For solar panel and storage battery installation in
Nerima, Tokyo,
Kakeru Koumuten is at your service!

Kakeru Koumuten is a company specializing in exterior renovations, headquartered in Aoba Ward, Yokohama City.
As a company strong in roofing work, we are entrusted with solar panel and storage battery installations considering roofing and waterproofing!

“How to Choose a Solar Panel Contractor in Nerima”
“Costs for Solar Panel and Storage Battery Installation”
“Subsidies Available for Solar System Installation in Nerima”
We will also explain the above three points!

Installing solar panels carries risks such as “the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtaining estimates from about three companies!

For solar panel and storage battery installation in Nerima, Tokyo, contact Kakeru Koumuten
Table of Contents (tap to open/close)
  1. Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Nerima, Tokyo
  2. Roof Inspection Before Installing Solar Panels
  3. Subsidies and Grants That May Apply in Nerima
  4. Price List for Solar Panel and Storage Battery Installation
  5. Breakdown of Installation Capacity, Equipment, and Construction Costs
  6. Self-Estimate and Profit Simulation for Solar Power Generation
  7. Customer Testimonials
  8. Case Studies of Solar Panel Installations
  9. How to Choose a Solar Panel Installation Company in Nerima, Tokyo
  10. Benefits of Introducing Solar Equipment
  11. Points to Consider When Introducing Solar Power Generation
  12. How to Choose Solar Panels
  13. Frequently Asked Questions About Solar and Storage Battery Installation in Nerima
  14. If You’re Looking for a Solar Panel Installation Company in Nerima, Contact Kakeru Koumuten
  15. Characteristics of Nerima, Tokyo and Key Points for Solar Installation
  16. Service Area in Nerima, Tokyo

Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Nerima, Tokyo

Link banner to Kakeru Koumuten's strengths introduction page

The reasons why we are entrusted with solar panel installation by customers in Nerima, Tokyo include
one reason being that “Kakeru Koumuten covers Kanagawa and Tokyo as service areas”,
and we have unique strengths in solar panel installation that cannot be imitated by other companies, which have received high praise from many customers.

In solar panel installation projects in Nerima, we have absolute confidence in “cost, quality, and plans”,
so we would appreciate it if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We Can Also Handle Exterior Renovations Other Than Solar Panel Installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Problems such as leaks caused by solar panel installation may arise from insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there may be cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It is reassuring to have expertise in roofing to avoid maintenance issues and troubles after installation!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!

2.Facilities Specialized in Exterior Renovation

Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases centered around Yokohama City, Kanagawa Prefecture for material storage and showrooms.

In-house Scaffolding Materials

Entrance of the material storage areaIn-house owned scaffolding materials
To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding based on construction conditions, allowing us to set up scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs associated with scaffolding work.
We own scaffolding materials for approximately 50 single-family homes!
Even in residential areas like Nerima Ward, our in-house scaffolding team will plan the scaffolding according to the site.

Storage of Materials in Our Large In-house Warehouse

Appearance of the material warehouse Interior of the warehouse storing materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we canrespond quickly in emergencies!

In-house sorting and transportation of waste materials

Sorting space for waste materialsThe installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly reduce waste disposal costs.

Exterior renovation dedicated showroom

Appearance of the exterior renovation dedicated showroomInterior of the showroom
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are attached to the roofing materials!
We can also provide simulations for potential earnings and installation costs when introducing solar panels!

Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!

3.All work performed by our own team

Diagram of the system for performing scaffolding, painting, and roofing renovations in-house

One of Kakeru Koumuten’s major strengths is its complete in-house construction.

By having Kakeru Koumuten manage everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will handle everything from the estimate to project completion.
Since the same person will be in charge, whether in sales or project management, smooth communication is ensured.

We can provide consistent in-house construction from temporary scaffolding installation to exterior wall painting and roof renovations!

4. Various Permits and Skilled Workers

Construction Industry LicenseDisplay of Permits and Qualifications Obtained by Kakeru Koumuten
We have obtained construction industry permits as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists, giving us confidence in our construction techniques.
We are capable of handling large-scale roof projects for factories and other facilities!

5. Warranty and Aftercare

Link banner to Kakeru Koumuten's warranty information page

In addition to the manufacturer’s warranty for solar panel installation, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary based on the warranty details.)
Aftercare is available annually, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Inspection response for roofs and solar panels

Our company is equipped to handle various roofing troubles and situations.

Even if you cannot access the roof at high altitudes, we can utilize drones to assist!
During leak investigations, we can also conduct surveys using a thermal imaging camera.

If the power generation of the solar panels decreases due to dirt or other factors, we can also provide cleaning of the solar panels with a specialized brush.
We will respond according to the customer’s wishes.

7. Human Resource Development

Training using models

To improve skills, we create various roofing models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct technical training to ensure that each staff member can handle various cases.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Easy-to-Understand Materials and Simulations

Examples of materials and simulations provided for solar work

Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction will receive materials that clearly summarize important points and disadvantages!

We encourage you to obtain comparative estimates and compare them with other companies’ plans!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.

1. Types of Roofing Materials and Age The fixing method varies depending on the roofing material, such as slate, tiles, metal roofs, and flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first.
2. Condition of Substrate and Waterproof Sheet If the sheathing or roofing (waterproof sheet) beneath the roofing material is damaged, it can affect the fastening strength and waterproofing. We will also check for any signs of leaks.
3. Orientation, Slope, and Shadows of the Roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, can affect power generation. We will create a layout diagram from the drawings and the site, and you can check it with a power generation simulation.
4. Shape of the Roof and Usable Area The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we will compare based on the total output of the roof.
5. Fixing Method and Waterproofing Details We will confirm whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please check the waterproofing treatment method for the fixing parts during the estimate.
6. Weight of the Roof The roof will become heavier due to the panels being added. After investigating the existing roof, substrate, and load capacity, switching to lighter roofing materials may also be an option if necessary.
7. Installation Location of Equipment and Wiring We will check the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring also affects the cost.

Fixing Methods and Checkpoints by Roofing Material

Roof Material Main Fixing Method Pre-Installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproofing of fixed parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay or replacement first.
Tile Roof Fixed with brackets and methods suitable for the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lighter roofing materials before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available.
Flat Roof / Rooftop Fixed by installing a frame Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work.
If you carry out roof renovations at the same time, you may be able to reduce future costs for removing and reinstalling solar panels!
If you perform roof renovations 10 to 20 years after installation, additional costs for removing and reinstalling solar panels will apply. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten is strong in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ Click here for roof renovations in Nerima, Tokyo

PossibleSubsidies and Grants

If you are introducing solar panels or storage batteries in Nerima, Tokyo, there is a possibility that you may be eligible for programs from the “National Government,” “Tokyo Metropolitan Government,” and “Nerima Ward”.
The following information is based on the official pages of each program as of October 7, 2026. The application status may change depending on the budget and application period, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Timing for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Tokyo Metropolitan Government “Reiwa 8 Year Household Solar Power Generation Promotion Project” (Cool Net Tokyo) New installation of certified solar modules in residential properties or their premises within Tokyo, with a system capacity of less than 50kW. Pre-application before installation is required. Existing homes: 150,000 JPY/kW for 3.75kW or less (maximum 450,000 JPY), 120,000 JPY/kW for over 3.75kW
New homes: 120,000 JPY/kW for 3.6kW or less (maximum 360,000 JPY), 100,000 JPY/kW for over 3.6kW
(Additional costs for mounting frames, waterproofing work, and renovation defect insurance, etc.)
Pre-application: From May 29, 2026
Grant application and performance report: From June 30, 2026 to March 30, 2029
Tokyo Metropolitan Government “Reiwa 8 Year Household Storage Battery Promotion Project” (Cool Net Tokyo) New installation of storage batteries in residential properties within Tokyo, which must be SII registered equipment. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries alone. Pre-applications after October 1, 2026 will only be eligible for SII registered products for Reiwa 8. Storage battery package: 100,000 JPY/kWh (maximum 1,200,000 JPY per household)
Storage battery unit expansion: 60,000 JPY/kWh (maximum 720,000 JPY per household)
(Additional amounts for participating in DR demonstrations, etc.)
Pre-application: From May 29, 2026
Grant application and performance report: From June 30, 2026
Nerima Ward “Carbon Neutral Equipment Installation Subsidy” Reiwa 8 Year Owners or residents of existing homes within the ward (the installation completion date must be more than one year after the building’s completion date; new homes are not eligible). Individuals and sole proprietors are eligible. Requirements include self-payment of installation costs and no delinquency in resident taxes. Storage batteries are not included in the ward’s subsidized equipment. Applications must be made after installation completion, not before. Solar power generation: 80,000 JPY (fixed amount)
Storage battery: Not eligible for ward subsidy
Installation completion period: From April 1, 2026 to March 31, 2027
Application acceptance: From April 15, 2026 to March 31, 2027 (must arrive by this date)
It is noted on the ward’s official page that as of September 15, 2026, the budget has been reached, and acceptance has been stopped. Please check the ward’s official page for the resumption date.
National “DR Home Storage Battery Project” (Reiwa 7 Year Supplement) New installation of home storage systems that can be utilized for DR (demand response) with registered products. Calculated based on an initial effective capacity of 34,500 JPY per kWh (subsidy rate within 3/10; maximum 600,000 JPY per application). The budget was reached on May 29, 2026, and the public recruitment has ended. (Applications cannot be made at this time.)
National “Mirai Eco Housing 2026 Project” (Renovation) The storage battery is one of the eligible facilities, but it must be combined with essential construction work such as insulation renovation of windows (openings) and the building structure; installation of the storage battery alone cannot be applied for. Solar panels are not included as eligible facilities. Storage Battery: 96,000 JPY/unit Ends as soon as the budget limit is reached. Please check the official website for application status.
Please pay attention to the “order of procedures” for subsidies!
In Tokyo, a pre-application before installation is required for subsidies, and starting construction beforehand may result in ineligibility. In Nerima Ward, the subsidy is applied for after installation is completed, but you must meet the requirements for eligible facilities, completion date, and necessary documents; applying does not guarantee approval. The Nerima Ward subsidy is processed in the order of arrival, and applications will close once the budget is reached (as of October 7, 2026, applications are currently suspended). The ward’s subsidy targets solar power generation, and storage batteries are not eligible. It is indicated on the ward’s official page that it can be combined with national and Tokyo subsidies. Procedures differ by system, so please confirm before contracting and starting work.
Kakeru Koumuten Co., Ltd. will provide guidance on eligibility conditions for each system after confirming them.

Tokyo “Reiwa 8 Year Household Solar Power Generation Promotion Project”

Tokyo is providing subsidies for those installing solar power generation systems in residential homes through Cool Net Tokyo. The target is systems using certified solar cell modules installed newly in residential homes or on their premises, with a capacity of less than 50 kW. A pre-application before installation is required.

For existing homes, the subsidy amount is 150,000 JPY/kW for 3.75 kW or less (maximum 450,000 JPY), and 120,000 JPY/kW for over 3.75 kW. Additionally, there are extra items for installation of mounting frames, waterproofing work, and renovation defect insurance. The pre-application period is from May 29, 2026, and the application for grants and performance reports is from June 30, 2026, to March 30, 2029. Please check the official page for details on eligible equipment, conditions, and budget status.
👉 Cool Net Tokyo | Official page for solar power generation is here

Tokyo “Reiwa 8 Year Household Storage Battery Promotion Project”

Tokyo is also providing subsidies for storage batteries installed newly in residential homes. The subsidy amount is 100,000 JPY per kWh for storage battery packages (maximum 1,200,000 JPY/unit), and 60,000 JPY per kWh for additional storage battery units (maximum 720,000 JPY/unit), with additional amounts for participation in DR demonstrations.

The target is equipment registered with SII (Environmental Collaboration Initiative). If applying for pre-application after October 1, 2026, only equipment listed in the Reiwa 8 Year SII registered product list will be eligible. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries alone. The application for grants and performance reports has been open since June 30, 2026.
👉 Cool Net Tokyo | Official page for storage batteries is here

Nerima Ward “Carbon Neutral Equipment Installation Subsidy”

In Nerima Ward, a “Carbon Neutral Equipment Installation Subsidy” is being implemented for those who install energy-saving and energy-generating equipment in existing homes within the ward. For the fiscal year 2026, the subsidy amount for solar power generation systems is set at 80,000 yen (fixed amount). Eligible applicants are owners or residents of existing homes in the ward (the installation completion date must be more than one year after the completion of new construction), including individuals and sole proprietors. Requirements include having paid the installation costs themselves, not being in arrears on residential taxes, and not having received a subsidy decision from the ward for similar equipment in the most recent fiscal year. Batteries are not included as eligible equipment for the ward’s subsidy (eligible equipment includes solar power generation, Enefarm, eco-cute, high-insulation windows and doors, and LED lighting).

Applications are to be submitted after installation completion, not before construction (the installation completion period is from April 1, 2026, to March 31, 2027, and application acceptance is from April 15, 2026, to March 31, 2027, by mail). Applications will be accepted on a first-come, first-served basis, and will end once the budget is exhausted. The ward’s official page indicates that applications were suspended on September 15, 2026, as the budget amount was reached. It is noted that this can be combined with subsidies from the national government and Tokyo Metropolitan Government.
👉 Here is the Nerima Ward official page (Carbon Neutral Equipment Installation Subsidy)

National Subsidy “DR Home Battery Project (Support Project for Home Battery Systems for DR Resource Introduction)”

The national government has been implementing the “DR Home Battery Project” to support the installation of home batteries.

This program targets those who are introducing registered products’ battery systems that can be utilized for demand response (DR), and for the fiscal year 2025 supplementary budget, the subsidy amount was determined based on a standard amount of 34,500 yen per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum of 600,000 yen per application. There are also conditions such as excluding contracts or orders made before the grant decision.

However, the fiscal year 2025 supplementary budget reached its application amount on May 29, 2026, and the public offering has ended (the previous fiscal year’s supplementary budget also ended on July 2, 2025). Applications are currently not possible, so please check the official site for future public offerings.

Additionally, there are currently no subsidies confirmed for the installation of solar panels on existing homes from the national government.
👉 Here is the official site for the DR Home Battery Project

Solar Panel Installation & Battery Installation Price List

Solar Panel Installation and Battery Installation Service Menu
⇧Service Menu | For Costs Related to Solar Panel Installation and Battery Installation, Click Here

Solar Panel Removal and Water Heater Removal Service Menu
⇧Service Menu | For Costs Related to Solar Panel Removal and Water Heater Removal, Click Here

Estimate Guidance

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and batteries should be checked separately as “Equipment Costs (Device Costs)” and “Construction Costs.”
Even for the same “Complete Solar Panel Installation,” the amount can vary greatly depending on the installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Battery Capacity (kWh)

The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Batteries are compared based on the amount of electricity they can store, expressed in kWh (kilowatt-hours).
The amount of kW that can be placed on the roof varies for each house based on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.

On our pricing page, we list solar panel costs as approximately 800,000 JPY to 1,200,000 JPY for 3-5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just guideline amounts and can vary based on wiring length, scaffold range, existing roofing materials, panel layout, etc.)
▶ Service Menu | For Costs Related to Solar Panel Installation and Battery Installation, Click Here

Items to Confirm in the Estimate (Cost Confirmation)

When comparing estimates, it’s common to compare different capacities and equipment. Please check if the following items are clearly stated in each company’s estimate!

1. Solar Panels Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) should be listed.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also confirm whether it is a type that controls in conjunction with a storage battery.
3. Storage Battery Manufacturer, model number, capacity (kWh), range usable during a power outage (entire house or specific circuits), installation location.
4. Mounting Frame and Hardware Name of hardware suitable for the roofing material and method of securing it (whether it involves drilling holes or clamping).
5. Wiring and Electrical Work Wiring route and length, work around the distribution board, presence of a monitor to check power generation.
6. Roof Reinforcement and Waterproofing Details of waterproofing treatment at the fixed points, whether necessary roof repairs and substrate reinforcements are included.
7. Applications Extent of support for applications to the power company, certification applications for selling electricity (FIT), and subsidy applications.
8. Scaffolding Scope and quantity of scaffolding. If roof work and exterior painting are done simultaneously, check that the same scope and quantity are not counted twice.
9. Removal and Disposal Whether the removal of existing solar thermal water heaters or old panels and disposal costs for waste materials are included.
10. Tax Classification and Warranty Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, details and duration of manufacturer and workmanship warranties.
Tip for Comparison: Align “Installation Capacity (kW)” and “Equipment Model Numbers” for Comparison!
Differences in capacity will change both the price and power generation. Kakeru Koumuten Co., Ltd. welcome comparisons, so if you bring estimates from other companies, we can explain the differences item by item!

Self-Estimate and Profit Simulation for Solar Power Generation

Self-Estimate and Profit Simulation for Solar Power Generation

With the simulator above,
you can obtain a rough estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can get a rough estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection and replacement.

Customer Testimonials

Case Studies of Solar Panel Installations

BEFORE

Metal roof before solar panel installation

AFTER

Roof after solar panel installation

Work Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh range
Base Mounting Hardware Used
 Niigata Manufactured / Aluminum Catch Type Hardware
Fixing Method & Waterproofing Arrangement
 Fixed by catching the horizontal metal roof with catch type hardware (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY
 Estimated recovery period for construction costs: about 8 to 9 years (self-consumption)

 *The amount of the grant and the estimated recovery are based on the system and calculations at the time of construction, and may differ under the current system.
Construction Period
 Approximately 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that grants are available, and I would like to know how much can be provided.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Nerima, Tokyo

There are many solar panel installation contractors that serve Nerima Ward, Tokyo, and you may be unsure which contractor to choose.

Therefore, when requesting solar panel installation and battery storage installation work, make sure to check the following 4 points:

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the existence of warranties and aftercare maintenance

● Obtain estimates from multiple contractors (3 companies is a guideline)

● Check if they provide support for subsidy applications

By confirming the above 4 points, you will be able to choose a reliable contractor.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Knowledge about roofs as well as solar panels

Defective installation of solar panels may be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing

・Solar panels were installed on a severely deteriorated roof, leading to leaks
・Solar panels were installed on a roof with a short lifespan, requiring a renovation for removal and reinstallation within a few years
・Misjudgment of the type of waterproofing led to incorrect treatment and subsequent leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unforeseen troubles.

▶ Go to “Roof Verification Before Installing Solar Panels” in this article

Confirm the existence of warranties and aftercare maintenance

When choosing a solar installation contractor, make sure to check for warranties. It is important to confirm not only the duration of the warranty but also the scope of coverage, disclaimers, and cost conditions.

While the solar panels and battery storage units come with manufacturer warranties, also check for the existence of workmanship warranties in case leaks occur after installation!

For contractors that offer workmanship warranties, if leaks occur after installation, they may cover the repairs under warranty, provided it is within the warranty period and conditions.

Additionally, some contractors offer after-sales service separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Changes or damage on the roof may occur in areas that are not visible, so there is a possibility that customers may not notice them.
By conducting inspections during after-sales maintenance, you can easily prevent major repairs or breakdowns by discovering abnormalities early!

Kakeru Koumuten Co., Ltd. provides a leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty without performing roof renovations.)
We also conduct after-sales maintenance and send out DM every year!
Please check the DM, and if you wish, we will visit for after-sales maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting solar panel installation, be sure to obtain estimates from multiple contractors.

Even for the same manufacturer and the same work content, costs may vary, as well as warranties and after-sales services.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request services from your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates, please check the following:

“Check the estimate items”
“Type of solar panels”
“Warranties and after-sales services”

Carefully compare these details to make your judgment! If the rank of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making decisions based solely on price!

▶ Go to “Breakdown of Installation Capacity, Equipment, and Construction Costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Confirm whether they provide support for subsidy applications

Subsidies may be available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
There are systems that require personal applications and cannot be handled by the contractor, as well as systems that require prior applications before installation, so it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for Tokyo’s subsidy, a prior application before installation is required) before proceeding with the construction! For the Nerima Ward subsidy, applications are made after installation is complete, not before construction!

In the case of subsidies in Tokyo, the process involves submitting a grant application and performance report after the completion of the work, followed by a review before the grant is awarded! For the subsidy in Nerima Ward, the application is submitted after installation is completed, and it is awarded after a review! (The procedure varies depending on the system.)

▶ Go to “Subsidies and Grants Available in Nerima Ward” within this article

Benefits of Introducing Solar Power Equipment

The benefits of introducing solar panels are summarized in the following 5 points!

Benefit 1: Economic Advantage

Household Budget Illustration

The biggest advantage of introducing solar panels is the economic benefit!
Although the selling price of electricity has decreased compared to ten years ago, you can gain benefits by reducing the electricity you buy from power companies by consuming the electricity you generate!
As electricity costs rise, the ability to cover your consumption with solar power becomes increasingly attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!

Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year” for certifications after October 2025, and the same price will apply for the fiscal year 2026. After the 5th year, it is generally more advantageous to use the electricity at home (self-consumption) rather than selling it, so combining it with a storage battery is also an option.
👉 For purchase prices and periods, click here

Benefit 2: Subsidies Can Be Utilized!

Illustration of a person happy about reduced costs

The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
Reducing the actual burden amount through subsidies is a significant advantage!
In the case of Nerima Ward, in addition to the national and Tokyo metropolitan government programs, there is a possibility of being eligible for the Nerima Ward Carbon Neutral Equipment Installation Subsidy (a fixed amount of 80,000 yen for solar power generation; storage batteries are not eligible for the ward’s subsidy), which requires application after installation completion and is on a first-come, first-served basis.

Benefit 3: Environmentally Friendly!

Environmentally friendly solar power illustration

Solar power generation contributes to the reduction of carbon dioxide emissions and dependence on fossil fuels, helping to mitigate global warming.
Since solar panels themselves do not produce noise or exhaust gases during the power generation process, they are considered an environmentally friendly method of generating electricity. (Devices like power conditioners may produce operational noise)

Benefit 4 Expect heat insulation effects!!

Illustration of heat insulation by solar panels

By installing them on the roof or rooftop, the panels block direct sunlight from hitting the roof.
Especially in summer, this can help reduce the temperature rise of the roof, providing expected heat insulation effects!
(Note that this does not improve the insulation performance of the building itself)

Benefit 5 Electricity can be used even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it is possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capabilities, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Illustration of a person explaining points to note

Point 1 Maintenance costs can be incurred

A particularly overlooked maintenance cost is related to the roof where solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reinstalling the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.

It would be reassuring to ask for a simulation that considers maintenance costs before introducing solar panels!

Point 2 The risk of leaks increases depending on the roofing material

The methods for securing slate roofs and tile roofs vary depending on the construction method, but when using screws and other fasteners to secure materials and substrates, waterproofing at the fastening points becomes crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and the fasteners, and it cannot be used with all metal roofs.)

Catch-type base fasteners for horizontal metal roofsCatch-type base fasteners for horizontal metal roofs

Note 3: The roof will become heavier

Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing it with a lighter roof may also be an option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their outputs and costs vary.
It is not simply a matter of “This manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

Choosing Method 1: Compare by Total Output of the Roof

When installing solar panels on the roof, it is important to consider how much power can be generated in a limited area, and generating more power is always better!

Solar panels come in various sizes and outputs depending on the manufacturer.
For example, a 350W output panel and a 400W output panel may seem that the higher output panel is better at first glance.
However, if the size of the panels does not fit well with the roof, “20 panels of 350W can be installed, while only 15 panels of 400W can be installed,” meaning that the number of panels that can be installed can differ even on the same roof due to the size difference.

400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than the output of a single panel!
*The above calculations are for total output (kW). The actual power generation (kWh) will vary depending on conditions such as the roof’s orientation, slope, and shading.

Choosing Method 2: Compare by Degradation Rate of Solar Panels

Solar panels have a degradation rate, and their output gradually decreases over 10 and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee values are standard figures for warranty purposes and do not indicate the actual degradation rate or power generation amount.
Choosing solar panels while considering the degradation rate, not just the initial output, will lead to a regret-free decision!

How to Choose 3: Compare by Warranty Period

There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Some manufacturers offer a 30-year warranty for output, while others may only provide a 10-year warranty, so it varies widely!
A longer warranty is always better, so be sure to check the warranty period and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar Power and Storage Battery Installation in Nerima Ward

We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Nerima Ward. (Tap to open the answers)

How much does it cost to install solar panels and storage batteries in Nerima Ward, Tokyo?

The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

Guidelines by capacity are published on the solar panel installation and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!

Are there any subsidies available for solar power and storage battery installation in Nerima Ward?

As of October 7, 2026, Tokyo’s subsidies for solar power generation and storage batteries (Cool Net Tokyo) are accepting pre-applications. For storage batteries, only SII registered devices (registered products for Reiwa 8) will be eligible from pre-applications made after October 1, 2026. The subsidy for carbon neutrality equipment installation in Nerima Ward (80,000 yen fixed for solar power generation, not applicable for storage batteries) has stopped accepting applications as of September 15, 2026, as the budget has been reached, according to the official page of the ward. The national DR household storage battery project has ended its public recruitment.

Since the acceptance status may change, please refer to the subsidy and grant section and consult us before signing a contract.

Can I apply for subsidies even after the construction is completed?

For many programs, procedures are required before construction. Tokyo’s subsidies require pre-application before installation, and if you install first, you will be ineligible. On the other hand, the subsidy in Nerima Ward is applied after the installation is completed, not before construction. The procedures differ by program.

Since the order of procedures varies by program, please confirm before signing a contract and starting construction.

Can solar panels be installed on slate roofs? I’m worried about leaks.

It is possible to install on slate roofs, but it is necessary to check the condition of the roofing material and substrate beforehand. The method of securing varies by construction method, and in methods that secure hardware to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.

Kakeru Koumuten Co., Ltd. is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation and suggest methods such as roof overlay (cover method) or replacement if deterioration is advanced.

My roof is old. Should I do a roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed 10 to 20 years after installation, the cost of removing and reinstalling solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate to a highly durable roofing material before installation.

Please consult us on how to proceed with the installation after checking the condition of the roof during the on-site survey!

Should I install a storage battery together with the solar panels?

If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it at home rather than selling it.

Additionally, the Tokyo Metropolitan Government’s subsidy for storage batteries is designed for simultaneous installation with solar panels, but applications can also be made for storage batteries alone. You can compare “solar panels only” and “solar panels + storage battery” in a financial simulation.

How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten Co., Ltd., we create a layout diagram from the drawings and on-site survey, and provide you with the installation capacity and power generation simulation.

Even in residential areas of Nerima Ward, the way shadows are cast by surrounding buildings varies from house to house. You can check the expected power generation through the power generation simulation.

How long will the construction period be?

In the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary depending on whether roofing work is done simultaneously and the shape and installation capacity of the roof.

Please note that additional time is required for applications for subsidies and power companies, so please consult us as soon as possible.

What is the current selling price (FIT)?

For residential use (less than 10 kW), the selling price will be 24 yen/kWh for the first 4 years and 8.3 yen/kWh from the 5th to the 10th year for certifications after October 2025, and the same price will apply in fiscal year 2026.

The idea is to recover initial costs quickly in the first 4 years and focus on self-consumption thereafter. Kakeru Koumuten Co., Ltd. provides a financial simulation considering loan interest rates and electricity costs.

Can you handle maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten Co., Ltd. sends out annual after-maintenance DM notifications and visits customers who wish to have inspections. We can also clean solar panels with a special brush if the power generation is reduced due to dirt.

The roof is a place that is difficult to check by yourself, so if you have any concerns, please feel free to consult us.

Can you also handle renovations for roofs that already have solar panels installed?

Yes, it is possible. Kakeru Koumuten Co., Ltd. can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them all in one go. The removed panels can be stored in our own warehouse.

For costs, please refer to the solar panel detachment and water heater removal pricing page.

Free estimates for solar panels and storage batteries in Nerima City are here

Estimates are completely free. We welcome competitive estimates!

If you are looking for a solar panel installation company in Nerima City, please consult Kakeru Koumuten

Our company handles a wide range of exterior renovations, including roof work and exterior wall work, in Nerima City, Tokyo, including solar panel installations.
We receive requests from many customers, including renovation companies and real estate agencies, who have contacted us!

Kakeru Koumuten promises “high-quality renovations at low costs”, and we have received positive feedback from many customers.
We continue to update our construction performance every year, and we will strive to improve quality to satisfy even more customers in the future.

Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and exterior wall cover methods.
We are also happy to handle small jobs such as partial repairs and rain gutter cleaning!

In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!

“I want to know recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide optimal solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and will propose the best construction plan!

We are confident that we will not be outdone by other companies in terms of cost, quality, and organization for exterior work!
We are confident, so we welcome competitive estimates!
Estimates are completely free, and if our company is found to be inferior to others, you are free to decline!

Characteristics of Nerima City, Tokyo and Points for Solar Work

Nerima Ward, Tokyo, is located in the northwest part of the 23 wards of Tokyo and is an area with extensive residential neighborhoods. The official page of Nerima Ward provides a flood and internal water damage hazard map, indicating that flooding risks are associated with the Shakujii River, Shirako River, and Ekoda River, while other areas are at risk of internal water flooding.
We have summarized the points to consider when installing solar panels and storage batteries in the residential environment of Nerima Ward below. (Tap to open)

View the characteristics of Nerima Ward, Tokyo, and points for solar construction

■ Check the installation location of storage batteries and power conditioners against the flood hazard map

The flood hazard map of Nerima Ward assumes a maximum hourly rainfall of 153mm and a total rainfall of 690mm, indicating that the areas marked in red are at risk of flooding from the rivers (Shakujii River, Shirako River, Ekoda River) within the ward, while areas outside the red frame are at risk of internal water flooding (a phenomenon where drainage cannot keep up with rainwater). It is noted that there is no risk of storm surge in Nerima Ward. When deciding on the installation location for storage batteries and power conditioners, it is advisable to check the flooding assumptions for your residence on the hazard map and consider the height and position of the installation for peace of mind.

■ Tokyo’s annual sunshine duration is approximately 1,927 hours

The Japan Meteorological Agency’s average values (1991-2020) indicate that Tokyo’s annual sunshine duration is about 1,927 hours.
Since power generation varies by season, it is important to conduct a year-round power generation simulation and select the capacity of the storage battery according to the times when electricity is used the most.

■ Check the shadows of surrounding buildings in areas with adjacent residences

In places where residences are closely built, the shadows cast by surrounding buildings vary for each house depending on the direction and height of the roof. Since solar panels generate less power when shaded, Kakeru Koumuten creates layout diagrams based on the drawings and the actual site conditions, allowing you to confirm the power generation simulation.

■ The ward’s subsidy targets solar power for “existing homes.” Storage batteries are not included

The subsidies in Nerima Ward are aimed at installations in existing homes within the ward (where the installation completion date is more than one year after construction) and do not apply to new homes. Additionally, storage batteries are not included in the ward’s subsidized equipment. If you are considering the introduction of storage batteries, please check the applicable systems such as Tokyo’s subsidies.

■ In areas with narrow front roads, plan scaffolding and equipment delivery carefully

In places where the front road is narrow or where surrounding buildings are close together, careful planning of scaffolding and equipment delivery may be necessary. Kakeru Koumuten will respond to the site conditions with its own scaffolding team and owned scaffolding materials.

■ Check the roof condition according to the age of the building

For buildings that have been around for a number of years, it is important to check the condition of the roofing materials and substrate before installing solar panels. Depending on the condition of the roof, installing them simultaneously with roof renovations can help reduce future costs for removing and reinstalling solar panels.

■ Subsidy applications: Tokyo before construction, Nerima Ward after installation completion

In Tokyo, prior application to Cool Net Tokyo is required before installation. The Carbon Neutral Equipment Installation Subsidy in Nerima Ward can be applied for after installation is complete, and applications will close once the budget is reached on a first-come, first-served basis. It is important to check the procedures and periods for each system in advance, in conjunction with the timing of the construction.

Our company serves Kanagawa Prefecture and Tokyo, and we handle many exterior construction and solar projects in Nerima Ward, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us for any sudden troubles!

Service Area in Nerima Ward, Tokyo

Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.

List of Areas in Nerima Ward, Tokyo

Asahigaoka, Nerima Ward / Asahimachi, Nerima Ward / Oizumigakuencho, Nerima Ward / Oizumicho, Nerima Ward / Kasugacho, Nerima Ward / Kamishakujii, Nerima Ward / Kamishakujii Minamimachi, Nerima Ward / Kitamachi, Nerima Ward / Mukaiyama, Nerima Ward / Kotakecho, Nerima Ward / Sakaemachi, Nerima Ward / Sakuradai, Nerima Ward / Shimoshakujii, Nerima Ward / Shakujidai, Nerima Ward / Shakujicho, Nerima Ward / Sekimachihigashi, Nerima Ward / Sekimachiminami, Nerima Ward / Sekimachikita, Nerima Ward / Takayanodai, Nerima Ward / Takamatsu, Nerima Ward / Tagara, Nerima Ward / Tatenomachi, Nerima Ward / Toyotamaue, Nerima Ward / Toyotamachu, Nerima Ward / Toyotamamin, Nerima Ward / Toyotamakita, Nerima Ward / Nakamura, Nerima Ward / Nakamura Minami, Nerima Ward / Nakamura Kita, Nerima Ward / Nishioizumi, Nerima Ward / Nishioizumicho, Nerima Ward / Nishiki, Nerima Ward / Nankai, Nerima Ward / Nerima, Nerima Ward / Hazawa, Nerima Ward / Hayamiya, Nerima Ward / Hikarigaoka, Nerima Ward / Hikawadai, Nerima Ward / Higashioizumi, Nerima Ward / Fujimidai, Nerima Ward / Heiwadai, Nerima Ward / Minamioizumi, Nerima Ward / Minamitanaka, Nerima Ward / Miharaidai, Nerima Ward / Tanihara, Nerima Ward

We welcome inquiries via LINE as well◎

LINE

LINE

We are also updating our Instagram regularly◎Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!