Leave Your Solar Panel Installation Work in Machida City, Tokyo to Kakeru Koumuten Co., Ltd.!
For solar panel and storage battery installation in
Machida City, Tokyo,
trust Kakeru Koumuten!
Kakeru Koumuten is a company specializing in exterior renovations.
As a company strong in roofing work, we are entrusted withsolar panel and storage battery installations that consider roofing and waterproofing!
“How to Choose a Solar Panel Contractor in Machida City, Tokyo”
“Costs for Solar Panel and Storage Battery Installation”
“Subsidies Available for Solar System Installation in Machida City, Tokyo”
We will also explain the above three points!
Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtainingestimates from about three companies!
Table of Contents (tap to open/close)
- Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Machida City, Tokyo
- Roof Inspection Before Installing Solar Panels
- Possible Subsidies and Grants Available in Machida City, Tokyo
- Price List for Solar Panel and Storage Battery Installation
- Breakdown of Installation Capacity, Equipment, and Construction Costs
- Self-Estimate and Profit Simulation for Solar Power Generation
- Customer Testimonials
- Case Studies of Solar Panel Installations
- How to Choose a Solar Panel Installation Contractor in Machida City, Tokyo
- Benefits of Introducing Solar Equipment
- Points to Consider When Introducing Solar Power Generation
- How to Choose Solar Panels
- Frequently Asked Questions about Solar and Storage Battery Installation in Machida City, Tokyo
- If You Are Looking for a Solar Panel Installation Contractor in Machida City, Tokyo, Contact Kakeru Koumuten
- Characteristics of Machida City, Tokyo and Points for Solar Construction
- Service Area in Machida City, Tokyo
Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Machida City, Tokyo
Regarding why our company is entrusted with solar panel installation by customers in Machida City, Tokyo,
we have unique strengths in solar panel installation that cannot be imitated by other companies, and we have received great feedback from many customers.
so we would be grateful if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from any number of companies!
1. We Can Also Handle Exterior Renovations Besides Solar Panel Installation!


Issues such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if one is knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside their expertise, so caution is necessary.
It is reassuring to have someone knowledgeable about the roof to avoid maintenance and trouble after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent issues after solar panel installation!
2.Facilities Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases for material storage and showrooms.
In-house Scaffolding Materials


To ensure safety during work on the roof, we own the necessary scaffolding materials for temporary scaffolding according to construction conditions and can assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs for scaffolding work.
We have scaffolding materials for approximately 50 single-family homes!
Even if there are height differences on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.
Storage of Materials in Our Large In-house Warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we canrespond quickly in emergencies!
Sorting and transporting waste materials in-house
The installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.
Exterior renovation dedicated showroom


In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are attached to the roofing materials!
We can also provide simulations of revenue and installation costs when introducing solar panels!
Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!
3.All work performed by our own team
One of Kakeru Koumuten’s major strengths is its complete in-house construction.
By having Kakeru Koumuten handle everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will assist you from the estimate to the completion of the work.
Since the same person will handle sales and construction management, smooth communication is possible.
We can provide consistent in-house construction from temporary scaffolding installation to exterior wall painting and roof renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry permits as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal and painting technicians on staff, and we are confident in our construction techniques.
We are capable of handling large-scale roof projects such as factories!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty for solar panel installation work, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless a roof renovation is performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary depending on the warranty details.)
Aftercare is available annually, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roofing troubles and situations.
If you cannot access the roof due to height, we can utilize a drone to assist!
During leak investigations, we can also conduct surveys using a thermal imaging camera.
If the power generation of solar panels decreases due to dirt or other factors, we can provide cleaning services using a specialized brush.
We will respond according to your preferences.
7. Human Resource Development
To improve skills, we create various roofing models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly provide technical training to ensure that each staff member can handle various cases.
8. Creation of Easy-to-Understand Materials and Simulations
Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar installation guidebook” and “profit and loss simulations” that take into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits over 20 to 30 years.
Even customers who are not familiar with solar installations will receive materials that clearly summarize important points and disadvantages!
We encourage you to obtain comparative estimates and compare them with other companies’ plans!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.
| 1. Types of Roofing Materials and Age | The fixing method varies depending on the roofing material, such as slate, tiles, metal roofs, and flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first. |
| 2. Condition of Substrate and Waterproof Sheet | If the sheathing or roofing (waterproof sheet) beneath the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of leaks. |
| 3. Orientation, Slope, and Shadows of the Roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect the amount of power generated. We can create a layout diagram from the drawings and the site, and you can check it with a power generation simulation. |
| 4. Shape of the Roof and Usable Area | The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. The number of panels that can be installed varies depending on the size of the panels, so we will compare based on the total output of the roof. |
| 5. Fixing Method and Waterproofing Details | We will confirm whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please check the waterproofing treatment method for the fixing parts during the estimate. |
| 6. Weight of the Roof | The roof will become heavier due to the panels. After investigating the existing roof, substrate, and load-bearing capacity, switching to lighter roofing materials may be an option if necessary. |
| 7. Installation Location of Equipment and Wiring | We will check the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect costs. |
| 8. Ease of Scaffolding Setup and Delivery Routes | If there are elevation differences on the site, planning for scaffolding and the delivery routes for equipment and materials may require some ingenuity. We will also check the width of the front road and any steps on the site during the on-site survey. |
Fixing Methods and Checkpoints by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets with screws to the roof material and substrate) | Waterproofing treatment of the fixing parts, cracks or deterioration of the slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first. |
| Tile Roof | Fixed with brackets and methods suitable for the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) | Type and condition of the tiles, substrate, load-bearing capacity. Depending on the survey results, there may be a method to replace with lightweight roofing material before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, a method that does not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a frame | Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work. |
If you perform roof renovations 10 to 20 years after installation, additional costs for the removal and reinstallation of solar panels will apply. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. is strong in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!
▶ Click here for roof renovations in Machida City, Tokyo
Potential Subsidies and Grants in Machida City, Tokyo
If you are introducing solar panels or storage batteries in Machida City, Tokyo, there is a possibility that you may be eligible for “national” and “Tokyo Metropolitan” programs. According to the official page of Machida City, the city’s own solar power subsidy program ended in 2016, and information on national and Tokyo Metropolitan programs is provided.
The following is based on the information confirmed on the official pages of each program as of October 7, 2026. The application status may change depending on the budget, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Period for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Tokyo “Household Solar Power Generation Promotion Project” | Individuals, corporations, or management associations installing a new unused solar power system (output less than 50kW, JET certification, etc.) in residential properties within Tokyo. The generated power must be used in the residential part. Pre-application is required | Existing homes: 15,000 JPY per kW for 3.75kW or less (maximum 450,000 JPY), 12,000 JPY/kW for over 3.75kW to less than 50kW New homes: 12,000 JPY/kW for 3.6kW or less (maximum 360,000 JPY), 10,000 JPY/kW for over 3.6kW |
For fiscal year Reiwa 8, pre-applications are being accepted from May 29 (ends when the budget is reached). From the pre-application for fiscal year Reiwa 8, submission of a certificate issued by a financial institution at the time of performance report is mandatory |
| Tokyo “Household Storage Battery Introduction Promotion Project” | Owners of eligible devices (storage batteries registered with SII, excluding national and local governments). Must be installed between April 1, Reiwa 8 and March 30, Reiwa 11. If pre-applying after October 1, Reiwa 8, only products registered with the national SII for fiscal year Reiwa 8 are eligible | Storage battery package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household) Additional amount for participating in DR demonstration (100,000 JPY per unit; 150,000 JPY per unit if energy management equipment is installed) Expansion of storage battery unit: 60,000 JPY/kWh (maximum 720,000 JPY per household) |
For fiscal year Reiwa 8, pre-applications are being accepted from May 29. Grant application and performance report will start from June 30 |
| National “DR Household Storage Battery Project” (Reiwa 7 Fiscal Year Supplement) | Newly introducing household storage systems of registered products that can be used for DR (demand response) | Calculated based on an initial effective capacity of 34,500 JPY per kWh (subsidy rate within 3/10; maximum 600,000 JPY per application) | The budget was reached on May 29, 2026, and the public recruitment has ended (there are no plans to reopen public recruitment as stated on the official website, and applications cannot be submitted at this time) |
| National “Mirai Eco Housing 2026 Project” (Renovation) | Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovation of windows (openings) and structures; applications cannot be made for just the installation of storage batteries. Solar panels are not included as eligible facilities | Storage battery: 96,000 JPY per household | Ends when the budget limit is reached. As of October 5, 2026, the application amount for renovations is displayed as 8% of the budget on the official website. Please check the official website for the application status |
The solar power and storage battery subsidies in Tokyo require prior application. For storage batteries applied for after October 1, 2026, only products registered with the national SII will be eligible, and the equipment requirements will change. According to the official page of Machida City, the city’s unique solar power generation subsidy program ended in 2016, and information on national and Tokyo Metropolitan programs is provided. The eligibility conditions, application procedures, and compatibility with other programs vary by system, and applying does not guarantee funding, so please confirm before contracting or starting work.
At Kakeru Koumuten, we will provide guidance on eligibility conditions and application periods for each program after confirming them.
National Subsidy “DR Home Storage Battery Project (Support Project for Home Storage Systems for DR Resource Introduction)”
The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.
This program targets those who are newly introducing registered storage systems that can be utilized for demand response (DR), and in the fiscal year 2025 supplementary budget, the subsidy amount was determined based on a standard amount of 34,500 JPY per 1kWh of initial effective capacity, with a subsidy rate of up to 30% and a maximum of 600,000 JPY per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.
However, the supplementary budget for fiscal year 2025 reached its application amount on May 29, 2026, and the public offering has ended. The official site states that there are no plans to reopen the public offering, and applications are currently not possible. Please check the official site for future public offerings.
Currently, there are no subsidies confirmed for the installation of solar panels on existing homes.
👉 Click here for the official site of the DR Home Storage Battery Project
Tokyo “Promotion Project for the Introduction of Solar Power Generation in Homes”
This subsidy is for those who are newly installing unused solar power generation systems in residential properties in Tokyo. The simultaneous installation of storage batteries is not a condition.
●Existing homes: For systems of 3.75kW or less, 150,000 JPY per kW (maximum 450,000 JPY); for systems over 3.75kW and under 50kW, 120,000 JPY per kW
●New homes: For systems of 3.6kW or less, 120,000 JPY per kW (maximum 360,000 JPY); for systems over 3.6kW and under 50kW, 100,000 JPY per kW
●There are also additions for the installation of rooftop structures and waterproofing work.
The target is for the installation of unused panels with an output of less than 50kW that have obtained JET certification, installed in residential properties in Tokyo, and used in living areas. The process involves prior application followed by a grant application after installation, and starting from the fiscal year 2026 prior application, the submission of certificates issued by financial institutions during performance reporting has become mandatory.
The official page of Tokyo states that prior applications have been accepted since May 29, 2026. It will end as soon as the budget is reached, so please check the official page for the application status.
👉 Click here for the official page of Tokyo (Cool Net Tokyo)
Tokyo “Promotion Project for the Introduction of Storage Batteries in Homes”
This is a subsidy for the installation costs of battery storage systems aimed at increasing self-consumption of electricity generated by solar power and enhancing energy independence during emergencies.
●Battery package: 100,000 JPY per kWh (up to 1,200,000 JPY per household)
●Additional for participating in DR demonstration: 100,000 JPY per unit (150,000 JPY per unit if energy management equipment is installed)
●Expansion of battery units: 60,000 JPY per kWh (up to 720,000 JPY per household)
Eligible applicants are owners of the subsidized equipment (excluding national and local governments), and installation must be completed between April 1, 2026, and March 30, 2027. If applying in advance after October 1, 2026, only products registered in the national SII for the fiscal year 2026 will be eligible.
According to the official Tokyo page, advance applications have been accepted since May 29, 2026. For details on conditions for combining with solar power generation and more, please check the official page.
👉 Here is the official page of Tokyo (Cool Net Tokyo)
About the Subsidy System in Machida City
The official page of Machida City states, “We support solar power generation systems,” and notes that the city’s residential natural energy utilization equipment subsidy program ended in 2016, and currently, there are no unique subsidies provided by the city. Information about national and Tokyo subsidies is available on the city’s official page. The systems for residential solar power generation and battery storage mainly rely on the aforementioned Tokyo and national programs. Please check for the latest information before making a contract, as the systems may change.
👉 Here is the official page of Machida City
Additionally, Machida City offers an incentive of 35,000 JPY for home fuel cell systems (EneFarm) under the “Next Generation Energy Promotion Project Incentive.” The application period for fiscal year 2026 is stated to be from June 15 to September 30, 2026 (must arrive by this date), and as of October 7, 2026, the application period has passed. Solar power generation and battery storage are not included in the eligible items.
👉 Here is the information on the subsidy system for global warming countermeasures in Machida City
Moreover, Machida City is calling for caution against “malicious door-to-door sales of solar power generation systems impersonating city officials.” It is recommended to obtain multiple estimates and verify with the official pages of the city and Tokyo when approached by door-to-door sales mentioning subsidies.
Solar Panel Installation & Battery Installation Price List

⇧Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here

⇧Service Menu | For Costs of Solar Panel Removal and Water Heater Removal, Click Here
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and batteries should be confirmed by separating them into “Equipment Costs (Equipment Price)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary greatly depending on the installation capacity, equipment grade, and roof condition.
Considerations for Installation Capacity (kW) and Battery Capacity (kWh)
The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Batteries are compared based on the amount of electricity they can store, represented in kWh (kilowatt-hours).
The amount of kW that can be installed on the roof varies for each house depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.
On our pricing page, we list solar panel costs as approximately 800,000 JPY to 1,200,000 JPY for 3 to 5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6 to 10 kW. (These are just approximate amounts and can vary based on wiring length, scaffold range, existing roofing materials, panel layout, etc.)
▶ Service Menu | For Costs of Solar Panel Installation and Battery Installation, Click Here
Items to Confirm in the Estimate (Cost Confirmation)
When comparing estimates, it is common to compare different capacities and equipment. Please check if the following items are clearly stated in each company’s estimate!
| 1. Solar Panels | Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified. |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also confirm if it is a type that controls the battery together. |
| 3. Battery | Manufacturer, model number, capacity (kWh), range available during power outages (entire house or specific circuits), installation location. |
| 4. Mounting Frame and Hardware | Name of hardware suitable for roofing materials and method of securing (whether it is a method that drills holes or a method that clamps). |
| 5. Wiring and Electrical Work | Wiring routes and lengths, work around the distribution board, presence of a monitor to check power generation. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment at fixed points, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Applications | How much support is included for applications to the power company, feed-in tariff (FIT) certification applications, and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If roofing work and exterior painting are done simultaneously, check that the same scope and quantity are not double counted. |
| 9. Removal and Disposal | Whether the removal of existing solar thermal water heaters and old panels, as well as disposal costs for waste materials, are included. |
| 10. Tax Classification and Warranty | Whether the price is tax-inclusive or tax-exclusive, conditions under which additional costs may arise, and details and duration of manufacturer and workmanship warranties. |
If the capacities are different, both the price and power generation will change. Kakeru Koumuten Co., Ltd. welcome comparisons of estimates, so if you bring estimates from other companies, we will explain the differences item by item!
Self-Estimate and Profit Simulation for Solar Power Generation
With the simulator above,
you can obtain a rough estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the battery, you can obtain a rough estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, feed-in prices, and costs for equipment inspection or replacement.
Customer Testimonials
Case Studies of Solar Panel Installation


| Construction Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh range |
| Base Mounting Hardware Used |
| Niigata Manufacturing / Aluminum Catch-Type Hardware |
| Fixing Method & Waterproofing Arrangement |
| Fixed using catch-type hardware gripping the horizontal metal roof (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY Expected recovery period for construction costs: about 8 to 9 years (self-consumption) *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system. |
| Construction Period |
| Approximately 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the installation of solar panels and storage batteries. I heard that grants are available, and I would like to know how much can be provided. |
Our Proposal
We visited to provide a quote and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the quote!
How to Choose a Solar Panel Installation Contractor in Machida City, Tokyo
There are many solar panel installation contractors available in Machida City, Tokyo, and you may be unsure which contractor to choose.
Therefore, when requesting solar panel installation and battery storage installation work, let’s confirm the following 4 points.
● Have extensive knowledge not only about solar panels but also about roofs
● Confirm the presence of warranties and after-sales maintenance
● Obtain estimates from multiple contractors (3 companies as a guideline)
● Check if they provide support for subsidy applications
By confirming the above 4 points, you will be able to choose a reliable contractor.
Have knowledge not only about solar panels but also about roofs
Defective installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing
・Solar panels were installed on a severely deteriorated roof, leading to leaks
・Solar panels were installed on a roof with a short lifespan, requiring a renovation to detach and reattach the solar panels within a few years
・Misjudging the type of waterproofing led to incorrect processing and subsequent leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.
▶ Go to “Roof Verification Before Installing Solar Panels” in this article
Confirm the presence of warranties and after-sales maintenance
When choosing a solar installation contractor, let’s confirm the presence of warranties. It is important to check not only the duration of the warranty but also the coverage, disclaimers, and cost conditions.
While the solar panels and battery storage units come with manufacturer warranties, also confirm whether there is a workmanship warranty in case leaks occur after installation!
For contractors that offer a workmanship warranty, if leaks occur after installation, they may cover it under the warranty if it falls within the warranty period and conditions.
Additionally, some contractors provide after-sales services separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Since abnormalities or damages on the roof can be in hidden areas, you may not notice them yourself.
By conducting inspections of hidden areas during after-sales maintenance, you can more easily prevent major repairs or failures by detecting abnormalities early!
Kakeru Koumuten Co., Ltd. provides a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed.)
We also conduct aftercare maintenance and send out annual direct mail!
Please check the DM, and if you wish, we will visit for aftercare maintenance!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting solar panel installation, let’s obtain estimates from multiple contractors.
Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request from your preferred contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates, please check:
“Check the estimate items”
“Type of solar panels”
“Warranties and after-services”
and make a detailed comparison! Avoid judging solely based on cost, as using lower-grade materials or skipping processes can reduce costs!
▶ To “Breakdown of installation capacity, equipment, and construction costs” in this article
Check if they provide support for subsidy applications
There may be subsidies available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
Since there are systems like the Tokyo subsidy that require prior application, it’s reassuring to have a contractor who supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the Tokyo subsidy, prior application) before proceeding with the construction!
For the Tokyo subsidy, after installation, you will need to submit a grant application and performance report, which will be reviewed before the grant is awarded! (The flow of procedures varies by system)
▶ To “Subsidies and grants that may be applicable in Machida City, Tokyo” in this article
Benefits of Introducing Solar Equipment
The benefits of introducing solar panels are as follows!
Benefit 1: Economic Benefits
The biggest advantage of introducing solar panels is the economic benefit!
The selling price of electricity has decreased compared to ten years ago, but by consuming the generated electricity, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity costs rise, the ability to cover your consumption with solar power becomes more attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!
Furthermore, the selling price (FIT) for residential use (under 10kW) will be set as “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply for the fiscal year 2026. After the fifth year, it is likely to be more advantageous to use it at home (self-consumption) rather than selling it, so combining it with a storage battery is also an option.
👉 Ministry of Economy, Trade and Industry | For purchase prices and periods, click here
Advantage 2 You can utilize subsidies!
The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
Reducing the actual burden amount through subsidies is a significant advantage!
In the case of Machida City, there is a possibility that the national and Tokyo Metropolitan systems may apply. According to the official page of Machida City, the city’s unique solar power subsidy program ended in 2016 (please check the official page for the status of the Tokyo Metropolitan system).
Advantage 3 Environmentally friendly!
Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices like power conditioners do have operational noise.)
Advantage 4 Heat insulation effects are expected!!
By installing panels on the roof or rooftop, they block direct sunlight to the roof.
Especially in summer, it can help reduce the temperature rise of the roof, providing a heat insulation effect!
(Note that this does not improve the building’s insulation performance itself.)
Benefit 5 Electricity can be used even during power outages!!
If a storage battery is installed, it becomes possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capability, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)
What points should be noted when introducing solar power generation?
Next, we will explain the “three points to note” when installing solar panels!
Point 1 Maintenance costs can be incurred
A particularly easy-to-overlook maintenance cost is for the roof where solar panels are installed.
If you perform roof remodeling 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorating, it is reassuring to remodel it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It would be reassuring to ask for a simulation that considers maintenance costs before introducing solar panels!
Point 2 The risk of leaks increases depending on the roofing material
The fixing methods for slate roofs and tile roofs vary by construction method, but in methods that fix hardware to the roofing material or substrate with screws, waterproofing treatment at the fixed points is crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing treatment, but if you are concerned about making holes, replacing the roofing material with a metal roof and fixing the solar panels using the catch method is also an option. (The catch method has compatibility conditions between the roofing material and hardware, and it cannot be used with all metal roofs.)
Catch-type base hardware exclusive for horizontal metal roofs
Point 3 The Roof Becomes Heavier
Installing solar panels will make the roof heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing it with a lightweight roof may also be an option if necessary.
How to Choose Solar Panels?
There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!
How to Choose 1: Compare Based on Total Output of the Roof
When installing solar panels on the roof, it is important to know how much power can be generated in a limited area, and the more power generated, the better!
Solar panels come in various sizes and outputs depending on the manufacturer.
A 350W output panel and a 400W output panel may seem that the higher output panel is better at first glance.
However, if the size of the panel does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” leading to different installation capacities on the same roof due to the size difference.
400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation (kWh) will vary depending on conditions such as roof orientation, slope, and shading.
How to Choose 2: Compare Based on Degradation Rate of Solar Panels
Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output decline after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation itself.
By not deciding solely based on initial output and considering the degradation rate, you can choose solar panels without regrets!
How to Choose 3: Compare Based on Warranty Period
Solar panel warranties include various types such as “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding output warranties, some manufacturers offer a 30-year warranty while others offer a 10-year warranty, so they differ!
Longer warranties are generally better, so be sure to check the warranty periods and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Power and Storage Battery Installation in Machida City, Tokyo
We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Machida City, Tokyo. (Tap to open the answers)
How much does it cost to install solar panels and storage batteries in Machida City, Tokyo?
The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
Estimates by capacity are published on the solar panel installation and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!
Are there any subsidies available for solar and storage battery installation in Machida City, Tokyo?
As of October 7, 2026, Tokyo’s “Promotion Project for Solar Power Generation in Households” (for existing homes, 15,000 yen per kW for systems under 3.75kW, with a maximum of 450,000 yen) and “Promotion Project for Storage Battery Installation in Households” (100,000 yen per kWh for storage batteries, with a maximum of 1.2 million yen per household) are accepting pre-applications starting May 29, 2026, as listed on the official Tokyo (Cool Net Tokyo) page. According to the official page of Machida City, the city’s own solar power subsidy program ended in 2016. The national DR household storage battery program has closed its public recruitment.
Since the application status may change, please refer to the subsidy and grant section and consult us before signing a contract.
Can I apply for subsidies after the construction is completed?
It varies by program. Tokyo’s subsidies require prior application. Conditions such as whether you can sign a contract or start construction before applying or submitting vary by program, so please confirm before signing a contract.
The order of procedures varies by program, so please check before signing a contract or starting construction.
Can solar panels be installed on a slate roof? I’m worried about leaks.
It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The method of fixing varies by construction method, and when fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is crucial.
Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation and propose methods such as roof overlay or replacement if deterioration is advanced.
My roof is old. Should I do a roof renovation first?
It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, the cost of removing and reattaching the solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate to a highly durable roofing material before installation.
Please consult us on how to proceed with the installation after checking the condition of the roof during the on-site survey!
Is it better to install a storage battery together with solar panels?
If you want to use generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price will be 8.3 JPY/kWh after the fifth year, making it more advantageous to use the electricity at home rather than selling it.
Additionally, the Tokyo Metropolitan Government’s subsidy for storage batteries (for Reiwa 8, it is 100,000 JPY per kWh, with a maximum of 1,200,000 JPY per household) aims to increase self-consumption of electricity generated by solar power. You can compare “solar only” and “solar + storage battery” through a financial simulation for your consideration.
How many kW can be installed on our roof? Is it okay for north-facing roofs or roofs with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and on-site survey, and provide you with the installation capacity and generation simulation.
Machida City spreads from the western to central part of the Tama Hills, characterized by significant elevation differences. The shape and orientation of the roof, as well as the shadows cast by surrounding buildings, will differ for each house. You can check the expected generation amount through the generation simulation.
How long is the construction period?
In the above construction example (solar panel 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is conducted simultaneously or depending on the roof shape and installation capacity.
Additionally, please note that there will be a separate period for applying for subsidies and to the power company, so we recommend consulting with us as soon as possible.
What is the current selling price (FIT)?
For residential use (less than 10 kW), the selling price from certifications after October 2025 will be 24 JPY/kWh for the first 4 years, and 8.3 JPY/kWh from the 5th to the 10th year, with the same price applied for the 2026 fiscal year.
The idea is to recover initial costs quickly within the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity prices.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-service maintenance notices via direct mail and visits customers who request inspections. We can also clean solar panels with a specialized brush if the generation amount decreases due to dirt.
Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.
Can you also handle renovations for roofs that already have solar panels installed?
Yes, we can. Kakeru Koumuten can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them consistently. The removed panels can be stored in our warehouse.
For costs, please refer to the solar panel removal and water heater removal pricing page.
If you are looking for a solar panel installation company in Machida City, Tokyo, please consult Kakeru Koumuten Co., Ltd.
Our company handles a wide range of exterior renovations, including solar panel installation, roofing work, and exterior wall work in Machida City, Tokyo.
We receive requests from many customers, including renovation companies and real estate agencies!
Kakeru Koumuten promises “high-quality renovations at low cost”, and we have received positive feedback from numerous customers.
We continue to update our construction achievements every year, and we will strive to improve quality to satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay (cover method) and re-roofing work but also partial roof repairs, exterior painting, and exterior wall cover methods.
We are also happy to handle small jobs like partial repairs and rain gutter cleaning!
In urgent cases such as water leakage work, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!
“I want to know recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide the best solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and will propose the optimal construction plan!
We are confident that we will not be outdone by other companies in terms of cost, quality, and planning for exterior work!
We welcome competitive estimates with confidence!
Estimates are completely free, and if you find our company to be inferior to others, feel free to decline!
Characteristics of Machida City, Tokyo and Points for Solar Work
Machida City is located at the southern end of Tokyo, protruding like a peninsula into Kanagawa Prefecture, covering the western to central part of the Tama Hills, with an area of 71.55 square kilometers. The highest elevation is 361.6 meters (Kusaduyama), and the lowest is 25 meters (east side of Miwa Housing Complex), as stated on the city’s official page. Below are summarized the characteristics of the terrain in Machida City, Tokyo, and points to consider when installing solar panels and storage batteries. (Tap to open)
View the characteristics of Machida City, Tokyo and points for solar work
■ Hilly area with elevations ranging from 25 to 361.6 meters. The height differences of the site and the slope of the front road must be checked on-site for each house.
In the hilly area with significant elevation differences within the city, even within the same neighborhood, the height differences of the site, the step differences with the front road, and the slope and width of the road vary from house to house. It may be necessary to devise the way scaffolding is set up and the delivery routes for panels and storage batteries, and the way shadows are cast by the orientation of the roof and surrounding buildings and trees also varies by location. At Kakeru Koumuten, our own scaffolding team plans scaffolding according to the site, creates layout diagrams from the drawings and on-site surveys, and you can check it with a power generation simulation.
■ Check the hazard map for floods, internal water, and landslides (Reiwa 8 version). Pay attention to the installation location of the equipment.
The flood and landslide hazard map for Machida City was published on March 19, Reiwa 8 (2026), and distribution to all households began in June, as stated on the official page. It displays the assumptions of flooding from overflowing rivers (external water) and rainwater overflow from sewers (internal water) together, and the areas assumed to be inundated by rainwater overflow are designated based on the maximum rainfall expected in the city (153 millimeters per hour), and it also includes the landslide warning areas and special warning areas designated by Tokyo Metropolis. The impact of power conditioners and storage batteries may vary depending on where they are installed indoors or outdoors during flooding. Please check the assumptions for your residence on the city’s hazard map and consult with us regarding the installation location and height, in accordance with the installation conditions of the manufacturer you are using.
■ Roof types and ages vary from house to house. Check the roof and waterproofing before installation
Even within the same city, the types of roofs, ages, and shapes of the properties vary from house to house. The capacity and fixing methods that can be installed change depending on the shape and orientation of the roof and the materials used. At Kakeru Koumuten Co., Ltd., we will check the type and condition of the roof and the situation of the property before installation and propose fixing methods, waterproofing arrangements, and scaffolding plans.
■ The annual sunshine hours at the Tokyo Observatory is about 1,927 hours
According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours at the Tokyo Observatory is about 1,927 hours, with January (about 193 hours) having the most, and June during the rainy season (about 124 hours) having the least. (This is a reference value, not an observation value for Machida City.)
The amount of electricity generated in Machida City can also change due to shadows from surrounding buildings and trees, so it is important to conduct annual power generation simulations and choose the capacity of storage batteries to match the times when electricity is used the most.
Our company handles many exterior construction and solar power projects in Machida City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!
Service Area in Machida City, Tokyo
Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and all of Tokyo.
List of Areas in Machida City, Tokyo
Aihara Town, Machida City / Asahimachi, Machida City / Okuracho, Machida City / Ogawa, Machida City / Onorimachi, Machida City / Koyamagahara, Machida City / Koyamada Sakuradai, Machida City / Koyamacho, Machida City / Kanai, Machida City / Kanaioka, Machida City / Kanai Town, Machida City / Kanamori, Machida City / Kanamori Higashi, Machida City / Kamikoyamada Town, Machida City / Kiso Nishi, Machida City / Kiso Higashi, Machida City / Kiso Town, Machida City / Takagasaka Town, Machida City / Shimokoyamada Town, Machida City / Shinkoji, Machida City / Shinkoji Town, Machida City / Zushi Town, Machida City / Chuo, Machida City / Tamagawa Gakuen, Machida City / Tsukushino, Machida City / Tsurukawa, Machida City / Tsuruma, Machida City / Tokiwacho, Machida City / Nakacho, Machida City / Naruse, Machida City / Narusegaoka, Machida City / Narusedai, Machida City / Nishi Naruse, Machida City / Negishi, Machida City / Negishi Town, Machida City / Nogaya, Machida City / Nodzuta Town, Machida City / Hara Machida, Machida City / Higashi Tamagawa Gakuen, Machida City / Hirogama, Machida City / Hirogama Town, Machida City / Fujinodai, Machida City / Hon Machida, Machida City / Minami Otani, Machida City / Minami Tsukushino, Machida City / Minami Naruse, Machida City / Minami Machida, Machida City / Miwa Town, Machida City / Miwa Midoriyama, Machida City / Morino, Machida City / Yakushidai, Machida City / Yabemachi, Machida City / Yamazaki, Machida City / Yamazaki Town
・Trust Kakeru Koumuten for exterior wall painting in Machida, Tokyo!
・Trust Kakeru Koumuten for roof renovations in Machida, Tokyo!
・Trust Kakeru Koumuten for exterior renovations in Machida, Tokyo!
・Kakeru Koumuten Co., Ltd. construction achievements
・Kakeru Koumuten Co., Ltd. aftercare services
・Kakeru Koumuten Co., Ltd. construction menu and price list
・Kakeru Koumuten Co., Ltd. staff blog and announcements
・Explaining the importance of comparative estimates and key points!
・Top 12 solar power generation manufacturers! Features and selection tips included!
・What are the installation costs for solar power generation? Comprehensive tips to reduce costs!
・What are the best locations for solar power installation? Key points for site selection included!
・Find out more about solar power generation estimates here!
We welcome consultations via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!





