.

Additionally, some contractors offer after-sales service separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Changes or damage on the roof can occur in areas that are not visible, so you may not notice them yourself.
By conducting inspections during after-sales maintenance, you can easily detect abnormalities early and prevent major repairs or breakdowns!

Kakeru Koumuten Co., Ltd. provides a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, a roof renovation may be required to provide the warranty.)
We also conduct after-sales maintenance and send out DM every year!
After reviewing the DM, if you wish, we will visit you for after-sales maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting the installation of solar panels, be sure to obtain estimates from multiple contractors.

Even for the same manufacturer and the same construction content, costs may differ, and warranties and after-sales services may vary.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request from your preferred contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates,

“Check the items in the estimate”
“Type of solar panel”
“Warranties and after-sales services”

and make a detailed comparison to make your judgment! If the rank of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid judging solely based on price!

▶ Go to “Breakdown of Installation Capacity, Equipment, and Construction Costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Check if they provide support for subsidy applications

There may be subsidies available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
Some systems require personal applications and cannot be handled by the contractor, and some require pre-application before installation, so it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for Tokyo’s subsidy, a pre-application before installation) before proceeding with the construction!

In the case of subsidies in Tokyo, the process involves submitting a grant application and performance report after the completion of the work, which will be granted after a review! (The procedure varies depending on the system)

▶ Go to “Subsidies and Grants that May Be Applicable in Katsushika Ward” within this article

Benefits of Introducing Solar Power Equipment

The benefits of installing solar panels are as follows!

Benefit 1: Economic Advantage

Household Budget Illustration

The biggest advantage of installing solar panels is the economic benefit!
Although the selling price of electricity has decreased compared to ten years ago, you can gain benefits by reducing the amount of electricity purchased from power companies by consuming the generated electricity yourself!
As electricity prices rise, the ability to cover your consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!

Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the fifth year, it is often more advantageous to use it in your home (self-consumption), making the combination with storage batteries a viable option.
👉 For purchase prices and periods, visit the Agency for Natural Resources and Energy

Benefit 2: You Can Utilize Subsidies!

Illustration of a Person Happy to Reduce Costs

The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the requirements, you may be able to utilize subsidies!
Reducing the actual burden amount through subsidies is a significant advantage!
In the case of Katsushika Ward, in addition to national and Tokyo metropolitan systems, there may be eligibility for the Katsushika Eco Grant (pre-consultation is required up to four weeks before the start of construction for the ward’s grant).

Benefit 3: Environmentally Friendly!

Environmentally Friendly Solar Power Illustration

Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices such as power conditioners may have operational noise.)

Merit 4 Expect a heat insulation effect!!

Illustration of heat insulation by solar panels

By installing the panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, it can help reduce the temperature rise of the roof, so a heat insulation effect is expected!
(Note that this does not improve the insulation performance of the building itself.)

Merit 5 Electricity can be used even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it is possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capabilities, you may be able to use electricity from a dedicated outlet during the daytime when generating power.
(Note that the devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Illustration of a person explaining points to note

Point 1 Maintenance costs can be incurred

A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof renovations after 10 to 20 years, there will be costs for removing and reinstalling the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.

It would be reassuring to consider maintenance costs in simulations before introducing solar panels!

Point 2 The risk of leaks increases depending on the roofing material

The methods for securing slate roofs and tile roofs vary depending on the construction method, but when using screws or other fasteners to secure materials and substrates, waterproofing at the fastening points becomes crucial.
In methods that involve making holes in the roof, there is inevitably a risk of leaks.
Of course, we will ensure thorough waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and the fasteners, and it cannot be used with all metal roofs.)

Catch-type base fastener for horizontal metal roofsCatch-type base fastener for horizontal metal roofs

Note 3: The roof will become heavier

Installing solar panels will add weight to the roof. After investigating the existing roof, substrate, and load capacity, replacing it with a lighter roof may also be an option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output and costs vary widely.
It is not simply a matter of “This manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

Choosing Method 1: Compare based on total output of the roof

When installing solar panels on the roof, it is important to consider how much electricity can be generated in a limited area, and the more electricity generated, the better!

Solar panels come in various sizes and outputs depending on the manufacturer.
For example, a 350W output panel and a 400W output panel may seem at first glance that the higher output panel is better.
However, if the size of the panels does not fit well with the roof, it may be the case that “20 panels of 350W can be installed” while “only 15 panels of 400W can be installed” due to the difference in panel sizes.

400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual electricity generation (kWh) will vary based on conditions such as roof orientation, slope, and shading.

Choosing Method 2: Compare based on the degradation rate of solar panels

Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output warranty values are benchmark figures for guarantees and do not indicate the actual degradation rate or power generation amount.
Choosing solar panels while considering both initial output and degradation rates will help you avoid regrets!

How to Choose 3: Compare by Warranty Period

There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Some manufacturers offer a 30-year warranty for output, while others provide a 10-year warranty, so it varies widely!
A longer warranty is always better, so be sure to check the warranty periods and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar and Storage Battery Installation in Katsushika Ward

We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Katsushika Ward. (Tap to open the answers)

How much does it cost to install solar panels and storage batteries in Katsushika Ward, Tokyo?

The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

Guidelines by capacity are published on the solar panel installation and storage battery installation pricing page. We will create a layout diagram based on the drawings and site survey and provide a free estimate!

Are there any subsidies available for solar and storage battery installation in Katsushika Ward?

As of October 6, 2026, Tokyo’s subsidies for solar power generation and storage batteries (Cool Net Tokyo) are accepting pre-applications. For storage batteries, only SII registered devices (registered products for Reiwa 8) are eligible from pre-applications made after October 1, 2026. The Katsushika Eco Subsidy in Katsushika Ward has an application period until March 31, 2027 (must arrive by this date), and prior consultation is required at least four weeks before the start of construction. The national DR household storage battery project has ended its public recruitment.

Since the acceptance status may change, please refer to the subsidy and grant section and consult with us before signing a contract.

Can I apply for subsidies after the construction is completed?

In many programs, procedures are required before construction. Tokyo’s subsidies require pre-application before installation, and the Katsushika Eco Subsidy requires prior consultation at least four weeks before the start of construction; if you install first, you may become ineligible. Procedures differ by program.

Since the order of procedures varies by program, please confirm before signing a contract or starting construction.

Can solar panels be installed on slate roofs? I’m worried about leaks.

It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate beforehand. The method of securing it varies depending on the construction method, and when securing hardware to the roofing material or substrate, waterproof treatment of the fixed parts is essential.

Kakeru Koumuten Co., Ltd. is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation, and if deterioration is progressing, we can also suggest methods such as roof overlay (cover method) or re-roofing before installation.

My roof is old. Should I do a roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed 10 to 20 years after installation, the cost of removing and reinstalling solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate to a highly durable roofing material before installation.

Please consult us on how to proceed with the installation after checking the condition of the roof during the on-site survey!

Should I install a storage battery together with the solar panels?

If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price of electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it at home rather than selling it.

Additionally, the Tokyo Metropolitan Government’s subsidy for storage batteries is intended for simultaneous installation with solar panels, but applications can also be made for storage batteries alone. You can compare “solar panels only” and “solar panels + storage batteries” using a financial simulation.

How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten Co., Ltd., we create a layout diagram based on the drawings and on-site survey, and provide you with the installation capacity and power generation simulation.

In Katsushika Ward, due to the high population density and many closely spaced houses, the shadowing from neighboring houses and buildings varies from one house to another. You can check the expected power generation through the power generation simulation.

How long will the construction period be?

For the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary depending on whether roofing work is performed simultaneously and the shape and installation capacity of the roof.

Please note that additional time is required for applications for subsidies and power companies, so please consult us as soon as possible.

What is the current selling price (FIT)?

For residential use (under 10 kW), from the certification after October 2025, the first 4 years will be 24 yen/kWh, and from the 5th to the 10th year it will be 8.3 yen/kWh, and the same price will apply for the 2026 fiscal year.

The idea is to recover the initial costs more quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten Co., Ltd. provides a financial simulation that takes into account loan interest rates and electricity costs.

Can you handle maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten Co., Ltd. sends out annual after-service maintenance DM notifications and visits for inspections to customers who wish. We can also clean solar panels with a special brush if the power generation decreases due to dirt.

It can be difficult to check areas on the roof by yourself, so please feel free to consult us if you have any concerns.

Can you also handle renovations for roofs that already have solar panels installed?

Yes, we can. Kakeru Koumuten Co., Ltd. can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them consistently. The removed panels can be stored in our own warehouse.

For costs, please refer to the solar panel detachment and water heater removal pricing page.

Free estimates for solar panels and storage batteries in Katsushika City

Estimates are completely free. We welcome competitive quotes!

If you are looking for a solar panel installation company in Katsushika City, please consult Kakeru Koumuten

Our company handles a wide range of exterior renovations, including roof work and exterior wall work, in Katsushika City, Tokyo, including solar panel installations.
We receive requests from many customers, including renovation companies and real estate agencies, who contact us!

Kakeru Koumuten Co., Ltd. promises “high-quality renovations at low costs”, and we have received positive feedback from many customers.
We continue to update our annual construction achievements and will strive to improve quality to satisfy even more customers in the future.

Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and exterior wall cover methods.
We are also happy to handle small jobs such as partial repairs and rain gutter cleaning!

In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!

“I want to know about recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide the best solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in our customers’ shoes and will propose the best construction plans!

We are confident that we will not lose in terms of cost, quality, and organization compared to other companies in exterior work!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if you find our company to be inferior to others, you are free to decline!

Characteristics of Katsushika City, Tokyo, and Points for Solar Work

Katsushika Ward, located in the northeastern part of Tokyo, is surrounded by rivers such as the Arakawa, Nakagawa, and Edogawa. The official page of Katsushika Ward introduces that to the east, it borders Matsudo City in Chiba Prefecture across the Edogawa River, to the west it borders Adachi and Sumida Wards, to the south it borders Edogawa Ward, and to the north it borders Yashio City and Misato City in Saitama Prefecture across the Oba River, with an area of 34.80 km2 and a population density of about 13,600 people per km2 (as of April 1, Reiwa 8).
We have summarized the points to consider when installing solar panels and storage batteries in the residential environment of Katsushika Ward below. (Tap to open)

View the characteristics of Katsushika Ward and points for solar construction

■ In densely populated residential areas, check for shadows from neighboring houses and the orientation of roofs

Katsushika Ward has a high population density, with many houses built close together. The way shadows are cast by neighboring houses and buildings varies for each house depending on the orientation and height of the roof. Since solar panels generate less electricity when shaded, Kakeru Koumuten creates layout diagrams based on blueprints and the actual site conditions, and we confirm this through power generation simulations.

■ Tokyo’s annual sunshine duration is about 1,927 hours

According to the Japan Meteorological Agency’s average values (1991–2020), Tokyo’s annual sunshine duration is about 1,927 hours.
Power generation varies by season, so it is important to conduct annual power generation simulations and choose the capacity of storage batteries to match the times when electricity is used most.

■ In areas surrounded by rivers, check the installation locations for storage batteries and power conditioners against flooding assumptions

Katsushika Ward is surrounded by the Arakawa, Nakagawa, and Edogawa rivers, and the ward’s flood hazard map explanation page indicates that there are areas where flooding is expected to persist due to low elevation. When deciding on the installation locations for storage batteries and power conditioners, it is reassuring to check the flooding assumptions for your residence on the hazard map.

■ In residential areas with narrow roads, plan scaffolding and equipment delivery carefully

In densely populated areas, the front roads may be narrow, requiring careful planning for scaffolding and equipment delivery. Kakeru Koumuten will respond to the site conditions with our own scaffolding team and our own scaffolding materials.

■ Check the roof condition according to the age of the building

For houses that have been built for many years, it is important to check the condition of the roofing materials and substrate before installing solar panels. Depending on the condition of the roof, installing them simultaneously with roof renovations can help reduce future costs for removing and reinstalling solar panels.

■ Subsidies require separate prior procedures from Tokyo and Katsushika Ward

Tokyo’s subsidies require prior application to Cool Net Tokyo, and Katsushika Ward’s Katsushika Eco Subsidy requires prior consultation at least four weeks before construction begins. It is important to check the procedures and conditions for each system in advance, in conjunction with the timing of the construction.

Our company serves Kanagawa Prefecture and Tokyo, and we handle many exterior and solar construction projects in Katsushika Ward.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us for any sudden troubles!

Service Area in Katsushika, Tokyo

Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and all of Tokyo.

List of Areas in Katsushika, Tokyo

Aoto, Katsushika / Okudo, Katsushika / Ohanajaya, Katsushika / Kanamachi, Katsushika / Kanamachi Water Purification Plant, Katsushika / Kamakura, Katsushika / Kameari, Katsushika / Kosuge, Katsushika / Shibamata, Katsushika / Shiratori, Katsushika / Shinkoiwa, Katsushika / Takasago, Katsushika / Takaracho, Katsushika / Tateishi, Katsushika / Shinjuku, Katsushika / Nishi-Kameari, Katsushika / Nishi-Shinkoiwa, Katsushika / Nishi-Mizumoto, Katsushika / Higashi-Kanamachi, Katsushika / Higashi-Shinkoiwa, Katsushika / Higashi-Tateishi, Katsushika / Higashi-Horikiri, Katsushika / Higashi-Mizumoto, Katsushika / Higashi-Yotsugi, Katsushika / Hosoda, Katsushika / Horikiri, Katsushika / Mizumoto, Katsushika / Mizumoto Park, Katsushika / Minami-Mizumoto, Katsushika / Yotsugi, Katsushika

We welcome inquiries via LINE as well◎

LINE

LINE

We are also updating our Instagram regularly◎Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!