Large-Scale Repairs for Condominiums, Apartments, and Buildings in Sakae Ward, Yokohama

To owners, management associations, and management companies considering large-scale repairs for condominiums, apartments, and buildings in Sakae Ward, Yokohama.

Kakeru Koumuten Co., Ltd. is a company that handles everything from the installation of temporary scaffolding to substrate repairs, exterior painting, tile repairs, sealing, waterproofing for rooftops and balconies, and roofing work, all managed and performed by our own team. Based in Yokohama, we have undertaken numerous large-scale repairs and exterior renovations for apartments, condominiums, and commercial facilities in Sakae Ward.

  • On-site surveys and estimates are completely free (we welcome competitive estimates)
  • Comprehensive management from temporary scaffolding to exterior and roofing work
  • We confirm site conditions and delivery routes on-site and plan scaffolding from our own team
  • Consultations for partial repairs or emergency measures for leaks are also possible
Conclusion First

  • Cost Estimate / For condominiums, the cost is approximately 750,000 to 1,500,000 yen per unit (according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% fall within this range, with the most common being 1,000,000 to 1,250,000 yen. This amount excludes consumption tax and common temporary costs). For wooden apartments, the estimate is 2,000,000 to 4,000,000 yen per building.
  • Estimated Cycle / 12 to 15 years. However, the determining factor is not the number of years but the condition of deterioration.
  • Particularly Relevant in Sakae Ward / This area is surrounded by hilly terrain connected to the Miura Peninsula, with low-lying areas along the Itachigawa and Kashio rivers. Scaffolding planning on sites with slopes and retaining walls, drainage paths during heavy rain (rooftop drains and drainage), and blockages in gutters and drains of buildings near trees are common points of discussion, with a green coverage rate of 38.8% (second highest in the city as of the fiscal year 2019), exceeding the city average of 27.8%.
  • Available Funding / There are no subsidies specifically for large-scale repairs, but if requirements are met, half reduction of fixed asset tax (for work completed by the end of March in the 9th year of Reiwa), national subsidies for windows and insulation may be available, and public financing may also be applicable.
  • Tips for Success / At least three competitive estimates. Compare not only the amounts but also the quantities, methods, and materials.
This page summarizes the cost estimates, unique repair points for Sakae Ward, construction process, contractor selection, collusion measures, and the latest support systems for 2026 when conducting large-scale repairs in Sakae Ward, Yokohama. (Information as of October 8, 2026)
Large-scale repairs in Sakae Ward, Yokohama, by Kakeru Koumuten | From scaffolding to exterior painting, waterproofing, and roofing work performed by our own team

Large-scale repair work that can be handled in Sakae Ward, Yokohama

Large-scale repairs are not just “exterior wall painting” or “waterproofing,” but rather a comprehensive repair of the entire building’s deterioration while scaffolding is in place. At Kakeru Koumuten, we can handle all of the following work in-house, ensuring clear responsibility and coordination of the process.

Type of Work Main Contents
Temporary Scaffolding Work Installed by our own scaffolding team using our own scaffolding materials. We handle mesh sheets, protection, and fall prevention measures.
Substrate Repair Work Crack repairs, injection of floating mortar and tiles, repair of spalling (exposed rebar), and resin mortar repairs for missing parts.
Exterior Wall Painting Work High-pressure washing, three coats of paint from primer to finish, and painting of ancillary parts (metal parts, gutters, water cut-offs, etc.). We accommodate radical control type, fluorine, and inorganic paints.
Tile Repair Work Replacement of broken tiles, joint repairs, and clear waterproofing of tile surfaces (such as Seven S).
Sealing Work Replacement and additional sealing around sashes and exterior wall joints.
Waterproofing Work Urethane waterproofing for rooftops, roof balconies, common corridors, and stairs, PVC sheet waterproofing, and installation of long sheet materials.
Roof Work Roof painting, roof overlay (cover method), re-roofing, and ridge cap replacement. We have sheet metal craftsmen on staff and can handle large roofs such as factories.
Metal and Hardware Work Surface painting of steel staircases, handrails, and PS doors, as well as replacement of coping and water cut-offs.
Drainage and Wastewater Work Cleaning and renovation of roof drains (insertion of renovation drains), and clearing of gutter blockages. This work is particularly important for preventing water pooling on rooftops and leaks during heavy rain.
Others Replacement of rain gutters, rooftop and exterior wall inspections using drones, leak investigations using thermography, and preliminary surveys of asbestos-containing materials.

Scope of Major Repairs Determined by Building Diagnosis

It is not always necessary to carry out all of the above works. The extent of the work will be determined based on the results of the building diagnosis. At Kakeru Koumuten, we conduct a free on-site survey to confirm the following and compile a deterioration diagnosis report with photos, after which we will propose the scope of work.

Diagnosis Area Main Investigation Method Scope of Work Determined by Diagnosis Results
Exterior Wall (Painted Surface) Visual inspection, checking the width of cracks and the condition of the paint film Method and quantity of crack repairs, specifications for painting (whether to repaint or paint after removing the existing paint film)
Exterior Wall (Tile Surface) Tap testing. High areas checked with a drone Scope and estimated quantity for injection and replacement, whether clear waterproofing is necessary
Sealing Checking for cracks, shrinkage, peeling, and hardening Whether to replace or add to the existing seal, scope of joints to be worked on
Rooftop, Balcony, Common Corridor Checking for blisters or breaks in the waterproof layer, puddles, and the condition of drains Full renovation or partial repair, method (urethane waterproofing, PVC sheet waterproofing, long sheet), whether drain renovation is necessary
Leak Areas Investigation using thermal imaging camera and drone Identification of the cause and priority areas for repair
Metal Parts, Roof, Accessories Checking for rust, corrosion, lifting, and cracks Whether painting is sufficient or if material replacement or overlay method is necessary
Site and Surroundings Checking trees, delivery routes, parking lots, and distance to neighboring properties Planning for scaffolding and scope of temporary construction
Diagnosis results will be categorized into three groups: “Must repair this time,” “Consolidate while scaffolding is up,” and “Can postpone to next time.” Items related to safety or leaks, such as leaks, floating tiles, and breaks in the waterproof layer, are essential work for this time. Exterior walls and sealing that cannot be worked on without scaffolding will be consolidated for this time, while work that is lightly deteriorated and not related to scaffolding will be candidates for postponement to next time. We can also propose multiple plans to fit your budget.

Reasons Kakeru Koumuten is Chosen for Large-Scale Renovations in Sakae Ward, Yokohama

Strengths of Kakeru Koumuten | Exterior Renovation Company with In-House Scaffolding, In-House Construction, and In-House Management

The reason why we can be entrusted with large-scale renovations in Sakae Ward is partly because “Kakeru Koumuten has a base in Yokohama City”, but also because of our “initiatives in large-scale renovation work that cannot be imitated by other companies”, which have been well received by many customers.

We have absolute confidence in “cost,” “quality,” and “plans” for exterior renovations of apartments, condominiums, and commercial facilities in Yokohama City, Sakae Ward, so please compare us with other companies’ estimates. Because we are confident, we welcome competitive estimates.

1. Equipment Specialized for Exterior Renovation

At Kakeru Koumuten, we have prepared the following warehouses and material storage areas to provide low-cost and high-quality exterior wall painting and waterproofing work for large-scale renovations. We have established five bases centered around Yokohama City for material storage and showrooms.

In-house Scaffolding Materials

Kakeru Koumuten's in-house scaffolding materials used for large-scale renovationsWe own the scaffolding materials necessary for temporary scaffolding required for large-scale renovations and can assemble the scaffolding ourselves.
By not outsourcing scaffolding work and using our own scaffolding team, we can cut costs on scaffolding work and provide quick and flexible responses.
We have approximately enough scaffolding materials for 100 single-family homes!

Storage of Materials in Our Large Warehouse

Paint and substrate repair materials stored in Kakeru Koumuten's large warehouseWe store paints and substrate repair materials used for exterior renovations. By ordering a large quantity of materials at once, we can procure materials at a lower cost! Additionally, we always have stock available, allowing us to respond quickly in emergencies!

In-house Waste Separation

Waste separated and recycled at Kakeru Koumuten's in-house yard for large-scale renovationsIn large-scale renovations, various waste materials such as waste paint, metal, and wood are generated. At Kakeru Koumuten, we separate and recycle waste materials in-house, which helps reduce waste disposal costs.

Showroom Dedicated to Exterior Renovation

Kakeru Koumuten's exterior renovation showroom interior Samples of exterior and roofing materials displayed in the showroom
In the showroom, you can not only have meetings but also check actual samples and colors of exterior materials. Color simulations for exterior wall painting and heat insulation tests using a heat insulation testing machine are also available!

2. Cost Reduction through In-House Management and Construction

In-house construction scene of large-scale repairs by Kakeru Koumuten craftsmenOne of Kakeru Koumuten’s major strengths is in-house management and construction.

From inquiry to project completion, everything is managed by Kakeru Koumuten in a consistent system, allowing for high-quality large-scale repairs at reduced costs. Additionally, one representative will handle everything from the estimate to project completion. Since the person in charge does not change, whether it’s sales or construction management, smooth communication is possible.

We can handle everything from temporary scaffolding installation to exterior wall painting, substrate repairs, waterproofing, and tile repairs with complete in-house construction! Those with specialized knowledge and experience will conduct inspections and actual construction for each process!

3. Various Permits and Skilled Workers

Construction industry license and qualifications for sheet metal and painting skilled workersWe have obtained construction industry licenses and permits for industrial waste collection and transportation! We also have nationally certified sheet metal and painting skilled workers, and we are confident in our construction techniques. We can also handle large-scale roofing projects for factories! We have qualified personnel for asbestos work supervisors and building materials containing asbestos inspectors, so we can manage asbestos-containing roofing materials and conduct preliminary investigations.

4. Warranty and Aftercare

Kakeru Koumuten's construction warranty and aftercare maintenance information
Most large-scale repair works come with a warranty for services such as “painting work,” “substrate repair work,” and “waterproofing work”!
Aftercare maintenance is available annually, and we send out notification DM every year.

5. Flexible and Prompt Response

Inspection of apartment rooftop and exterior walls using drones

Our company is equipped to handle various troubles and situations in apartments and condominiums.

We can also address exterior walls and rooftops that cannot be checked from high places using drones! During leak investigations, we can utilize a thermal imaging camera to help identify the cause of leaks!

We will respond according to your wishes. We also accept emergency measures for sudden leaks! We will promptly respond to urgent requests or emergencies!

6. Staff Development

Technical training of Kakeru Koumuten staff using self-made models

Our staff create various models for skill enhancement and conduct practical training. Since different sites require various processing and techniques, we regularly provide skill improvement education to ensure each staff member can respond effectively. We also educate on points to be cautious of and areas to check in each stage of large-scale repair work.

7. Consideration for Residents and Neighbors

Construction schedule and notice board installed at the entrance during large-scale repairs
During large-scale repair work, we will not only notify residents and greet nearby residents, but also install a notice board at the entrance to display the construction schedule and announcements! Additionally, we will thoroughly educate visitors on proper manners to minimize any inconvenience to residents and neighbors.

8. Strict Quality Control

Quality inspection of the painting process using a film thickness inspection machine and check sheets
Each process will be inspected by a responsible person, and detailed construction photos will be taken. We will use film thickness inspection machines and check sheets to ensure that there are no oversights in the inspections. During exterior wall painting and waterproofing work, we will check the quantity of used paint cans to confirm that the specified amount of paint is being used, and by ordering paint in-house, we will prevent construction defects in advance. Of course, we will also take photos of the used paint and report them.

9. Exterior Wall Painting Color Simulation

9-1 Self Color Simulation

Example of color simulation for apartment exterior walls (two-tone color) Self color simulation screen operable by smartphone
The simulations created by our company can be done using actual photos of your apartment or building!You can also perform the simulation on your smartphone or computer. By simulating before making a two-tone color change or image change, we hope to enhance the stylish appearance and contribute to an increase in occupancy rates! Of course, we can also arrange paint samples for actual color confirmation.

* In Sakae Ward, there are areas where building agreements and district plans are established, and the color of the exterior walls may need to harmonize with the surroundings. Having a color simulation screen can make explanations at neighborhood associations and general meetings proceed smoothly.

9-2 Confirm the Actual Color with a Test Paint!

Confirm the actual color and gloss with a test paint on the exterior wallYou can order samples of the paint you are considering and perform test painting on your exterior wall. By conducting a test paint, you can confirm the actual color and gloss!

9-3 Exterior Renovation Simulation

Exterior renovation simulation using metal siding and accent materials

It is also possible to perform the following exterior simulations for apartments and condominiums!
・Exterior wall color simulation (two-tone colors are also possible)
・Simulation for when metal siding is applied
・Simulation using accent materials such as cornices and louvers
・Simulation for roof painting and roof replacement work

With the exterior renovation simulation, you can minimize the risk of failure in your image change! We hope that renovating the appearance of your apartment or condominium will help increase occupancy rates.

Cost Estimates for Major Repairs in Yokohama City Sakae Ward

The cost of major repairs varies significantly depending on the size of the building, the degree of deterioration, the scope of work, and the materials used. First, please refer to the national average based on public statistics, then to our company’s cost estimates based on our construction records, and finally to examples of unit prices for each project.

The national average for condominiums is 750,000 to 1,500,000 yen per unit

According to a survey conducted by the Ministry of Land, Infrastructure, Transport and Tourism, which compiled 818 construction cases (FY 2021), the construction costs for major repairs are concentrated at about 70% in the range of 750,000 to 1,500,000 yen per unit, with the most common price range being 1,000,000 to 1,250,000 yen. Yokohama City also indicates on its official website that the cost is approximately 1,000,000 to 1,300,000 yen per unit. Note that the amounts in this survey do not include consumption tax and common temporary construction costs, so they differ from the current total construction costs including tax.

Construction Cost per Unit Percentage Construction Cost per Unit Percentage
Up to 750,000 JPY 15.1% 1,250,000 to 1,500,000 JPY 17.4%
750,000 to 1,000,000 JPY 24.7% 1,500,000 to 2,000,000 JPY 9.1%
1,000,000 to 1,250,000 JPY 27.0% (most common) Over 2,000,000 JPY 2.8%

Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (200 companies, 818 cases) / Yokohama City “Market Prices for Large-Scale Renovation Costs and How to Address Shortages in Repair Reserves” *Amounts do not include consumption tax or common temporary construction costs. Percentages may not total 100% due to rounding and non-responses.

The fewer the number of units, the higher the cost per unit. Since scaffolding, common temporary construction, and site management costs are fixed costs determined by the size of the building, dividing these by a smaller number of units increases the burden per unit. For a condominium with fewer than 20 units, a quote of “over 1,500,000 JPY per unit” is not necessarily an excessively high estimate. Conversely, the effect of choosing a company that can reduce scaffolding costs is greater for smaller buildings.

Breakdown of Construction Costs (What the Money is Spent On)

Category Composition Ratio Main Contents
Construction-related Work 60.3% About half for exterior walls, about one-third for waterproofing. Substrate repairs, tiles, painting, waterproofing
Temporary Work 22.8% Scaffolding, mesh sheets, protection, etc. (does not include common temporary construction costs)
Miscellaneous Expenses 10.3% Site management costs, general management costs, statutory welfare costs, etc. (9.5%), insurance premiums for large-scale renovation defect insurance (0.8%)

Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (Second aggregation of large-scale renovation work. Overall average is construction-related 59.0%, temporary work 22.3%, miscellaneous expenses 9.9%). *The total does not equal 100% because equipment-related work, exterior works, and others are included. This is an average value and not a criterion for judging the appropriateness of individual estimates.

Approximately one-fifth of the construction cost is for temporary work (scaffolding). Kakeru Koumuten Co., Ltd. owns its own scaffolding materials and has its own scaffolding team, so it becomes easier to keep the costs of this temporary work down. While not all temporary costs can be eliminated, site conditions vary by building, so it is important to plan the scaffolding after inspecting the site to prevent additional costs after construction begins.

Cost Estimates by Building Scale (Scaffolding, Substrate Repair, Exterior Painting, Waterproofing, Sealing)

Type and Scale of Building Cost Estimate Estimated Construction Period
Wooden Apartment (2 stories, 6-10 units) 2,000,000 – 4,000,000 JPY 3 – 5 weeks
Steel Frame/RC Apartment (3 stories, 10-20 units) 4,000,000 – 9,000,000 JPY 1 – 2 months
Mixed-Use Building/Small Apartment (4-5 stories) 5,000,000 – 15,000,000 JPY 1.5 – 3 months
Medium-Sized Apartment (30-50 units) 20,000,000 – 50,000,000 JPY 3 – 5 months
Large Apartment (Over 100 units) Around 100,000,000 JPY – 6 months –

*The above estimates are based on Kakeru Koumuten’s construction records and may vary depending on the presence of roofing work, metal work, plumbing, etc. For apartments, please also consider the amount calculated by multiplying the national statistics (750,000 – 1,500,000 JPY per unit) by the number of units.

Breakdown of Costs for Temporary Structures, Substrate Repair, Exterior Walls, and Waterproofing

The estimate for large-scale repairs is broadly divided into “Temporary Structures,” “Substrate Repair,” “Sealing,” “Exterior Painting,” “Waterproofing,” and “Miscellaneous Expenses.” Before comparing total amounts, please check what each item includes, how much, and at what cost.

Item What to Check in the Estimate
Building Prerequisites Structure (Wooden, Steel Frame, RC), number of stories, number of units, exterior wall area, waterproofing area. Also confirm whether the area is based on drawings or actual measurements.
Common Temporary Structures/Scaffolding Area and unit price of scaffolding, contents such as mesh sheets, protection, temporary toilets, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, temporary works such as scaffolding account for about 20% of construction costs (excluding common temporary costs).
Substrate Repair Quantities and unit prices for each repair method, such as cracks, lifting, and spalling. Since these items are not confirmed until scaffolding is set up, please check whether the quantities are estimated or settled based on actual numbers, and the settlement method if quantities increase or decrease.
Sealing Whether it is a replacement or an additional application, the length to be applied (m), and the name of the materials.
Exterior Painting Painting area (㎡), name and product name of the paint manufacturer, grade, number of coats, and scope of ancillary parts.
Waterproofing Area for each part such as rooftops, balconies, and common corridors, construction method, name of materials, and whether drain renovations are included.
Inspection and Reporting Whether inspections for each process, construction photos, completion reports, and warranty documents are included.
Miscellaneous Expenses Contents and proportions of site management fees, general management fees, statutory welfare expenses, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, these average about 10% of construction costs, but vary depending on the scale and conditions of the building, so there is no uniform standard.
Tax Classification Whether the amounts are tax-inclusive or tax-exclusive. Since companies may display this differently, be sure to standardize before comparing total amounts.
At Kakeru Koumuten Co., Ltd., we provide estimates that clearly specify quantities, methods, and materials for each construction item. For reference on unit prices for each type of repair work, please see the following “Unit Price Examples for Repair Work.”

Unit Price Examples for Repair Work

Repair Method Materials Used Cost
Tile Replacement Existing Similar Tiles per piece / 2,000 JPY〜4,000 JPY
Repair of Floating Tile and Mortar Areas Epoxy Resin Injection per square meter / 3,000 JPY〜5,000 JPY
(Varies depending on the degree)
Tile Joint Mortar Repair Mortar for Tile Joints per square meter / 1,000 JPY〜2,000 JPY
(Varies depending on the degree)
Concrete Spalling Repair Rust Inhibitor + Resin Mortar per location / 1,000 JPY〜2,000 JPY
(Varies depending on the degree)
Crack Repair Filler or Polymer Cement per meter / 100 JPY〜2,500 JPY
(Varies depending on the degree)
Exterior Wall Painting (3 Coats) Radical Control Silicone Paint per square meter / 2,500 JPY〜3,500 JPY
Roof Top Urethane Waterproofing (Ventilated Buffer Method) High Strength Urethane per square meter / 6,500 JPY〜9,500 JPY
Sealing Replacement Modified Silicone per meter / 900 JPY〜1,500 JPY
Temporary Scaffolding In-house Owned Scaffolding Materials (Wedge Type) per square meter / 700 JPY〜1,000 JPY

*Costs and warranty periods vary depending on shape, quantity, substrate condition, and type of materials. If you would like a detailed estimate, please feel free to contact us. Estimates are completely free.

Select Paint and Waterproofing Grades Based on “Years Until Next Repair”

“Good paint does not equal the right choice.” The best way to choose is to align when to perform the next major repair with the lifespan of the materials, minimizing waste.

Grade Estimated Lifespan Suitable Cases
Silicone / Radical Control Type 10-16 years Buildings that are cycled every 12-15 years. A good balance between cost and performance. Since the lifespan varies by product, choose a product specification that matches the cycle.
Fluorine 16-20 years Buildings where the next repair is planned for 15 years or later, high-rise or complex-shaped buildings where scaffolding costs are high.
Inorganic 18-22 years Buildings that want to suppress dirt adhesion. Consider this option for locations such as along busy roads where dirt easily accumulates and durability is desired.
Urethane Waterproofing (Rooftop) 8-15 years Complex-shaped rooftops, or when wanting to renovate while utilizing the existing waterproof layer. Mid-term inspections and repairs, such as re-coating the top coat, are prerequisites.
PVC Sheet Waterproofing 20-25 years Rooftops with a large area and simple shape. Short construction time.
Asphalt Waterproofing 15-20 years Rooftops planned for long cycles. The cost per instance will increase.

* The estimated lifespan is a general guideline and may vary depending on sunlight, location, and substrate condition. Since deterioration progresses differently for each side of a property with many slopes or varying sunlight and wind exposure, it is advisable to confirm the condition of each side through a site survey and select paint suitable for the location to improve durability.

Guidelines for Repair Reserve Funds and Options When Insufficient

According to the Ministry of Land, Infrastructure, Transport and Tourism guidelines, the guideline for repair reserve funds is indicated as a monthly amount per exclusive area. Additional charges are required if there is a mechanical parking lot.

Building Size (Less than 20 Stories) Monthly Guideline (Average) Range Covering Two-Thirds of Cases Conversion for 70㎡
Less than 5,000㎡ Total Floor Area 335 JPY/㎡ 235-430 JPY/㎡ Approximately 16,500-30,100 JPY
5,000-10,000㎡ 252 JPY/㎡ 170-320 JPY/㎡ Approximately 11,900-22,400 JPY
10,000-20,000㎡ 271 JPY/㎡ 200-330 JPY/㎡ Approximately 14,000-23,100 JPY
More than 20,000㎡ 255 JPY/㎡ 190-325 JPY/㎡ Approximately 13,300-22,750 JPY

Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Repair Reserve Funds for Condominiums” (Reiwa 6, June revision, PDF) / National average is 13,378 JPY per unit per month (Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums)

In the Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums, 36.6% of management associations reported that “repair reserve funds are insufficient compared to the plan.” There are four main options when funds are insufficient.

Options Considerations and Cautions
① Adjusting the Construction Schedule Based on the deterioration diagnosis, postpone less urgent work to the next time. However, it is essential to distinguish between work that can be postponed and work that cannot, as delaying waterproofing and tile detachment measures will ultimately be more costly.
② Reviewing the Scope and Specifications of Work Consider changes such as revising paint grades or switching from full renovations to partial renovations. Please differentiate this from “apparent cost reductions” that skip processes.
③ Utilizing Subsidies and Tax Systems Subsidies for energy-saving renovations, etc. (to be discussed later). The reduction of fixed asset taxes is a system that lowers the tax amount for each unit owner, and does not directly increase the repair funds of the management association.
④ Increasing Reserve Funds, Loans, and One-Time Payments In addition to considering an increase in repair reserve funds at the general meeting, the Housing Finance Agency’s condominium common area renovation loans require no collateral. Interest rates can be lowered by obtaining management plan certification.
If you have estimates from other companies, please present them through the inquiry form | Kakeru Koumuten

Subsidies, Tax Systems, and Loans to Check for Large-Scale Renovations in Sakae Ward, Yokohama

Both Yokohama City and Kanagawa Prefecture do not have subsidies specifically for large-scale renovation work. The available options can be broadly categorized into the following four types. The eligibility and application status of these systems may change during the fiscal year, so please be sure to confirm with our company or the respective offices before contracting or starting work. (As of October 8, 2026)

Type Details
① Assistance for Investigation and Planning Costs for deterioration diagnosis and creation of long-term repair plans. Can be used in the preliminary stage before large-scale repairs.
② Construction Assistance by Purpose Energy conservation (windows, insulation), earthquake resistance, barrier-free, asbestos, EV charging, etc. Incorporated into large-scale repairs.
③ Tax Incentives Reduction of property tax under the condominium longevity promotion tax system.
④ Public Financing Renovation financing for common areas of condominiums from the Japan Housing Finance Agency.
Common Pitfall: The application timing and applicants differ by system, and applications will close as soon as the budget is reached, even mid-year. Many subsidies from Yokohama City require applications before contracts and commencement, Kanagawa Prefecture’s subsidies require construction to start after grant decisions, and national energy conservation subsidies require registered contractors to apply after project completion. Property tax reductions require declarations after project completion. Please check the eligibility conditions and application procedures for each system before contracts and commencement, and plan accordingly with the general meeting resolution schedule. If you miss this, you may lose access to systems that should have been available.

① Condominium Longevity Promotion Tax System (Property Tax Reduction)

If large-scale repairs (including exterior painting, floor waterproofing, and roof waterproofing) that contribute to the longevity of condominiums meeting certain requirements are carried out, the property tax amount for the following year will be reduced by half (up to the equivalent of 100㎡ per unit; urban planning tax is not included).

Main Requirements Built over 20 years ago, with a total of 10 or more units / previously completed exterior painting, floor waterproofing, and roof waterproofing at least once each / must meet one of the following: ① A management plan certified condominium that raised the amount of repair reserve funds (average amount during the planning period) from below to above the certification standard after September 1, 2021 ② A management association that received advice and guidance from the city, resulting in compliance of the long-term repair plan with the standards (advice and guidance are not available upon request).
Construction Implementation Deadline From April 1, 2023, to March 31, 2027, completion of construction.
Declaration Declare within three months after project completion at the ward office of the building’s location (Sakae Ward Office, Tax Division, Building Section). A large-scale repair construction certificate issued by an architect, etc., is required.
Points to Note The reduction is limited to once for the same condominium. Simply obtaining management plan certification does not qualify; requirements such as raising the repair reserve funds apply. A review of the long-term repair plan is also necessary, so it is recommended to prepare at least one year before the construction.
The application deadline is for construction completed by March 31, 2027. Obtaining management plan certification takes 2-3 months from application to certification, and a review of the long-term repair plan and general meeting resolution is also necessary as a prerequisite. Since construction must be completed by March 31, 2027, starting in the fiscal year 2026 may not guarantee completion in time. Please confirm early whether you are eligible and the schedule.

* The national leaflet shows the range of reduction rates as a nationwide system. The reduction rate for Yokohama City is 50%.

② Support for Apartment Management in Yokohama City (Management Associations Start Here)

The support system in Yokohama City is mostly based on registration in the “Yokohama City Apartment Registration System” (free). Management associations that are not yet registered should start here.

System Details
Condominium Registration System Free. This registration is a prerequisite for utilizing various support systems and advisor dispatch.
Condominium Advisor Dispatch Dispatch of condominium management professionals and architects. First time free (if there has been no usage before the fiscal year 2025), 12,650 yen (tax included) from the second time onwards, up to 6 times in principle. Consultations on large-scale repairs, long-term repair plans, and energy-saving renovations are available.
Long-Term Repair Plan Creation Promotion Model Project Targeting management associations that have not created a long-term repair plan or have not reviewed it for over 15 years. Half of the cost for deterioration investigation diagnosis and commissioning of long-term repair plan creation, up to 200,000 yen. *Contracts and commencement with the contractor cannot be made before the grant decision. Please confirm with the city’s Building Bureau Housing Regeneration Division before applying due to budget limits.
Same (Energy-Saving Menu) For creating long-term repair plans that include insulation, window renovations, and high-efficiency equipment, half of the cost, up to 200,000 yen. Obtaining management plan certification (or a general meeting resolution for application) is a requirement.
Condominium Barrier-Free Support Project For eliminating steps in common areas and grounds, installing slopes, handrails on both sides, and renovations to non-slip flooring, one-third of the construction cost (excluding tax), up to 300,000 yen. *Handrails on only one side are not eligible / Application before the construction contract is mandatory.
Condominium Earthquake Diagnosis and Earthquake Renovation Targeting condominiums that received building confirmation before the end of May 1981. Two-thirds of the diagnosis cost, one-third of the renovation construction cost (with limits ranging from 20 million to 50 million yen depending on the scale). *Pre-consultation is required before obtaining estimates.
Sprayed Asbestos Countermeasure Project Only for common areas of condominiums; management association application. Containment investigation is free, two-thirds of the removal and other construction costs (up to 3 million yen). *Please check with the Building Disaster Prevention Division for the implementation status in fiscal year 2026.
Subsidy for Installing EV Charging Equipment for Multi-Family Housing Targeting management associations, etc. Half of the remaining amount after deducting national and prefectural subsidies, ordinary charging equipment is 100,000 yen per unit (up to 5 units per multi-family housing). Fiscal year 2026 is from June 26, 2026, to February 12, 2027 (ends as soon as the budget limit is reached).

Source: Yokohama City “Support and Subsidy System List by Concerns for Condominium Management Associations” / Long-term Repair Plan Creation Promotion Model Project / Condominium Advisor Dispatch / Yokohama Condominium Portal

③ Management Plan Certification System (Tax and Interest Rate Benefits)

This is a system certified by Yokohama City. Upon certification, the loan interest rate from the Japan Housing Finance Agency is reduced by 0.2% per year, preferential interest rates for Flat 35, and it meets one of the requirements for the Long Lifespan Promotion Tax System (certification alone does not guarantee tax reduction). The main criteria include holding general meetings at least once a year, maintaining management regulations, separate accounting for management fees and repair reserve funds, overdue amounts within 10% of the total, and “having a long-term repair plan that includes large-scale repair work twice or more over a period of 30 years or more, created or reviewed within 7 years”, among others.

*The fees are a system usage fee of 10,000 yen + the city’s application fee of 3,900 yen, among others. It takes 2 to 3 months from application to certification. The validity period of the certification is 5 years.

④ National Energy Conservation Support | Housing Energy Conservation 2026 Campaign

Changes for FY 2026The “Child-Rearing Green Housing Support Project” for FY 2025 has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Additionally, the “Long-term Excellent Housing Renovation Promotion Project” will end in FY 2027 and will not be implemented in FY 2028. Please be careful not to establish financial plans based on outdated information.

Mirai Eco Housing 2026 Project

Target Renovations of existing homes built before December 31, 2016, regardless of whether they are single-family or multi-family residences. Management associations and management corporations can also become joint contractors (i.e., can be used for common area renovations). Rental housing is also eligible.
Required Work Insulation renovations for openings, insulation renovations for the structure (floor, walls, ceiling), and installation of eco-friendly housing equipment are mandatory combinations.
Subsidy Limit Depending on the age of the building and the energy-saving performance achieved, 400,000 to 1,000,000 yen per unit (1,000,000 yen for homes built before 1991 that reach the mandatory standards).
Period Subsidy applications are generally submitted by registered contractors (construction contractors) after the completion of the work (the client cannot apply themselves). Applications (including reservations) will end once the budget limit is reached. The status of budget execution is published on the official website, so please check the latest application status before contracting.

Advanced Window Renovation 2026 Project

Target Renovations to existing homes (single-family and multi-family) including the installation of interior windows, replacement of exterior windows, and glass replacement to high-insulation windows. Subsidy rates are set separately for “low-rise” and “mid-to-high-rise” multi-family residences.
Bulk Application for Multi-Family Residences From May 29, 2026, applications for “bulk subsidy applications for multi-family residences (including reservations)” have begun. The application process is conducted by registered contractors (window renovation contractors), and management associations cannot apply themselves, but they can apply for all units collectively, making it a system that works well with large-scale repairs for window and entrance door renovations.
Subsidy Limit For residential properties, 1,000,000 yen per unit (changed from 2,000,000 yen in fiscal year 2025). For non-residential properties over 240㎡, 10,000,000 yen per building.
Period Work that commenced after November 28, 2025. Applications for subsidies will be made after the completion and handover of the work, and will end once the budget limit is reached. The status of budget execution is updated daily on the official website, so please check the latest application status before contracting.

⑤ Kanagawa Prefecture Subsidies (Applications for Fiscal Year 2026 have ended)

Existing Housing Energy Efficiency Renovation Subsidy Houses (including exclusive parts of condominiums) that the applicant resides in and owns or has a share in within the prefecture are eligible. Renovation of windows (including entrance doors) that are exposed to the outside air is mandatory. The subsidy covers one-third of the eligible expenses, or a maximum of 150,000 yen, whichever is lower. For the fiscal year 2026, the application amount reached the budget limit, and applications closed on September 30. Construction that started before the notification of the grant decision is not eligible, and applications by contractors on behalf of the applicant are not permitted.
Subsidy for Residential Solar Power Generation and Storage Battery Installation Management associations of condominium complexes in the prefecture are also eligible. Solar power is 70,000 yen/kW, and storage systems are 150,000 yen/unit. The application deadline for the second phase of fiscal year 2026 was September 30, and applications are now closed. If construction started before the grant decision date, it is not eligible. This is a system to check if you are considering installing solar power along with rooftop waterproofing.

* The Existing Housing Energy Efficiency Renovation Subsidy does not cover common areas of rental apartments or units where the owner does not reside.

⑥ Financing System (Housing Finance Agency Condominium Sumairu Loan)

If the management association borrows funds for large-scale repairs, it can utilize the Housing Finance Agency’s “Condominium Common Area Renovation Loan (Condominium Sumairu Loan).”

Eligible Construction Large-scale repairs, seismic retrofitting, flood prevention measures, energy-saving measures, balcony repairs, safety measures for elevators and parking lots, asbestos measures, and costs for diagnosis and investigation design by experts.
Collateral No collateral required (guaranteed by the condominium management center, etc.)
Repayment Period Generally 1 to 10 years; for specific construction, 1 to 20 years; if seismic, flood, and energy-saving construction is conducted after obtaining management plan certification, up to 35 years.
Interest Rate Reduction ① Holding of Sumairu Bonds ② Obtaining management plan certification ③ Implementation of seismic, flood, and energy-saving construction, each reducing the rate by 0.2% per year (up to 0.6% per year maximum).
Main Requirements Improvement of management regulations, resolution at the general meeting, the delinquency rate of repair reserve funds must be within 10%. Applications are accepted year-round.

Source: Housing Finance Agency “Condominium Sumairu Loan” (Official)

Cases Where Fire Insurance Can Be Used and Cases Where It Should Not Be Used

Damage caused by typhoons, strong winds, flying debris from rooftop waterproof sheets, caps, fences, hail damage, lightning strikes, and other “accidental incidents” may be covered by fire insurance. It is important to separate and record damage from accidents and normal wear and tear during the deterioration diagnosis.

On the other hand, normal wear and tear itself is not covered. There have been numerous troubles across the country caused by contractors who solicit, saying, “You can repair it without any out-of-pocket expenses with insurance,” and the National Consumer Affairs Center has repeatedly issued warnings. False claims can lead to insurance fraud charges. Please confirm the eligibility of claims directly with your management association or property owner with the insurance company or agency. Kakeru Koumuten Co., Ltd. does not provide such guidance.

Building Conditions and Repair Points in Sakae Ward, Yokohama City

Sakae Ward, Yokohama City, was established on November 3, 1986, through the reorganization of administrative districts, separating from Totsuka Ward. According to ward documents, it is characterized by the Itachigawa River flowing east-west through the center of the ward, and the Kashio River flowing north-south on the west side, forming lowlands surrounded by hilly areas connected to the Miura Peninsula. From the 1960s to the early 1970s, large-scale residential development centered around the hilly areas took place, leading to a rapid population increase and transformation into a residential city. It is also characterized by a small area of residential land and a large area of forest. Depending on the location, the way buildings deteriorate and the method of scaffolding also change.

120,145 peoplePopulation of Sakae Ward
(As of September 30, Reiwa 7)
58,427 householdsNumber of households in Sakae Ward
(As of September 30, Reiwa 7)
30.8%Percentage of elderly population (65 years and older)
(As of September 30, Reiwa 7)
38.8%Green coverage rate (Survey of Reiwa 1)
2nd among 18 wards in the city; city average is 27.8%
10 casesNumber of building agreements
(List of Yokohama City, updated July 3, Reiwa 8)

Source: Yokohama City Sakae Ward “SAKAE Quick Reference Note (Sakae Ward Statistical Overview)” (Population, Households, Elderly Population)/Same (Location, Topography, Green Coverage Rate)/Yokohama City “Data on Greenery” (FY 2019)/Yokohama City “Building Agreement (Sakae Ward)”/Yokohama City Sakae Ward “History of Sakae Ward”

Buildings in Sakae Ward are divided into “four types”

Sakae Ward has different urban developments depending on the location, so not only the age of the building but also the location of the building (lowland urban area, hilly residential area, redeveloped area in front of the station, slopes near greenery) will affect the nature of the major repairs required in the next large-scale renovation. Please check which type your building falls under.

Type District Formation (from public documents) Estimated Age Heavy Repairs in the Next Renovation
Lowland along Itachigawa and Kashio River
Urban area spreading in lowland
According to district documents, Itachigawa and Kashio River flow and form the lowland. The urban area spreads around the station along the riverside lowland. Varies depending on the year of construction Depending on the age, full renovation of rooftop waterproofing, updating of water supply and drainage pipes, painting or replacement of iron parts will be points of discussion. For buildings including stores and offices, waterproofing of exterior walls and rooftops is also important.
Large-scale residential area in hilly terrain
Developed in the early Showa 40s to 50s
From the early Showa 40s to 50s, large-scale residential development centered on hilly areas was carried out, leading to a rapid increase in population. There are sites with slopes and steps. Older buildings may exceed 40 years of age In the 3rd and 4th renovations, updating of water supply and drainage pipes, replacement of steel stairs and handrails, seismic diagnosis for old seismic standards (before May 1981) will be points of discussion. Drainage around retaining walls will also be checked.
Redevelopment area in front of the station
Around Ofuna Station North Exit and Hongodai Station
The Ofuna Station North Second District is a district plan to develop commercial and business facilities and urban-type housing through urban redevelopment projects in front of the station. The area around Hongodai Station is a district plan to ensure continuity from the station square to Itachigawa. Varies depending on the year of construction In mixed-use buildings and stores/offices, exterior wall tiles, waterproofing, and rooftop equipment will be points of discussion. For buildings in front of the station, the placement of scaffolding and planning of pedestrian traffic flow is also important.
Buildings near green slopes and forest edges
District with a large area of forest
According to district documents, the area has less residential land compared to the city as a whole and more forest area, with a green coverage rate of 38.8% (FY Reiwa 1), ranking second in the city. Varies depending on the year of construction For buildings close to trees, clogging of gutters and drains with fallen leaves, moss and algae on shaded sides, and moisture around exterior walls will be the focus of inspections. Surface preparation for painting and anti-mold and anti-algae specifications will also be points of discussion.

Source: Yokohama City Sakae Ward “History of Sakae Ward” / Same “Sakae Ward Statistical Overview (Location and Topography)” / Yokohama City “Oofuna Station North Second District” District Plan・“Hongodai Station Surrounding Area” District Plan

This type classification reflects the “overall trends of the ward” and does not determine the condition of individual buildings. The age of the buildings is a reference based on the descriptions in the ward’s materials, and even within the same area, the degree of deterioration can vary significantly due to specifications and past repair histories. Individual confirmations will be made through on-site surveys. Furthermore, the annual survey conducted by Yokohama City on condominium management associations targets condominiums built in “1984” for the fiscal year 2024 and “1985-1995” for the fiscal year 2025. Management associations residing in buildings constructed during this period in Sakae Ward are increasingly reviewing their long-term repair plans prompted by the city’s survey.

Four Factors Unique to Sakae Ward That Damage Buildings

We have organized four characteristics visible from Yokohama City’s public materials that are linked to large-scale repairs.

① Terrain with Lowlands and Hills

According to the ward’s materials, the central Itachigawa River and the western Kashio River form lowlands, surrounded by hilly areas. On the hilly side, there are sites with slopes, height differences, and retaining walls, which may require ingenuity in setting up scaffolding, transporting materials, and truck routes. Even within the same ward, the necessary surveys and scaffolding plans differ by location. In the comprehensive condominium survey for fiscal year 2023, 36.6% of management associations reported that their repair reserve funds were insufficient compared to their plans.

② Water Escape Routes During Heavy Rain and Around Slopes and Retaining Walls

Yokohama City has published flood hazard maps (flood, internal water, storm surge) and landslide hazard maps for Sakae Ward (updated March 1, 2024). The buildings affected vary depending on your residence’s location. During heavy rain, we recommend checking roof drains, drainage pipes, water escape routes around the first floor, and drainage around retaining walls. Clogs in drains and damage to waterproof layers are common causes of leaks.

③ A Green District with Preparedness for Trees, Moisture, and Moss

The green coverage rate in Sakae Ward is 38.8% (as of the fiscal year 2019), ranking second in the city and exceeding the city average of 27.8%. When trees are close to buildings, it is common for fallen leaves to clog gutters and drains, and for moss and algae to appear on shaded surfaces. It is efficient to conduct inspections of exterior walls and rain gutters alongside other exterior work. The elderly population ratio is 30.8% (as of September 30, 2025), so it is necessary to carefully address concerns about the burden of being home during construction, laundry, noise, and the movement of scaffolding.

④ City Rules of Building Agreements and District Plans

In Sakae Ward, there are a total of 10 architectural agreements (Iijima “Hikarigaoka” area, Ofuna Midorigaoka Neopolis Kobe area, Hongodai Chuo residential area, Kamigou Neopolis, Shodoto 1-chome and 4-chome areas, Shodoto First area, Nomura Totsuka Hongodai residential area, Matsugaoka residential area, Kajigaya residential area, Shihirei Ue area). Additionally, there are district plans established in 11 areas including Sakae Nagao-dai area, Ofuna Station North First area, Ofuna Station North Second area, Sakae Shonan Katsuradai area, Sakae Kosugegaya area, Sakae Kasama area, Sakae Katsuradai area, Sakae Hongodai area, Sakae Koyamadai area, Hongodai Station surrounding area, and Sakae Kamigou Town area (updated on September 24, Reiwa 8). Among these, the Sakae Hongodai area states that “the colors of the roof and exterior walls should harmonize with the surrounding landscape,” while the Ofuna Station North Second area and the Hongodai Station surrounding area have regulations regarding design and color. Before deciding on colors, it is essential to check what is affecting your property, as this is the first step in forming consensus with neighbors and management associations. Sharing a completed image through color simulation can facilitate discussions.

Source: Yokohama City “Flood Hazard Map” / Yokohama City “Landslide Hazard Map” / Yokohama City “Data on Greenery” / Yokohama City “Architectural Agreements (Sakae Ward)”・“District Plans”・“Sakae Hongodai Area”/Ministry of Land, Infrastructure, Transport and Tourism “Reiwa 5 Fiscal Year Comprehensive Survey on Condominiums” (PDF)

Key Points to Consider When Proceeding with Construction in Sakae Ward

Issues Current Situation in Sakae Ward and Kakeru Koumuten’s Response
Sites with Slopes, Elevation Differences, and Retaining Walls In residential areas spread across hilly terrain, the elevation differences, retaining walls, and the width of the front roads vary significantly from building to building. Our own scaffolding team will assess the site, plan the delivery route and scaffolding layout, and also check the drainage around the retaining walls and any deterioration.
Water Escape Routes in Lowlands and Valleys For buildings near lowlands along rivers or close to valleys, drainage during heavy rain becomes a key issue. We will inspect the rooftop drains, drainage pipes, and water gradients around parking areas, and after confirming there are no damages or blockages in the waterproofing layer, we will propose specifications.
Trees, Moss, and Fallen Leaves In green areas, fallen leaves can clog gutters and drains, and moss and algae can easily grow in shaded areas. We will propose specifications based on thorough cleaning of gutters and drains, as well as washing and substrate treatment of the exterior walls.
Complex Buildings in Front of Stations For buildings facing squares or pedestrian spaces, such as around Ofuna Station North Exit or Hongodai Station, it is crucial to adjust the scaffolding installation position, pedestrian flow, and delivery time. We will confirm the scaffolding plan on-site before making our proposal.
Parking Lots During Construction The parking spaces on the side where scaffolding will be erected need to be temporarily cleared. For buildings with limited parking, securing temporary relocation spots for vehicles may take time. We will coordinate with you about the availability of nearby coin parking and monthly parking starting 2 to 3 months before construction begins.
Community Rules and Colors The district plans for the Hongodai area, Ofuna Station North Second area, and around Hongodai Station have regulations regarding form, design, and color. We will check the existence and content of building agreements and district plans before deciding on colors, and share the completed image with the management association and neighbors through color simulations.
Consideration for Neighbors In locations adjacent to single-family homes, stores, offices, or other management association buildings, the splatter from high-pressure washing and the smell of paint can directly reach neighbors. Prior explanations are essential. We ensure thorough greetings, posting of schedules, and adherence to working hours.
*When considering the color of the exterior walls, we recommend checking in advance whether your property is subject to district plans or building agreements. The Sakae Ward Office, Promotion Division (phone 045-894-8335) also provides information regarding community development. We will also investigate this during our survey.

*Kakeru Koumuten has five bases in Yokohama City and serves the entire Sakae Ward, including Hongodai, Ofuna, Katsuradai, Kosugegaya, Kamigou, Kasama, and Nagao-dai.

Signs of Deterioration Requiring Major Repairs and Timing

Generally, major repairs are estimated to occur on a 12 to 15-year cycle. According to the Ministry of Land, Infrastructure, Transport and Tourism’s actual survey, the actual repair cycle is most commonly 13 years, with about 70% falling within the 12 to 15-year range, and the cycle tends to shorten with repeated occurrences. However, the actual judgment should be based on the condition of deterioration rather than just the number of years, so if you observe symptoms like those listed below, we recommend an early on-site survey.

Part Dangerous Signs of Deterioration if Left Unattended Main Measures
Exterior Wall (Painted Surface) Chalking (white powder on hands), fading, cracks wider than 0.3mm, blistering or peeling of paint Substrate repair + exterior wall painting
Exterior Wall (Tile Surface) Tile lifting or falling off, chipping of joints, efflorescence, hollow sound when tapped Injection for lifting, replacement, clear waterproofing
Sealing Cracks in joints, shrinkage, peeling, hardening Re-sealing
Roof and Balcony Bloating or breaking of waterproof layer, puddles, clogged drains, rain leaks to lower floors Urethane waterproofing, sheet waterproofing, drain renovation
Metal Parts and Steel Stairs Rust, peeling paint, corrosion of treads Grinding + rust prevention + painting, component replacement
Roof Lifting of ridge cap, cracking or warping of slate, moss, shifting of tiles Roof painting, roof overlay (cover method), re-roofing
Concrete Spalling (exposed rebar with rust stains), water leakage from cracks Spalling repair + resin mortar filling
Common Corridor and Stair Floor Lifting, peeling, or opening at the edges of long sheets, exposure of substrate Replacement of long sheets + substrate waterproofing

Estimated Repair Cycles by Part (Ministry of Land, Infrastructure, Transport and Tourism Guidelines)

Part/Work Estimated Cycle Part/Work Estimated Cycle
Exterior Wall Painting (Repainting) 12-15 years Re-sealing 12-15 years
Exterior Wall Painting (Existing Removal + Painting) 24-30 years Metal Part Painting 5-7 years
Roof Waterproofing (Repair) 12-15 years Water Supply Pipe (Rehabilitation/Replacement) 19-23 years / 30-40 years
Roof Waterproofing (Removal + New Installation) 24-30 years Drain Pipe (Rehabilitation/Replacement) 19-23 years / 30-40 years

*The above are reference examples from the guidelines and are not uniform construction deadlines. Actual cycles will be set according to the specifications, location conditions, and deterioration status of the building.

Source: Ministry of Land, Infrastructure, Transport and Tourism “Long-term Repair Plan Creation Guidelines” (Revised June 2024, PDF) / Ministry of Land, Infrastructure, Transport and Tourism “Fiscal Year 2021 Survey on Large-Scale Repair Work for Condominiums”

Depending on the building, a statutory exterior wall inspection may be required. For buildings subject to the periodic reporting under Article 12 of the Building Standards Act, an inspection through comprehensive tapping, etc. (including infrared inspections that meet the requirements) is required for parts of the exterior walls made of tiles, stone, mortar, etc., that may pose a risk of falling and harming pedestrians, under certain conditions such as when more than 10 years have passed since completion or exterior wall renovation. However, in Yokohama City, buildings used solely for apartment purposes (excluding serviced senior housing) are not designated as subject to periodic reporting. Mixed-use buildings that include applicable uses such as stores require individual confirmation. Even if not subject to statutory inspection, regular inspections and maintenance to prevent the falling of exterior walls are essential. (Periodic reporting for elevators, etc., is a separate system. Please consult us if you are unsure.)

Examples of Large-Scale Renovation Work

This is an example of exterior renovation work on a mixed-use building undertaken by Kakeru Koumuten. The building had leaks occurring from several locations, and we renovated it by combining clear waterproofing for the tile exterior walls and waterproofing for the roof.

Exterior Renovation Work on a Mixed-Use Building (Tile Exterior Waterproofing + Roof Waterproofing)

BEFORE

Exterior wall of the mixed-use building before large-scale renovation | Stains on tiles and overgrowth of ivy

AFTER

Exterior wall of the mixed-use building after large-scale renovation | Renovation with tile replacement and clear waterproofing

Construction Details Partial replacement of damaged tiles / Painting of auxiliary parts (pipes, water cut-off) / Rooftop waterproofing work (urethane waterproofing) / Exterior wall tile waterproofing (Seven S) / Sealing work around windows / Repair of exterior wall tile mortar joints / Removal of ivy
New Materials Used Exterior wall tiles: Kunishiro Tiles / Painting of auxiliary parts: Radical silicone paint / Rooftop waterproofing: High-strength urethane (Sarasene A) / Exterior wall tile waterproofing: Seven S
Price Range 4,000,000 – 4,100,000 JPY
Construction Period 45 days
Location Not disclosed
Background to the Construction Due to rain leaks occurring from several areas such as the exterior walls and rooftop, we proposed waterproofing for the entire exterior wall. Seven S is a clear waterproofing material for tile exteriors, and while the cost is somewhat high, it is highly waterproof, making it recommended for cases where rain leaks are occurring from several points on the exterior wall.

Customer Feedback

Flow from On-site Investigation to Completion of Construction

From inquiry to completion of construction and aftercare, one representative will consistently handle your case. In the case of management associations, a resolution at the general meeting is necessary, so starting the process 1 to 1.5 years before the desired start date allows for a smoother progression.

  1. Contact Us (Free) Please reach out via phone, form, or LINE. If you have estimates from other companies, it’s fine to just present those.
  2. On-Site Survey & Building Diagnosis (Free) We will conduct an exterior wall inspection, check for cracks, sealing, and waterproof layers, and if necessary, use drones or thermal imaging to investigate the roof, high places, and leak areas. For properties in Sakae Ward, we will also check the slope and elevation differences of the site, retaining walls, drainage, tree conditions, access routes, parking, and distances to neighboring properties.
  3. Survey Report & Estimate Submission We will provide a deterioration diagnosis report with photos and an estimate detailing quantities, methods, and materials for each work item. Multiple plans can also be proposed.
  4. Plan Decision & Contract Confirm colors through color simulations, paint samples, and trial painting. For management associations, we can assist in preparing materials for general meetings. In areas subject to district planning or building agreements, we will also explain the considerations for color choices.
  5. Notification to Residents & Neighbors We will distribute construction notifications, visit neighbors for greetings, and set up a bulletin board at the entrance (with a schedule and laundry information). If temporary relocation of parking is necessary, adjustments will be made at this stage.
  6. Temporary Scaffold Installation & Various Works Our in-house scaffold team will set up the scaffolding, followed by high-pressure washing, substrate repairs, sealing, exterior wall painting, tile repairs, waterproofing, and work on metal parts and accessories in that order. A supervisor will inspect each process and take construction photos.
  7. Completion Inspection, Scaffold Dismantling & Handover We will confirm the finished work in the presence of the customer and provide construction photos, a report on the paints used, and a warranty certificate.
  8. Aftercare Maintenance We will send out annual DM notifications, and inspections can be conducted every year. Simple repairs such as partial sealing are provided free of charge.

Resident Communication, Additional Work Approval, Inspection Reports

Equally important as the construction itself is “when, what, and with what materials we report”. At Kakeru Koumuten, we provide materials and reports in the following four situations.

Situation Materials Provided / Actions Taken
Before Construction
Building Diagnosis
We will provide a deterioration diagnosis report with photos. This document summarizes the deteriorated areas and the basis for the proposed scope of work.
Before Construction to During Construction
Notification to Residents & Neighbors
We will distribute construction notifications, visit neighbors for greetings, and provide information on the schedule and laundry through the entrance bulletin board.
During Construction
Approval for Additional Work
Deterioration discovered after scaffolding is set up will be presented with photos, quantities, and costs for approval before proceeding with the work.
During Construction to Completion
Inspection Report
A supervisor will inspect each process and take construction photos. Upon completion, we will confirm the finished work in the presence of the customer and provide construction photos, a report on the paints used, and a warranty certificate.

* For management associations, it is smooth to decide in advance who will approve additional work (such as the chairman or repair committee) and the estimated amount that will require approval before the contract.

How Will Life Be During Construction? Impact on Residents

For large-scale repairs, the principle is to proceed while you continue to live in your home. However, there will be some restrictions on daily life while scaffolding is in place. Most troubles can be prevented by providing prior notice, so Kakeru Koumuten Co., Ltd. thoroughly explains and posts information before construction.

What will be affected What will actually happen / Our response
Laundry On days of high-pressure washing, painting, and waterproofing, outdoor drying will not be possible. We will inform you via bulletin board and each household’s mailbox about “which side will be worked on today” and will secure as many days as possible for drying.
Window opening and closing In addition to washing and painting days, there may be times when windows cannot be opened during other processes such as protection, drying, and waterproofing. We will provide information for each process, so please check the postings and notifications. We will organize the processes to avoid continuous closures.
Balcony During floor waterproofing and handrail painting, we ask for temporary relocation of personal items, plants, and air conditioning outdoor units. The timing will be notified in advance for each household.
Noise and Odor The period of substrate repair (chipping and drilling) will produce the most noise. Working hours are generally from 8 AM to 5 PM, and we will accommodate requests such as refraining from work on Sundays and holidays. It is also possible to select low-odor types of paint.
Security and Privacy Scaffolding can become an entry route. We can take measures such as blocking sightlines with mesh sheets and installing locks and sensor lights on the scaffolding’s access stairs at night. We also thoroughly educate visitors on manners.
Parking Vehicles on the side where scaffolding will be erected will need to be temporarily relocated. Since securing a relocation spot may take time, we will start securing a relocation spot together 2 to 3 months before construction begins.
Pets, Small Children, and Working from Home If you have sensitivities to noise, please inform us in advance, and we may be able to adjust the work schedule accordingly. Please feel free to let us know.
Rented Rooms We can assist owners in creating notification documents for tenants. If you are concerned about the impact of construction on occupancy rates, we can also suggest an image change with color simulations.

How to Choose a Large-Scale Repair Contractor and Ordering Method

There are many large-scale repair contractors that cover Sakae Ward in Yokohama City, and you may be unsure which contractor to choose. When requesting renovations for apartments, condominiums, or buildings, please check the following four points.

● Have extensive experience in large-scale repairs

● Confirm the presence of warranties and aftercare services

● Obtain estimates from multiple contractors (at least 3 companies)

● Confirm if they are self-managed

Have Extensive Experience in Large-Scale Repairs

Large-scale repair contractors often have websites that showcase their exterior renovation achievements. If they provide detailed explanations of repair contents with photos, it gives you peace of mind as a reference when you actually request work.

Using Google and review sites to evaluate large-scale repair contractors can also be effective when comparing them! Be cautious if there are many negative reviews. If there are few reviews, also check their construction achievements, explanation content, and management system.

Large-scale repair work involves not only the construction itself but also the potential for troubles with residents and nearby neighbors. Therefore, it is necessary to post updates on the progress of the work and information about laundry, etc., on bulletin boards to prevent issues before they arise. Kakeru Koumuten Co., Ltd. specializes in exterior work, and we receive many requests for exterior renovations of apartments and condominiums.

Check for Warranty and Aftercare Services

When choosing a large-scale repair company, make sure to check for warranties. If any issues such as leaks occur after the construction, having a leak warranty from the contractor ensures that repairs can be made at no cost, providing peace of mind! Companies that offer warranty periods are often confident in their work, making this a key criterion for selecting a contractor.

Warranty periods vary by contractor and the nature of the work, but typically range from 1 to 10 years. Emergency repairs or partial fixes often do not come with leak warranties. Some contractors also offer aftercare services separate from warranties, so be sure to check for warranties and aftercare services.

At Kakeru Koumuten Co., Ltd., we send out annual direct mail for aftercare maintenance, allowing for yearly inspections. We also provide free responses for simple repairs like partial sealing.

Obtain Estimates from Multiple Contractors (at least 3 companies)

When requesting large-scale repairs, be sure to obtain estimates from multiple contractors. It is important to get estimates from at least 3 companies and compare their quotes and reports! Even for the same work, costs can vary between contractors, as can warranties and aftercare services. Additionally, obtaining multiple estimates makes it easier to negotiate prices.

When comparing estimates, consider not only the cost but also the “items in the estimate,” “methods and materials for substrate repair and exterior wall painting,” and “confirmation of the process” in detail! If the quality of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making decisions based solely on price. Especially since substrate repair work can be difficult to assess visually, make sure to verify whether the repair method is appropriate for the condition of the substrate!

Check This on the Estimate (Checklist)

Confirmation Items Points to Consider
Is there an excessive use of “one set” notation? Are the quantities and unit prices clearly stated? With “Exterior Wall Repair One Set,” comparisons and verifications cannot be made.
Do the quantities match actual measurements? Are there quantities recorded that are far from the drawings or actual measurements? This is the area where inflation is most likely to occur.
Proportion of miscellaneous expenses Details and proportions of site management costs, general management costs, statutory welfare costs, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, the average is about 10% of construction costs (excluding common temporary costs), but it varies depending on the scale and conditions of the building, so there is no uniform standard.
Are the names of materials written? Are the manufacturer names, product names, grades, and number of coats for paints and waterproofing materials listed?
Treatment of quantities for substrate repairs This is an item that cannot be accurately measured until scaffolding is set up. Is it stated whether it is “estimated quantity” or “actual quantity settlement,” and are there agreements for increases or decreases? This is the most important point.
Warranty and after-inspection Warranty period for each construction, frequency of inspections, and scope of free support.
Company backing Types of construction industry licenses, track record of similar scale and structure, presence of qualified personnel.

Check if it is managed in-house

Large-scale repair work includes various tasks such as “substrate repair work,” “exterior wall painting,” “waterproofing work,” and “pipe replacement,” and the plan content will change based on the actual deterioration state and customer preferences.

In cases where a contractor completely outsources to subcontractors, they may lack knowledge and experience, leading to proposals for repairs in irrelevant areas or unnecessary work. If you investigate and then request a subcontractor, it may incur additional time and costs. By having knowledge and experience and managing in-house, responsible construction can be achieved at a reduced cost.

Additionally, contractors that outsource may be slow to respond if any troubles occur during construction. It is safer to avoid companies that do not actually meet with customers to manage the construction. Kakeru Koumuten performs everything from temporary scaffolding setup to exterior wall painting and waterproofing work in-house, managed by knowledgeable and experienced personnel!

There are three ordering methods. The choice affects how the process proceeds.

Especially for management associations, it is necessary to decide “how to request” before “which company to hire.” The main ordering methods are the following three.

Method Procedure Advantages Disadvantages
Responsibility Construction Method The construction company handles everything from investigation, design, construction to management No additional costs for design consulting (investigation and design costs may be included in the construction costs) / Single point of contact reduces the burden on the management association / Clear responsibility / May shorten the period until ordering Specifications can easily be left to the construction company, making it difficult to compare side by side / Third-party checks are hard to implement, requiring the management association to verify price, specifications, and construction status
Design Supervision Method A design office or consultant conducts the investigation and design, while a separate company handles the construction Allows for comparison of construction companies under the same conditions / Independent supervision during construction Consulting fees are required separately / Attention needed for risks of conflicts of interest and collusion / Tends to prolong the period
Management Company Prime Contract Method The management company acts as the prime contractor, with subcontractors performing the construction Easy coordination with daily management / Minimal effort required from the management association Tends to be more expensive due to intermediate margins / Competition principles are hard to apply
We believe that the responsibility construction method is often suitable for small to medium-sized buildings. This is because the burden of consulting fees increases as the number of units decreases. However, the weaknesses of the responsibility construction method are “difficulty in comparing side by side” and “difficulty in third-party checks,” so verification of price, specifications, and construction status is necessary for any method. Therefore, Kakeru Koumuten provides estimates that clearly state quantities, methods, and materials for each construction item, allowing you to compare on the same level as other companies. If you bring in estimates from other companies, we can recreate them under the same conditions.

Collusion and Inappropriate Consulting Issues in Large-Scale Renovations and Self-Defense Measures

Latest 2026 In the large-scale renovation industry, inappropriate orders linked between design consultants and construction companies have long been a problem. The Ministry of Land, Infrastructure, Transport and Tourism issued warnings and notifications to management associations in January 2017 and April 2023, and on September 28, 2026, the Japan Fair Trade Commission announced that it had issued exclusion orders to 38 companies and imposed a total of 1.63788 billion yen in surcharge payment orders on 37 companies regarding large-scale renovation work commissioned by condominium management associations to design consulting firms in the Kanto region (two design consulting firms were also subject to exclusion orders).

※This content is based on the announcement by the Japan Fair Trade Commission (September 28, 2026).

Three Typical Methods

① Dummy Estimates

Deciding in advance which company will win the order, while other companies only submit formal high estimates, creating a “fixed race.” It appears to the management association that “proper competitive estimates were obtained.”

② Collusion with Design Supervisors

While consultants contract at extremely low design supervision fees, they receive kickbacks from the high construction costs of their partner construction companies. Fees that are too low for design supervision are a warning sign.

③ Back Margin

A certain percentage of the contract amount is given as a kickback, which is then added to the construction costs as an expense. As a result, the management association ends up paying extra.

Source: Yokohama City “What is collusion in large-scale repair work for condominiums?” / Ministry of Land, Infrastructure, Transport and Tourism “On the Proper Ordering of Large-Scale Repair Work for Condominiums” (Notification dated April 3, Reiwa 5, PDF)

Self-Defense Measures for Management Associations

  • Obtain independent estimates from multiple companies
  • Consult with neutral third parties such as condominium management professionals or architects
  • Document the vendor selection process in meeting minutes to ensure transparency
  • Confirm the reasons for any unusually low consulting fees
  • Include a penalty clause in the contract for cases of collusion
  • Avoid concentrating information with a single consultant and verify specifications independently

New System in Yokohama City Bid Agency Service for Large-Scale Repair Work

In response to this issue, in October 2025, Yokohama City and the Yokohama Housing Supply Corporation established the “Bid Agency Service for Large-Scale Repair Work.” This system separates the selection of design and construction companies, with the corporation acting as a third party to conduct conditional general competitive bidding. The estimated price will not be disclosed, and the process will follow methods similar to public works.

Target Condominiums in Yokohama City. The management association must be the applicant, and the design work must be completed with a construction management system in place.
Fee 0.2% to 1% of the winning bid amount (excluding tax / lower rates for larger projects). No charge if the bidding is unsuccessful.
Contact Yokohama Housing Supply Corporation, Phone 045-451-7780 (Weekdays 9:00 AM – 5:00 PM)

Source: Yokohama City Press Release (October 16, 2025) / Yokohama Housing Supply Corporation

Kakeru Koumuten welcomes such fair bidding and opportunities for comparison involving third parties. Because we keep costs down with our own construction work and provide estimates that specify quantities, methods, and materials, we believe it makes us advantageous enough to be compared on the same level. We welcome competitive estimates.

Frequently Asked Questions about Large-Scale Repairs in Sakae Ward, Yokohama

How much does large-scale repair in Sakae Ward, Yokohama cost?
For condominiums, according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% fall within the range of 750,000 to 1,500,000 yen (excluding consumption tax and common temporary construction costs), with the most common range being 1,000,000 to 1,250,000 yen. Yokohama City also indicates “approximately 1,000,000 to 1,300,000 yen per unit.” Based on our construction records, the cost for a two-story wooden apartment ranges from 2,000,000 to 4,000,000 yen, for a three-story steel or RC apartment from 4,000,000 to 9,000,000 yen, and for small condominiums or mixed-use buildings from 5,000,000 to 15,000,000 yen. The cost varies depending on the condition of the substrate and whether waterproofing and roofing work is required, so we provide free on-site estimates.
How often should large-scale repairs be conducted?
Generally, a cycle of 12 to 15 years is recommended, and the actual cycle is most commonly 13 years according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey, with about 70% falling within 12 to 15 years. However, the decision should be based on the condition of deterioration rather than just the number of years. If signs of deterioration such as sealing degradation, tile lifting, or waterproof layer breakage are observed, it is advisable to carry out repairs without waiting for the cycle, as this can ultimately reduce costs. Older buildings tend to have a greater proportion of tile repairs and metal part replacements in the second and third repairs.
How long does the construction period take? Can residents stay during the work?
For apartments, the period is typically 3 weeks to 2 months, for small condominiums or buildings 1.5 to 3 months, and for condominiums with over 50 units about 4 to 6 months. Residents can remain in their homes during the construction. However, while scaffolding is in place, there may be restrictions on drying laundry outside and opening windows, so we take thorough measures to minimize the impact on daily life, including distributing notifications before construction, providing information on the schedule and laundry on bulletin boards, and strictly adhering to working hours.
How long should we expect from the start of planning to the completion of construction?
For management associations, it typically takes about 1 to 1.5 years for the establishment of the repair committee, building diagnosis, contractor selection, and general meeting resolutions, followed by 3 to 6 months for construction. Overall, it is advisable to plan for about 2 years to proceed with ample time. If using subsidies or tax incentives, please also factor in the time required to obtain management plan certification (2 to 3 months from application to certification).
Are there any subsidies available for large-scale repairs in Sakae Ward, Yokohama?
Neither Yokohama City nor Kanagawa Prefecture provides subsidies specifically for large-scale repair work. However, for condominium owners, if certain conditions are met, there are benefits such as a 50% reduction in fixed property tax under the “Condominium Longevity Promotion Tax System,” subsidies from Yokohama City for deterioration diagnosis and long-term repair planning (50% with a cap of 200,000 yen), and subsidies for barrier-free renovations in common areas (one-third with a cap of 300,000 yen). If the work includes windows and insulation, it may qualify for “Advanced Window Renovation 2026” or “Mirai Eco Housing 2026.” The application timing and applicants vary by program, so please check the eligibility conditions and application procedures for each program before contracting or starting construction.
I heard that fixed property tax can be reduced through large-scale repairs; is that true?
Yes, it is true if certain conditions are met. Under the Condominium Longevity Promotion Tax System, if a condominium that is over 20 years old and has more than 10 units conducts large-scale repairs that contribute to longevity (including exterior painting, floor waterproofing, and roof waterproofing), the fixed property tax for the following year will be reduced by half for the equivalent of 100 square meters per unit. This applies to work completed between April 1, 2023, and March 31, 2027, and a declaration must be made to the Sakae Ward Office within three months of completion. For certified management plan condominiums, there are additional requirements such as raising repair reserve funds, so it is recommended to start preparations more than a year in advance.
Are there any changes to subsidies starting from the fiscal year 2026?
Yes, there are. The national “Child-Rearing Green Housing Support Project” has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Management associations and management corporations can also become joint project participants, allowing for insulation renovations in common areas. Additionally, the “Long-Term Excellent Housing Renovation Promotion Project” will end in fiscal year 2025, and it will not be implemented in fiscal year 2026. The “Advanced Window Renovation 2026 Project” has started accepting bulk applications for collective housing from May 29, 2026 (the application process is handled by registered contractors). Please be careful not to base your financial planning on outdated information.
What should I do if the repair reserve fund is insufficient?
There are mainly four options: ① Postpone low-urgency work based on deterioration diagnosis to the next time, ② Review the scope and specifications of the work, ③ Check support systems such as subsidies, ④ Consider increasing the repair reserve fund or financing from the Japan Housing Finance Agency. The agency’s condominium common area renovation loans do not require collateral, and interest rates can be reduced by up to 0.6% per year by obtaining management plan certification and implementing energy-saving and seismic work. Please note that postponing waterproofing and tile peeling measures often ends up being more expensive, so please consult us for a decision on separation.
Can you handle large-scale repairs for properties with many buildings, like in a housing complex?
You can consult us. Sakae Ward is known for large-scale residential development centered around hilly areas from the 1960s to the early 1970s (according to the ward’s official page). For properties with many buildings, it is important to conduct deterioration diagnosis for each building, create a plan for whether to do it all together or separate by building or year, and form consensus at the general meeting. Kakeru Koumuten Co., Ltd. also targets condominiums with over 100 units as cost estimates and will propose multiple plans for comparison.
What happens to the residents’ parking during construction?
Vehicles on the side where scaffolding is set up will need to be temporarily moved. In buildings with limited parking space, it may take time to secure an alternative location. Kakeru Koumuten Co., Ltd. will coordinate with you about the availability of nearby coin parking and monthly parking starting 2 to 3 months before construction begins.
Can I freely decide the color of the exterior walls?
In Sakae Ward, there are 10 building agreements listed by Yokohama City (Iijima “Hikarigaoka” area, Ofuna Midorigaoka Neopolis Kobe area, Hongodai Central Housing Area, Kamigou Neopolis, Shodoto 1st and 4th districts, Shodoto 1st district, Nomura Totsuka Hongodai Housing Area, Matsugaoka Housing Area, Kajigaya Housing Area, Shihirei Ue area), and there are district plans established in areas such as Sakae Nagao-dai, Ofuna Station North 1st district, Ofuna Station North 2nd district, Sakae Shonan Katsuradai district, Sakae Kosugegaya district, Sakae Kasama district, Sakae Katsuradai district, Sakae Hongodai district, Sakae Koyamadai district, and around Hongodai Station, as well as Sakae Kamigou Town district. The existence and content of agreements or plans regarding appearance and color vary by agreement and plan; for example, the district plans for Sakae Hongodai, Ofuna Station North 2nd district, and around Hongodai Station have regulations regarding form, design, and color. You can check what applies to your property through the public information on Yokohama City’s building agreements and district plans, and the Sakae Ward Office’s Urban Development Division (045-894-8335) also provides guidance on urban development in the ward. We will also investigate this during our survey. Sharing a color simulation of the completed image can facilitate discussions with neighbors and the community association.
Are there any differences in construction for buildings located in green areas or on slopes?
According to the ward’s materials, Sakae Ward is characterized by a terrain where the Itachi River and Kashio River form lowlands surrounded by hilly areas, with a green coverage rate of 38.8% (2nd in the city for the fiscal year 2019). For buildings on slopes or with elevation differences and retaining walls, special considerations may be needed for scaffolding installation and material transportation. Kakeru Koumuten Co., Ltd. has its own scaffolding team that checks the site and plans the transportation route and scaffolding layout. Additionally, for buildings close to trees, there is a higher likelihood of gutter and drain blockages due to fallen leaves, as well as moss and algae growth in shaded areas, so we focus on inspecting roof drains, drainage areas, exterior wall cleanliness, and waterproof layer damage. The degree of deterioration varies by building, so we conduct individual assessments during on-site surveys.
Which should I choose, the responsibility construction method or the design supervision method?
For buildings with fewer units, the burden of consulting fees tends to be heavier, so we believe that the responsibility construction method is often more suitable for small to medium-sized buildings. The design supervision method allows for comparison of construction companies under the same conditions since a third party creates the specifications, but it incurs separate consulting fees, and caution is needed regarding conflicts of interest and collusion risks. Even with the responsibility construction method, verifying price, specifications, and construction status is essential. Kakeru Koumuten Co., Ltd. provides detailed estimates specifying quantities, methods, and materials for each construction item, allowing you to compare with other companies on the same level.
How can I detect collusion in large-scale repairs?
There are three typical methods: ① Pre-determining the contractor and having other companies submit only formal high estimates as “dummy estimates,” ② A consultant contracts at an extremely low design supervision fee and receives kickbacks from partner companies, ③ Adding a portion of the contract amount as a back margin to the construction costs. Countermeasures include obtaining independent estimates, consulting a neutral third party, documenting the selection process in meeting minutes, and including penalty clauses in contracts. In October 2025, Yokohama City and the Yokohama City Housing Supply Corporation will establish a “Large-Scale Repair Construction Bid Agency Service.”
How many estimates should I obtain?
We recommend at least three companies. If there are too many, it becomes difficult to compare, and if there are too few, competition does not occur. What is important is not the number of companies but to “compare after creating the same playing field.” By creating a common specification sheet and quantity table and requesting under the same conditions, and making detailed breakdowns mandatory instead of accepting “one set” notation, it becomes clear whether the price difference is due to differences in range or unit price.
What is the difference if you have your own scaffolding?
In large-scale repair work, temporary construction accounts for about 20% of the total cost (according to the Ministry of Land, Infrastructure, Transport and Tourism’s fiscal year 2021 survey). By not outsourcing scaffolding work, it is easier to keep costs down in this area, and our own scaffolding team can flexibly respond to sudden changes in the schedule or additional work. Kakeru Koumuten Co., Ltd. owns scaffolding materials for about 100 single-family homes and plans scaffolding on-site according to the site conditions.
I’m in the middle of obtaining estimates, but can I just have my estimate reviewed?
Of course, that’s possible. If you bring in estimates from other companies, we will check whether the items, quantities, methods, and materials are appropriate for free and provide you with an estimate under the same conditions. We welcome competitive estimates.
Can I request just emergency repairs for a leak?
Yes. As a preliminary step before large-scale repairs, we also accept requests for emergency repairs or partial repairs for leaks. We will identify the cause using thermal imaging and drones and propose the minimum necessary repairs.
Can you handle roofing or exterior wall materials that contain asbestos?
Yes, we can. We have qualified personnel who are certified asbestos work supervisors and building material asbestos surveyors, and we handle everything from the legally required preliminary surveys to the roof overlay method and removal of asbestos-containing roofing materials. If there is sprayed asbestos, there is a possibility of receiving free surveys under Yokohama City’s countermeasures project and subsidies for two-thirds of the removal costs (up to 3 million yen), so we will provide information on that as well.
What happens if large-scale repairs are not done?
There are risks such as personal injury accidents due to falling exterior wall tiles, structural deterioration due to corrosion of rebar, leaks, and a decrease in asset value. Furthermore, for buildings subject to periodic reporting under Article 12 of the Building Standards Act, investigations using full probing, etc., are required under certain conditions, such as when the exterior wall has exceeded 10 years since completion or exterior wall renovation. In Yokohama City, buildings that are only apartments are not designated as subject to periodic reporting, but mixed-use buildings that include stores require individual confirmation. Even if not subject to statutory surveys, regular inspections and maintenance are essential, so please consult us if you are unsure.
How much does large-scale repair for an apartment (about 10 units) cost?
For a two-story wooden building with 6 to 10 units, it is estimated to be between 2 million and 4 million yen, and for a three-story steel or RC building with 10 to 20 units, it is estimated to be between 4 million and 9 million yen based on our company’s track record (including scaffolding, substrate repairs, exterior wall painting, sealing, and waterproofing). It is common for apartments to undergo repairs every 10 to 15 years. For owners, there is an increasing trend to change the appearance with color simulations at the same time as repairs to improve occupancy rates.

If you are looking for a large-scale repair contractor in Sakae Ward, Yokohama City, contact Kakeru Koumuten Co., Ltd.

Our company is based in Yokohama City and has handled many exterior wall renovations and large-scale repairs for condominiums and apartments in Sakae Ward. We are happy to respond not only to large-scale repair work but also to partial repairs and leak repairs. In urgent cases such as leaks, emergency measures may be possible, so please feel free to consult us. “I want it to last long with one renovation”, “I want to keep costs down as much as possible”, “I want to improve insulation performance because the indoors are hot”, we will propose the best solutions for your specific requests and future repair plans.

From temporary scaffolding work to roofing and exterior wall painting, all work is performed by our own team. We are confident that we will not lose in terms of cost, quality, and planning compared to other companies, so we welcome competitive estimates!

On-site surveys, estimates, and color simulations are all free of charge

Please feel free to consult us via the inquiry form, phone, or LINE.
It’s perfectly fine to just present estimates from other companies.

Request a Free Estimate Consult via LINE

Large-Scale Repair Work Service Area

Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and Tokyo.

Service Area in Sakae Ward, Yokohama City
Iijima-cho / Inuyama-cho / Otsuki / Kasama-cho / Kasama / Kajigaya-cho / Kajigaya / Katsuradai Kita / Katsuradai Naka / Katsuradai Nishi / Katsuradai Higashi / Katsuradai Minami / Katsura-cho / Kanai-cho / Kamigou-cho / Kamino-cho / Kamei-cho / Kouta-cho / Kosugegaya-cho / Kosugegaya / Koyamadai / Shodoto / Tayacho / Nakano-cho / Nagao-dai-cho / Nagakura-cho / Naganuma-cho / Nonanazato / Kashiyou / Higashi Kamigou-cho / Hongodai / Moto Ohashi / Wakatake-cho

Consultations via LINE are also very welcome◎

LINE

Kakeru Koumuten LINE Official Account Add Friend

We are also updating our Instagram regularly◎ Please follow us!

Instagram
Kakeru Koumuten Official Instagram

For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!