Leave the repairs and renovations of condominiums and apartments in Izumi, Yokohama City to Kakeru Koumuten Co., Ltd.!
Large-Scale Renovations for Condominiums, Apartments, and Buildings in Izumi Ward, Yokohama
To owners, management associations, and management companies considering large-scale renovations for condominiums, apartments, and buildings in Izumi Ward, Yokohama.
Kakeru Koumuten Co., Ltd. is a company that handles everything from the installation of temporary scaffolding, substrate repairs, exterior painting, tile repairs, sealing, waterproofing for roofs and balconies, to roofing work, all managed and performed by our own team. Based in Yokohama, we have undertaken numerous large-scale renovations and exterior reforms for apartments, condominiums, and commercial facilities in Izumi Ward.
- On-site surveys and estimates are completely free (multiple estimates are welcome)
- All management from temporary scaffolding to exterior and roofing work is handled in-house
- We confirm site conditions and delivery routes on-site and plan scaffolding from our own team
- Consultations for partial repairs or emergency measures for leaks are also possible
- Cost Estimate / For condominiums, the cost per unit is 750,000 to 1,500,000 yen (about 70% fall within this range according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, with the most common being 1,000,000 to 1,250,000 yen. This amount excludes consumption tax and common temporary costs). For wooden apartments, the estimate is 2,000,000 to 4,000,000 yen per building.
- Estimated Cycle / 12 to 15 years. However, the deciding factor is not the number of years but the condition of deterioration.
- Particularly Relevant in Izumi Ward / The opening of the Izumino Line in 1976, the establishment of the ward in 1986, and subsequent extensions and developments have layered the age of buildings, affecting the type of heavy work required. With a green coverage rate of 36.3% (compared to the city average of 27.8%), care must be taken regarding drain blockages from algae, moss, and fallen leaves. In the areas around the Sakai River, Izumi River, and Akuwa River, it is also important to inspect drainage during heavy rain.
- Available Funds / There are no subsidies specifically for large-scale renovations, but if requirements are met, there may be a 50% reduction in fixed property tax (for work completed by the end of March 2027), national subsidies if windows and insulation are included, and public financing may be available.
- Tips for Success / At least three competitive estimates. Compare not only the amounts but also the quantities, methods, and materials.
Large-scale renovation work that can be handled in Izumi Ward, Yokohama
Large-scale renovations are not just “exterior painting” or “waterproofing,” but a comprehensive repair of the entire building’s deterioration while scaffolding is in place. At Kakeru Koumuten, we can handle all of the following work in-house, ensuring clear responsibility and coordination of the process.
| Type of Work | Main Contents |
|---|---|
| Temporary Scaffolding Work | Installed by our own scaffolding team using our own scaffolding materials. Covers mesh sheets, protection, and fall prevention measures. |
| Substrate Repair Work | Crack repairs, injection of floating mortar and tiles, explosion (exposed rebar) repairs, resin mortar repairs for missing parts. |
| Exterior Wall Painting Work | High-pressure washing, three coats from primer to topcoat, painting of auxiliary parts (iron parts, gutters, water cut-offs, etc.). Supports radical control type, fluorine, and inorganic paints. |
| Tile Repair Work | Replacement of broken tiles, joint repairs, clear waterproofing of tile surfaces (such as Seven S). |
| Sealing Work | Re-sealing around sashes and exterior wall joints, additional sealing. |
| Waterproofing Work | Urethane waterproofing for rooftops, roof balconies, shared corridors, and stairs, PVC sheet waterproofing, and long sheet installation. |
| Roof Work | Roof painting, roof overlay (cover method), re-roofing, and ridge cap replacement. Skilled sheet metal workers are available to handle large roofs such as factories. |
| Iron and Metal Work | Surface painting of steel stairs, handrails, and PS doors, replacement of coping and water cut-offs. |
| Drainage and Wastewater Work | Cleaning and renovation of roof drains (inserting renovation drains), resolving gutter blockages. In the greenery-rich Izumi Ward, this work is particularly important to prevent blockages caused by fallen leaves. |
| Others | Rain gutter replacement, rooftop and exterior wall inspections using drones, leak investigations using thermography, and preliminary investigations of asbestos-containing materials. |
Scope of Major Repairs Determined by Building Diagnosis
It is not always necessary to carry out all the above works. The extent of the work will be determined based on the results of the building diagnosis. At Kakeru Koumuten Co., Ltd., we conduct a free on-site survey to confirm the items below, compile them into a deterioration diagnosis report with photos, and propose the scope of work.
| Diagnosis Area | Main Investigation Method | Scope of Work Determined by Diagnosis Results |
|---|---|---|
| Exterior Wall (Painted Surface) | Visual inspection, checking the width of cracks and the condition of the paint film | Methods and quantity for crack repair, specifications for painting (whether repainting or painting after removing the existing paint film) |
| Exterior Wall (Tile Surface) | Tap testing. High areas checked with a drone | Scope and estimated quantity for injection and replacement, whether clear waterproofing is necessary |
| Sealing | Checking for cracks, shrinkage, peeling, and hardening | Whether to replace or add to the existing sealant, scope of joints to be worked on |
| Rooftop, Balcony, Shared Corridor | Checking for blisters or breaks in the waterproof layer, puddles, and the condition of drains | Full renovation or partial repair, method (urethane waterproofing, PVC sheet waterproofing, long sheet), whether drain renovation is necessary |
| Leak Areas | Investigation using thermal imaging camera and drone | Identification of the cause and the priority areas for repair |
| Metal Parts, Roof, Accessories | Checking for rust, corrosion, lifting, and cracking | Whether it can be resolved with painting or if material replacement or cover method is necessary |
| Site and Surroundings | Checking trees, delivery routes, parking lots, and distance to neighboring properties | Planning for scaffolding and scope of temporary construction |
Reasons Kakeru Koumuten is Chosen for Large-Scale Renovations in Izumi Ward, Yokohama City
The reason why we can be entrusted with large-scale repairs in Izumi Ward is partly because “Kakeru Koumuten has a base in Yokohama City”, but also due to our “unique initiatives in large-scale repair work that cannot be imitated by other companies”, which have received high praise from many customers.
1. Equipment Specialized for Exterior Renovations
At Kakeru Koumuten, we have prepared the following warehouses and material storage areas to provide low-cost, high-quality exterior wall painting and waterproofing work for large-scale repairs. We have established five bases centered around Yokohama City for material storage and showrooms.
In-house Scaffolding Materials
We own the scaffolding materials necessary for temporary scaffolding required for large-scale repairs and can assemble the scaffolding ourselves.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can cut costs on scaffolding work and provide quick and flexible responses.
We have approximately enough scaffolding materials for 100 single-family homes!
Storage of Materials in Our Large Warehouse
We store paints and substrate repair materials used for exterior renovations. By ordering a large quantity of materials at once, we can procure materials at a lower cost! Additionally, we always have stock available, allowing us to respond quickly in emergencies!
In-house Waste Separation
During large-scale repairs, various waste materials such as leftover paint, metal, and wood are generated. At Kakeru Koumuten, we sort and recycle waste materials in-house, leading to cost reductions in waste disposal.
Showroom Dedicated to Exterior Renovations

In the showroom, not only can you have meetings, but you can also check actual samples and colors of exterior materials. Color simulations for exterior wall painting and heat insulation tests using a heat insulation testing machine are also available!
2. Cost Reduction through In-House Management and Construction
One of Kakeru Koumuten’s major strengths is in-house management and construction.
From inquiry to project completion, everything is managed by Kakeru Koumuten in a consistent system, allowing for high-quality large-scale repairs at reduced costs. Additionally, one representative will handle everything from the estimate to project completion. Since the person in charge does not change, whether it’s the sales representative or the construction management representative, smooth communication is possible.
We can handle everything from temporary scaffolding installation to exterior wall painting, substrate repairs, waterproofing work, and tile repairs with complete in-house construction! Those with specialized knowledge and experience will conduct inspections and actual construction for each process!
3. Obtaining Various Permits and Skilled Workers
We have obtained construction industry licenses and permits for industrial waste collection and transportation! We also have nationally certified sheet metal and painting skilled workers, and we are confident in our construction techniques. We can also handle large-scale roofing work for factories! We have qualified personnel for asbestos work supervisors and investigators of buildings containing asbestos materials, so we can handle and conduct preliminary investigations of roofing materials containing asbestos.
4. Warranty and Aftercare

Most large-scale repair works, including “painting work,” “substrate repair work,” and “waterproofing work,” come with a warranty!
Aftercare maintenance is available annually, and we send out notification DM every year.
5. Flexible and Prompt Response
Our company is equipped to handle various troubles and situations related to apartments and condominiums.
We can also address exterior walls and rooftops that cannot be checked from high places using a drone! During rain leak investigations, we can use a thermal imaging camera to help identify the cause of the leaks!
We will respond according to your wishes. We also accept emergency measures for sudden rain leaks! We will promptly respond to urgent requests or emergencies!
6. Human Resource Development
Our staff create various models to improve their skills and conduct practical training. Since different sites require various processing and techniques, we regularly provide skill enhancement education to ensure each staff member can respond effectively. We also educate on points to be cautious of and areas to check during each stage of large-scale repair work.
7. Consideration for Residents and Neighbors

During large-scale renovation work, we will not only notify residents and greet nearby residents, but also install a bulletin board at the entrance to display the construction schedule and notices! Additionally, we will thoroughly educate visitors on proper manners to minimize any inconvenience to residents and neighbors.
8. Strict Quality Control

Each process will be inspected by a responsible person, and detailed construction photos will be taken. We use film thickness inspection devices and check sheets to ensure that there are no oversights in inspections. During exterior wall painting and waterproofing work, we confirm the quantity of used paint cans to ensure that the specified amount of paint is used, and we prevent construction defects by ordering paint directly from our company. Of course, we will also take photos of the used paint and report them.
9. Exterior Wall Painting Color Simulation
9-1 Self Color Simulation

The simulations we create can be done using actual photos of your apartment or building!You can also perform simulations on your smartphone or computer. By simulating and then changing to a two-tone color or altering the image, we hope to enhance the stylish appearance and increase occupancy rates! Of course, we can also arrange paint samples for actual color confirmation.
* There are areas in Izumi Ward where building agreements and district plans are established, and the color of the exterior walls may need to harmonize with the surroundings. Having a color simulation screen will help facilitate explanations at community meetings and general meetings.
9-2 Confirm the Actual Color with a Test Paint!
You can order samples of the paint you are considering and conduct a test paint on your exterior wall. By doing a test paint, you can confirm the actual color and gloss!
9-3 Exterior Renovation Simulation
Exterior simulations for apartments and condominiums are also possible!
・Exterior wall color simulation (two-tone colors are also possible)
・Simulation for when metal siding is applied
・Simulation for when accent materials such as cornices and louvers are used
・Simulation for roof painting and roof replacement work
With the exterior renovation simulation, you can significantly reduce the risk of failure in image changes! We hope that renovating the appearance of apartments and condominiums will help increase occupancy rates.
Cost Estimates for Major Repairs in Yokohama City, Izumi Ward
The cost of major repairs varies greatly depending on the size of the building, the degree of deterioration, the scope of work, and the materials used. First, please refer to the national average based on public statistics, then to our company’s estimates based on construction performance by scale, and finally to examples of unit prices for each project.
The national average for condominiums is 750,000 to 1,500,000 yen per unit
According to a survey conducted by the Ministry of Land, Infrastructure, Transport and Tourism, which collected 818 construction cases (FY 2021), the cost of major repairs is concentrated at approximately 70% in the range of 750,000 to 1,500,000 yen per unit, with the most common price range being 1,000,000 to 1,250,000 yen. Yokohama City also indicates on its official website that the cost is “approximately 1,000,000 to 1,300,000 yen per unit.” Note that the amounts in this survey do not include consumption tax and common temporary construction costs, so they differ from the current total construction costs including tax.
| Construction Cost per Unit | Percentage | Construction Cost per Unit | Percentage |
|---|---|---|---|
| Up to 750,000 JPY | 15.1% | 1,250,000 to 1,500,000 JPY | 17.4% |
| 750,000 to 1,000,000 JPY | 24.7% | 1,500,000 to 2,000,000 JPY | 9.1% |
| 1,000,000 to 1,250,000 JPY | 27.0% (most common) | Over 2,000,000 JPY | 2.8% |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (200 companies, 818 cases) / Yokohama City “Market Prices for Large-Scale Renovation Costs and How to Address Shortfalls in Repair Reserve Funds” *Amounts do not include consumption tax or common temporary construction costs. Percentages may not total 100% due to rounding and non-responses.
Breakdown of Construction Costs (What the Money is Spent On)
| Category | Composition Ratio | Main Contents |
|---|---|---|
| Construction-related Work | 60.3% | About half for exterior walls, about one-third for waterproofing. Substrate repairs, tiles, painting, waterproofing |
| Temporary Construction | 22.8% | Scaffolding, mesh sheets, protective coverings, etc. (does not include common temporary construction costs) |
| Miscellaneous Expenses | 10.3% | Site management costs, general management costs, statutory welfare costs, etc. (9.5%), insurance premiums for large-scale renovation defect insurance (0.8%) |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Renovation Work for Condominiums in FY2021” (Second aggregation of large-scale renovation work. Overall average is 59.0% for construction-related work, 22.3% for temporary construction, and 9.9% for miscellaneous expenses). *The total does not equal 100% because it includes equipment-related work, exterior works, and others. This is an average value and not a criterion for judging the appropriateness of individual estimates.
Cost Estimates by Building Size (Scaffolding, Substrate Repair, Exterior Painting, Waterproofing, Sealing)
| Type and Size of Building | Cost Estimate | Estimated Construction Period |
|---|---|---|
| Wooden Apartment (2 stories, 6-10 units) | 2,000,000 – 4,000,000 JPY | 3 – 5 weeks |
| Steel Frame/RC Apartment (3 stories, 10-20 units) | 4,000,000 – 9,000,000 JPY | 1 – 2 months |
| Mixed-Use Building/Small Apartment (4-5 stories) | 5,000,000 – 15,000,000 JPY | 1.5 – 3 months |
| Medium-Sized Apartment (30-50 units) | 20,000,000 – 50,000,000 JPY | 3 – 5 months |
| Large Apartment (Over 100 units) | Around 100,000,000 JPY and up | 6 months and up |
*The above estimates are based on Kakeru Koumuten’s construction records and may vary depending on the presence of roofing work, metal work, plumbing, etc. For apartments, please also consider the national statistics above (750,000 – 1,500,000 JPY per unit) multiplied by the number of units as a reference.
Breakdown of Costs for Scaffolding, Substrate Repair, Exterior Walls, and Waterproofing
The estimate for large-scale repairs is broadly divided into “Scaffolding,” “Substrate Repair,” “Sealing,” “Exterior Painting,” “Waterproofing,” and “Miscellaneous Expenses.” Before comparing total amounts, please check what each item includes, how much, and at what cost.
| Item | What to Check in the Estimate |
|---|---|
| Building Prerequisites | Structure (wooden, steel frame, RC), number of stories, number of units, exterior wall area, waterproofing area. Also verify whether the area is based on drawings or actual measurements. |
| Common Scaffolding | Area and unit price of scaffolding, contents such as mesh sheets, protection, and temporary toilets. According to the Ministry of Land, Infrastructure, Transport and Tourism’s 2021 survey, temporary works like scaffolding account for about 20% of construction costs (excluding common scaffolding costs). |
| Substrate Repair | Quantities and unit prices for repair methods such as cracks, bulging, and spalling. Since these items are not finalized until scaffolding is set up, please confirm whether the quantities are estimated or actual, and the settlement method if quantities increase or decrease. |
| Sealing | Whether it is a replacement or additional sealing, length to be applied (m), and material name. |
| Exterior Painting | Painting area (㎡), manufacturer name, product name, grade of paint, number of coats, and scope of ancillary parts. |
| Waterproofing | Area for each part such as rooftops, balconies, and common corridors, construction method, material name, and whether drain renovations are included. |
| Inspection and Reporting | Whether inspections for each stage, construction photos, completion reports, and warranty documents are included. |
| Miscellaneous Expenses | Contents and proportions of site management fees, general management fees, statutory welfare expenses, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s 2021 survey, these average about 10% of construction costs, but this can vary depending on the size and conditions of the building, so there is no uniform standard. |
| Tax Classification | Whether amounts are tax-inclusive or tax-exclusive. Since companies may display this differently, be sure to align totals before comparing. |
Unit Price Examples for Repair Work
| Repair Method | Materials Used | Cost |
|---|---|---|
| Tile Replacement | Existing Similar Tiles | per piece / 2,000 JPY to 4,000 JPY |
| Repair of Floating Tile and Mortar Areas | Epoxy Resin Injection | per square meter / 3,000 JPY to 5,000 JPY (Varies depending on the degree) |
| Tile Joint Mortar Repair | Mortar for Tile Joints | per square meter / 1,000 JPY to 2,000 JPY (Varies depending on the degree) |
| Concrete Spalling Repair | Rust Preventive for Rebar + Resin Mortar | per location / 1,000 JPY to 2,000 JPY (Varies depending on the degree) |
| Crack Repair | Filler or Polymer Cement | per meter / 100 JPY to 2,500 JPY (Varies depending on the degree) |
| Exterior Wall Painting (3 Coats) | Radical Control Silicone Paint | per square meter / 2,500 JPY to 3,500 JPY |
| Roof Top Urethane Waterproofing (Ventilated Buffer Method) | High Strength Urethane | per square meter / 6,500 JPY to 9,500 JPY |
| Sealing Replacement | Modified Silicone | per meter / 900 JPY to 1,500 JPY |
| Temporary Scaffolding | In-house Owned Scaffolding Materials (Wedge Type) | per square meter / 700 JPY to 1,000 JPY |
*Costs and warranty periods vary depending on shape, quantity, substrate condition, and type of materials. If you would like a detailed estimate, please feel free to contact us. Estimates are completely free.
Select Paint and Waterproofing Grades Based on “Years Until Next Repair”
“Good paint does not equal the right choice.” The best way to choose is to align when you will conduct the next major repair with the lifespan of the materials to avoid waste.
| Grade | Estimated Lifespan | Suitable Cases |
|---|---|---|
| Silicone / Radical Control Type | 10-16 years | Buildings that are cycled every 12-15 years. A good choice balancing cost and performance. Since the lifespan varies by product, select specifications that match the cycle. |
| Fluorine | 16-20 years | Buildings that want to set the next repair after 15 years, high-rise or complex-shaped buildings where scaffolding costs are high. |
| Inorganic | 18-22 years | Buildings that want to suppress dirt adhesion. Effective for surfaces surrounded by trees or on the north side of Izumi Ward where moss and algae need to be controlled. |
| Urethane Waterproofing (Rooftop) | 8-15 years | Rooftops with complex shapes, or when wanting to renovate while utilizing the existing waterproof layer. Mid-term inspections and repairs, such as re-coating the top coat, are prerequisites. |
| Vinyl Sheet Waterproofing | 20-25 years | Rooftops with a large area and simple shapes. Short construction time. |
| Asphalt Waterproofing | 15-20 years | Rooftops planned for long cycles. The cost per instance will increase. |
*The estimated lifespan is a general guideline and may vary depending on sunlight, location, and substrate condition. In areas like Izumi Ward, where there is a lot of greenery and shade, choosing paints with anti-algae and anti-mold properties can change durability.
Guidelines for Repair Reserve Funds and Options When Insufficient
The Ministry of Land, Infrastructure, Transport and Tourism guidelines indicate the estimated repair reserve fund on a monthly basis per unit area. Additional charges are required if there is a mechanical parking lot.
| Building Size (Less than 20 Floors) | Monthly Estimate (Average) | Range Covering Two-Thirds of Cases | Conversion for 70㎡ |
|---|---|---|---|
| Less than 5,000㎡ Total Floor Area | 335 JPY/㎡ | 235-430 JPY/㎡ | Approximately 16,500-30,100 JPY |
| 5,000-10,000㎡ | 252 JPY/㎡ | 170-320 JPY/㎡ | Approximately 11,900-22,400 JPY |
| 10,000-20,000㎡ | 271 JPY/㎡ | 200-330 JPY/㎡ | Approximately 14,000-23,100 JPY |
| More than 20,000㎡ | 255 JPY/㎡ | 190-325 JPY/㎡ | Approximately 13,300-22,750 JPY |
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Repair Reserve Funds for Condominiums” (Reiwa 6, June revision, PDF) / National average is 13,378 JPY per unit per month (Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums)
In the Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums, 36.6% of management associations responded that “the repair reserve fund is insufficient compared to the plan.” There are four main options when insufficient.
| Options | Considerations and Cautions |
|---|---|
| ① Adjusting the Construction Schedule | Based on the deterioration diagnosis, postpone less urgent construction to the next time. However, it is essential to distinguish between construction that can be postponed and that which cannot, as delaying waterproofing and tile detachment measures will ultimately be more costly. |
| ② Reviewing the Scope and Specifications of Work | Revising paint grades, changing from full renovation to partial renovation, etc. Please consider this separately from “apparent cost reductions” that skip processes. |
| ③ Utilizing Subsidies and Tax Systems | Subsidies for energy-saving renovations, etc. (to be discussed later). The reduction of fixed asset tax is a system that lowers the tax amount for each unit owner, and does not directly increase the repair funds of the management association. |
| ④ Increasing Reserve Funds, Borrowing, and One-Time Payments | In addition to considering an increase in repair reserve funds at the general meeting, the Housing Finance Agency’s condominium common area renovation loan requires no collateral. Interest rates can be lowered by obtaining management plan certification. |
Subsidies, Tax Systems, and Loans to Check for Large-Scale Renovations in Izumi Ward, Yokohama City
Both Yokohama City and Kanagawa Prefecture do not have subsidies specifically for large-scale renovation work. The available options can be broadly categorized into four types. The eligibility and application status of the systems may change even during the fiscal year, so please be sure to confirm with our company or the respective offices before contracting or starting work.(As of October 7, 2026)
| Type | Details |
|---|---|
| ① Assistance for Investigation and Planning | Costs for deterioration diagnosis and creation of long-term repair plans. Can be used as a preliminary step before large-scale repairs. |
| ② Construction Assistance by Purpose | Energy saving (windows, insulation), earthquake resistance, barrier-free, asbestos, EV charging, etc. Incorporated into large-scale repairs. |
| ③ Tax Incentives | Reduction of fixed property tax under the condominium longevity promotion tax system. |
| ④ Public Financing | Housing Finance Agency’s condominium common area renovation loans. |
① Condominium Longevity Promotion Tax System (Reduction of Fixed Property Tax)
If large-scale repairs (including exterior painting, floor waterproofing, and roof waterproofing) that contribute to the longevity of certain qualifying condominiums are carried out, the fixed property tax amount for the following year will be reduced by half (up to 100㎡ equivalent per unit; urban planning tax is not included).
| Main Requirements | Built 20 years or more; total number of units 10 or more / at least one instance of exterior painting, floor waterproofing, and roof waterproofing each carried out in the past / must meet one of the following: ① A management plan certified condominium that raised the amount of repair reserve funds (average amount during the planning period) from below to above the certification standard after September 1, 2021 ② A management association that received advice and guidance from the city, resulting in long-term repair plans meeting the standards (advice and guidance are not available upon request). |
|---|---|
| Deadline for Implementation | From April 1, 2023, to March 31, 2027, completion of construction. |
| Declaration | Declare within three months after construction completion at the ward office (Izumi Ward Office Tax Division Building Section). A large-scale repair construction certificate issued by an architect, etc., is required. |
| Points to Note | The reduction is limited to once for the same condominium. Simply obtaining management plan certification does not qualify; there are requirements such as raising the repair reserve fund. A review of the long-term repair plan is also necessary, so it is recommended to prepare at least one year before construction. |
- Yokohama City: Details of the Apartment Longevity Promotion Tax System (Official)
- Ministry of Land, Infrastructure, Transport and Tourism: Apartment Longevity Promotion Tax System (Official)
- Ministry of Land, Infrastructure, Transport and Tourism: Property Tax Reduction for Large-Scale Repairs of Apartments (PDF)
- Ministry of Land, Infrastructure, Transport and Tourism: Information on Management Plan Certification System and Tax and Loan Benefits (PDF)
* The national leaflet shows the range of reduction rates as a nationwide system. The reduction rate in Yokohama City is 50%.
② Support for Apartment Management in Yokohama City (For Management Associations, Start Here)
The support system in Yokohama City is mostly based on registration in the “Yokohama City Apartment Registration System” (free). Management associations that are not yet registered should start here.
| System | Details |
|---|---|
| Condominium Registration System | Free. This registration is a prerequisite for utilizing various support systems and advisor dispatch. |
| Condominium Advisor Dispatch | Dispatch of condominium management specialists and architects, etc. First time free (if there has been no usage record before the fiscal year 2025), 12,650 yen (including tax) from the second time onwards, up to a maximum of 6 times. Consultations on large-scale repairs, long-term repair plans, and energy-saving renovations are available. |
| Long-Term Repair Plan Creation Promotion Model Project | Targeting management associations that have not created a long-term repair plan or have not reviewed it for over 15 years. Half of the cost of deterioration survey diagnosis and long-term repair plan creation commission, up to 200,000 yen. *Contracts and commencement with the commissioned party cannot be made before the grant decision. Please confirm with the city’s Building Bureau Housing Regeneration Division before applying due to budget limits. |
| Same (Energy-Saving Menu) | For creating long-term repair plans that include insulation, window renovations, and high-efficiency equipment, half of the cost, up to 200,000 yen. Obtaining management plan certification (or a general meeting resolution for application) is a requirement. |
| Condominium Barrier-Free Support Project | For eliminating level differences in common areas and grounds, installing ramps, handrails on both sides, and renovations to non-slip floors, one-third of the construction cost (excluding tax), up to 300,000 yen. *Handrails on only one side are not eligible / Application before the construction contract is mandatory. |
| Condominium Seismic Diagnosis and Seismic Renovation | Targeting condominiums that received building confirmation before the end of May 1981. Two-thirds of the diagnosis cost, one-third of the renovation construction cost (limit varies from 20 million to 50 million yen depending on scale). *Pre-consultation before obtaining estimates is necessary. |
| Sprayed Asbestos Countermeasure Project | Only for common areas of condominiums; management association application. Containment survey is free, two-thirds of the removal and other construction costs (up to 3 million yen). *Please confirm the implementation status for fiscal year 2026 with the Building Disaster Prevention Division. |
| Subsidy for Installing EV Charging Equipment for Collective Housing | Targeting management associations, etc. Half of the remaining amount after deducting national and prefectural subsidies, for standard charging equipment 100,000 yen per unit (up to 5 units per collective housing). Fiscal year 2026 is from June 26, 2026, to February 12, 2027 (ends when the budget limit is reached). |
Source: Yokohama City “Support and Subsidy System List by Concerns for Condominium Management Associations” / Long-term Repair Plan Creation Promotion Model Project / Condominium Advisor Dispatch / Yokohama Condominium Portal
③ Management Plan Certification System (Entrance to Tax and Interest Rate Benefits)
This is a system certified by Yokohama City. Once certified, it allows for a 0.2% reduction in the loan interest rate from the Japan Housing Finance Agency, preferential interest rates for Flat 35, and meets one of the requirements for the long-life promotion tax system (certification alone does not guarantee tax reduction). The main criteria include holding general meetings at least once a year, organizing management regulations, separate accounting for management fees and repair reserve funds, ensuring that the total amount of arrears is within 10% of the total, and “having created or reviewed a long-term repair plan that includes large-scale repair work at least twice and has a planning period of over 30 years within the last 7 years.”
*Fees include a system usage fee of 10,000 yen + a city application fee of 3,900 yen, among others. It takes 2 to 3 months from application to certification. The validity period of the certification is 5 years.
④ National Energy Conservation Support | Housing Energy Conservation 2026 Campaign
Changes for Fiscal Year 2026The “Child-Rearing Green Housing Support Project” for Fiscal Year 2025 has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Additionally, the “Long-Term Quality Housing Renovation Promotion Project” will end in Fiscal Year 7 and will not be implemented in Fiscal Year 8. Please be careful not to create financial plans based on outdated information.
Mirai Eco Housing 2026 Project
| Target | Renovations of existing homes built before December 31, 2016, regardless of whether they are single-family or multi-family residences. Management associations and management corporations can also become joint contractors (can be used for common area renovations). Rental properties are also eligible. |
|---|---|
| Required Work | Insulation renovations for openings, insulation renovations for the structure (floor, walls, ceiling), and installation of eco-friendly housing equipment are mandatory combinations. |
| Subsidy Limit | Based on the age of the building and the energy-saving performance achieved, 400,000 to 1,000,000 yen per unit (1,000,000 yen if the house built before 1991 meets the mandatory standards). |
| Period | Subsidy applications are generally made by registered contractors (construction contractors) after the completion of the work (the ordering party cannot apply themselves). Applications (including reservations) will end once the budget limit is reached. The status of budget execution is published on the official website, so please check the latest application status before contracting. |
Advanced Window Renovation 2026 Project
| Target | Renovations to existing homes (single-family and multi-family) including the installation of interior windows, replacement of exterior windows, and glass replacement to high-performance insulated windows. Subsidy rates are set separately for “low-rise” and “mid-to-high-rise” multi-family residences. |
|---|---|
| Bulk Application for Multi-Family Residences | From May 29, 2026, applications for “bulk subsidy applications for multi-family residences (including reservations)” have started. The application process is conducted by registered contractors (window renovation contractors), and management associations cannot apply themselves, but they can apply for all units collectively, making it a system that works well with large-scale repairs for window and entrance door renovations. |
| Subsidy Limit | For residences, 1,000,000 yen per unit (changed from 2,000,000 yen in the 2025 fiscal year). For non-residential buildings over 240 square meters, 10,000,000 yen per building. |
| Period | Work started after November 28, 2025. Subsidy applications will be made after the completion and handover of the work, and will end once the budget limit is reached. The status of budget execution is updated daily on the official website, so please check the latest application status before contracting. |
⑤ Kanagawa Prefecture Subsidies (Applications for the 2026 Fiscal Year Have Ended)
| Existing Housing Energy Efficiency Renovation Subsidy | Houses where the applicant resides permanently and owns or has a share in (including exclusive parts of condominium apartments) are eligible. Renovation of windows (including entrance doors) that are exposed to the outside air is mandatory. Subsidy covers one-third of eligible expenses, or a maximum of 150,000 yen, whichever is lower. The application for the 2026 fiscal year reached the budget limit, and acceptance was closed on September 30. Construction started before the notification of grant decision is not eligible, and applications by contractors on behalf of the owner are not permitted. |
|---|---|
| Subsidy for Residential Solar Power Generation and Storage Battery Installation | Management associations of condominium apartments in the prefecture are also eligible. Solar power is 70,000 yen/kW, and storage systems are 150,000 yen/unit. The application deadline for the second phase of the 2026 fiscal year was September 30, and acceptance has ended. If work was started before the grant decision date, it is not eligible. This is a system to confirm if you are considering installing solar power along with rooftop waterproofing. |
* The Existing Housing Energy Efficiency Renovation Subsidy does not cover common areas of rental apartments or units not occupied by the owner.
⑥ Financing System (Housing Finance Agency Condominium Sumairu Loan)
If the management association borrows funds for large-scale repairs, it can utilize the Housing Finance Agency’s “Condominium Common Area Renovation Loan (Condominium Sumairu Loan).”
| Eligible Construction | Large-scale repairs, seismic renovations, flood prevention measures, energy-saving measures, balcony repairs, safety measures for elevators and parking lots, asbestos measures, and diagnostic and design costs by specialists. |
|---|---|
| Collateral | No collateral required (joint guarantee by the condominium management center, etc.) |
| Repayment Period | Generally 1 to 10 years; 1 to 20 years for specific construction; up to 35 years for seismic, flood, and energy-saving construction after obtaining management plan certification. |
| Interest Rate Reduction | ① Holding of Sumairu Bonds ② Obtaining management plan certification ③ Implementation of seismic, flood, and energy-saving construction, each can reduce by 0.2% per year (up to 0.6% per year). |
| Main Requirements | Improvement of management regulations, resolution at the general meeting, the delinquency rate of repair reserve funds must be within 10%. Applications are accepted year-round. |
Source: Housing Finance Agency “Condominium Sumairu Loan” (Official)
Cases where fire insurance can be used and cases where it should not be used
Damage caused by “accidental incidents” such as flying debris from rooftop waterproof sheets, caps, and fences due to typhoons or strong winds, hail damage, and lightning strikes may be covered by fire insurance. It is important to clearly document and differentiate between damage caused by accidents and wear and tear during the deterioration diagnosis.
On the other hand, wear and tear itself is not covered. There have been numerous troubles nationwide with companies soliciting, “You can repair without any out-of-pocket costs with insurance,” and the National Consumer Affairs Center has repeatedly issued warnings. False claims can lead to insurance fraud charges. Please confirm the eligibility of your claim directly with your management association or owner to the insurance company or agent. Kakeru Koumuten Co., Ltd. does not provide such guidance.
Building conditions and repair points in Izumi Ward, Yokohama City
Izumi Ward, Yokohama City, was established in November 1986 (Showa 61) when it was separated from Totsuka Ward. Throughout the history of the ward, the opening of the Sotetsu Izumino Line (from Futamatagawa Station to Izumino Station) in 1976, the extension to Izumi Chuo Station in 1990, the extension to Shonandai Station in 2000, and the commencement of the land readjustment project in the Izumi Yumegaoka area in 2015 have led to gradual development. As a result, the characteristic feature is that apartment buildings constructed in line with the growth of the ward are mixed with varying years of construction. Buildings constructed in the same period will reach their repair period at the same time.
(as of October 1, Reiwa 7)
(as of October 1, Reiwa 7)
(as of September 30, Reiwa 7)
City average is 27.8%
(about 5.4% of the city area)
Source: Yokohama City Izumi Ward “Ward Statistics Handbook” (PDF) / Yokohama City “Data on Greenery” (FY 2019)
Apartment buildings in Izumi Ward are divided into “four generations”
The apartment buildings in Izumi Ward reflect the history of the ward’s development in their varying years of construction. The type of heavy construction required for the next large-scale renovation will change depending on which generation your building belongs to.
| Construction Period | District Developments | Age of Building (as of 2026) | Major Repairs in Next Renovation |
|---|---|---|---|
| Until around 1975 Buildings from the Totsuka Ward era |
Before the establishment of the district (1986). Multi-family residences and apartments built before the opening of the Izumino Line (1976) | Over 51 years old | 3rd and 4th repairs. Replacement of water supply and drainage pipes, replacement of steel staircases and handrails, seismic diagnosis for old seismic standards (before May 1981) will be the main issues |
| 1976 to around 1985 Development along the line after the opening of the Izumino Line |
A period when residential areas expanded along the line following the opening of the Izumino Line (1976) | 41 to 50 years old | Around the 3rd repair. Measures against tile lifting and peeling, renovation of sashes and entrance doors will become more significant |
| 1986 to around 1999 Period of district establishment and extension |
Establishment of the district (1986), extension to Izumi Chuo Station (1990) | 27 to 40 years old | 2nd and 3rd repairs. Comprehensive renovation of rooftop waterproofing, replacement of long sheet flooring in common corridors will be the focus |
| After 2000 Generation under 26 years old |
Extension to Shonandai Station (2000), land readjustment project in the Izumi Yumegaoka area (started in 2015) | 26 years old or younger | 1st and 2nd repairs. Re-caulking and exterior wall painting will be the main tasks |
Source: Yokohama City Izumi Ward “District Overview” (Based on the establishment of the district, the opening and extension of the Izumino Line, and the land readjustment project in the Izumi Yumegaoka area)
Four Unique Factors in Izumi Ward That Damage Buildings
We have organized four characteristics of Izumi Ward visible from public documents of Yokohama City that are linked to major repairs.
① The growth stage of the district corresponds to the age layers of buildings
As shown in the table above, the residential buildings in Izumi Ward are characterized by a wide range of construction years, from before the opening of the Izumino Line to new buildings from the 2000s. Even within the same ward, there are buildings that will require “plumbing, seismic, and metal updates” in the next repairs, and buildings that only need “sealing and painting” right next to each other. According to the comprehensive condominium survey for the fiscal year 2023, 36.6% of management associations are facing a shortfall in their repair reserve funds compared to their plans. A financial plan that matches the range of construction years is as important as the construction work itself.
② The Basins of Sakai River, Izumi River, and Akuwa River and Drainage
In Izumi Ward, Sakai River and its tributaries, Izumi River, Akuwa River, and Udagawa (Muraoka River) flow through the area. The Yokohama City Izumi Ward urban development materials (2018) also mention concerns about flooding damage and landslides due to heavy rain. In low-lying areas close to rivers and sites with elevation differences, the drainage from rooftop drains, drainage pipes, and the escape routes for water around the first floor, as well as drainage around the retaining walls of the site, are critical during heavy rain. Please check the flood risk for your property on Yokohama City’s hazard map.
③ More Greenery Means Algae, Moss, and Fallen Leaves
The green coverage rate in Izumi Ward is 36.3% (as per the 2019 survey; the city average is 27.8%). Although it has decreased from 41.1% in 2004, it is still a ward with more greenery than the city average. Additionally, the district overview indicates that the proportion of urbanization control areas is the highest among the 18 wards. On the north-facing exterior walls and the floors of shared corridors that do not receive sunlight, algae, moss, and dark stains are likely to appear, and clogging of roof drains and gutters due to fallen leaves can trigger puddles on the roof and leaks. We recommend thorough high-pressure washing, selecting paints with anti-algae and anti-mold properties, and conducting inspections and cleaning of drains, incorporating renovations into the work items as needed.
④ Building Agreements and District Plans as City Rules
In Izumi Ward, there are two building agreements (Nishigaoka District and Okazu District) listed by Yokohama City (updated on February 22, 2022). Additionally, district plans have been established for areas such as Izumi Yayoi-dai Housing Area, Izumi Ryokuen 1st and 2nd Chome Areas, Izumino Station North Exit Area, Izumi Chuo Station South Area, and Tachiba Station South Area (as per the 2018 Izumi Ward urban development materials, there are 13 districts). The existence and content of agreements and plans regarding appearance and color vary, so before deciding on colors, it is essential to check what regulations apply to your property as the first step in forming consensus with neighbors and community associations. Sharing a completed image through color simulation can facilitate discussions.
Source: Yokohama City Izumi Ward “Ward Overview” (PDF) / Yokohama City “Izumi Ward Urban Development (Revised Draft)” (PDF) / Yokohama City “Data on Greenery” / Yokohama City “Building Agreement (Izumi Ward)”・“District Planning” / Ministry of Land, Infrastructure, Transport and Tourism “FY2023 Comprehensive Survey on Condominiums” (PDF)
Key Issues to Address in Construction in Izumi Ward
| Issues | Current Situation in Izumi Ward and Kakeru Koumuten’s Response |
|---|---|
| Consensus Building and Financial Planning | The type of repairs and associated costs will vary depending on the age of the building. Decisions made at the general meeting, operation of the repair committee, and informing residents can take time, so we will prepare multiple proposals and financial plans that allow for comparisons, including narrowed-down options for the construction content and plans that consider future repairs. |
| Parking During Construction | Parking spaces on the side where scaffolding will be erected need to be temporarily cleared. In buildings with limited parking availability, it may take time to secure temporary relocation spots for vehicles. We will coordinate arrangements, including the availability of nearby coin parking and monthly rental spaces, starting 2 to 3 months before construction begins. |
| Material Delivery and Scaffolding | The size of the site, width of the front road, distance from neighboring properties, and the presence of elevation differences or retaining walls vary by building. Our own scaffolding team will assess the site and plan the delivery route and scaffolding layout. For properties with pathways or common areas, we will also include plans for temporary enclosures and the placement of guides to separate pedestrian traffic. |
| Protection and Pruning of Plants | In the green-rich Izumi Ward, there are many buildings where trees may obstruct the scaffolding. If trees need to be cut down or relocated for scaffolding, we will confirm the applicable greening regulations and agreements for that building, as well as the content of greening discussions at the time of construction, and include pruning, relocation, and restoration in our construction specifications. |
| Consideration for Neighbors | In locations adjacent to single-family homes or buildings managed by other associations, high-pressure washing splatter and paint odors can reach directly. In areas with active neighborhood associations, prior explanations are practically essential. We ensure thorough greetings, posting of schedules, and adherence to working hours. |
| At-Home Time Periods | The Izumi Ward demographic guide indicates that the daytime and nighttime population ratio is the lowest in the city, highlighting that Izumi Ward is a residential area. The aging rate is also about 29.2% (as of September 30, Reiwa 7), and there are many buildings where residents are home during the day. Since at-home time periods vary by building and household, we will inquire about your convenience in advance regarding requests for clearing balconies and confirming residents at home. |
*Kakeru Koumuten has five bases in Yokohama City and serves all areas of Izumi Ward, including Yayoi-dai, Ryokuen, Izumi Chuo, Izumi-cho, Nakada, Kamiida, and Okazu.
Deterioration Symptoms and Timing Requiring Major Repairs
Generally, major repairs are typically expected every 12 to 15 years. According to a survey by the Ministry of Land, Infrastructure, Transport and Tourism, the actual repair cycle is most commonly 13 years, with about 70% falling within the 12 to 15 year range, and the cycle tends to shorten with repeated occurrences. However, the actual judgment should be based on the condition of deterioration rather than just the number of years, so if you observe symptoms like those listed below, we recommend an early on-site inspection.
| Location | Dangerous Signs of Deterioration if Left Unattended | Main Actions |
|---|---|---|
| Exterior Wall (Painted Surface) | Chalking (white powder on hands), fading, cracks wider than 0.3mm, peeling or blistering of paint | Substrate repair + exterior wall painting |
| Exterior Wall (Tile Surface) | Tile lifting or falling off, chipping of joints, efflorescence, hollow sounds when tapped | Injection for lifting, replacement, clear waterproofing |
| Sealing | Cracks in joints, shrinkage, peeling, hardening | Re-sealing |
| Roof and Balcony | Bloating or breaking of waterproof layer, puddles, clogged drains, leaks to lower floors | Urethane waterproofing, sheet waterproofing, drain renovation |
| Metal Parts and Steel Stairs | Rust, peeling paint, corrosion of treads | Grinding + rust prevention + painting, component replacement |
| Roof | Lifting of ridge cap, cracking or warping of slate, moss, misalignment of tiles | Roof painting, overlay method, re-roofing |
| Concrete | Spalling (exposed rebar with rust stains), water leakage from cracks | Spalling repair + resin mortar filling |
| Common Corridor and Stair Floor | Lifting or peeling of long sheet, opening at edges, exposure of substrate | Replacement of long sheet + substrate waterproofing |
Repair Cycle Guidelines by Location (Ministry of Land, Infrastructure, Transport and Tourism Guidelines)
| Location/Work | Estimated Cycle | Location/Work | Estimated Cycle |
|---|---|---|---|
| Exterior Wall Painting (Repainting) | 12-15 years | Re-sealing | 12-15 years |
| Exterior Wall Painting (Existing Removal + Painting) | 24-30 years | Metal Parts Painting | 5-7 years |
| Roof Waterproofing (Repair/Renovation) | 12-15 years | Water Supply Pipe (Rehabilitation/Replacement) | 19-23 years / 30-40 years |
| Roof Waterproofing (Removal/New Installation) | 24-30 years | Drain Pipe (Rehabilitation/Replacement) | 19-23 years / 30-40 years |
*The above are reference examples from the guidelines and are not uniform construction deadlines. Actual cycles will be set according to the specifications, location conditions, and deterioration status of the building.
Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Creating Long-Term Repair Plans” (Revised June 2024, PDF) / Ministry of Land, Infrastructure, Transport and Tourism “Survey on Large-Scale Repair Work for Condominiums in FY2021”
Examples of Large-Scale Renovation Work
This is an example of exterior renovation work on a mixed-use building handled by Kakeru Koumuten. The building had leaks occurring in several places, and we combined clear waterproofing for the tile exterior wall with waterproofing for the rooftop for the renovation.
Exterior Renovation Work on a Mixed-Use Building (Tile Exterior Wall Waterproofing + Rooftop Waterproofing)
| Construction Details | Partial replacement of damaged tiles / Painting of ancillary parts (pipes, water cut-off) / Rooftop waterproofing work (urethane waterproofing) / Exterior wall tile waterproofing (Seven S) / Sealing work around sashes / Repair of exterior wall tile mortar joints / Removal of ivy |
|---|---|
| New Materials Used | Exterior wall tiles: Kunishiro tiles / Painting of ancillary parts: Radical silicone paint / Rooftop waterproofing: High-strength urethane (Sarasene A) / Exterior wall tile waterproofing: Seven S |
| Price Range | 4,000,000 – 4,100,000 JPY |
| Construction Period | 45 days |
| Location | Not disclosed |
| Background to the Construction | Due to rain leaks occurring from several areas such as the exterior walls and rooftop, we proposed waterproofing for the entire exterior wall. Seven S is a clear waterproofing material for tile exteriors, and while it is somewhat expensive, it offers high waterproofing performance, making it recommended for cases where rain leaks are occurring from multiple areas of the exterior wall. |
Customer Feedback
Flow from On-Site Investigation to Completion of Construction
From inquiry to completion of construction and aftercare, one representative will consistently handle your case. In the case of management associations, a resolution at the general meeting is required, so starting the process 1 to 1.5 years before the desired start date will allow for a smoother progression.
- Contact Us (Free) Please reach out via phone, form, or LINE. If you have estimates from other companies, it’s fine to just present those.
- On-site Investigation & Building Diagnosis (Free) We will conduct a survey of the exterior walls, check for cracks, sealing, and waterproofing layers, and if necessary, use drones or thermal imaging to investigate the roof, high places, and leak areas. For properties in Izumi Ward, we will also check the condition of trees, delivery routes, parking, and the distance to neighboring properties.
- Submission of Investigation Report & Estimate We will provide a deterioration diagnosis report with photos and an estimate detailing quantities, methods, and materials for each work item. Multiple plan proposals are also possible.
- Plan Decision & Contract Confirm colors through color simulations, sample boards, and trial painting. For management associations, we can assist in preparing materials for general meetings. In areas subject to district planning or building agreements, we will also explain the considerations for color choices.
- Notification to Residents & Neighbors We will distribute construction notifications, visit neighbors to greet them, and set up a bulletin board at the entrance (with a schedule and laundry information). If temporary relocation of parking is necessary, we will coordinate this at this stage.
- Installation of Temporary Scaffolding & Various Works Our own scaffolding team will set up the scaffolding, followed by high-pressure washing → substrate repair → sealing → exterior wall painting & tile repair → waterproofing → iron parts & ancillary work in that order. A supervisor will inspect each process and take construction photos.
- Completion Inspection, Scaffolding Dismantling & Handover We will confirm the finish in the presence of the customer and provide construction photos, a report on the paint used, and a warranty certificate.
- Aftercare Maintenance We will send out annual DM notifications, and inspections can be conducted every year. Simple repairs such as partial sealing are provided free of charge.
Resident Communication, Approval for Additional Work, Inspection Reports
Just as important as the construction itself is “when, what, and with what materials we report”. At Kakeru Koumuten, we will provide materials and reports in the following four situations.
| Situation | Materials Provided / Actions Taken |
|---|---|
| Before Construction Building Diagnosis |
We will provide a deterioration diagnosis report with photos. This document summarizes the deteriorated areas and the basis for the proposed scope of work. |
| Before Construction to During Construction Notification to Residents & Neighbors |
We will distribute construction notifications, visit neighbors to greet them, and provide information on the schedule and laundry through the entrance bulletin board. |
| During Construction Approval for Additional Work |
If deterioration is discovered after scaffolding is erected, we will present photos, quantities, and costs for approval before proceeding with the work. |
| During Construction to Completion Inspection Reports |
A supervisor will inspect each process and take construction photos. At completion, we will confirm the finish in the presence of the customer and provide construction photos, a report on the paint used, and a warranty certificate. |
* For management associations, it is smooth to decide in advance who will approve additional work (such as the chairman or repair committee) and the estimated amount that will require approval before the contract.
How Will Life Be During Construction? Impact on Residents
For large-scale repairs, the principle is to proceed while you continue to live in your home. However, there will be some limitations on your daily life while scaffolding is in place. Most troubles can be prevented by providing prior notice, so Kakeru Koumuten Co., Ltd. thoroughly explains and posts information before construction begins.
| What will be affected | What will actually happen / Our response |
|---|---|
| Laundry | On days of high-pressure washing, painting, and waterproofing, outdoor drying will not be possible. We will inform you via bulletin boards and each household’s mailbox about “which side will be worked on today” and will ensure as many days as possible for drying. |
| Opening and closing windows | In addition to washing and painting days, there may be times when windows cannot be opened during other processes such as protection, drying, and waterproofing. We will inform you for each process, so please check the postings and notifications. We will organize the schedule to avoid continuous closures. |
| Balcony | During floor waterproofing and handrail painting, we ask for the temporary relocation of personal belongings, potted plants, and air conditioning outdoor units. The timing will be notified in advance for each household. |
| Noise and odors | The period of substrate repairs (breaking and drilling) will produce the most noise. Working hours are generally from 8 AM to 5 PM, and we will accommodate requests such as refraining from work on Sundays and holidays. Low-odor paint options are also available. |
| Security and privacy | Scaffolding can become an access route. We can take measures such as blocking sightlines with mesh sheets and installing locks and sensor lights on the scaffolding’s access stairs at night. We also thoroughly educate visitors on proper manners. |
| Parking | Vehicles on the side where scaffolding will be erected will need to be temporarily relocated. Since securing a new parking spot may take time, we will work together to secure a new parking location starting 2 to 3 months before construction begins. |
| Pets, small children, and working from home | If you have sensitivities to noise, please inform us in advance, and we may be able to adjust the work schedule accordingly. Please feel free to let us know. |
| Rented rooms | We can assist owners in creating notification documents for tenants. If you are concerned about the impact of construction on occupancy rates, we can also suggest a color simulation for a change in image. |
How to Choose a Large-Scale Repair Contractor and Ordering Method
There are many large-scale repair contractors that cover Izumi Ward in Yokohama City, and you may be unsure which contractor to choose. When requesting renovations for apartments, condominiums, or buildings, please check the following four points.
● Have extensive experience in large-scale repairs
● Confirm the presence of warranties and aftercare services
● Obtain estimates from multiple contractors (at least 3 companies)
● Confirm whether they manage their own work
Have extensive experience in large-scale repairs
Large-scale repair contractors often have websites that showcase their exterior renovation achievements. If they provide detailed explanations of repair contents with photos, it gives you peace of mind as a reference when you actually request work.
Using Google and review sites to evaluate large-scale repair contractors can also be effective when comparing them! Be cautious if there are many negative reviews. If there are few reviews, also check their construction achievements, explanation content, and management system.
Large-scale repair work involves not only the construction itself but also the potential for conflicts with residents and neighbors. Therefore, it is necessary to post updates on the progress of the work and information about laundry on bulletin boards to prevent troubles before they occur. Kakeru Koumuten Co., Ltd. specializes in exterior work, and we receive many requests for exterior renovations of apartments and condominiums.
Check for Warranty and Aftercare Services
When choosing a large-scale repair company, let’s confirm the presence of a warranty. If any issues such as leaks occur after the construction, having a leak warranty from the contractor ensures that repairs can be made free of charge, providing peace of mind! Companies that offer a warranty period are often confident in their work, which can serve as a criterion for selecting a contractor.
The warranty period varies by contractor and the nature of the work, but it is generally set between 1 to 10 years. Emergency repairs or partial fixes often do not come with a leak warranty. Some contractors also offer aftercare services separate from the warranty, so be sure to check for the presence of warranties and aftercare services.
At Kakeru Koumuten Co., Ltd., we send out annual direct mail for aftercare maintenance, allowing for yearly inspections. We also provide free support for simple repairs such as partial sealing.
Obtain Estimates from Multiple Contractors (at least 3 companies)
When requesting large-scale repairs, be sure to obtain estimates from multiple contractors. It is important to get estimates from at least three companies and compare their estimates and reports! Even for the same work, costs can vary by contractor, and warranties and aftercare services may differ. Additionally, obtaining multiple estimates makes price negotiations easier.
When comparing estimates, consider not only the cost but also the “items in the estimate,” “methods and materials for substrate repair and exterior wall painting,” and “confirmation of the process” in detail! Costs can be lowered by using lower-grade materials or skipping steps, so avoid making decisions based solely on price. Especially since substrate repair work can be difficult to assess from appearance alone, be sure to check whether the repair method is appropriate for the condition of the substrate!
Check These Points on the Estimate (Checklist)
| Confirmation Items | Points to Consider |
|---|---|
| Is there an excessive use of “one set” notation? | Are the quantities and unit prices clearly stated? With “Exterior Wall Repair One Set,” comparisons and verifications cannot be made. |
| Do the quantities match the actual measurements? | Are there quantities recorded that are far from the drawings or actual measurements? This is the area where inflation is most likely to occur. |
| Proportion of miscellaneous expenses | Details and proportions of site management costs, general management costs, statutory welfare costs, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, the average is about 10% of the construction cost (excluding common temporary costs), but this varies depending on the scale and conditions of the building, so there is no uniform standard. |
| Are the names of materials written? | Are the manufacturer names, product names, grades, and number of coats for paints and waterproofing materials specified? |
| Treatment of quantities for substrate repairs | This is an item that cannot be accurately measured until the scaffolding is set up. Is it stated whether it is “estimated quantity” or “actual quantity settlement,” and are there agreements for increases or decreases? This is the most important point. |
| Warranties and after-inspection | Warranty period for each construction, frequency of inspections, and scope of free support. |
| Company backing | Types of construction industry licenses, track record of similar scale and structure, presence of qualified personnel. |
Confirm if it is managed in-house
Large-scale repair work includes various tasks such as “substrate repair work,” “exterior wall painting,” “waterproofing work,” and “pipe replacement,” and the plan content will change depending on the actual deterioration condition and customer preferences.
Contractors that completely outsource to subcontractors may lack knowledge and experience, leading to proposals for repairs in irrelevant areas or meaningless work. If you investigate and then request a subcontractor, it may incur additional time and costs. By having knowledge and experience and managing in-house, responsible construction at a reduced cost becomes possible.
Additionally, contractors that outsource may respond slowly in the event of trouble during construction. It is prudent to avoid having a company that has not actually met with the customer manage the construction. Kakeru Koumuten performs everything from temporary scaffolding installation to exterior wall painting and waterproofing work in-house, managed by knowledgeable and experienced personnel!
There are three ordering methods. The choice affects the approach.
Especially for management associations, it is necessary to decide “how to request” before “which company to hire.” The main ordering methods are the following three.
| Method | Process | Advantages | Disadvantages |
|---|---|---|---|
| Responsibility Construction Method | The construction company handles investigation, design, construction, and management all at once | No additional costs for outsourcing to design consultants (investigation and design costs may be included in the construction costs) / Single point of contact reduces the burden on the management association / Responsibility is clear / May shorten the period until ordering | Specifications can easily be left to the construction company, making side-by-side comparisons difficult / Third-party checks are hard to implement, requiring the management association to verify prices, specifications, and construction status |
| Design Supervision Method | A design office or consultant conducts investigation and design, while a different company handles construction | Allows for comparison of construction companies under the same conditions / Independent supervision during construction | Consultant fees are required separately / Attention needed for risks of conflicts of interest and collusion / Tends to prolong the period |
| Management Company Prime Contract Method | The management company becomes the prime contractor, and subcontractors perform the construction | Easy coordination with daily management / Minimal effort required from the management association | Tends to be more expensive due to intermediate margins / Competition principles are hard to apply |
Collusion and Inappropriate Consulting Issues in Large-Scale Renovations and Self-Defense Measures
Latest 2026 In the large-scale renovation industry, inappropriate orders linked between design consultants and construction companies have long been a problem. The Ministry of Land, Infrastructure, Transport and Tourism issued warnings and notifications to management associations in January 2017 and April 2023, and on September 28, 2026, the Japan Fair Trade Commission announced that it had issued exclusion orders to 38 companies and a total of 1.63788 billion yen in payment orders to 37 companies regarding large-scale renovation work commissioned by condominium management associations to design consulting firms in the Kanto region (two design consulting firms were also subject to exclusion orders).
※Based on the Japan Fair Trade Commission announcement (September 28, 2026).
Three Typical Methods
① Dummy Estimates
A predetermined company is chosen to receive the order, while other companies only submit high estimates as a formality, creating a “fixed race.” It appears to the management association that “proper competitive estimates were obtained.”
② Collusion with Design Supervisors
While consultants contract at extremely low design and supervision fees, they receive kickbacks from the high construction costs of their partner construction companies. Fees that are too low for design and supervision are a warning sign.
③ Back Margin
A certain percentage of the contract amount is given as a kickback, which is then added to the construction costs as an expense. As a result, the management association ends up paying extra.
Source: Yokohama City “What is collusion in large-scale repair work for condominiums?” / Ministry of Land, Infrastructure, Transport and Tourism “On the Proper Ordering of Large-Scale Repair Work for Condominiums” (Notification dated April 3, Reiwa 5, PDF)
Self-Defense Measures for Management Associations
- Obtain independent estimates from multiple companies
- Consult with neutral third parties such as condominium management professionals or architects
- Document the vendor selection process in minutes to ensure transparency
- Confirm the reasons for unusually low consulting fees
- Include a penalty clause in the contract for cases of collusion
- Avoid concentrating information with a single consultant and verify specifications independently
New System in Yokohama City Bid Agency Service for Large-Scale Repair Work
In response to this issue, in October 2025, Yokohama City and the Yokohama Housing Supply Corporation established the “Bid Agency Service for Large-Scale Repair Work.” This system separates the selection of design and construction companies, with the corporation acting as a third party to conduct conditional general competitive bidding. The estimated price will not be disclosed, and the process will follow methods similar to public works.
| Target | Condominiums in Yokohama City. The management association must be the applicant, and the design work must be completed with a construction supervision system in place. |
|---|---|
| Fee | 0.2% to 1% of the winning bid amount (excluding tax / lower rates for larger projects). No charge if the bidding is unsuccessful. |
| Contact | Yokohama Housing Supply Corporation, Phone 045-451-7780 (Weekdays 9:00 AM – 5:00 PM) |
Source: Yokohama City Press Release (October 16, 2025) / Yokohama Housing Supply Corporation
Frequently Asked Questions about Large-Scale Repairs in Izumi Ward, Yokohama
- How much does large-scale repair in Izumi Ward, Yokohama cost?
- For apartments, according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% fall within the range of 750,000 to 1,500,000 yen (excluding consumption tax and common temporary construction costs), with the most common being 1,000,000 to 1,250,000 yen. Yokohama City also indicates “approximately 1,000,000 to 1,300,000 yen per unit.” Based on our company’s track record, the cost for a two-story wooden apartment ranges from 2,000,000 to 4,000,000 yen, for a three-story steel or RC apartment from 4,000,000 to 9,000,000 yen, and for small-scale apartments or mixed-use buildings from 5,000,000 to 15,000,000 yen. The cost varies depending on the condition of the substrate and whether waterproofing or roofing work is needed, so we provide free on-site estimates.
- How often should large-scale repairs be conducted?
- Generally, a cycle of 12 to 15 years is recommended, and the actual cycle is most commonly 13 years according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey, with about 70% falling within 12 to 15 years. However, the decision should be based on the condition of deterioration rather than just the number of years. If signs of deterioration such as sealing degradation, tile lifting, or waterproof layer rupture are observed, it is advisable to conduct repairs without waiting for the cycle, as this can ultimately reduce costs. Older buildings tend to have a greater proportion of tile repairs and metal part replacements during the second and third repairs.
- How long does the construction period take? Can residents stay during the work?
- For apartments, the duration is typically 3 weeks to 2 months, for small-scale apartments or buildings 1.5 to 3 months, and for apartments with over 50 units about 4 to 6 months. Residents can remain in their homes during the construction. However, there will be restrictions on drying laundry outside and opening windows while scaffolding is in place, so we take thorough measures to minimize the impact on daily life, including distributing advance notices, providing information on the schedule and laundry through bulletin boards, and strictly adhering to working hours.
- How long should I expect from the start of planning to the completion of construction?
- For management associations, it typically takes about 1 to 1.5 years for the establishment of the repair committee, building diagnosis, contractor selection, and general meeting resolutions, followed by 3 to 6 months for the construction itself. Overall, it is advisable to plan for around 2 years to proceed comfortably. If utilizing subsidies or tax incentives, please also factor in the time required to obtain management plan certification (2 to 3 months from application to certification).
- Are there any subsidies available for large-scale repairs in Izumi Ward, Yokohama?
- Neither Yokohama City nor Kanagawa Prefecture offers subsidies specifically for large-scale repair work. However, for condominium apartments, if certain conditions are met, there are reductions in fixed property tax by half under the “Condominium Longevity Promotion Tax System,” subsidies from Yokohama City for deterioration diagnosis and long-term repair planning (half, up to 200,000 yen), and subsidies for barrier-free renovations in common areas (one-third, up to 300,000 yen). If the work includes windows and insulation, it may qualify for “Advanced Window Renovation 2026” or “Mirai Eco Housing 2026.” The application timing and applicants vary by system, so please check the eligibility conditions and application procedures for each system before contracting or starting construction.
- I heard that fixed property taxes can be reduced through large-scale repairs. Is that true?
- It is true if the conditions are met. Under the Condominium Longevity Promotion Tax System, if a condominium apartment that meets the requirements, such as being over 20 years old and having more than 10 units, conducts large-scale repairs that contribute to longevity (including exterior painting, floor waterproofing, and roof waterproofing), the fixed property tax for the following year will be reduced by half for up to 100 square meters per unit. This applies to work completed between April 1, 2023, and March 31, 2027, and a declaration must be made to the Izumi Ward Office within three months of completion. For management plan certified condominiums, there are additional requirements such as raising the repair reserve fund, which takes time to prepare, so it is recommended to start the process more than a year in advance.
- Are there any changes to subsidies starting from the fiscal year 2026?
- Yes. The national “Child-Rearing Green Housing Support Project” has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Management associations and management association corporations can also become joint project participants, allowing for insulation renovations in common areas. Additionally, the “Long-Term Excellent Housing Renovation Promotion Project” will end in fiscal year 2025 and will not be implemented in fiscal year 2026. The “Advanced Window Renovation 2026 Project” has begun accepting bulk applications for apartment buildings starting May 29, 2026 (application procedures are handled by registered contractors). Please be careful not to base your financial planning on outdated information.
- What should I do if the repair reserve fund is insufficient?
- The options are mainly four: ① Postpone low-urgency work after a deterioration diagnosis to the next time, ② Review the scope and specifications of the work, ③ Check support systems such as subsidies, ④ Consider increasing the repair reserve fund or loans from the Japan Housing Finance Agency. The agency’s condominium common area renovation loan does not require collateral, and the interest rate can be reduced by up to 0.6% per year by obtaining management plan certification and implementing energy-saving and seismic work. Please note that postponing waterproofing and tile peeling measures often ends up being more expensive, so please consult us for a decision on separation.
- Can you handle large-scale repairs for properties with many buildings, like in a housing complex?
- You can consult us. For properties with many buildings, it is important to conduct deterioration diagnoses for each building, plan the process for whether to do them all together or separate by building or year, and form consensus at the general meeting. Kakeru Koumuten Co., Ltd. also targets condominiums with over 100 units as a cost estimate and will propose multiple process plans for comparison.
- What happens to the residents’ parking during construction?
- Vehicles on the side where scaffolding is set up will need to be temporarily moved. In buildings with limited parking availability, it may take time to secure an alternative location. Kakeru Koumuten Co., Ltd. will coordinate with you about the availability of nearby coin parking and monthly parking lots starting 2 to 3 months before construction begins.
- Can I freely decide the color of the exterior walls?
- In Izumi Ward, there are two building agreements (Nishigaoka District and Okazu District) listed by Yokohama City, and district plans are established for areas such as Izumi Yayoi-dai Housing Area, Izumi Ryokuen 1st and 2nd Chome Areas, and Izumino Station North Exit Area. The existence and content of agreements and plans regarding appearance and color vary by agreement and plan, so it is important to check in advance. You can confirm what applies to your property through Yokohama City’s public information on building agreements and district plans, and the Izumi Ward Office’s Urban Development Promotion Division (045-800-2331) also provides guidance on urban development in the ward. We will also investigate this during our research. Sharing a color simulation to visualize the completed image can facilitate discussions with neighbors and the neighborhood association.
- Why is the north-facing exterior wall particularly covered in moss and algae?
- Izumi Ward has a green coverage rate of 36.3% (as of the 2019 survey; city average 27.8%), making it a green area where shaded surfaces from trees are common. When sunlight is insufficient and humidity is high, moss, algae, and mold can thrive. By thoroughly cleaning with high-pressure washing and choosing paint with anti-algae and anti-mold properties, recurrence can be minimized. Additionally, we recommend checking for blockages in roof drains and gutters caused by fallen leaves, as these often lead to puddles on the roof and leaks.
- Which should I choose, the responsibility construction method or the design supervision method?
- For properties with fewer units, the burden of consulting fees tends to be heavier, so we believe that the responsibility construction method is often more suitable for small to medium-sized buildings. The design supervision method allows for comparison of construction companies under the same conditions since a third party creates the specifications; however, it incurs separate consulting fees and requires caution regarding conflicts of interest and collusion risks. Even with the responsibility construction method, verifying price, specifications, and construction status is essential. Kakeru Koumuten Co., Ltd. provides detailed estimates listing quantities, methods, and materials for each construction item, allowing for comparison on the same level as other companies.
- How can I detect collusion in large-scale repairs?
- There are three typical tactics. ① Pre-selecting a contractor and having other companies submit only nominally high estimates, known as “dummy estimates,” ② A consultant signing a contract with an extremely low design supervision fee and receiving kickbacks from partner companies, ③ Adding a portion of the contract amount as a back margin to the construction costs. Countermeasures include obtaining independent estimates, consulting a neutral third party, documenting the selection process in meeting minutes, and including penalty clauses in contracts. In October 2025, Yokohama City and the Yokohama City Housing Supply Corporation will establish a “Large-Scale Repair Work Bidding Agency Service.”
- How many companies should I get estimates from?
- We recommend at least three companies. If there are too many, comparisons become unmanageable; if too few, competition does not occur. What is important is not the number of companies but “creating the same playing field before comparing.” By creating a common specification sheet and quantity table and requesting estimates under the same conditions, and by requiring detailed breakdowns instead of accepting “one set” notation, it becomes clear whether price differences are due to variations in scope or unit prices.
- What is the difference if you own your own scaffolding?
- Among the costs of large-scale repair work, temporary construction accounts for about 20% (according to the Ministry of Land, Infrastructure, Transport and Tourism’s fiscal year 2021 survey). By not outsourcing scaffold work, we can easily control costs in this area, and our in-house scaffold team can flexibly respond to sudden changes in the schedule or additional work. Kakeru Koumuten Co., Ltd. owns scaffold materials for approximately 100 single-family homes and plans the scaffolding on-site according to the site conditions.
- Can I just have a look at the estimate while I’m comparing quotes?
- Of course, that’s possible. If you bring in estimates from other companies, we will check for free whether the items, quantities, methods, and materials are appropriate, and provide you with an estimate under the same conditions. We welcome competitive estimates.
- Can I request just an emergency repair for a leak?
- Yes. As a preliminary step before large-scale repairs, we also accept requests for emergency repairs or partial repairs for leaks. We will identify the cause using thermography and drones and propose the minimum necessary repairs.
- Can you handle roofing or exterior wall materials that contain asbestos?
- Yes, we can. We have qualified personnel such as asbestos work supervisors and building material asbestos surveyors, and we handle everything from the legally required preliminary surveys to the cover method and removal of asbestos-containing roofing materials. If there is sprayed asbestos, you may be eligible for free surveys and subsidies covering two-thirds of the removal costs (up to 3 million yen) through Yokohama City’s countermeasures project, so we will provide that information as well.
- What happens if we don’t do large-scale repairs?
- There are risks such as personal injury accidents due to falling exterior wall tiles, structural deterioration due to corrosion of rebar, leaks, and a decrease in asset value. Furthermore, for buildings subject to periodic reporting under Article 12 of the Building Standards Act, investigations through full tapping and other methods are required under certain conditions, such as when more than 10 years have passed since completion or exterior wall renovations for tiled or mortar-finished walls. In Yokohama City, buildings that are only apartment complexes are not designated for periodic reporting, but mixed-use buildings that include stores require individual confirmation. Even if not subject to statutory inspections, regular inspections and maintenance are essential, so please consult us if you are unsure.
- How much does large-scale repair for an apartment (about 10 units) cost?
- For a wooden two-story building with 6 to 10 units, the estimate is around 2 million to 4 million yen, and for a three-story steel or RC building with 10 to 20 units, it is about 4 million to 9 million yen based on our company’s track record (including scaffolding, substrate repairs, exterior wall painting, sealing, and waterproofing). It is common for apartments to undergo repairs every 10 to 15 years. For owners, there is an increasing trend to change the appearance with color simulations during repairs to improve occupancy rates.
If you are looking for a large-scale repair contractor in Izumi Ward, Yokohama City, contact Kakeru Koumuten
Our company is based in Yokohama City and has handled many exterior wall renovations and large-scale repairs for condominiums and apartments in Izumi Ward. We are happy to assist not only with large-scale repair work but also with partial repairs and leak repairs. In urgent cases like leaks, emergency repairs may be possible, so please feel free to consult us. “I want it to last long with one renovation” “I want to keep costs down as much as possible” “I want to improve insulation performance because the interior is hot” We will propose optimal solutions for your specific requests and future repair plans.
From temporary scaffolding work to roofing and exterior wall painting, all work is performed by our own team. We are confident that we will not be outdone by others in terms of cost, quality, and planning, so we welcome competitive estimates!
On-site surveys, estimates, and color simulations are all free
Please feel free to consult us via the inquiry form, phone, or LINE.
It’s also fine to just present estimates from other companies.
Areas Covered for Large-Scale Repair Work
Kakeru Koumuten Co., Ltd. accepts requests for work throughout Kanagawa Prefecture and Tokyo.
Ikenotani / Izumigaoka / Izumichuo North / Izumichuo South / Izumicho / Okazucho / Katsurazaka / Kamiiida Town / Shimoida Town / Shimoizumi / Shirayuri / Shinbashi Town / Nakada North / Nakada Town / Nakada West / Nakada East / Nakada South / Nishigaoka / Yayoidai / Ryoke / Ryokuen
・When should large-scale renovations be carried out? An explanation of the optimal timing and risks of postponement!
・Estimates are essential for large-scale renovations! Key comparison points and precautions!
・5 common troubles in large-scale renovations of condominiums! Thorough explanation of causes and prevention measures!
・What is waterproofing work in large-scale renovations? A thorough explanation of roles, signs of deterioration, and precautions!
・Insufficient funds for large-scale renovations… Solutions for funding shortages and preparations you can do right now!
・What is substrate repair, which is important in large-scale renovations? A thorough explanation of necessary reasons, signs of deterioration, and types of work!
・What is sealing work in large-scale renovations? An introduction to roles, methods, and tips for avoiding mistakes!
・What is tile repair, which is important in large-scale renovations? An explanation of signs of deterioration, types of work, and cost averages!
・What is exterior wall painting, which is important in large-scale renovations? A thorough explanation of necessity, signs of deterioration, and cost averages!
・For exterior renovations in Izumi Ward, Yokohama City, trust Kakeru Koumuten!
・For roof renovations in Izumi Ward, Yokohama City, trust Kakeru Koumuten!
・For exterior wall painting in Izumi Ward, Yokohama City, trust Kakeru Koumuten!
We welcome consultations via LINE as well◎
We are also regularly updating our Instagram◎ Please follow us!
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!



