Leave the repair and renovation of condominiums and apartments in Itabashi, Tokyo to Kakeru Koumuten Co., Ltd.!
Large-Scale Repairs for Condominiums, Apartments, and Buildings in Itabashi Ward
To owners, management associations, and management companies considering large-scale repairs for condominiums, apartments, and buildings in Itabashi Ward, Tokyo.
Kakeru Koumuten Co., Ltd. is a company that handles exterior repairs with comprehensive management and self-construction from the installation of temporary scaffolding to substrate repairs, exterior wall painting, tile repairs, sealing, waterproofing of roofs and balconies, and roofing work. In Itabashi Ward, we have undertaken numerous large-scale repairs and exterior renovations for apartments, condominiums, and commercial facilities.
- On-site surveys and estimates are completely free (multiple estimates are welcome)
- Comprehensive management from temporary scaffolding to exterior and roofing work
- For considering exterior wall colors, color simulations and trial painting are available
- Consultations for partial repairs and emergency measures for leaks are also possible
- Cost Estimate / For condominiums, the cost is approximately 750,000 to 1,500,000 yen per unit (about 70% fall within this range according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, with the most common being 1,000,000 to 1,250,000 yen. This amount excludes consumption tax and common temporary costs). For wooden apartments, the estimate is around 2,000,000 to 4,000,000 yen per building.
- Estimated Cycle / 12 to 15 years. However, the determining factor is not the number of years but the condition of deterioration.
- Particularly Relevant in Itabashi Ward / Itabashi Ward is a scenic administrative organization with a unique landscape plan. Buildings over 20 meters tall or with a total floor area of over 2,000 square meters are subject to notification for color changes. The landscape formation priority areas in Kaga, Tokiwadai, and Itabashi-juku Fudō Street are applicable regardless of scale. The ward spans the Musashino Plateau and the alluvial lowlands of the Arakawa River, and flooding from rivers such as the Arakawa and Shakujii River is anticipated, necessitating inspections of drainage and waterproofing for roofs and balconies. The certification of management plans is handled by Itabashi Ward.
- Available Funds / There are no subsidies for the construction costs of large-scale repairs in Itabashi Ward or Tokyo, but if requirements are met, property tax reductions (50% for the 23 wards of Tokyo; the national application deadline is for work completed by March 31, 2027), interest-subsidized loans from Tokyo, seismic grants for non-wooden buildings from the ward, and national subsidies for including windows and insulation may be available.
- Tips for Success / At least three comparative estimates. Compare not only the amounts but also the quantities, methods, and materials.
Large-scale repair work that can be handled in Itabashi Ward
Large-scale repairs are not just “exterior wall painting” or “waterproofing”; they are construction work that addresses the overall deterioration of the building while scaffolding is in place. At Kakeru Koumuten, we can handle all of the following work in-house, ensuring clear responsibility and coordination of the process.
| Type of Work | Main Details |
|---|---|
| Temporary Scaffolding Work | Installed by our own scaffolding team using our own scaffolding materials. We handle mesh sheets, protection, and fall prevention measures. |
| Substrate Repair Work | Crack repairs, injection of floating mortar and tiles, explosion (exposed rebar) repairs, resin mortar repairs for missing parts. |
| Exterior Wall Painting Work | High-pressure washing, three coats from primer to topcoat, painting of ancillary parts (metal parts, gutters, water cut-offs, etc.). We accommodate radical control type, fluorine, and inorganic paints. |
| Tile Repair Work | Replacement of damaged tiles, joint repairs, clear waterproofing of tile surfaces (such as Seven S). |
| Sealing Work | Replacement and additional sealing around sashes and exterior wall joints. |
| Waterproofing Work | Urethane waterproofing for rooftops, roof balconies, shared corridors, and stairs, PVC sheet waterproofing, and installation of long sheet materials. |
| Roof Work | Roof painting, roof overlay (cover method), re-roofing, and ridge cap replacement. We have sheet metal craftsmen on staff and can handle large roofs such as factories. |
| Metal and Hardware Work | Painting of steel staircases, handrails, and PS doors, replacement of caps and water cut-offs. |
| Drainage and Wastewater Work | Cleaning and renovation of roof drains (inserting renovation drains), resolving gutter blockages. This work is particularly important for rooftops and balconies where rainwater tends to accumulate during heavy rain. |
| Others | Gutter replacement, drone inspections of rooftops and exterior walls, thermal imaging for leak investigations, and preliminary surveys of asbestos-containing materials. |
Scope of Major Repairs Determined by Building Diagnosis
It is not always necessary to carry out all of the above works. The extent of the work will be determined based on the results of the building diagnosis. At Kakeru Koumuten, we conduct a free on-site survey to confirm the items below, compile a deterioration diagnosis report with photographs, and propose the scope of work.
| Diagnosis Area | Main Investigation Method | Scope of Work Determined by Diagnosis Results |
|---|---|---|
| Exterior Wall (Painted Surface) | Visual inspection, checking the width of cracks and the condition of the paint film | Methods and quantities for crack repair, specifications for painting (whether to repaint or paint after removing the existing paint film) |
| Exterior Wall (Tile Surface) | Sounding investigation. High places checked with a drone | Scope and estimated quantity for injection and replacement, whether clear waterproofing is necessary |
| Sealing | Checking for cracks, shrinkage, peeling, and hardening | Whether to replace or add to the existing seal, the scope of joints to be worked on |
| Rooftop, Balcony, Shared Corridor | Checking for blisters or breaks in the waterproof layer, puddles, and the condition of drains | Full renovation or partial repair, method (urethane waterproofing, PVC sheet waterproofing, long sheet), whether drain renovation is necessary |
| Leak Areas | Investigation using thermal imaging cameras and drones | Identification of the cause and the priority areas for repair |
| Metal Parts, Roof, Auxiliary Parts | Checking for rust, corrosion, lifting, and cracking | Whether painting is sufficient or if material replacement or overlay installation is necessary |
| Site and Surroundings | Checking retaining walls, slopes, trees, access routes, and parking lots | Planning for scaffolding and the scope of temporary construction |
Reasons Kakeru Koumuten is Chosen for Large-Scale Renovations in Itabashi Ward
The reason why we can be entrusted with large-scale repairs in Itabashi Ward is our “initiatives that cannot be imitated by other companies in large-scale repair work”, which have received high praise from many customers.
1. Equipment Specialized for Exterior Renovations
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality exterior wall painting and waterproofing work for large-scale repairs. We have established five bases centered around Yokohama City for material storage and showrooms.
In-house Ownership of Scaffolding Materials
We own the scaffolding materials necessary for temporary scaffolding required for large-scale repairs and can assemble the scaffolding ourselves.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can cut costs related to scaffolding work and enable quick and flexible responses.
We have approximately enough scaffolding materials for 100 single-family homes!
Storage of Materials in Our Large In-house Warehouse
We store paints and substrate repair materials used for exterior renovations. By ordering a large quantity of materials at once, we can procure materials at a lower cost! Additionally, we always have stock available, allowing for swift responses even in emergencies!
In-house Sorting of Waste Materials
Large-scale repairs generate various waste materials such as leftover paint, metals, and wood. Kakeru Koumuten sorts and recycles waste materials in-house, leading to cost reductions in waste disposal fees.
Showroom Dedicated to Exterior Renovations

In the showroom, you can not only have meetings but also check actual samples and colors of exterior materials. You can also perform color simulations for exterior painting and check thermal insulation properties using a thermal insulation testing machine!
2. Cost Reduction through In-House Management and Construction
One of Kakeru Koumuten’s major strengths is in-house management and construction.
By managing everything from inquiries to project completion in a unified system, we can keep costs down while providing high-quality large-scale repairs. Additionally, one representative will handle everything from the estimate to project completion. Since the person in charge does not change, communication can be smooth.
We can handle everything from temporary scaffolding installation to exterior painting, substrate repair, waterproofing work, and tile repairs with complete in-house construction! Those with specialized knowledge and experience will conduct inspections and actual construction for each process!
3. Obtaining Various Permits and Skilled Workers
We have obtained construction business licenses and permits for industrial waste collection and transportation! We also have nationally certified sheet metal and painting skilled workers, and we are confident in our construction techniques. We can also handle large-scale roofing work for factories! We have qualified personnel for asbestos work supervisors and building materials containing asbestos inspectors, so we can manage asbestos-containing roofing materials and conduct preliminary surveys.
4. Warranty and Aftercare

Most large-scale repair works, including “painting work,” “substrate repair work,” and “waterproofing work,” come with a warranty!
Aftercare maintenance is available every year, and we send out notification DM annually.
5. Flexible and Prompt Response
Our company is equipped to handle various troubles and situations related to apartments and condominiums.
We can also address exterior walls and rooftops that cannot be checked from high places using a drone! During leak investigations, we can use a thermal imaging camera to help identify the cause of leaks!
We will respond according to your wishes. We also accept emergency measures for sudden leaks! We will promptly respond to urgent requests and emergencies!
6. Staff Development
Our staff create various models to enhance their skills and conduct practical training. Since different sites require various processing and techniques, we regularly provide skill enhancement education to ensure each staff member can respond appropriately. We also educate on points to pay attention to and areas to check in each process of large-scale repair work.
7. Consideration for Residents and Neighbors

During large-scale renovation work, we will not only notify residents and greet nearby residents, but also install a bulletin board at the entrance to display the construction schedule and notices! Additionally, we will thoroughly educate visitors on proper manners to minimize any inconvenience to residents and neighbors.
8. Strict Quality Control

Each process will undergo inspection by a responsible person, along with detailed photographs of the work. We utilize film thickness inspection machines and check sheets to ensure that no inspections are overlooked. During exterior wall painting and waterproofing work, we will verify the quantity of used paint cans to ensure that the specified amount of paint is used, and by ordering paint in-house, we prevent construction defects in advance. Of course, we will also photograph and report the used paint.
9. Exterior Wall Painting Color Simulation
9-1 Self Color Simulation

Our simulations can be created from actual photos of your apartment or building!You can also perform simulations on your smartphone or computer. By simulating and then changing to a two-tone color or altering the image, we hope to enhance the stylish appearance and increase occupancy rates! Of course, we can also arrange paint samples for actual color confirmation.
* In Itabashi Ward, changes in color and repainting to a color that does not meet the standards are included in the actions subject to the landscape plan notification (depending on the size of the building and the district). Having a color simulation screen will help facilitate explanations at the neighborhood association and management committee meetings.
9-2 Confirm the actual color with a test paint!
You can order samples of the paint you are considering and conduct test painting on your exterior wall. By conducting a test paint, you can confirm the actual color and gloss!
9-3 Exterior Renovation Simulation
Exterior simulations for apartments and condominiums are also possible!
・Exterior wall color simulation (two-tone colors are also possible)
・Simulation for when metal siding is applied
・Simulation for when accent materials such as cornices and louvers are used
・Simulation for roof painting and roof replacement work
With the exterior renovation simulation, you can minimize the risk of failure in changing the image! We hope that renovating the appearance of your apartment or condominium will help increase occupancy rates.
Cost Estimates for Major Repairs in Itabashi Ward
The cost of major repairs varies greatly depending on the size of the building, the degree of deterioration, the scope of work, and the materials used. First, refer to the national average based on public statistics, then to our company’s cost estimates based on construction performance by scale, and finally to unit price examples for each construction.
The national average for condominiums is 750,000 to 1,500,000 yen per unit
According to a survey conducted by the Ministry of Land, Infrastructure, Transport and Tourism, which compiled 818 construction cases (FY 2021), the construction costs for major repairs are concentrated at about 70% in the range of 750,000 to 1,500,000 yen per unit, with the most common price range being 1,000,000 to 1,250,000 yen. Note that the amounts in this survey do not include consumption tax and common temporary construction costs, so the conditions differ from the current total construction costs including tax.
| Construction Cost per Unit | Percentage | Construction Cost per Unit | Percentage |
|---|---|---|---|
| Up to 750,000 JPY | 15.1% | 1,250,000 to 1,500,000 JPY | 17.4% |
| 750,000 to 1,000,000 JPY | 24.7% | 1,500,000 to 2,000,000 JPY | 9.1% |
| 1,000,000 to 1,250,000 JPY | 27.0% (most common) | Over 2,000,000 JPY | 2.8% |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (200 companies, 818 cases) *Amounts do not include consumption tax or common temporary costs. Percentages may not total 100% due to rounding and non-responses.
Breakdown of Construction Costs (What the Money is Spent On)
| Category | Composition Ratio | Main Contents |
|---|---|---|
| Construction-related Work | 60.3% | About half for exterior walls, about one-third for waterproofing. Substrate repairs, tiles, painting, waterproofing |
| Temporary Work | 22.8% | Scaffolding, mesh sheets, protection, etc. (does not include common temporary costs) |
| Miscellaneous Expenses | 10.3% | Site management fees, general management fees, statutory welfare expenses, etc. (9.5%), insurance premiums for large-scale renovation defects (0.8%) |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (Second aggregation of large-scale renovation work. Overall average is construction-related 59.0%, temporary 22.3%, miscellaneous expenses 9.9%). *The total does not equal 100% because equipment-related work, exterior work, and others are included. This is an average value and is not a criterion for judging the appropriateness of individual estimates.
Cost Estimates by Building Size (Scaffolding, Substrate Repairs, Exterior Wall Painting, Waterproofing, Sealing Set)
| Type and Scale of Building | Estimated Cost | Estimated Construction Period |
|---|---|---|
| Wooden Apartment (2 stories, 6-10 units) | 2,000,000 – 4,000,000 JPY | 3 – 5 weeks |
| Steel Frame/RC Apartment (3 stories, 10-20 units) | 4,000,000 – 9,000,000 JPY | 1 – 2 months |
| Mixed-Use Building/Small Apartment (4-5 stories) | 5,000,000 – 15,000,000 JPY | 1.5 – 3 months |
| Medium-Sized Apartment (30-50 units) | 20,000,000 – 50,000,000 JPY | 3 – 5 months |
| Large Apartment (100 units or more) | Around 100,000,000 JPY or more | 6 months or more |
* The above estimates are based on Kakeru Koumuten’s construction records and may vary depending on the presence of roofing work, metal work, plumbing, etc. For apartments, please also consider the amount calculated by multiplying the national statistics above (750,000 – 1,500,000 JPY per unit) by the number of units.
Breakdown of Costs for Temporary Works, Substrate Repairs, Exterior Walls, and Waterproofing
The estimate for large-scale repairs is broadly divided into “Temporary Works,” “Substrate Repairs,” “Sealing,” “Exterior Painting,” “Waterproofing,” and “Miscellaneous Expenses.” Before comparing total amounts, please check what is included in each item, how much, and at what cost.
| Item | What to Check in the Estimate |
|---|---|
| Building Prerequisites | Structure (wooden, steel frame, RC), number of stories, number of units, exterior wall area, and waterproofing area. Also confirm whether the area is based on drawings or actual measurements. |
| Common Temporary Works/Scaffolding | Area and unit price of scaffolding, mesh sheets, protective measures, temporary toilets, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for Reiwa 3, temporary works such as scaffolding account for about 20% of construction costs (excluding common temporary costs). |
| Substrate Repairs | Quantities and unit prices for repair methods such as cracks, lifting, and spalling. Since these items are not confirmed until scaffolding is set up, please check whether it is estimated quantities or actual settlement, and the settlement method if quantities increase or decrease. |
| Sealing | Whether it is a replacement or additional sealing, length of work (m), and material name. |
| Exterior Painting | Painting area (㎡), manufacturer name, product name, grade of paint, number of coats, and scope of ancillary parts. |
| Waterproofing | Area for each part such as rooftop, balcony, and common corridor, construction method, material name, and whether drain renovations are included. |
| Inspection and Reporting | Inspections for each stage, construction photos, and whether a completion report and warranty are included. |
| Miscellaneous Expenses | Details and proportions of site management costs, general management costs, and statutory welfare costs. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for Reiwa 3, these average about 10% of construction costs, but they vary depending on the size and conditions of the building, so there is no uniform standard. |
| Tax Classification | Whether the amounts are tax-inclusive or tax-exclusive. Since companies display this differently, make sure to align them before comparing total amounts. |
Examples of Unit Prices for Repair Work
| Repair Method | Materials Used | Cost |
|---|---|---|
| Tile Replacement | Existing Similar Tiles | per piece / 2,000 JPY〜4,000 JPY |
| Repair of Floating Tile and Mortar Areas | Epoxy Resin Injection | per square meter / 3,000 JPY〜5,000 JPY (Varies depending on the degree) |
| Tile Joint Mortar Repair | Mortar for Tile Joints | per square meter / 1,000 JPY〜2,000 JPY (Varies depending on the degree) |
| Concrete Spalling Repair | Rust Preventive for Rebar + Resin Mortar | per location / 1,000 JPY〜2,000 JPY (Varies depending on the degree) |
| Crack Repair | Filler or Polymer Cement | per meter / 100 JPY〜2,500 JPY (Varies depending on the degree) |
| Exterior Wall Painting (3 Coats) | Radical Control Silicone Paint | per square meter / 2,500 JPY〜3,500 JPY |
| Roof Top Urethane Waterproofing (Ventilated Buffer Method) | High Strength Urethane | per square meter / 6,500 JPY〜9,500 JPY |
| Sealing Replacement | Modified Silicone | per meter / 900 JPY〜1,500 JPY |
| Temporary Scaffolding | Company-Owned Scaffolding Materials (Wedge Type) | per square meter / 700 JPY〜1,000 JPY |
*Costs and warranty periods vary based on shape, quantity, substrate condition, and type of materials. For detailed estimates, please feel free to contact us. Estimates are completely free.
Select Paint and Waterproofing Grades Based on “Years Until Next Repair”
“Good paint does not equal the right choice.” Aligning when the next major repair will be with the lifespan of the materials is the most efficient way to choose.
| Grade | Estimated Lifespan | Suitable Cases |
|---|---|---|
| Silicone / Radical Control Type | 10-16 years | Buildings that are cycled every 12-15 years. A good choice balancing cost and performance. The lifespan varies by product, so choose specifications that match the cycle. |
| Fluorine | 16-20 years | Buildings that want to set the next repair after 15 years, high-rise or complex-shaped buildings where scaffolding costs are high. |
| Inorganic | 18-22 years | Buildings that want to suppress dirt adhesion. Effective for areas surrounded by trees or on the north side where moss and algae need to be controlled. |
| Urethane Waterproofing (Rooftop) | 8-15 years | Complex-shaped rooftops, or when wanting to renovate while utilizing the existing waterproof layer. Mid-term inspections and repairs, such as re-coating the top coat, are prerequisites. |
| Vinyl Sheet Waterproofing | 20-25 years | Rooftops with a large area and simple shape. Short construction period. |
| Asphalt Waterproofing | 15-20 years | Rooftops planned for long cycles. The cost per instance will increase. |
* The estimated lifespan is a general guideline and may vary depending on sunlight, location, and substrate condition. Choosing paints with anti-algae and anti-mold properties can improve durability in shaded and humid areas.
Guidelines for Repair Reserve Funds and Options When Insufficient
According to the Ministry of Land, Infrastructure, Transport and Tourism guidelines, the standard for repair reserve funds is indicated as a monthly amount per exclusive area. Additional charges are required if there is a mechanical parking lot.
| Building Size (Less than 20 Stories) | Monthly Estimate (Average) | Range Covering Two-Thirds of Cases | Conversion for 70㎡ |
|---|---|---|---|
| Less than 5,000㎡ Total Floor Area | 335 JPY/㎡ | 235-430 JPY/㎡ | Approximately 16,500-30,100 JPY |
| 5,000-10,000㎡ | 252 JPY/㎡ | 170-320 JPY/㎡ | Approximately 11,900-22,400 JPY |
| 10,000-20,000㎡ | 271 JPY/㎡ | 200-330 JPY/㎡ | Approximately 14,000-23,100 JPY |
| Over 20,000㎡ | 255 JPY/㎡ | 190-325 JPY/㎡ | Approximately 13,300-22,750 JPY |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Repair Reserve Funds for Condominiums” (Reiwa 6 June Revision – PDF) / National average is 13,378 JPY per unit per month (Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums)
In the Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums, 36.6% of management associations reported that “the repair reserve fund is insufficient compared to the plan.” There are four main options when funds are insufficient.
| Options | Considerations and Points of Caution |
|---|---|
| ① Adjusting the Construction Schedule | Based on the deterioration diagnosis, postpone less urgent work to the next time. However, it is essential to distinguish between work that can be postponed and work that cannot, as delaying waterproofing and tile fall prevention measures will ultimately be more costly. |
| ② Reviewing the Scope and Specifications of Work | Consider changes such as reviewing paint grades and switching from full renovations to partial renovations. Please separate this from “apparent cost reductions” that skip processes. |
| ③ Utilizing Subsidies and Tax Systems | Subsidies for energy-saving renovations, etc. (to be discussed later). The reduction of fixed asset taxes is a system that lowers the tax amount for each unit owner, and does not directly increase the repair funds of the management association. |
| ④ Increasing Reserve Funds, Loans, and One-Time Payments | In addition to considering increasing the repair reserve fund at the general meeting, the Housing Finance Agency’s condominium common area renovation loan requires no collateral. Interest rates can be lowered by obtaining management plan certification. |
Subsidies, Tax Systems, and Loans to Check for Large-Scale Renovations in Itabashi Ward
In Itabashi Ward, Tokyo, there are no subsidies specifically targeting the construction costs of large-scale renovations. The available options can be broadly categorized into four types. The eligibility and application status of these systems may change even during the fiscal year, so please be sure to confirm with our company or the relevant offices before contracting or starting work. (As of October 9, 2026)
| Type | Details |
|---|---|
| ① Support for Investigation and Consultation | Dispatch of district condominium management advisors (free), management plan certification window (Itabashi Ward). Can be used in the preliminary stage before large-scale repairs. |
| ② Construction Subsidies by Purpose | Earthquake resistance grants for non-wooden buildings in the district, energy-saving (windows, insulation), insulation and renewable energy for rental housing, etc. To be incorporated into large-scale repairs. |
| ③ Tax Incentives | Reduction of property tax under the condominium longevity promotion tax system. |
| ④ Public Loans and Interest Subsidies | Loans for condominium common area renovations from the Housing Finance Agency and interest subsidies from Tokyo (condominium improvement construction grants). |
① Condominium Longevity Promotion Tax System (Property Tax Reduction)
If large-scale repairs (including exterior painting, floor waterproofing, and roof waterproofing) that contribute to the longevity of certain qualifying condominiums are carried out, the property tax amount for the following year will be reduced. The reduction rate is determined by the municipality within the national range (1/6 to 1/2). The property tax in the 23 wards of Tokyo is a metropolitan tax, and the reduction rate in Tokyo is 1/2 (up to the tax amount for 100㎡ per unit).
| Main Requirements | Built over 20 years ago, with a total of 10 or more units, and more than half of the exclusive area is for residential use / At least one instance of exterior painting, floor waterproofing, and roof waterproofing has been completed in the past / Meets one of the following: ① A management plan certified condominium that has raised the amount of the repair reserve fund to the certification standard after September 1, 2021 ② A management association that has received advice and guidance from the municipality and has created or reviewed a long-term repair plan (advice and guidance are not available upon request). |
|---|---|
| Reduction Rate | 1/2 for the 23 wards of Tokyo. The target is the property tax amount for up to 100㎡ per unit. |
| Construction Completion Deadline | From April 1, 2023, to March 31, 2027, all three works (exterior painting, floor waterproofing, and roof waterproofing) must be completed. |
| Declaration | Must declare to the metropolitan tax office of the ward where the condominium is located within three months of the completion date (online declaration via eLTAX is also possible). If the manager compiles the necessary documents and submits them, it can replace the declarations of each owner. Please confirm with the Itabashi Metropolitan Tax Office (phone 03-3963-2111, main). |
| Notes | Cannot be combined with other reduction measures, and is limited to one time per unit. Simply obtaining management plan certification does not qualify; there are requirements such as raising the repair reserve fund. A review of the long-term repair plan is also necessary, so it is recommended to prepare at least one year before the construction. |
② District and Metropolitan Window (Management Associations should start here)
The certification of the management plan for condominiums is conducted by Itabashi Ward. While it is not a subsidy for the actual costs of large-scale repair work, it can be used as consultation and decision-making material in the preliminary stages.
| Contact & System | Details |
|---|---|
| Management Plan Certification System Contact (Itabashi Ward) | Urban Development Department, Housing Policy Division, Condominium Policy Section (North Building 5th Floor, Window 14, Phone 03-3579-2730). Applications can be submitted directly to the ward or through the Condominium Management Center’s “Management Plan Certification Procedure Support Service” for prior confirmation before submitting the main application to the ward (for inquiries about the support service, call 03-6261-1274). The new application fee is 26,300 JPY if applying directly to the ward. Fees vary depending on the application method, so please check the ward’s page for details. |
| Itabashi Appropriate Management Promotion Condominium Certification System (Itabashi Ward) | This is a unique certification system by the ward for condominiums that have received national management plan certification. The application for certification is free. The contact is the Housing Policy Division, Condominium Policy Section (Phone 03-3579-2730). |
| Condominium Management Advisor Dispatch (Itabashi Ward) | This service is available for free and is accepted at any time (standard decision time is 14 days from application). The target is management associations that have submitted a management status report. There is a limit on the number of times this service can be used, so please check with the contact. |
| Condominium Management Status Reporting System (Tokyo Metropolitan Ordinance) | This applies to residential condominiums with six or more units built before December 31, 1983, and must be updated every five years. The reporting destination is the ward’s Housing Policy Division. The metropolitan comprehensive consultation contact is Phone 03-6427-4900. |
| Seismic Consultation (Itabashi Ward) | Urban Development Department, Building Safety Division, Seismic Safety Section (Phone 03-3579-2554). This service provides partial subsidies for seismic diagnosis, reinforcement design, and seismic renovation work for non-wooden buildings that received construction confirmation before May 31, 1981 (for details, please see item ⑤ below). |
| Fixed Asset Tax Consultation (Itabashi Tax Office) | Phone 03-3963-2111 (main line). Please confirm the application procedures for the Long-Life Promotion Tax System. The certificate from the management association, which is one of the requirements for “advice and guidance from the municipality,” is issued by each ward. For Itabashi Ward, please check with the Housing Policy Division (Phone 03-3579-2730). |
| Landscape Procedure Consultation | Urban Development Department, Urban Planning Division, Urban Landscape Section (North Building 5th Floor, Window 15, Phone 03-3579-2549) (for details, see the next section). |
Source: Itabashi Ward “Management Plan Certification System”/Itabashi Ward “Itabashi Appropriate Management Promotion Condominium Certification System”/Itabashi Ward “Condominium Management Support Project”/Itabashi Ward “Condominium Management Status Notification System”/Itabashi Ward “Landscape Plan” *The status of the system’s window and reception may change.
③ Management Plan Certification System (Entry for Tax and Interest Rate Benefits)
This is a system certified by Itabashi Ward, and upon certification, you can meet one of the requirements for lower interest rates on the Housing Finance Agency’s “Flat 35” and condominium common area renovation loans, as well as the long-term durability promotion tax system (certification alone does not guarantee tax reduction). The certification criteria are mainly based on national guidelines, with the main criteria including holding general meetings at least once a year, establishing management regulations, separate accounting for management fees and repair reserves, ensuring that the amount of arrears is within 10% of the total, and “having a long-term repair plan that includes large-scale repair work at least twice and is created or reviewed within 7 years, with a planning period of 30 years or more.”
*Certification is subject to renewal every 5 years, and approval from the general meeting is required for the application. Please check the ward’s website for details on procedures and certification criteria.
④ National Energy Conservation Support | Housing Energy Conservation 2026 Campaign
Changes for Fiscal Year 2026The “Child-Rearing Green Housing Support Project” for Fiscal Year 2025 has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Additionally, the “Long-Term Excellent Housing Renovation Promotion Project” will end in Fiscal Year 7 and will not be implemented in Fiscal Year 8. Please be careful not to create financial plans based on outdated information.
Mirai Eco Housing 2026 Project
| Target | Renovations of existing homes built before December 31, 2016, regardless of whether they are single-family or multi-family residences. Management associations and management corporations can also become joint contractors (can be used for common area renovations). Rental housing is also eligible. |
|---|---|
| Required Work | Combination of thermal insulation improvements for openings, thermal insulation improvements for the structure (floor, walls, ceiling), and installation of eco-friendly housing equipment is mandatory. |
| Subsidy Limit | Based on the age of the building and the energy-saving performance achieved, 400,000 to 1,000,000 yen per unit (1,000,000 yen for homes built before 1991 that meet mandatory standards). |
| Period | Subsidy applications are generally made by registered contractors (construction contractors) after the completion of work (clients cannot apply themselves). Reservations for subsidy applications must be made by November 16, 2026, and applications must be submitted by December 31, 2026, at the latest (will end once the budget limit is reached). |
Advanced Window Renovation 2026 Project
| Target | Installation of interior windows, replacement of exterior windows, and glass replacement in existing homes (single-family and multi-family) to upgrade to high thermal insulation windows. Subsidy rates are set separately for “low-rise” and “mid-to-high-rise” multi-family residences. |
|---|---|
| Bulk Application for Multi-Family Residences | From May 29, 2026, applications for “bulk subsidy applications for multi-family residences (including reservations)” have begun. The application process is handled by registered contractors (window renovation contractors), and management associations cannot apply themselves, but they can apply for all units collectively, making it a system that works well with large-scale repairs for window and entrance door renovations. |
| Subsidy Limit | For residences, 1,000,000 yen per unit (changed from 2,000,000 yen in fiscal 2025). For non-residential buildings over 240 square meters, the limit is 10,000,000 yen per building. |
| Period | Work must start after November 28, 2025. Subsidy applications are made after the completion and handover of the work, with reservations due by November 16, 2026, and applications by December 31, 2026, at the latest (will end once the budget limit is reached). |
⑤ Tokyo Metropolitan Area, Itabashi Ward Subsidies and Support
| Tokyo Metropolitan Apartment Improvement Construction Subsidy (Interest Subsidy) | If the management association of a fire-resistant condominium in Tokyo uses the Housing Finance Agency’s “Condominium Common Area Renovation Loan,” the Tokyo Metropolitan Government will provide an interest subsidy, lowering the agency’s interest rate by 1% (the interest subsidy period is up to 20 years). The second phase for the fiscal year 2026 runs from October 1, 2026, to February 19, 2027, and applications for each phase will close when they reach 2,500 units or the budget amount (first-come, first-served basis for in-person and mail applications). Buildings constructed under the old seismic standards (before May 31, 1981) require a seismic diagnosis. The contact point is the Tokyo Metropolitan Housing Policy Headquarters, Condominium Division (Phone: 03-5320-7532). |
|---|---|
| Tokyo Metropolitan Rental Housing Insulation and Renewable Energy Promotion Project | This program targets owners of entire rental housing units. High-insulation windows (up to 300,000 JPY/unit), high-insulation doors (up to 270,000 JPY/unit), and insulation material renovations for walls and floors (up to 600,000 JPY/unit) are subsidized at a rate of two-thirds, and energy performance diagnosis and labeling is capped at 1,200,000 JPY/building. Solar power generation and storage batteries are also eligible, and when installing solar panels on the flat roofs of existing rental housing, there is an additional waterproofing cost (180,000 JPY/kW). Pre-application for the subsidy is from May 29, 2026, to March 31, 2027, and it will end when the total application amount reaches the cap. The construction must be carried out by a contractor registered with the Tokyo Metropolitan Environmental Public Corporation “Cool-Net Tokyo.” |
| Itabashi Ward Non-Wooden Building Seismic Subsidy | This program targets buildings such as reinforced concrete, steel, and steel-reinforced concrete structures that received construction confirmation before May 31, 1981, and applications must be made before contracting with designers, etc. According to the ward’s guidelines (fiscal year 2027 version), for condominiums not located along emergency transport roads, the seismic diagnosis is up to two-thirds (maximum 2,000,000 JPY), reinforcement design is up to one-third (maximum 1,000,000 JPY), and seismic retrofitting work is up to two-thirds (maximum 20,000,000 JPY). The details and application period for fiscal year 2026 are not found on the ward’s page, so please check with the contact point. A copy of the general meeting resolution is required for condominiums. The contact point is the Urban Development Department, Building Safety Division, Building Seismic Section (Phone: 03-3579-2554). |
| Itabashi Ward Asbestos Analysis Survey Cost Subsidy | This subsidy covers the costs incurred for analysis surveys, with a maximum of 50,000 JPY per application. Collective housing may be eligible, but buildings owned by multiple parties must have a representative apply, and applications cannot be made for each unit. There is no specified application period, and it will close once the budget is reached. There is no mention of subsidies for removal work on the ward’s page. The contact point is the Resources and Environment Department, Environmental Policy Division, Living Environment Conservation Section (Phone: 03-3579-2594). |
| Tokyo Metropolitan Special Nursing Home Renovation Cost Subsidy | This program supports renovations for elderly facilities (such as special nursing homes). Condominium and rental housing are not eligible. Please check the details and application status on the Tokyo Metropolitan Government’s explanatory video or contact point. |
* The ward’s seismic subsidy requires application before contracting. There are no confirmed subsidies for thermal insulation painting or insulation renovations in the ward. The rental housing insulation and renewable energy promotion project has specific requirements for contractors and other detailed conditions. Please confirm the conditions before contracting.
- Tokyo: Subsidy for Repairs of Condominiums (Official)
- Tokyo: Rental Housing Insulation and Renewable Energy Promotion Project (Official)
- Cool Network Tokyo: FY 2026 Rental Housing Insulation and Renewable Energy Promotion Project
- Tokyo: Explanation Video on Subsidies for Renovation Costs of Special Nursing Homes
- Itabashi Ward: Earthquake Resistance Subsidy for Non-Wooden Buildings (Official)
- Itabashi Ward: Subsidy for Asbestos Analysis Survey Costs (Official)
⑥ Loan System (Housing Finance Agency Condominium Sumairu Loan)
If the management association borrows funds for large-scale repairs, they can utilize the Housing Finance Agency’s “Condominium Common Area Renovation Loan (Condominium Sumairu Loan).”
| Eligible Work | Large-scale repairs, earthquake reinforcement, flood prevention measures, energy-saving measures, balcony repairs, safety measures for elevators and parking lots, asbestos measures, costs for diagnosis and survey design by experts |
|---|---|
| Collateral | No collateral required (joint guarantee by the condominium management center, etc.) |
| Repayment Period | Generally 1 to 10 years; for specific works, 1 to 20 years; if earthquake, flood, and energy-saving works are carried out after obtaining management plan certification, up to 35 years |
| Interest Rate Reduction | ① Holding of Sumairu Bonds ② Obtaining Management Plan Certification ③ Implementation of earthquake, flood, and energy-saving works, each reducing by 0.2% per year (up to 0.6% per year) |
| Main Requirements | Improvement of management regulations, resolution at the general meeting, repair reserve fund delinquency rate generally within 10%. Applications accepted year-round |
Source: Housing Finance Agency “Condominium Sumairu Loan” (Official)
Cases Where Fire Insurance Can Be Used and Cases Where It Should Not Be Used
Damage caused by typhoons, strong winds, flying debris from rooftop waterproof sheets, coping, fences, hail damage, and lightning strikes due to “accidental incidents” may be covered by fire insurance. It is important to separate and record damage from accidents and deterioration during the deterioration diagnosis.
On the other hand, the deterioration itself is not covered. There have been numerous troubles nationwide caused by contractors who solicit with claims like, “You can repair it without any out-of-pocket expenses with insurance,” and the National Consumer Affairs Center has repeatedly issued warnings. False claims can lead to insurance fraud charges. Please confirm the eligibility of your claim directly with your management association or owner to the insurance company or agent. Kakeru Koumuten Co., Ltd. does not provide such guidance.
Building Conditions and Repair Points in Itabashi Ward
Itabashi Ward is formed by the Musashino Plateau, which is approximately 30 meters above sea level, and the alluvial lowlands of the Arakawa River. According to the ward’s description, the northern part is generally lowland, while the southern part is elevated. There are 1,802 condominium buildings with a total of 82,697 units in the ward, with 43.9% of the units being over 30 years old (as of Reiwa 5). The ward is a landscape administrative body and has established a unique landscape plan. However, these figures are for the entire ward. The age and deterioration status of your own building will be individually confirmed through on-site surveys.
(as of May 1, Reiwa 8)
(as of May 1, Reiwa 8)
(9th among 23 wards in Reiwa 6)
(1,802 buildings as of Reiwa 5)
(based on number of units, as of Reiwa 5)
Source: Itabashi Ward “Population and Number of Households Based on the Basic Resident Register (as of May 8)” / Itabashi Ward “Profile of the Ward” / Itabashi Ward “Results of the Condominium Actual Condition Survey (Reiwa 6, PDF)” *Population and household numbers are based on values publicly announced by the ward based on the Basic Resident Register, including foreign residents. The percentage of buildings over 30 years old is based on the ward’s actual condition survey (from July Reiwa 5 to February Reiwa 6). The number of units over 40 years old is not indicated within the confirmed range.
Organizing the Topography and Buildings of Itabashi Ward from a Repair Perspective
The table below summarizes only the items that can be confirmed from the district and metropolitan public documents. The overall figures for the district do not determine the circumstances of individual buildings.
| Item | Confirmable Content | Perspective When Considering Repairs |
|---|---|---|
| Topography | According to the district’s description, it is formed by the Musashino Plateau, which has an average elevation of around 30 meters, and the alluvial lowlands of the Arakawa River. Generally, the northern part is lowland, while the southern part is elevated, with the highest point near the Tokumaru Substation (about 35m) and the lowest point located between the Shinkawaguchi River and the Arakawa River (about 2m). | The location of the building, whether on the plateau or in the lowland, affects how rainwater accumulates and the expectations for flooding. On rooftops and balconies, the condition of drains, gutters, and waterproof layers should be included in the inspection items. |
| Flood Risk Assessment | The flood hazard maps include the Arakawa flood version and the inundation duration version (revised December of Reiwa 7) and the small river version (Shakujii River, Shirako River, Shinkawaguchi River, revised August of Reiwa 8), all based on the maximum expected rainfall (Arakawa basin: 72-hour rainfall of 632mm, Shakujii River, Shirako River, Shinkawaguchi River: maximum hourly rainfall of 153mm and total rainfall of 690mm). The storm surge hazard map was revised in December of Reiwa 7. | Please check the hazard map for your building’s location for assessments. It is reassuring to share the locations of facilities such as electrical rooms and pumps with the management association during the repair planning stage. |
| Age of Condominiums | There are 1,802 condominium buildings and 82,697 units in the district, with 36,343 units (43.9%, as of Reiwa 5) being over 30 years old. The number of buildings subject to the Tokyo Metropolitan Ordinance management status report (new constructions before December 31, 1983) is reported as 587. | More buildings are reaching their second and third major repairs. Advancing the review of long-term repair plans and reserve funds early will expand your options. |
| Factories and Businesses | According to the district’s description (based on industrial statistics), the printing-related industry is the largest sector in terms of the number of factories, number of employees, and manufacturing shipment value. Optical and precision equipment and copper processing are also mentioned as local industries. The district promotes optical-related businesses as the “town of optics.” | In sites where residences and businesses are in close proximity, careful consideration of delivery routes and nearby residents is essential. We can also consult on the roofs and exterior walls of factories and warehouses. |
| Landscape Rules | Itabashi Ward is a landscape administrative body (since March 23, 2011) and has a landscape plan. According to the guidance, buildings in general areas that are 20m or taller, have a total floor area of 2,000㎡ or more, or a site area of 1,000㎡ or more are subject to notification, and changes in color or repainting to colors that do not comply with standards are also included as subject actions. Key landscape formation areas are subject regardless of scale. | Whether repainting the exterior walls requires notification depends on the building’s size and location. Key areas include Kaga 1 and 2 Chome, Tokiwa 1 and 2 Chome, and Itabashi-juku Fudō Street (see the table below). |
| Areas with Dense Wooden Houses | Two areas have been designated as non-combustible special zones: the area around Otaniguchi 1 Chome and the area west of Oyama Station. | In areas where roads and buildings are in close proximity, we will confirm the delivery routes and scaffolding layout on-site. |
| District Plans and Building Agreements | There are district plans (including roadside district plans) within the ward, and there are no registered areas or agreements concluded within the district. | In areas with district plans, there may be different regulations regarding the color of exterior walls. We will confirm the location of the building during the investigation phase. |
Four Key Factors to Consider for Large-Scale Repairs Unique to Itabashi Ward
Based on the topography and age trends of Itabashi Ward, as well as the rules of the town, we have organized four factors to keep in mind for large-scale repairs. Since circumstances vary for each building, individual confirmation will be conducted through on-site surveys.
① Consideration of Plateaus, Lowlands, and River Flooding
The ward spans the Musashino Plateau and the alluvial lowlands of the Arakawa River, with flood hazard maps targeting the Arakawa, Shakujii, Shirako, and Shinkawaguchi rivers. This is a projection, and the assumptions about flooding for each building vary by location. On rooftops and balconies, if roof drains or gutters become clogged during heavy rain, it can lead to puddles and leaks. We recommend conducting inspections and cleaning of drains and including renovations in the work items based on their condition. For equipment such as electrical rooms and pumps, it is reassuring to share considerations for placement to prepare for flooding with the management association during the repair planning stage.
② Over 40% of Condominiums are Over 30 Years Old
According to the ward’s actual survey, 43.9% of the 82,697 condominium units are over 30 years old (as of Reiwa 5). Generally, buildings approaching their second or third large-scale repairs tend to experience significant deterioration in substrate repairs, tiles, and waterproofing, so early building diagnostics can be beneficial. The management plan certification is handled by Itabashi Ward, and there is also a unique certification system for condominiums that have received national certification.
③ Landscape Notifications are Determined by Scale and Area
Itabashi Ward is a landscape administrative organization with a landscape plan. In general areas, buildings that are 20m or taller, have a total floor area of 2,000㎡ or more, or a site area of 1,000㎡ or more are subject to notification, including changes in color and repainting to the same color that does not meet standards. The key landscape formation areas in Kaga 1 and 2 Chome, Tokiwadai 1 and 2 Chome, and Itabashi-juku Fudō Street are subject to notification regardless of scale. As of April 1, Reiwa 3, “accent colors” have also been added to the color standards. It is important to incorporate the duration of procedures into contracts and schedules. Our company will also check whether the area is subject to notification during the survey.
④ Printing and Optical Factories in Dense Areas
According to the ward’s description, the printing-related industry is the largest manufacturing sector in the ward, with optical, precision machinery, and copper processing also being local industries. In addition to condominiums and apartments, we can also consult on large roofs and exteriors of factories, warehouses, and office buildings. Our company has sheet metal craftsmen on staff and can handle large roofs of factories. In locations where residential and business areas are in close proximity, or near areas densely populated with wooden houses like non-combustible special zones, the splashing from high-pressure washing, the smell of paint, and the movement of construction vehicles can easily reach nearby residents, so we will provide thorough explanations in advance.
Source: Itabashi Ward “Flood Hazard Map”/Itabashi Ward “Storm Surge Hazard Map”/Itabashi Ward “Results of Apartment Reality Survey (PDF)”/Itabashi Ward “Industry in Itabashi”/Itabashi Ward “Non-Combustible Special Zone”/Itabashi Ward “Building Agreement”
When Landscape Procedures Are Required (Buildings)
When performing exterior wall repainting and other activities within Itabashi Ward, the notification related to the ward’s landscape plan is as follows.
| Area/Scale | Applicable Actions | Procedure |
|---|---|---|
| General Area Height of 20m or more, total floor area of 2,000㎡ or more, or site area of 1,000㎡ or more (according to the information desk) |
New construction, extension, as well as color changes and repainting in the same color to colors that do not meet the standards | Notification to Itabashi Ward (before starting work). Please confirm the timing of submission and details of the site area conditions with the ward’s Urban Landscape Division. |
| Landscape Formation Priority District Kaga 1-2 Chome / Tokiwadai 1-2 Chome / Itabashi-juku Fudō Street |
All actions are subject regardless of scale | Notification to Itabashi Ward. Akatsuka 4-5 Chome is currently undergoing procedures for designation. Please confirm whether your building’s location is subject to this with the Urban Landscape Division (phone 03-3579-2549). |
| District Planning Area | There may be separate provisions for each district | The notification desk is the Building Guidance Division, Design Review Section (phone 03-3579-2573). |
Source: Itabashi Ward “Landscape Plan” / Itabashi Ward “Window Guide for Notifications Based on the Landscape Act (PDF)” / Itabashi Ward “District Plan” *The scale applies to buildings. Please confirm at the window whether your building is subject to this.
Points of Discussion When Proceeding with Construction in Itabashi Ward
| Point of Discussion | Actual Situation in Itabashi Ward and Kakeru Koumuten’s Response |
|---|---|
| Exterior Wall Color and Landscape Notification | Depending on the size and location of the building, changes in color or repainting in the same color may be subject to the ward’s landscape plan notification. Areas of landscape formation are subject regardless of size. We will confirm whether it is subject during the investigation phase, decide on colors through color simulation and trial painting, and assist in preparing the necessary documents for notification. |
| Rainwater Drainage and Drains | As a ward spanning plateaus and lowlands, flooding from the Arakawa and Shakujii rivers is anticipated. Drainage during heavy rain is crucial. We will check the roof drains, gutters, and balcony drainage outlets during the investigation and include any blockages or damage to the waterproof layer in our proposals. |
| Material Delivery, Scaffolding, and Parking | In sites with limited road widths or close distances to neighboring properties, large vehicles may not be able to enter. Our own scaffolding team will assess the site and plan the delivery route and scaffolding layout. Vehicles on the scaffolding side will need to be temporarily moved, so we will arrange the relocation together 2 to 3 months before construction starts. |
| Proximity of Residential and Business Locations | In areas where residences are close to factories or businesses, splashing from high-pressure washing, paint odors, and the movement of construction vehicles can easily affect neighbors. We recommend prior explanations through neighborhood associations or management organizations, and we strictly adhere to greeting rounds, posting schedules, and keeping work hours. |
| Plans for Older Buildings | For older buildings, understanding the condition of the substrate, tiles, and waterproof layers through building diagnostics is the starting point. Based on a deterioration diagnosis report with photos, we will categorize the work to be done this time, work that can be consolidated while scaffolding is up, and work that can be postponed for next time. |
*Kakeru Koumuten has established five bases centered in Yokohama City and will visit Itabashi Ward.
Deterioration Symptoms and Timing That Require Major Repairs
Generally, large-scale repairs are recommended every 12 to 15 years. According to a survey by the Ministry of Land, Infrastructure, Transport and Tourism, the actual repair cycle is most commonly 13 years, with about 70% falling within the 12 to 15 year range, and the cycle tends to shorten with each occurrence. However, the actual decision should be based on the condition of deterioration rather than just the number of years, so if you observe any of the symptoms listed below, we recommend an early on-site inspection.
| Location | Dangerous Deterioration Signs if Left Unattended | Main Countermeasures |
|---|---|---|
| Exterior Wall (Painted Surface) | Chalking (white powder on hands), fading, cracks wider than 0.3mm, blistering or peeling of the paint film | Substrate repair + exterior wall painting |
| Exterior Wall (Tile Surface) | Tile lifting or falling off, chipping of joints, efflorescence, hollow sounds when tapped | Injection for lifting, replacement, clear waterproofing |
| Sealing | Cracks in joints, shrinkage, peeling, hardening | Re-sealing |
| Roof and Balcony | Bloating or breaking of the waterproof layer, puddles, clogged drains, leaks to lower floors | Urethane waterproofing, sheet waterproofing, drain renovation |
| Metal Parts and Steel Stairs | Rust, peeling of the paint film, corrosion of treads | Grinding + rust prevention + painting, component replacement |
| Roof | Lifting of ridge cap, cracking or warping of slate, moss, misalignment of tiles | Roof painting, overlay method, re-roofing |
| Concrete | Spalling (exposed rebar with rust stains), water leakage from cracks | Spalling repair + resin mortar filling |
| Common Corridor and Stair Floor | Lifting or peeling of long sheet, opening at edges, exposure of substrate | Replacement of long sheet + substrate waterproofing |
Estimated Repair Cycles by Location (Ministry of Land, Infrastructure, Transport and Tourism Guidelines)
| Location/Work | Estimated Cycle | Location/Work | Estimated Cycle |
|---|---|---|---|
| Exterior Wall Painting (Repainting) | 12 to 15 years | Re-sealing | 12 to 15 years |
| Exterior Wall Painting (Existing Removal + Painting) | 24 to 30 years | Metal Parts Painting | 5 to 7 years |
| Roof Waterproofing (Repair) | 12 to 15 years | Water Supply Pipe (Rehabilitation/Replacement) | 19 to 23 years / 30 to 40 years |
| Roof Waterproofing (Removal + New Installation) | 24 to 30 years | Drainage Pipe (Rehabilitation/Replacement) | 19 to 23 years / 30 to 40 years |
*The above are reference examples from the guidelines and are not uniform construction deadlines. The actual cycle will be set according to the building’s specifications, location conditions, and deterioration status.
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Creating Long-Term Repair Plans” (Revised June 2024, PDF) / Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Repair Work for Condominiums in FY2021”
Examples of Large-Scale Renovation Work
This is an example of exterior renovation work on a mixed-use building handled by Kakeru Koumuten. The building had leaks occurring in several places, and we combined clear waterproofing for the tile exterior wall with waterproofing for the rooftop for the renovation.
Exterior Renovation Work on a Mixed-Use Building (Tile Exterior Wall Waterproofing + Rooftop Waterproofing)
| Construction Details | Partial replacement of damaged tiles / Painting of ancillary parts (pipes, water cut-off) / Rooftop waterproofing work (urethane waterproofing) / Exterior wall tile waterproofing (Seven S) / Sealing work around sashes / Repair of exterior wall tile mortar joints / Removal of ivy |
|---|---|
| New Materials Used | Exterior wall tiles: Kunishiro Tiles / Painting of ancillary parts: Radical silicone paint / Rooftop waterproofing: High-strength urethane (Sarasene A) / Exterior wall tile waterproofing: Seven S |
| Price Range | 4,000,000 – 4,100,000 JPY |
| Construction Period | 45 days |
| Location | Not disclosed |
| Background to the Construction | Due to rain leaks occurring from several areas such as the exterior walls and rooftop, we proposed waterproofing for the entire exterior wall. Seven S is a clear waterproofing material for tile exteriors, and while the cost is somewhat high, its waterproofing performance is excellent, making it recommended for cases where rain leaks are occurring from multiple areas of the exterior wall. |
Customer Feedback
Flow from On-site Investigation to Completion of Construction
From inquiry to completion of construction and aftercare, a single representative will consistently handle your case. In the case of management associations, a resolution at the general meeting is necessary, so starting the process 1 to 1.5 years before the desired start date will allow for a smoother progression.
- Contact Us (Free) Please reach out via phone, form, or LINE. If you have estimates from other companies, it’s fine to just present those.
- On-site Investigation & Building Diagnosis (Free) We will conduct a survey of the exterior walls, check for cracks, sealing, and waterproofing layers, and if necessary, investigate the rooftop, high places, and leak areas using drones or thermal imaging. For properties in Itabashi Ward, we will also check the road width, distance from neighboring properties, delivery routes, parking, and drainage conditions on rooftops and balconies.
- Investigation Report & Estimate Submission We will provide a deterioration diagnosis report with photos and an estimate detailing quantities, methods, and materials for each work item. Multiple plans can also be proposed.
- Plan Decision & Contract Confirm colors using color simulations, paint boards, and trial painting. For management associations, we can assist in preparing materials for general meetings. For buildings requiring notification under the Itabashi Ward landscape plan, we will explain the notification process and color considerations.
- Notification to Residents & Neighbors We will distribute construction notices, conduct greetings to neighbors, and set up a bulletin board at the entrance (with a schedule and laundry information). If temporary relocation of parking is necessary, adjustments will be made at this stage.
- Temporary Scaffold Installation & Various Works Our in-house scaffold team will set up scaffolding, followed by high-pressure washing → substrate repair → sealing → exterior wall painting & tile repair → waterproofing → iron parts & ancillary work in that order. A supervisor will inspect each process and take construction photos.
- Completion Inspection, Scaffold Dismantling & Handover We will confirm the finish in the presence of the customer and provide construction photos, a report on the paints used, and a warranty certificate.
- Aftercare Maintenance We will send annual DM notifications, and inspections can be conducted every year. Simple repairs such as partial sealing are provided free of charge.
Resident Communication, Additional Work Approval, Inspection Reports
Just as important as the construction itself is “when, what, and with what materials we report”. At Kakeru Koumuten, we provide materials and reports in the following four situations.
| Situation | Materials Provided / Actions Taken |
|---|---|
| Before Construction Building Diagnosis |
We will provide a deterioration diagnosis report with photos. This document summarizes the deterioration areas and the basis for the proposed scope of work. |
| Before Construction to During Construction Notification to Residents & Neighbors |
We will distribute construction notices, conduct greetings to neighbors, and provide a schedule and laundry information on the entrance bulletin board. |
| During Construction Approval for Additional Work |
Deterioration discovered after scaffolding is set up will be addressed with photos and quantities & costs presented for approval before proceeding with the work. |
| During Construction to Completion Inspection Report |
A supervisor will inspect each process and take construction photos. Upon completion, we will confirm the finish in the presence of the customer and provide construction photos, a report on the paints used, and a warranty certificate. |
* For management associations, it is smooth to decide in advance who will approve additional work (such as the chairman or repair committee) and the estimated amount that requires approval before the contract.
How Will Life Be During Construction? Impact on Residents
For large-scale repairs, the principle is to proceed while you continue to live in your home. However, there will be some restrictions on daily life while scaffolding is in place. Most troubles can be prevented by providing prior notice, so Kakeru Koumuten Co., Ltd. thoroughly explains and posts information before construction begins.
| Impacts | What Actually Happens / Our Response |
|---|---|
| Laundry | On days of high-pressure washing, painting, and waterproofing, outdoor drying is not possible. We will inform you via bulletin board and each unit’s mailbox about “which side will be worked on today” and will ensure as many days as possible for drying. |
| Window Opening and Closing | In addition to washing and painting days, there may be times when windows cannot be opened during other processes such as protection, drying, and waterproofing. We will provide information for each process, so please check the postings and notifications. We will schedule the work to avoid continuous closures. |
| Balcony | During floor waterproofing and handrail painting, we ask for temporary relocation of personal items, potted plants, and air conditioning outdoor units. The timing will be notified in advance for each unit. |
| Noise and Odor | The period of substrate repair (chipping and drilling) will generate the most noise. Working hours are generally from 8 AM to 5 PM, and we will accommodate requests such as refraining from work on Sundays and holidays. Low-odor paint options are also available. |
| Security and Privacy | Scaffolding can become an entry point. We can take measures such as blocking sightlines with mesh sheets and installing locks and sensor lights on the scaffolding’s access stairs at night. We also emphasize manners education for visitors. |
| Parking | Vehicles on the side where scaffolding will be erected will need to be temporarily relocated. Since securing a relocation spot may take time, we will work together to secure a relocation spot starting 2 to 3 months before construction begins. |
| Pets, Small Children, and Working from Home | If you have sensitivities to noise, please inform us in advance, and we may be able to adjust the work schedule accordingly. Please feel free to let us know. |
| Rented Rooms | We assist owners in creating notification letters for tenants. If you are concerned about the impact of construction on occupancy rates, we can also propose an image change using color simulations. |
How to Choose a Large-Scale Repair Contractor and Ordering Method
There are many large-scale repair contractors that cover Itabashi Ward, and you may be unsure which contractor to choose. When requesting renovations for apartments, condominiums, or buildings, please check the following four points.
● Have extensive experience in large-scale repairs
● Confirm the presence of warranties and aftercare services
● Obtain estimates from multiple contractors (at least 3 companies)
● Confirm whether they are self-managed
Have Extensive Experience in Large-Scale Repairs
Large-scale repair contractors often have websites that showcase their exterior renovation achievements. If they provide detailed explanations of repair contents with photos, it gives you peace of mind as a reference when you actually request their services.
Using Google and review sites to evaluate large-scale repair contractors can also be effective! Be cautious if there are many negative reviews. If there are few reviews, also check their construction achievements, explanation content, and management systems.
Large-scale repair work involves not only the construction itself but also the potential for troubles with residents and nearby neighbors. Therefore, it is necessary to post updates on the progress of the work and information about laundry on bulletin boards to prevent issues before they arise. Kakeru Koumuten Co., Ltd. specializes in exterior work, and we receive many requests for exterior renovations of apartments and condominiums.
Check for Warranty and Aftercare Services
When choosing a large-scale repair company, let’s confirm the availability of warranties. If any issues such as leaks occur after the work is completed, having a leak warranty from the contractor ensures that repairs can be made at no cost, providing peace of mind! Companies that offer warranty periods are often confident in their work, making this a key criterion for selecting a contractor.
Warranty periods vary by contractor and the nature of the work, but typically range from 1 to 10 years. Emergency repairs or partial fixes often do not come with a leak warranty. Some contractors also provide aftercare services separate from warranties, so be sure to check for warranties and aftercare services.
Kakeru Koumuten Co., Ltd. sends out annual direct mail for aftercare maintenance, allowing for yearly inspections. We also provide free assistance for simple repairs such as partial sealing.
Obtain Estimates from Multiple Contractors (at least 3 companies)
When requesting large-scale repairs, let’s obtain estimates from multiple contractors. It is important to get estimates from at least 3 companies and compare their quotes and reports! Even for the same work, costs can vary between contractors, and warranties and aftercare services may differ. Additionally, obtaining multiple estimates makes price negotiations easier.
When comparing estimates, consider not only the cost but also the “items in the estimate,” “methods and materials for substrate repairs and exterior wall painting,” and “confirmation of the process”. Be cautious, as lower-grade materials or skipping processes can reduce costs, so avoid making decisions based solely on price. Especially since substrate repair work can be difficult to assess visually, ensure that the repair methods are appropriate for the condition of the substrate!
Check These Points on the Estimate (Checklist)
| Confirmation Items | Points to Consider |
|---|---|
| Is there an excessive use of “lump sum” notation? | Are the quantities and unit prices clearly stated? With “Exterior Wall Repair Lump Sum,” comparisons and verifications cannot be made. |
| Do the quantities match the actual measurements? | Are there quantities recorded that deviate significantly from the drawings or actual measurements? This is the area where inflation is most likely to occur. |
| Proportion of miscellaneous expenses | Details and proportions of site management costs, general management costs, statutory welfare costs, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, the average is about 10% of the construction cost (excluding common temporary costs), but it varies depending on the scale and conditions of the building, so there is no uniform standard. |
| Are the names of materials written? | Are the manufacturer names, product names, grades, and number of coats for paints and waterproofing materials specified? |
| Treatment of quantities for substrate repairs | This is an item that cannot be accurately measured until scaffolding is erected. Is it clearly stated whether it is “estimated quantity” or “actual quantity settlement,” and what the arrangements are for increases or decreases? This is the most important point. |
| Guarantees and after-inspection | Warranty period for each construction, frequency of inspections, and scope of free support. |
| Company backing | Type of construction industry license, track record of similar scale and structure, presence of qualified personnel. |
Confirm if it is managed in-house
Large-scale repair work involves various tasks such as “substrate repair work,” “exterior wall painting,” “waterproofing work,” and “pipe replacement,” and the plan content will change based on the actual deterioration condition and customer preferences.
If a contractor completely outsources to subcontractors, they may lack knowledge and experience, leading to proposals for repairs in irrelevant areas or unnecessary work. If you request a subcontractor after investigation, it may incur additional time and costs. By having knowledge and experience and managing in-house, responsible construction can be performed at a reduced cost.
Moreover, if a contractor is outsourcing to subcontractors, there is a risk that their response will be delayed in the event of any trouble during construction. It is safer to avoid having a company that has not actually met with the customer manage the construction. Kakeru Koumuten performs everything from temporary scaffolding installation to exterior wall painting and waterproofing work in-house, with knowledgeable and experienced personnel managing the construction!
There are three ordering methods. The choice affects the approach.
Especially for management associations, it is necessary to decide “how to request” before “which company to hire.” The main ordering methods are the following three.
| Method | Procedure | Advantages | Disadvantages |
|---|---|---|---|
| Responsible Construction Method | The construction company handles investigation, design, construction, and management all at once | No additional costs for commissioning design consultants (investigation and design costs may be included in the construction costs) / Single point of contact reduces the burden on the management association / Clear accountability / Can shorten the period until ordering | Specifications can easily be left to the construction company, making it difficult to compare side by side / Third-party checks are hard to implement, requiring the management association to verify price, specifications, and construction status |
| Design Supervision Method | A design office or consultant conducts investigation and design, while a separate company is responsible for construction | Allows comparison of construction companies under the same conditions / Independent supervision during construction | Consulting fees are required separately / Attention needed for risks of conflicts of interest and collusion / Can lead to longer timelines |
| Management Company Prime Contract Method | The management company acts as the prime contractor, with subcontractors performing the construction | Easy coordination with daily management / Minimal effort required from the management association | Intermediate margins can lead to higher costs / Competition principles may not be effective |
Collusion and Improper Consulting Issues in Large-Scale Renovations and Self-Defense Measures
Latest 2026 In the large-scale renovation industry, improper orders linked between design consultants and construction companies have long been a concern. The Ministry of Land, Infrastructure, Transport and Tourism issued warnings and notifications to management associations in January 2017 and April 2023, and on September 28, 2026, the Japan Fair Trade Commission announced that it had issued exclusion orders to 38 companies and payment orders for a total of 1.63788 billion yen to 37 companies regarding large-scale renovation work commissioned by condominium management associations to design consulting firms in the Kanto region (two design consulting firms were also subject to exclusion orders).
※Based on the announcement by the Japan Fair Trade Commission (September 28, 2026).
Three Typical Methods
① Dummy Estimates
A predetermined company is chosen to receive the order, while other companies only submit formal high estimates, creating a “fixed race.” It appears to the management association that “proper competitive estimates were obtained.”
② Collusion with Design Supervisors
While consultants contract at extremely low design management fees, they receive kickbacks from the high construction costs of their partner construction companies. Design management fees that are too low are a warning sign.
③ Back Margin
A certain percentage of the contract amount is given as a kickback, which is then added to the construction costs as an expense. As a result, the management association ends up paying extra.
Source: Yokohama City “What is collusion in large-scale repair work for condominiums?” / Ministry of Land, Infrastructure, Transport and Tourism “On the proper ordering of large-scale repair work for condominiums” (Notification dated April 3, Reiwa 5, PDF)
Self-Defense Measures for Management Associations
- Obtain independent estimates from multiple companies
- Consult with neutral third parties such as condominium management professionals or architects
- Document the vendor selection process in minutes to ensure transparency
- Confirm the reasons for unusually low design management fees from consultants
- Include a penalty clause in the contract for cases of collusion discovery
- Avoid concentrating information with a single consultant and verify specifications by the management association itself
Contact Points for Third-Party Consultation
If you are unsure about reading estimates or how to proceed with vendor selection, consulting a third party separate from the construction company can be effective. Here are the main contact points available for management associations in Itabashi Ward.
| Contact Point | Details |
|---|---|
| Itabashi Ward Housing Policy Division Condominium Policy Section | Phone 03-3579-2730. This is the contact point for management plan certification for condominiums in the ward, free dispatch of condominium management advisors, and the management status reporting system. |
| Tokyo Metropolitan Government Comprehensive Consultation Desk for Condominium Sales | Phone 03-6427-4900. This desk handles inquiries regarding the condominium management status reporting system. |
| Smile Dial (Housing Renovation and Dispute Resolution Support Center) | Phone 03-3556-5147 (Monday to Friday 10:00 AM to 5:00 PM, excluding holidays and year-end/New Year). This center provides consultations regarding large-scale repairs, and the estimate checking service is free. |
| Condominium Management Center | Phone 03-3222-1519 (Monday to Friday 9:30 AM to 5:00 PM, excluding holidays and year-end/New Year). This center handles consultations regarding the maintenance of buildings and facilities. For inquiries about the management plan certification support system, call 03-6261-1274. |
| Condominium Management Plan Certification System Consultation Dial | Phone 03-5801-0858. Condominium management professionals will answer questions about certification standards and application procedures. |
Source: Itabashi Ward “Condominium Management Support Project”/Itabashi Ward “Condominium Management Status Notification System”/Ministry of Land, Infrastructure, Transport and Tourism “Consultation Desk for Large-Scale Renovation Work Orders”/Condominium Management Plan Certification System Consultation Dial
Frequently Asked Questions about Large-Scale Repairs in Itabashi Ward
- How much does large-scale repair in Itabashi Ward cost?
- For condominiums, according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% fall within the range of 750,000 to 1,500,000 yen (excluding consumption tax and common temporary costs), with the most common range being 1,000,000 to 1,250,000 yen. Based on our company’s construction records, the cost for a two-story wooden apartment ranges from 2,000,000 to 4,000,000 yen, for a three-story steel or RC apartment from 4,000,000 to 9,000,000 yen, and for small condominiums or mixed-use buildings from 5,000,000 to 15,000,000 yen. The cost varies depending on the condition of the substrate and whether waterproofing and roofing work are needed, so we will provide an estimate through a free on-site survey.
- How often should large-scale repairs be conducted?
- Generally, a cycle of 12 to 15 years is a guideline, and the actual cycle is most commonly 13 years according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey, with about 70% falling within 12 to 15 years. However, the decision should be based on the condition of deterioration rather than just the number of years. If deterioration of sealing, tile lifting, or breakage of the waterproof layer is observed, it is advisable to carry out repairs without waiting for the cycle, as this can ultimately reduce costs. We will confirm and assess the age and condition of your building during the on-site survey.
- How long does the construction period take? Can residents stay during the work?
- For apartments, the period is typically 3 weeks to 2 months, for small condominiums or buildings 1.5 to 3 months, and for condominiums with over 50 units about 4 to 6 months. Residents can remain in their homes during the construction. However, while scaffolding is in place, there will be restrictions on drying laundry outside and opening windows, so we thoroughly ensure minimal impact on daily life by distributing advance notices, providing information on the bulletin board regarding the schedule and laundry, and strictly adhering to working hours.
- How long should I expect from the start of planning to the completion of construction?
- For management associations, it typically takes about 1 to 1.5 years for establishing a repair committee, conducting building diagnostics, selecting contractors, and passing resolutions at general meetings, followed by 3 to 6 months for construction. Overall, it is advisable to plan for about 2 years to proceed comfortably. If you are utilizing subsidies or tax incentives, please also factor in the time required for obtaining management plan certification (procedures for district certification).
- Are there any subsidies available for large-scale repairs in Itabashi Ward?
- As of now, there do not appear to be any subsidies specifically for large-scale repair work for condominiums in Itabashi Ward or Tokyo. However, potential options include the Tokyo Metropolitan Government’s subsidy for condominium improvement work (interest subsidies for management associations utilizing loans from the Japan Housing Finance Agency), reductions in fixed asset tax (50% for the 23 wards of Tokyo), free dispatch of condominium management advisors from the ward, and seismic reinforcement subsidies for non-wooden buildings (with conditions). Owners of rental apartments may be eligible for the Tokyo Metropolitan Government’s “Insulation and Renewable Energy Promotion Project for Rental Housing.” If the work includes windows and insulation, it may also qualify for “Advanced Window Renovation 2026” and “Mirai Eco Housing 2026.” The application timing and applicants vary by program, so please check the eligibility conditions and application procedures for each program before contracting or starting construction.
- I heard that fixed asset tax can be reduced through large-scale repairs. Is that true?
- It is true if the requirements are met. Under the condominium longevity promotion tax system, if a condominium that is over 20 years old and has more than 10 units conducts large-scale repairs (including exterior painting, floor waterproofing, and roof waterproofing) that contribute to its longevity, the fixed asset tax amount for the following year will be reduced. The reduction rate for the 23 wards of Tokyo is 50%, and the tax amount is applicable for up to 100 square meters per unit. The eligible repairs must be completed between April 1, 2023, and March 31, 2027, and a declaration must be made within three months of completion to the Tokyo tax office in the ward where the condominium is located (for Itabashi Ward, it is the Itabashi Tax Office, phone 03-3963-2111). If the manager submits the declaration collectively, it can replace individual declarations from each owner. For certified management plan condominiums, it is also a requirement to raise the repair reserve fund to the certification standard, which takes time to prepare, so it is recommended to start the process more than a year before the construction.
- Are there any changes to subsidies starting from the fiscal year 2026?
- There are four main options. ① Postpone low-urgency repairs based on a deterioration diagnosis, ② Review the scope and specifications of the work, ③ Check for subsidies and support systems, ④ Consider increasing the repair reserve fund or financing from the Japan Housing Finance Agency. The agency’s condominium common area renovation loans do not require collateral, and interest rates can be reduced by up to 0.6% per year by obtaining management plan certification and implementing energy-saving and seismic retrofitting work. Please note that postponing waterproofing and tile peeling measures often ends up being more costly, so please consult us for a decision on separation.
Can scaffolding be set up on narrow sites or buildings close to neighboring properties?
Yes, it can. There are sites in Itabashi Ward with limited road widths and buildings close to neighboring properties. Kakeru Koumuten Co., Ltd. owns its own scaffolding materials and has its own scaffolding team, allowing us to plan the delivery route and scaffolding layout after confirming the site. This is an area where additional costs can easily arise after seeing the site, so it is important to confirm the delivery route during the estimation stage.What happens to the parking for residents during construction?
Vehicles on the side where scaffolding will be erected will need to be temporarily moved. In buildings where there is not enough parking space on the premises, it may take time to secure an alternative parking location. Kakeru Koumuten Co., Ltd. will coordinate with you about the availability of nearby parking starting 2 to 3 months before construction begins.Can I freely decide the color of the exterior walls?
Itabashi Ward is a landscape administrative body and has a landscape plan for the ward. In general areas, buildings that are 20m or taller, have a total floor area of 2,000㎡ or more, or a site area of 1,000㎡ or more are subject to notification, and changes in color or repainting to colors that do not meet the standards are also included in the subject actions. The landscape formation priority areas in Kaga 1-2 Chome, Tokiwa 1-2 Chome, and Itabashi-juku Fudō Street are subject regardless of scale. Please check with the Urban Planning Division, Urban Landscape Section of the ward (phone 03-3579-2549) to see if your building is subject to this. There may be separate regulations in district planning areas. We will also check this during our investigation. Sharing a color simulation to visualize the completed image can facilitate discussions.Why is the north-facing exterior wall particularly covered in moss and algae?
The north side receives less sunlight throughout the day, and when shadows from trees or neighboring buildings overlap, moisture can accumulate, making it easier for algae, moss, and mold to thrive. This is more likely to occur in locations close to trees. After thoroughly cleaning with high-pressure washing, choosing paint with anti-algae and anti-mold properties can help prevent recurrence. Additionally, we recommend checking for blockages in roof drains and gutters caused by fallen leaves, as these often lead to water pooling on the roof and leaks.Which method should I choose: responsibility construction method or design supervision method?
In buildings with fewer units, the burden of consulting fees tends to be heavier, so for small to medium-sized buildings with fewer units, the responsibility construction method is often more suitable. The design supervision method allows for comparison of construction companies under the same conditions since a third party creates the specifications, but it incurs separate consulting fees and requires caution regarding conflicts of interest and collusion risks. Even with the responsibility construction method, verifying price, specifications, and construction status is essential. Kakeru Koumuten Co., Ltd. provides estimates that clearly state quantities, methods, and materials for each construction item, allowing you to compare us on the same level as other companies.How can I detect collusion in large-scale repairs?
There are three typical tactics. ① Pre-selecting a contractor and having other companies submit only formal high estimates, known as “dummy estimates,” ② A consultant contracts at an extremely low design supervision fee and receives kickbacks from partner companies, creating collusion, ③ Adding a portion of the contract amount as a back margin to the construction costs. Countermeasures include obtaining independent estimates, consulting a neutral third party, documenting the selection process in meeting minutes, and including penalty clauses in contracts.How many companies should I get estimates from?最低3社をおすすめします。多すぎると比較しきれず、少なすぎると競争が働きません。大切なのは社数よりも「同じ土俵を作ってから比べること」です。共通の仕様書や数量表を作って同一条件で依頼し、「一式」表記を認めず内訳明細を必須にすると、金額差が範囲の違いなのか単価の違いなのかがはっきりします。
- What is the difference if we have our own scaffolding?
- In large-scale repair projects, temporary construction accounts for about 20% of the total cost (according to the Ministry of Land, Infrastructure, Transport and Tourism’s fiscal year 2021 survey). By not outsourcing scaffolding work, we can easily control costs in this area, and our in-house scaffolding team can flexibly respond to sudden changes in the schedule or additional work. Kakeru Koumuten Co., Ltd. owns scaffolding materials for approximately 100 single-family homes and plans according to the site, even in areas with limited road width.
- Can I just have a look at the estimate while in the middle of getting multiple quotes?
- Of course, that’s possible. If you bring estimates from other companies, we will check for free whether the items, quantities, methods, and materials are appropriate and provide you with an estimate under the same conditions. We welcome multiple quotes.
- Can I request just emergency repairs for a leak?
- Yes. As a preliminary step before large-scale repairs, we also accept requests for emergency repairs or partial repairs for leaks. We will identify the cause using thermal imaging and drones and propose the minimum necessary repairs.
- Can you handle roofing or exterior wall materials that contain asbestos?
- Yes, we can. We have qualified personnel who are asbestos work supervisors and building material surveyors, and we handle everything from the legally required preliminary surveys to the cover method and removal of asbestos-containing roofing materials. In Itabashi Ward, there is a subsidy for asbestos analysis and investigation costs (up to 50,000 yen per instance), which may apply to multi-family residences. For buildings owned by multiple people, the representative must apply. There is no specified application period, and it will close once the budget is reached. The contact point is the Environmental Policy Division, Living Environment Conservation Section of the ward (phone 03-3579-2594). We will also provide guidance based on the survey results.
- What happens if large-scale repairs are not done?
- There are risks such as personal injury from falling exterior wall tiles, structural deterioration due to corrosion of rebar, leaks, and a decrease in asset value. Furthermore, for buildings subject to periodic reporting under Article 12 of the Building Standards Act, investigations through full tapping and other methods are required under certain conditions, such as when more than 10 years have passed since completion or exterior wall renovations for tiled or mortar-finished walls. The scale of multi-family residences that are subject to this and the timing of reports can be confirmed in the “List of Buildings and Equipment Subject to Periodic Reporting and Reporting Timing” published by Tokyo Metropolitan Government. The applicable uses and scales may be revised, so please check the latest information with the Building Guidance Division, Equipment Review Section of Itabashi Ward (phone 03-3579-2577). Even if not subject to statutory investigations, regular inspections and maintenance are essential, so please consult us if you are unsure about your judgment.
- How much does large-scale repair for an apartment (about 10 units) cost?
- For a wooden two-story building with 6 to 10 units, the estimate is between 2 million and 4 million yen, and for a three-story steel or RC building with 10 to 20 units, it is between 4 million and 9 million yen based on our company’s track record (including scaffolding, substrate repairs, exterior wall painting, sealing, and waterproofing). It is common to carry out repairs for apartments every 10 to 15 years. For owners, there is an increasing trend to change the exterior appearance through color simulations at the same time as repairs to improve occupancy rates.
If you are looking for a large-scale repair contractor in Itabashi Ward, contact Kakeru Koumuten Co., Ltd.
We handle many exterior wall renovations and large-scale repairs for condominiums and apartments in Itabashi Ward. We are happy to assist not only with large-scale repair work but also with partial repairs and leak repairs. “I want it to last long with one renovation” “I want to keep costs down as much as possible” “I want to improve insulation performance because the indoors are hot” We will propose the best solutions for your specific requests and future repair plans.
From temporary scaffolding work to roofing and exterior wall painting, all work is performed by our own team. We are confident that we will not lose in terms of cost, quality, and planning compared to other companies, so we welcome multiple quotes!
On-site surveys, estimates, and color simulations are all free of charge
Please feel free to contact us via the inquiry form, phone, or LINE.
It’s perfectly fine to just present estimates from other companies.
Large-Scale Repair Work Service Area
Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and Tokyo.
Aioi-cho / Akatsuka / Akatsuka Shinmachi / Azusawa / Izumicho / Itabashi / Inaridai / Ohara-cho / Otaniguchi / Otaniguchi Kamimachi / Otaniguchi Kitamachi / Oyamakanai-cho / Oyamahigashi-cho / Oyamanishi-cho / Oyamacho / Kaga / Kamitakabashi / Kumano-cho / Komone / Saiwaicho / Sakae-cho / Sakashita / Sakuragawa / Shimizu-cho / Shimura / Shinkawagishi / Daimon / Takashimadaira / Higashishinmachi / Tokiwa-dai / Tokumaru / Nakaitabashi / Nakajuku / Nakadai / Nakamachi / Nakamuro-cho / Narimasu / Nishidai / Hasune-cho / Hasune / Hikawa-cho / Higashisakashita / Higashiyama-cho / Fujimicho / Futaba-cho / Funado / Honmachi / Maeno-cho / Misono / Minami-cho / Minami Tokiwa-dai / Miyamoto-cho / Mukahara / Yamato-cho / Yayoicho / Yotsuba / Wakaki
・When should large-scale renovations be carried out? An explanation of the optimal timing and risks of postponement!
・Estimates are essential when carrying out large-scale renovations! Key points for comparison and precautions!
・5 common troubles in large-scale renovations of condominiums! A thorough explanation of causes and preventive measures!
・What is waterproofing work in large-scale renovations? A thorough explanation of roles, signs of deterioration, and precautions!
・Insufficient funds for large-scale renovations… An explanation of how to deal with funding shortages and preparations you can do right now!
・What is substrate repair, which is important in large-scale renovations? A thorough explanation of necessary reasons, signs of deterioration, and types of work!
・What is sealing work in large-scale renovations? An introduction to roles, methods, and tips for avoiding mistakes!
・What is tile repair, which is important in large-scale renovations? An explanation of signs of deterioration, types of work, and cost averages!
・What is exterior wall painting, which is important in large-scale renovations? A thorough explanation of necessity, signs of deterioration, and cost averages!
・For exterior renovations in Itabashi Ward, Tokyo, trust Kakeru Koumuten!
・For roof renovations in Itabashi Ward, Tokyo, trust Kakeru Koumuten!
・Leave your exterior wall painting in Itabashi, Tokyo to Kakeru Koumuten!
We also welcome consultations via LINE◎
We are also regularly updating our Instagram◎ Please follow us!
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!



