This is Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of exterior renovations in Tama-ku, Kawasaki City, Kanagawa Prefecture.
The work this time includes roof overlay (cover method), solar panel removal and reinstallation, exterior painting, and balcony top coat waterproofing!

Thank you very much for choosing Kakeru Koumuten Co., Ltd. from among many contractors.

Construction Data

Construction Location
 Tama Ward, Kawasaki City
Construction details

 ・Temporary scaffolding installation
 ・Exterior wall painting work
 ・Balcony waterproofing work
 ・Concrete floor cleaning
 ・Air conditioning hose repair
 ・Roof overlay installation (roof re-roofing work)
  ・Solar panel removal and reinstallation

Inquiry Details

We received an inquiry from a customer living in Tama Ward, Kawasaki City, stating, "I am considering a renovation of the roof where solar panels are installed. I think it will be necessary to remove and reinstall the solar panels, so I would like a plan that uses highly durable roofing materials to minimize the need for future renovations. Since scaffolding will be set up, please also provide an estimate for exterior wall painting."

Regarding the roof, since the base was solid, we proposed the overlay installation method!
We created estimates for 4 types of roofing materials and explained the advantages and disadvantages of each.
Since you requested highly durable roofing materials, we were entrusted with the roof overlay installation using the highly durable Diplomat Star!
For the solar panel removal and reinstallation, it will be necessary to replace the existing base rack with aluminum catch-type fittings due to compatibility issues.

We also created estimates for 4 types of exterior wall paints, and after comparison, you entrusted us with the ultra-durable exterior wall paint, Super Ceranflex!
We received compliments saying, "Compared to other companies, the costs were lower and easy to understand," and we were entrusted with the work.

Base Material/New Material Used

・Roof overlay installation work
 Existing roofing material: Colonial
 New roofing material: Deez Roofing / Diplomat Star 
(Durability approximately 40–45 years / Manufacturer warranty: 30 years)
 New roofing sheet: Tajima Roofing / New Liner Roofing
(Durability approximately 30 years)
 New ridge base: H&R ridge base (made of Galvalume steel)
(Durability approximately 30 years)
Sealing material: Auton Exceed
(Durability approximately 30 years)
 
  ・Solar panel removal and reinstallation
 Fittings: Catch-type fittings (made of aluminum)

 ・Exterior wall painting work
 Exterior wall primer: Dia Acless Filler
 Intermediate and top coat: Dia Super Seranflex (Durability approximately 24–26 years / Construction warranty 10 years)
 Accessory parts: Premium inorganic mild
 Eaves ceiling: Clean mild fluorine
 Water drainage primer: (Rust prevention) Mild Bousei,
    Top coat: Premium inorganic mild

 ・Balcony waterproofing work
 New: Top coat

 - Floor cleaning, air conditioning hose repair

Price
 2,500,000–3,000,000 yen
Construction Period
 Approximately 1 month
Completion month
 2024-07

Roof Repair (Roof Overlay Construction) Procedure

1. Temporary Removal of Solar Panels

  

We will dismantle the solar panels and the base rack. Since a dedicated rack is required, all existing base racks and fittings will be disposed of.。

The slate roof rack is fixed by making holes in the roof, so after the rack is removed, the holes will be repaired with caulking.

 

The removed solar panels will be carefully stored in our warehouse.

2. Dismantling Existing Ridge and Snow Guards


 

We will dismantle unnecessary parts (ridge flashing and snow guards) for the roof overlay method! The lifespan of wooden purlins is about 10 to 15 years. Exceeding the lifespan can lead to corrosion and discoloration, resulting in the ridge flashing coming loose or being blown away.

 

3. Installing Roofing (Waterproof Sheet)

 

Next, we will install the roofing sheet (waterproof sheet)! The roofing used isTajima Roofing/New Liner Roofing!

This underlayment material boasts the highest quality, unmatched in waterproofness and durability. By sandwiching a modified asphalt layer between non-woven fabric and base paper, it fully demonstrates the inherent performance of modified asphalt.
The expected durability is about 30 years!
As a primary waterproofing measure, if the roofing is properly installed, there will be no leaks! We will ensure it is securely attached to prevent it from blowing away.
When selecting the durability of the roofing sheet, choose one that is as close as possible to the durability of the new roofing material! New Liner Roofing has a durability that is relatively close to Diplomat Star, so we recommend using New Liner Roofing when performing roofing work with Diplomat Star!

4. Heat Insulation Sheet Installation

The heat insulation sheet can be expected to provide energy-saving effects by keeping it cool in summer and warm in winter!
We will ensure it is securely attached to prevent it from blowing away.

5. Component Processing (Karakusa, Keraba)

Before the main roof construction, we will process and install components such as eaves and decorative brackets!
The components used are genuine parts made of galvalume steel!

6. Main Construction (D’s Roofing / Diplomat Star)

 

After processing the components, we will install the Diplomat Star roofing material up to the ridge! We will secure the roofing material with stainless steel screws.

7. Installation of Ridge Base (Nail Board)

  

We will install the necessary ridge underlayment to secure the ridge cap. The types of batten (ridge underlayment) we handle include cedar, resin, and Galvalume steel, and this time we used the Galvalume steel H&R ridge underlayment!
The Galvalume steel is expected to have three times the durability compared to cedar! Unlike resin or cedar, it does not crack, providing peace of mind!
We recommend choosing a ridge underlayment that has a durability similar to that of the new roofing materials, just like the roofing sheet.

8. Sealing at Various Locations

Next, we will thoroughly apply sealing to the inside of the joints at various locations. The screws used for securing are made of stainless steel, which is resistant to rust!

9. Installation of New Solar Panel Base Rack Hardware

The existing base was fixed by drilling holes in the roof, but the new hardware uses a catch-type that grips the roofing material itself to secure the solar panels. This reduces the risk of leaks and the burden on the roof. The base hardware is made of aluminum, making it resistant to rust.
There are specific hardware options available for each manufacturer and model of solar panel, so we will select the appropriate hardware for your solar panels.
Be careful, as there may be no applicable hardware for older solar panels!

10. Installation of Solar Panels

We will finish by putting back the removed solar panels! Finally, we will also check to ensure they are generating power properly. If the solar panels are dirty, we will clean them before installation.
We have confirmed that the power generation amount is the same as before the removal!!

11. Cleaning

We will clean up any debris that has fallen onto the balcony and rain gutters. We will thoroughly remove nails and metal scraps that could cause injuries. Additionally, we will wipe away footprints and small stains to ensure everything is clean.

About Roofing Materials

The roofing material used is Deez Roofing’s Diplomat Star.
Deez Roofing comes with a 30-year warranty on the base material.
Our company also provides a 10-year workmanship warranty!

It uses zinc-aluminum steel, which has the same composition as galvanized steel, known for its rust resistance.

Deez Roofing reduces heat conduction to the steel layer due to the effect of the surface stone granules. This structure makes it more difficult for heat to transfer to the attic compared to other roofing materials, as it secures a sufficient air layer between the roofing material and the roof substrate.
Moreover, the unevenness of the surface stone granules helps to disperse raindrops, causing them to hit the surface smaller than they would on a normal smooth surface. As a result, the high-frequency noise caused by the micro-vibrations of the steel plate when raindrops hit, which is the cause of the “noisy sound” from steel roofs, can be suppressed by the natural stone granule layer on the surface.

By adopting the “interlocking method” that integrates the roofing materials, it has excellent performance that can withstand winds of 60m/s, as well as superior fire resistance and waterproofing.

Color

■ Onyx

■Cafe

■Terracotta     

■Evergreen

You can choose from the above 4 colors!

This time, the roof overlay work at the cafe turned out exceptionally well!
The customer was very satisfied, and I was also very happy!
Thank you very much!

Please check out other roofing work achievements from here!

Roof Material

Dee’s Roofing/Diplomat Star

Manufacturer Warranty 30-year warranty
Expected Durability About 45 years
Color Used This Time

Cafe

 

Exterior Painting Construction Procedure

1. High-Pressure Washing



First, we thoroughly remove dirt and moss attached to the exterior walls using high-pressure washing! We will also wash the exterior and concrete areas as well!

2. Masking

Next, we use masking tape, blue sheets, and polymer masks to
protect areas that will not be painted, such as windows, sashes, and floors.
Masking is a very important task in the painting process! If masking is neglected, gaps can form, allowing paint to seep in and cause stains, or resulting in uneven lines. Therefore, we will work carefully on each area.

3. Primer Application

 

Primer application is the first step in painting after high-pressure washing and substrate treatment, using a paint that ensures that the subsequent middle and top coats adhere well to the surface. It also serves as a primer with substrate adjustment functions, providing elasticity and reducing the occurrence of cracks. By applying the primer properly, there will be a significant difference in durability and the final color finish!

The paint used for the primer this time is Seika Japan’s Diaacres Filler. Generally, we use products from the same manufacturer for the middle and top coats.

4. Middle Coat

It is an important process to bring out the performance of the paint, to achieve a beautiful finish, and to eliminate unevenness in application!

5. Top Coat

The final step is the top coat, which is the finishing touch for exterior wall painting. We focus on ensuring that there are no uneven areas or missed spots, resulting in a beautiful finish! The paint used is from Seika Japan / Dia Super Selan Flex!


6. Painting of Auxiliary Parts (Eaves, Water Cutters, Shutter Boxes, Ventilation Hoods, Awnings)

Eaves

    

Water Cutting

  

・Shutter Box

   

・Ventilation Hood

   

・Eaves Flashing

   

Balcony Waterproofing Construction Procedure

1.Surface Preparation

To improve the adhesion of the

top coat, we will perform surface preparation. By intentionally creating fine scratches on the surface of the substrate at this stage, we enhance the paint’s grip (adhesion). For example, when the application surface is smooth and flat like glass, compared to a surface with slight irregularities, the latter allows the new paint to adhere more easily.

2.Acetone Wipe

Next, we will perform an acetone wipe! This is also an important substrate treatment. The acetone wipe is the process of removing the oil film from the FRP waterproofing surface! Skipping this step can lead to paint peeling.

3.Primer Application (Base Coat)

The primer acts as an adhesive that promotes the adhesion between the waterproof layer and the top coat! When performing waterproofing work, it is generally necessary to apply the primer before applying the top coat.

4.Top Coat Application

 

The

top coat is generally applied in two layers!
After finishing the application, we will check for any missed spots.

5. Balcony Waterproofing Work Completed

The balcony is complete once it dries!

This time, we also performed floor cleaning and air conditioning hose repairs as a complimentary service during the high-pressure washing.

We were able to finish it beautifully!
The client was pleased with the work, and we are happy as well!

For Roof Repairs and Exterior Painting in Tamaku, Kawasaki, Trust Kakeru Koumuten!

As our company is based in Aoba-ku, Yokohama, we have extensive experience in roof repairs and exterior painting in Tamaku.
We are happy to assist with exterior painting, roof overlay (cover method), roof replacement, leak repairs, rain gutter work, and even partial roof repairs.
If you have any questions like “I just want to know the estimate,” “I want to know about roofing materials,” or “I want to ask about rain gutter work,” please feel free to contact us!

We have handled many roof renovations in Kanagawa Prefecture, so we deeply understand the needs of local customers.

“I want it to last long with one renovation.”

“I want to keep costs down as much as possible.”

“I want to improve insulation because the indoors are hot.”

We will propose the best solutions from various plans based on your specific requests. Please note that there may be cases where we cannot start the work immediately due to the need for road use permits or occupancy permits.
In urgent cases like leak repairs, we can sometimes provide emergency measures without scaffolding, so please feel free to consult us!

Summary

Above are the results of the roof overlay work, solar panel removal and installation, exterior painting, and balcony waterproofing in Tamaku, Kawasaki.
Since the removal and installation of solar panels can become costly when replacing the base rack, we recommend using durable roofing materials like Diplomat Star that require minimal maintenance for roof repairs!

List of Areas in Tamaku, Kawasaki

Ikuta in Tamaku / Kuritani in Tamaku / Shukugawara in Tamaku / Seki in Tamaku / Nakanojima in Tamaku / Nagao in Tamaku / Nishiikuta in Tamaku / Noborito in Tamaku / Noborito Shinmachi in Tamaku / Higashiikuta in Tamaku / Higashisanda in Tamaku / Masugata in Tamaku / Sanda in Tamaku / Minamiikuta in Tamaku / Nagasawa in Tamaku / Sugan Inada Tsutsumi in Tamaku / Sugan Shiroshita in Tamaku / Sugan Kitaura in Tamaku / Sugan Sengoku in Tamaku / Sugan Bababa in Tamaku

Kakeru Koumuten Co., Ltd. offers free estimates and inspections!
If you have any concerns regarding roofs, rain gutters, exteriors, or landscaping, please feel free to consult us!

We are also happy to handle requests for solar panel removal and installation only!

Kakeru Koumuten Co., Ltd. is an exterior renovation company that performs everything from temporary scaffolding work to roof work and exterior painting completely in-house.
We are confident that our “cost, quality, and efficiency” in exterior renovation work are unmatched compared to other companies!

We are confident in the costs and quality of our exterior renovation work, so we
welcome comparative estimates from other companies!
We also provide comprehensive construction guarantees and aftercare maintenance, which has earned us praise for our appropriate proposals that align with our customers’ future life plans and desired price ranges!

We strive to ensure that everyone feels “I’m glad I chose them!” by sincerely addressing every request we receive.

We have also posted our pricing plans for roof work and exterior painting below, so please take a look if you are interested!

We look forward to your inquiries. Thank you very much.

Helpful information about exterior renovations can be found here!

 

We welcome consultations via LINE◎

LINE

LINE

We are also updating our Instagram regularly◎ Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!