Large-Scale Renovations for Condominiums, Apartments, and Buildings in Chigasaki City

To owners, management associations, and management companies considering large-scale renovations for condominiums, apartments, and buildings in Chigasaki City.

Kakeru Koumuten Co., Ltd. is an exterior renovation company that handles everything from the installation of temporary scaffolding to substrate repairs, exterior wall painting, tile repairs, sealing, rooftop and balcony waterproofing, and roof work, all managed and performed by our own team. Based in Yokohama City, we have undertaken numerous large-scale renovations and exterior reforms for apartments, condominiums, and commercial facilities in Chigasaki City.

  • On-site surveys and estimates are completely free (we welcome competitive estimates)
  • All management from temporary scaffolding to exterior and roof work is handled in-house
  • We confirm site conditions and delivery routes on-site and plan the scaffolding from our own team
  • Consultations for partial repairs or emergency measures for leaks are also possible
Conclusion First

  • Cost Estimate / For condominiums, the cost per unit is 750,000 to 1,500,000 yen (according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% fall within this range, with the most common being 1,000,000 to 1,250,000 yen. This amount excludes consumption tax and common temporary costs). For wooden apartments, the estimate is 2,000,000 to 4,000,000 yen per building.
  • Estimated Cycle / 12 to 15 years. However, the deciding factor is not the number of years but the condition of deterioration.
  • Particularly Relevant in Chigasaki City / The city has areas with different environments, such as coastal areas facing Sagami Bay, housing complexes in the Hamamihiradai area, and lowlands along the Sagami River. Even for repainting without changing the exterior wall color, there are landscape rules that require notification, and issues like rust, sealing, and waterproofing damage along the coast, as well as drainage on rooftops and premises are often points of discussion. For buildings with 8 or more units, notification under the Landscape Act is required at least 30 days before the start of construction.
  • Available Funds / There were no publicly available confirmations of subsidies for large-scale renovation construction costs from Chigasaki City or Kanagawa Prefecture. If requirements are met, there may be reductions in fixed property tax under the condominium longevity promotion tax system (Chigasaki City offers one-third off for the following fiscal year for work completed by the end of March 2027), national subsidies if windows and insulation are included, and public financing may be available.
  • Tips for Success / At least three competitive estimates. Compare not only the amounts but also the quantities, methods, and materials.
This page summarizes cost estimates, unique renovation points in Chigasaki City, construction processes, choosing contractors, anti-collusion measures, and the latest support systems as of 2026. (Information as of October 8, 2026)
Large-scale renovations in Chigasaki City by Kakeru Koumuten|Scaffolding, exterior wall painting, waterproofing, and roof work performed by our own team

Large-scale repair work that can be handled in Chigasaki City

Large-scale repairs are not just “exterior wall painting” or “waterproofing,” but rather a comprehensive repair of the entire building’s deterioration while scaffolding is in place. At Kakeru Koumuten, we can handle all of the following work in-house, ensuring clear responsibility and coordination of the process.

Type of Work Main Contents
Temporary Scaffolding Work Installed by our own scaffolding team using our own scaffolding materials. We handle mesh sheets, protection, and fall prevention measures.
Substrate Repair Work Crack repairs, injection of floating mortar and tiles, explosion (exposed rebar) repairs, resin mortar repairs for missing parts.
Exterior Wall Painting Work High-pressure washing, three coats from primer to topcoat, painting of ancillary parts (metal parts, gutters, water cutting, etc.). We accommodate radical control type, fluorine, and inorganic paints.
Tile Repair Work Replacement of broken tiles, joint repairs, clear waterproofing of tile surfaces (such as Seven S).
Sealing Work Re-sealing around sashes and exterior wall joints, additional sealing.
Waterproofing Work Urethane waterproofing for rooftops, roof balconies, shared corridors, and stairs, PVC sheet waterproofing, and long sheet installation.
Roof Work Roof painting, roof overlay (cover method), re-roofing, and ridge metal replacement. We have sheet metal craftsmen on staff and can handle large roofs such as factories.
Metal Parts and Hardware Work Surface preparation and painting of steel staircases, handrails, and PS doors, replacement of coping and water cutting.
Drainage and Wastewater Work Cleaning and renovation of roof drains (insertion of renovation drains), resolving gutter blockages. This work is particularly important for preventing puddles and leaks on rooftops and ensuring drainage during heavy rain.
Others Replacement of rain gutters, rooftop and exterior wall inspections using drones, leak investigations using thermography, and preliminary surveys of asbestos-containing materials.

Scope of Major Repairs Determined from Building Diagnosis

It is not guaranteed that all of the above works will be carried out. The extent of the work will be determined based on the results of the building diagnosis. At Kakeru Koumuten, we conduct a free on-site survey to confirm the items below, compile them into a deterioration diagnosis report with photos, and propose the scope of work.

Diagnosis Area Main Inspection Method Scope of Work Determined by Diagnosis Results
Exterior Wall (Painted Surface) Visual inspection, checking the width of cracks and the condition of the paint film Methods and quantities for crack repair, specifications for painting (repainting or painting after removing the existing paint film)
Exterior Wall (Tile Surface) Sounding inspection. High areas checked with a drone Scope and estimated quantity for injection and replacement, whether clear waterproofing is necessary
Sealing Checking for cracks, shrinkage, peeling, and hardening Whether to replace or add to the existing seal, the scope of joints to be worked on
Rooftop, Balcony, Common Corridor Checking for blisters or breaks in the waterproof layer, puddles, and the condition of drains Full renovation or partial repair, method (urethane waterproofing, PVC sheet waterproofing, long sheet), whether drain renovation is necessary
Leak Areas Inspection using thermal imaging camera and drone Identification of the cause and the priority areas for repair
Metal Parts, Roof, Accessories Checking for rust, corrosion, lifting, and cracking Whether it can be resolved with painting or if component replacement or cover method is necessary
Site and Surroundings Checking trees, delivery routes, parking, and distance to neighboring properties Planning for scaffolding and the scope of temporary construction
The diagnosis results will be categorized into three groups: “Must Repair This Time,” “Consolidate While Scaffolding is Up,” and “Can Be Postponed to Next Time.” Items related to safety or water leakage, such as leaks, tile lifting, and breaks in the waterproof layer, are essential work for this time. Exterior walls and sealing that cannot be constructed without scaffolding will be consolidated work for this time, while lightly deteriorated work that does not relate to scaffolding will be candidates for postponement to next time. We can also provide multiple plans to fit your budget.

Reasons Why Kakeru Koumuten is Chosen for Large-Scale Renovations in Chigasaki City

Kakeru Koumuten's Strengths | Exterior Renovation Company with In-House Scaffolding, In-House Construction, and In-House Management

The reason why we can be entrusted with large-scale renovations in Chigasaki City is partly because “Kakeru Koumuten has a base in Yokohama City”, but also due to our “initiatives in large-scale renovation work that cannot be imitated by other companies”, which have received high praise from many customers.

We have absolute confidence in “cost,” “quality,” and “plans” for exterior renovations of apartments, condominiums, and commercial facilities in Chigasaki City, so please compare our estimates with those of other companies. Because we are confident, we welcome competitive estimates.

1. Equipment Specialized for Exterior Renovations

At Kakeru Koumuten, we have prepared the following warehouses and material storage areas to provide low-cost, high-quality exterior wall painting and waterproofing work for large-scale renovations. We have established five bases centered around Yokohama City for material storage and showrooms.

In-house Scaffolding Materials

Kakeru Koumuten's in-house scaffolding materials used for large-scale renovationsWe own the scaffolding materials necessary for temporary scaffolding required for large-scale renovations and can assemble the scaffolding ourselves.
By not outsourcing scaffolding work and using our own scaffolding team, we can cut costs on scaffolding work and provide quick and flexible responses.
We have approximately enough scaffolding materials for 100 single-family homes!

Storage of Materials in Our Large In-house Warehouse

Paint and substrate repair materials stored in Kakeru Koumuten's large in-house warehouseWe store paints and substrate repair materials used for exterior renovations. By ordering a large quantity of materials at once, we can purchase materials at a lower cost! Additionally, we always have stock available, allowing for swift responses in emergencies!

In-house Waste Sorting

Waste sorted and recycled at Kakeru Koumuten's in-house yard for large-scale renovationsLarge-scale renovations generate various types of waste, including leftover paint, metal, and wood. At Kakeru Koumuten, we sort and recycle waste in-house, which helps reduce waste disposal costs.

Showroom Dedicated to Exterior Renovations

Kakeru Koumuten's exterior renovation showroom interior Samples of exterior materials and roofing materials displayed in the showroom
In the showroom, not only can you have meetings, but you can also check actual samples and colors of exterior materials. Color simulations for exterior wall painting and heat resistance tests using a heat resistance testing machine are also available!

2. Cost Reduction through In-House Management and Construction

In-house construction scene of large-scale repairs by Kakeru Koumuten craftsmenOne of Kakeru Koumuten’s major strengths is in-house management and construction.

By managing everything from inquiries to project completion in a consistent system by Kakeru Koumuten, we can keep costs down while ensuring high-quality large-scale repairs. Additionally, one representative will handle everything from the estimate to project completion. Since the person in charge does not change, whether it’s sales or construction management, smooth communication is possible.

We can handle everything from temporary scaffolding installation to exterior wall painting, substrate repairs, waterproofing work, and tile repairs with complete in-house construction! Those with specialized knowledge and experience conduct inspections and actual construction for each process!

3. Obtaining Various Permits and Skilled Workers

Construction industry license and qualifications for sheet metal and painting specialistsWe have obtained permits for the construction industry and for the collection and transportation of industrial waste! We also have nationally certified sheet metal and painting specialists on staff, and we are confident in our construction techniques. We can also handle large-scale roofing work for factories! We have qualified personnel for asbestos work supervisors and building material asbestos surveyors, so we can manage asbestos-containing roofing materials and conduct preliminary surveys.

4. Warranty and Aftercare

Kakeru Koumuten's construction warranty and aftercare information
Most large-scale repair works, including “painting work,” “substrate repair work,” and “waterproofing work,” come with a warranty!
Aftercare is available every year, and we send out notification DM every year.

5. Flexible and Prompt Response

Inspection of apartment rooftop and exterior walls using a drone

Our company is equipped to handle various troubles and situations related to apartments and condominiums.

We can also address exterior walls and rooftops that cannot be checked from high places using a drone! During leak investigations, we can utilize a thermal imaging camera to help identify the cause of leaks!

We will respond according to your wishes. We also accept emergency measures for sudden leaks! We will promptly respond to urgent requests!

6. Staff Development

Technical training of Kakeru Koumuten staff using self-made models

Our staff create various models for skill enhancement and conduct practical training. Since different processing and techniques are required at the site, we regularly provide skill improvement education to ensure each staff member can respond appropriately. We also educate on points to be careful about and areas to check during large-scale repair work.

7. Consideration for Residents and Neighbors

Progress chart and notice board set up at the entrance during large-scale repairs
During large-scale repair work, we not only notify residents and visit neighbors to greet and explain, but we also set up notice boards at entrances to display progress charts and announcements! Additionally, we thoroughly educate entrants on manners to minimize inconvenience to residents and neighbors.

8. Strict Quality Control

Quality inspection of painting process using a film thickness tester and check sheets
Each process is inspected by a responsible person, and detailed construction photos are taken. We use film thickness testers and check sheets to ensure there are no oversights in inspections. During exterior painting and waterproofing work, we confirm the quantity of used paint cans to ensure the specified amount of paint is used, and we prevent construction defects by ordering paint in-house. Of course, we will also take photos of used paint and report them.

9. Exterior Painting Color Simulation

9-1 Self-Color Simulation

Example of color simulation for apartment exterior (two-tone color) Self-color simulation screen operable by smartphone
The simulations created by our company can be done using photos of your actual apartment or building!You can also perform simulations on your smartphone or computer. By simulating and then changing to a two-tone color or altering the image, we hope to help enhance the stylish appearance and increase occupancy rates! Of course, we can also arrange for paint samples to confirm the actual colors.

*In Chigasaki City, notification is required for changes in color for buildings above a certain size and for repainting exteriors in special scenic areas. Since the regulations differ by area, prior confirmation of the exterior color is necessary. Having a color simulation screen will help facilitate explanations at community meetings and general meetings.

9-2 Confirm the actual color with a test paint!

Confirm the actual color and gloss with a test paint on the exterior wallYou can order samples of the paint you are considering and conduct a test paint on your exterior wall. By doing a test paint, you can confirm the actual color and gloss!

9-3 Exterior renovation simulation

Exterior renovation simulation using metal siding and accent materials

We can also perform the following exterior simulations for apartments and condominiums!
・Exterior wall color simulation (two-tone colors are also possible)
・Simulation for applying metal siding
・Simulation using accent materials such as cornices and louvers
・Simulation for roof painting or roof replacement work

With the exterior renovation simulation, you can minimize the risk of failure in image changes! We hope that renovating the appearance of your apartment or condominium will help increase occupancy rates.

Cost Estimates for Large-Scale Repairs in Chigasaki City

The cost of large-scale repairs varies significantly depending on the size of the building, its condition, the scope of work, and the materials used. First, please refer to the national average based on public statistics, then to our company’s estimates based on past performance by scale, and finally to examples of unit prices for each type of work.

The national average for condominiums is 750,000 to 1,500,000 yen per unit

According to a survey conducted by the Ministry of Land, Infrastructure, Transport and Tourism, which compiled 818 construction cases (FY 2021), approximately 70% of the costs for large-scale repairs are concentrated in the range of 750,000 to 1,500,000 yen per unit, with the most common price range being 1,000,000 to 1,250,000 yen. Note that the amounts in this survey do not include consumption tax and common temporary costs, so they differ from the current total construction costs including tax.

Construction Cost per Unit Percentage Construction Cost per Unit Percentage
Up to 750,000 yen 15.1% 1,250,000 to 1,500,000 yen 17.4%
750,000 to 1,000,000 yen 24.7% 1,500,000 to 2,000,000 yen 9.1%
1,000,000 to 1,250,000 yen 27.0% (most common) Over 2,000,000 yen 2.8%

Source: Ministry of Land, Infrastructure, Transport and Tourism “FY 2021 Survey on Large-Scale Repair Work for Condominiums” (200 companies, 818 cases) *The amounts do not include consumption tax or common temporary costs. The percentages may not total 100% due to rounding and non-responses.

The fewer the units, the higher the cost per unit. Since scaffolding, common temporary costs, and site management fees are fixed costs determined by the size of the building, dividing these by a smaller number of units increases the burden per unit. It is not uncommon for a condominium with fewer than 20 units to exceed “1,500,000 yen per unit” in estimates. Conversely, the effect of choosing a company that can reduce scaffolding costs is greater for smaller buildings.

Breakdown of Construction Costs (Where the Money Goes)

Category Composition Ratio Main Contents
Construction-related Work 60.3% About half for exterior walls, about one-third for waterproofing. Substrate repair, tiles, painting, waterproofing
Temporary Work 22.8% Scaffolding, mesh sheets, protective coverings, etc. (does not include common temporary costs)
Miscellaneous Expenses 10.3% Site management fees, general management fees, statutory welfare expenses, etc. (9.5%), insurance premiums for large-scale repair defect insurance (0.8%)

Source: Ministry of Land, Infrastructure, Transport and Tourism “Fiscal Year 2021 Survey on Large-Scale Renovation Work for Condominiums” (Second survey of large-scale renovation work. The overall average is 59.0% for construction-related, 22.3% for temporary structures, and 9.9% for miscellaneous expenses). *The total does not equal 100% because it includes equipment-related work, exterior works, and others. This is an average value and is not a criterion for judging the appropriateness of individual estimates.

Approximately one-fifth of the construction cost is for temporary structures (scaffolding). Kakeru Koumuten Co., Ltd. owns its own scaffolding materials and has its own scaffolding team, so it becomes easier to keep the costs of this temporary portion down. While not all temporary costs can be eliminated, site conditions vary by building, so planning the scaffolding after inspecting the site is an important aspect to prevent additional costs after construction begins.

Cost Estimates by Building Size (Scaffolding, Substrate Repair, Exterior Wall Painting, Waterproofing, Sealing)

Type and Size of Building Cost Estimate Estimated Construction Period
Wooden Apartment (2 stories, 6-10 units) 2,000,000 – 4,000,000 JPY 3 – 5 weeks
Steel Frame / RC Apartment (3 stories, 10-20 units) 4,000,000 – 9,000,000 JPY 1 – 2 months
Mixed-Use Building / Small Condominium (4-5 stories) 5,000,000 – 15,000,000 JPY 1.5 – 3 months
Medium-Sized Condominium (30-50 units) 20,000,000 – 50,000,000 JPY 3 – 5 months
Large Condominium (100 units or more) Around 100,000,000 JPY and up 6 months and up

*The above is a rough estimate based on Kakeru Koumuten’s construction performance and may vary depending on the presence of roofing work, metal work, plumbing, etc. For condominiums, please also consider the amount obtained by multiplying the above national statistics (750,000 – 1,500,000 JPY per unit) by the number of units as a guideline.

Breakdown of Costs for Temporary Structures, Substrate Repair, Exterior Walls, and Waterproofing

The estimate for large-scale renovations is broadly divided into “temporary structures,” “substrate repair,” “sealing,” “exterior wall painting,” “waterproofing,” and “miscellaneous expenses.” Before comparing total amounts, please check what each item includes, how much, and at what cost.

Item What to Confirm in the Estimate
Building Prerequisites Structure (wooden, steel frame, RC), number of floors, number of units, exterior wall area, waterproof area. Also confirm whether the area is based on drawings or actual measurements.
Common Temporary Works & Scaffolding Area and unit price of scaffolding, mesh sheets, protective measures, temporary toilets, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for Reiwa 3, temporary works such as scaffolding account for about 20% of construction costs (excluding common temporary costs).
Substrate Repair Quantities and unit prices for repair methods such as cracks, lifting, and spalling. Since these items are not finalized until scaffolding is set up, confirm whether it will be estimated quantities or actual settlement, and the settlement method if quantities increase or decrease.
Sealing Whether it is a replacement or additional sealing, the length to be applied (m), and the name of the material.
Exterior Wall Painting Painting area (㎡), name of the paint manufacturer, product name, grade, number of coats, and scope of ancillary parts.
Waterproofing Area by part such as rooftop, balcony, and common corridor, construction method, name of the material, and whether drain renovation is included.
Inspection & Reporting Inspections for each process, construction photos, and whether a completion report and warranty are included.
Miscellaneous Expenses Contents and ratios of site management costs, general management costs, statutory welfare costs, etc. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for Reiwa 3, the average is about 10% of construction costs, but it varies depending on the size and conditions of the building, so there is no uniform standard.
Tax Classification Whether the amount is tax-inclusive or tax-exclusive. Since the display varies by company, be sure to align them before comparing total amounts.
At Kakeru Koumuten, we provide estimates that clearly state quantities, methods, and materials for each construction item. For reference, please see the following “Unit Price Examples for Repair Works.”

Unit Price Examples for Repair Works

Repair Method Materials Used Cost
Tile Replacement Existing Similar Tiles per piece / 2,000 JPY〜4,000 JPY
Repair of Tile and Mortar Lifting Areas Epoxy Resin Injection per square meter / 3,000 JPY〜5,000 JPY
(Varies depending on the degree)
Tile Joint Mortar Repair Mortar for Tile Joints per square meter / 1,000 JPY〜2,000 JPY
(Varies depending on the degree)
Concrete Spalling Repair Reinforcement Rust Prevention + Resin Mortar per location / 1,000 JPY〜2,000 JPY
(Varies depending on the degree)
Crack Repair Filler or Polymer Cement per meter / 100 JPY〜2,500 JPY
(Varies depending on the degree)
Exterior Wall Painting (3 Coats) Radical Control Silicone Paint per square meter / 2,500 JPY〜3,500 JPY
Roof Top Urethane Waterproofing (Ventilated Cushion Method) High Strength Urethane per square meter / 6,500 JPY〜9,500 JPY
Sealing Replacement Modified Silicone per meter / 900 JPY〜1,500 JPY
Temporary Scaffolding Company-Owned Scaffolding Materials (Wedge Type) per square meter / 700 JPY〜1,000 JPY

*Costs and warranty periods vary depending on shape, quantity, substrate condition, and type of materials. If you would like a detailed estimate, please feel free to contact us. Estimates are completely free.

Select Paint and Waterproofing Grades Based on “Years Until Next Repair”

“Good paint does not equal the right choice.” The best way to choose is to align when the next major repair will be with the lifespan of the materials to avoid waste.

Grade Estimated Lifespan Suitable Cases
Silicone / Radical Control Type 10 to 16 years Buildings that are cycled every 12 to 15 years. A good choice balancing cost and performance. The lifespan varies by product, so choose a product specification that matches the cycle.
Fluorine 16 to 20 years Buildings that want to set the next repair after 15 years, high-rise or complex-shaped buildings where scaffolding costs are high.
Inorganic 18 to 22 years Buildings that want to suppress dirt adhesion. Consider this option for locations prone to dirt, such as along busy roads, to ensure longevity.
Urethane Waterproofing (Rooftop) 8 to 15 years Rooftops with complex shapes, or when wanting to renovate using the existing waterproof layer. Mid-term inspections and repairs, such as re-coating the top coat, are prerequisites.
PVC Sheet Waterproofing 20 to 25 years Rooftops with a large area and simple shapes. The construction period is short.
Asphalt Waterproofing 15 to 20 years Rooftops planned for long cycles. The cost per instance will increase.

* The estimated lifespan is a general guideline and may vary depending on sunlight, location, and substrate condition. The rate of deterioration differs for each side based on location, sunlight, and ventilation, so confirming the condition of each side through a site survey and selecting paint suitable for the location can change durability.

Guidelines for Repair Reserve Funds and Options When Insufficient

The Ministry of Land, Infrastructure, Transport and Tourism guidelines indicate the estimated repair reserve fund on a monthly basis per exclusive area. Additional charges are necessary if there is a mechanical parking lot.

Building Scale (Less than 20 Stories) Monthly Estimate (Average) Range Where Two-Thirds of Cases Fit Conversion for 70㎡
Building Total Floor Area Less than 5,000㎡ 335 JPY/㎡ 235 to 430 JPY/㎡ Approximately 16,500 to 30,100 JPY
5,000 to 10,000㎡ 252 JPY/㎡ 170 to 320 JPY/㎡ Approximately 11,900 to 22,400 JPY
10,000 to 20,000㎡ 271 JPY/㎡ 200 to 330 JPY/㎡ Approximately 14,000 to 23,100 JPY
20,000㎡ or More 255 JPY/㎡ 190 to 325 JPY/㎡ Approximately 13,300 to 22,750 JPY

Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines on Repair Reserve Funds for Condominiums” (Reiwa 6, June Revision, PDF) / National average is 13,378 JPY per unit per month (Reiwa 5 Fiscal Year Comprehensive Survey of Condominiums)

In the comprehensive survey for the fiscal year Reiwa 5, 36.6% of management associations responded that “the repair reserve fund is insufficient compared to the plan.” There are four main options if there is a shortfall.

Options Considerations and Cautions
① Adjusting the Construction Schedule Based on deterioration diagnosis, postpone low-urgency work to the next time. However, it is essential to distinguish between work that can be postponed and work that cannot, as delaying waterproofing and tile detachment measures will ultimately be more costly.
② Reviewing the Scope and Specifications of Work Reviewing paint grades, changing from full renovation to partial renovation, etc. Please consider this separately from “apparent reductions” that skip processes.
③ Utilizing Subsidies and Tax Systems Subsidies for energy-saving renovations, etc. (to be discussed later). The reduction of fixed asset tax is a system that lowers the tax amount for each unit owner and does not directly increase the repair funds of the management association.
④ Increasing Reserve Funds, Borrowing, or One-Time Payments In addition to considering an increase in the repair reserve fund at the general meeting, the housing finance support organization’s loan for condominium common area renovations requires no collateral. Interest rates can be lowered by obtaining management plan certification.
If you have estimates from other companies, please present them through the inquiry form|Kakeru Koumuten

Subsidies, Tax Systems, and Loans to Check for Large-Scale Renovations in Chigasaki City

In both Chigasaki City and Kanagawa Prefecture, there were no publicly available subsidies specifically targeting large-scale renovation work (the city has subsidies for seismic diagnosis of old earthquake-resistant condominiums). The available options can be broadly categorized into four types. The eligibility and application status of these systems may change during the fiscal year, so please be sure to confirm with our company or each contact point before contracting or starting work. (As of October 8, 2026)

Type Details
① Support for Consultation and Planning Consultation desk for condominiums, management plan certification, assistance for seismic diagnosis, etc. Can be used in the preliminary stages before large-scale repairs.
② Construction Subsidies by Purpose Energy-saving (windows, insulation), etc., under national and prefectural systems. Incorporated into large-scale repairs.
③ Tax Incentives Reduction of fixed property tax under the condominium longevity promotion tax system.
④ Public Financing Renovation loans for common areas of condominiums from the Japan Housing Finance Agency.
Common Pitfall: The application timing and applicants differ by system, and applications will close as soon as the budget is reached, even during the fiscal year. Kanagawa Prefecture’s subsidies require construction to start after the grant decision, while national energy-saving subsidies require registered contractors to apply after the completion of work, and the reduction of fixed property tax requires declaration after the completion of work. Please check the eligibility conditions and application procedures for each system before contracting and starting construction, and plan backwards in conjunction with the schedule for the general meeting’s resolution. If you miss this, you may lose access to systems that you could have utilized.

① Condominium Longevity Promotion Tax System (Reduction of Fixed Property Tax)

If large-scale repairs (all three types: exterior wall painting, floor waterproofing, and roof waterproofing) that contribute to the longevity of condominiums meeting certain requirements are carried out, the fixed property tax amount for the residential portion will be reduced (up to 100㎡ equivalent per unit). In Chigasaki City, the fixed property tax for the following year will be reduced by one-third for eligible properties.

Main Requirements Condominiums with more than 20 years since construction and a total of 10 or more units (with residential exclusive portions) / At least one previous instance of longevity work such as exterior wall painting, floor waterproofing, or roof waterproofing (this being the second or subsequent work) / Must meet one of the following: ① For certified management plan condominiums, the repair reserve fund must have been raised to the certification standard after September 1, 2021 ② For management associations that received advice and guidance, a long-term repair plan must have been created and reviewed, meeting certain standards / Cannot be combined with reduction systems related to energy-saving renovations, barrier-free renovations, or seismic renovations.
Deadline for Implementation From April 1, 2023, to March 31, 2027.
Reduction Ratio The fixed property tax for the following year will be one-third (up to 100㎡ equivalent per residential unit). Urban planning tax is not subject to reduction.
Declaration Must be declared within three months of the completion date. The declaration destination is the Asset Tax Division of the Citizen’s Department of the city (2nd floor of the city hall main building). Required documents include the declaration form, proof of large-scale repairs, proof of past work, and documents indicating the total number of units; for certified management plan condominiums, the certification notification and proof of repair reserve fund increase are also required, and for condominiums that received advice and guidance, proof of implementation of the advice and guidance is necessary. If the representative of the management association submits the declaration collectively, a separate sheet with the signatures (or seals for printed names) of each owner is required.
Points to Note Simply obtaining management plan certification does not qualify; there are requirements such as raising the repair reserve fund. A review of the long-term repair plan is also necessary, so it is recommended to prepare at least one year before the construction.
The applicable period is until the completion of construction by March 31, 2027. Obtaining management plan certification requires prior confirmation and a general meeting resolution, and as a prerequisite, a review of the long-term repair plan is also necessary. Since construction must be completed by March 31, 2027, starting during the 2026 fiscal year may not guarantee timely completion. Please confirm early whether you are eligible and check the schedule.

* The contact for applications is Chigasaki City, Citizens’ Department, Asset Tax Division, Building Valuation Section (phone 0467-81-7142). For management plan certification and advice/guidance, please confirm with the Urban Policy Division, Housing Policy Section (phone 0467-81-7181) before construction.

② Condominium Management Support in Chigasaki City (For management associations, start here)

The contact for condominium-related matters in Chigasaki City is the Urban Policy Division, Housing Policy Section (phone 0467-81-7181). On the city’s housing-related page, no subsidies for the construction costs of large-scale repairs were confirmed. The focus is on consultation, planning, and support for seismic assessments.

System Details
Consultation related to condominiums and prefectural exchange meetings On the city’s housing page, information is provided not only for condominium consultations but also for the Kanagawa Prefecture’s condominium management association exchange meetings and condominium management and regeneration seminars. This can be used as an opportunity to review the management of the association and long-term repair plans before large-scale renovations.
Subsidy for seismic diagnosis of condominiums The target is condominiums built or started before May 31, 1981, with three or more stories made of reinforced concrete, steel-reinforced concrete, or steel. Conditions include a resolution from the management association approving the diagnosis. The subsidy amount is either half of the diagnosis cost or 30,000 yen multiplied by the number of units occupied by the owner, whichever is lower. The subsidy applies to the cost of diagnosis only; renovation work is not included. Before starting the diagnosis, please consult the Building Guidance Division (phone 0467-81-7185). The city’s page was last updated on March 31, Reiwa 5, so please confirm the latest information with the city.
Condominium management plan certification system This is a system that allows management plans created by management associations to be certified if they meet certain standards. For details, please see section ③ below.

Source: Chigasaki City “Housing (Housing Policy)” / Same “Information on Subsidy for Seismic Diagnosis of Condominiums”

③ Management Plan Certification System (Tax and Interest Rate Benefits)

This is a system certified by Chigasaki City based on national regulations. Upon certification, there are interest rate benefits for the Housing Finance Agency’s “Condominium Common Area Renovation Loans” and Flat 35 (Maintenance and Preservation Type), and it relates to one of the requirements for the Long Lifespan Promotion Tax System (certification alone does not guarantee tax reduction). The certification requirements are based on the national “Standards for Condominium Management,” which includes 16 items. The main criteria include holding general meetings at least once a year, maintaining management regulations, separate accounting for management fees and repair reserves, ensuring that overdue amounts for more than three months do not exceed 10% of the total, and “having created or reviewed a long-term repair plan that includes two or more large-scale repair works over a period of 30 years within the last seven years.” Pre-confirmation and application are conducted through the Public Interest Incorporated Foundation Condominium Management Center’s “Management Plan Certification Procedure Support Service,” and the city will review and issue a certification notification. The city’s page only provides information on the national certification standards.

*Fees and the validity period of the certification are not listed on the city’s page. Please confirm with the Condominium Management Center or the Urban Policy Division, Housing Policy Section.

④ National Energy Saving Support | Housing Energy Saving 2026 Campaign

Changes for Fiscal Year 2026The “Childcare Green Housing Support Project” for Fiscal Year 2025 has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Additionally, the “Long-Term Excellent Housing Renovation Promotion Project” will end in Fiscal Year 7, and will not be implemented in Fiscal Year 8. Please be careful not to base your financial plans on outdated information.

Mirai Eco Housing 2026 Project

Target Renovations of existing homes, regardless of whether they are single-family or multi-family, that were newly built before December 31, 2016. Management associations and management corporations can also become joint contractors (i.e., can be used for renovations of common areas). Rental housing is also eligible.
Required Work A combination of insulation renovations for openings, structural (floor, wall, ceiling) insulation renovations, and installation of eco-friendly housing equipment is mandatory.
Subsidy Limit Depending on the age of the building and the energy-saving performance achieved, 400,000 to 1,000,000 yen per unit (1,000,000 yen if reaching the mandatory standards for houses built before 1991).
Period Subsidy applications are generally made by registered contractors (construction contractors) after the completion of the work (the ordering party cannot apply themselves). Applications (including reservations) will end once the budget limit is reached. The status of budget execution is published on the official website, so please check the latest application status before contracting.

Advanced Window Renovation 2026 Project

Target Renovations to existing homes (single-family and multi-family) involving the installation of interior windows, replacement of exterior windows, and glass replacement to high-performance insulation windows. Subsidy rates are set separately for “low-rise” and “mid-to-high-rise” multi-family buildings.
Bulk Application for Multi-Family Housing From May 29, 2026, applications for “bulk subsidy applications for multi-family housing (including reservations)” have started. The application process is carried out by registered contractors (window renovation contractors), and management associations cannot apply themselves, but they can apply for all units collectively, making it a system that works well with large-scale repairs for window and entrance door renovations.
Subsidy Limit For residential properties, 1,000,000 yen per unit (changed from 2,000,000 yen in Fiscal Year 2025). For non-residential properties over 240 square meters, 10,000,000 yen per building.
Period Work commenced after November 28, 2025. Applications for subsidies will be made after the completion and handover of the work, and will end once the budget limit is reached. The status of budget execution is updated daily on the official website, so please check the latest application status before contracting.

⑤ Kanagawa Prefecture Subsidies (Applications for FY 2026 have closed)

Subsidy for Existing Housing Energy Efficiency Renovation Costs Applicable to homes (including exclusive parts of condominiums) where the applicant resides permanently and owns or has a share in the property within the prefecture. Renovation of windows (including entrance doors) that are exposed to the outside air is mandatory. The subsidy covers one-third of the eligible expenses, or a maximum of 150,000 yen, whichever is lower. For FY 2026, the application amount reached the budget limit, and applications were closed on September 30. Construction that commenced before the notification of grant decision is not eligible, and applications by contractors on behalf of the applicant are not permitted.
Subsidy for Residential Solar Power Generation and Storage Battery Installation Costs Management associations of condominium units in the prefecture are also eligible. Solar power: 70,000 yen/kW, storage systems: 150,000 yen/unit. The application deadline for the second phase of FY 2026 was September 30, and applications have closed. If construction commenced before the grant decision date, it is not eligible. This is a system to check if you are considering installing solar power along with rooftop waterproofing.

* The subsidy for existing housing energy efficiency renovation costs does not apply to common areas of rental apartments or units where the owner does not reside.

⑥ Financing System (Housing Finance Agency Condominium Sumairu Loan)

If the management association borrows funds for large-scale repairs, the Housing Finance Agency’s “Condominium Common Area Renovation Loan (Condominium Sumairu Loan)” can be utilized.

Target Construction Large-scale repairs, seismic retrofitting, flood prevention measures, energy-saving measures, balcony repairs, safety measures for elevators and parking lots, asbestos measures, diagnosis and design costs by experts.
Collateral No collateral required (joint guarantee by the condominium management center, etc.)
Repayment Period Generally 1 to 10 years, 1 to 20 years for specific construction, up to 35 years if seismic, flood, and energy-saving construction is carried out after obtaining management plan certification.
Interest Rate Reduction ① Holding of Sumairu Bonds ② Obtaining management plan certification ③ Implementation of seismic, flood, and energy-saving construction, each reducing by 0.2% per year (maximum 0.6% per year).
Main Requirements Improvement of management regulations, resolution at the general meeting, the delinquency rate of repair reserve funds must be within 10%. Applications are accepted year-round.

Source: Housing Finance Agency “Condominium Sumairu Loan” (official)

Cases Where Fire Insurance Can Be Used and Cases Where It Cannot

Damage caused by “accidental incidents” such as flying waterproof sheets, caps, and fences due to typhoons or strong winds, hail damage, and lightning strikes may be covered by fire insurance. It is important to separate and record damage caused by accidents from normal wear and tear during deterioration diagnosis.

On the other hand, normal wear and tear itself is not covered. There have been many troubles nationwide with businesses soliciting, “You can repair without out-of-pocket expenses with insurance,” and the National Consumer Affairs Center has repeatedly issued warnings. False claims may be prosecuted as insurance fraud. Please confirm the eligibility of claims directly with your management association or property owner with the insurance company or agent. Kakeru Koumuten does not provide such guidance.

Building Conditions and Repair Points in Chigasaki City

Chigasaki City is a city that faces Sagami Bay to the south and is adjacent to the Sagami River to the west. It has an area of 35.70 km², with different environments within the same city, from the urban area around Chigasaki Station to coastal residential areas, the Hamamidaira area undergoing redevelopment, and low-lying residential areas along rivers. There are rules related to appearance and construction, such as notifications based on the Landscape Act and special landscape town planning areas around Chigasaki Beach and the fishing port, and district plans, which vary depending on the location, affecting how buildings deteriorate, how scaffolding is set up, and the necessary procedures before construction.

244,729 peoplePopulation of Chigasaki City
(as of September 1, Reiwa 8, estimated)
108,518 householdsNumber of households in Chigasaki City
(as of September 1, 2026, estimated)
6,855.2 people/km²Population density
(as of September 1, 2026, city announcement)
35.70 km²Area of Chigasaki City
(based on the National Land Geographic Institute’s area data by prefecture and municipality)
12 districtsNumber of districts with established district plans
(total approximately 88.4 hectares)

Source: Chigasaki City “Latest Population and Households” (estimates based on the preliminary results of the 2025 national census. The city plans to recalculate after the confirmed values are announced around November 2026) / Same “District Plans”

Buildings in Chigasaki City are divided into “four types”

In Chigasaki City, the rules regarding the formation and appearance of the town differ by location, so not only the age of the building but also the location of the building (Hamamihira area, around Chigasaki Coast and fishing port, buildings subject to landscape law notification, districts with district plans and other residential areas) will affect the construction and procedures that become more burdensome during the next major repair. Please check which type your building falls under.

Type According to City Public Documents Estimated Age of Construction Heavy Repairs and Procedures for the Next Renovation
Hamamihiradai Area (Danchi Redevelopment Area)
Hamamihiradai Area
The Hamamihiradai Danchi was built by the Urban Renaissance Agency (UR) in the late 1950s, and due to changes in lifestyle and the aging of buildings, the city is promoting redevelopment. The district plan was established in 2008 and designated as a special scenic town planning area in 2011. Varies depending on the timing of redevelopment In large apartment complexes with many units, the focus is on diagnosing deterioration by building, painting and sealing exterior walls, waterproofing roofs and flat roofs, painting iron parts, and draining rain gutters and drains. As it is a special scenic town planning area, repairs that change the appearance or color are subject to notification.
Chigasaki Coast and Fishing Port Area
Special Scenic Town Planning Area around Chigasaki Coast and Fishing Port
As of April 1, 2011, it has been designated as a special scenic town planning area around Chigasaki Coast and Fishing Port. All buildings within the area are subject to notification for repairs that change the appearance, remodeling, or color changes, including exterior wall repainting. Even if repainting in the same color, submission of plans indicating the painting locations and colors (Munsell values) is required. Varies depending on the year of construction Buildings close to the sea will focus on inspecting rust on iron parts, railings, and hardware, sealing of exterior walls, and waterproofing layers on roofs. A landscape simulation experiment is required for notification, and if it does not meet color standards, it may be subject to change orders.
Buildings Subject to Notification under the Landscape Act
Entire City (Outside Designated Areas)
Even outside designated areas, buildings exceeding 10m in height (in low-rise residential areas, exceeding 7m in eaves height), with a total floor area of 1,000㎡ or more, commercial floor area of 500㎡ or more, or planning 8 or more housing units are subject to notification for repairs that change the appearance or color. Notification must be made 30 days prior to the start of construction. Varies depending on the year of construction For medium-sized apartments, condominiums, and buildings, the focus is on painting exterior walls, tile repairs, sealing, and roof waterproofing. The notification period (30 days prior) must be incorporated into the schedule.
Areas with District Plans and Other Residential Areas
12 District Plans and Other Urban and Lowland Residential Areas
District plans have been established in 12 areas within the city. In areas with district plans, notification to the mayor is required 30 days prior to starting construction (the contact is the Building Guidance Division). Varies depending on the year of construction For rental apartments, condominiums, and owner-occupied condominiums, the focus is on painting and sealing exterior walls, waterproofing roofs and flat roofs, painting iron parts, and draining rain gutters and drains. Since the contents of district plans differ by area, it is necessary to confirm in advance whether the site is affected.

Source: Chigasaki City “About Town Development in Hamamidaira Area” / Same “Chigasaki Coast and Fishing Port Special Scenic Town Development Area” / Same “Notifications Based on the Landscape Act (Outside Designated Areas)” / Same “District Plan”

This classification reflects the “overall trends in the city” and does not determine the condition of individual buildings. The age of a building can vary significantly based on its construction year. Even within the same area, the degree of deterioration can vary greatly due to specifications and past repair histories. The designation of areas and the necessity for notifications differ by site, so individual judgments are made through on-site surveys and confirmations with the city.

Four Factors Unique to Chigasaki City That Damage Buildings

From the characteristics visible in Chigasaki City’s public documents, we have narrowed it down to four factors that lead to major repairs.

① Coastal Location Facing Sagami Bay

Chigasaki City faces Sagami Bay to the south, and Kanagawa Prefecture designated the city’s tsunami disaster warning area on March 24, Reiwa 7. In response, the city created a new tsunami hazard map in August, Reiwa 7. For buildings close to the sea, we focus on checking the condition of rust on metal parts, handrails, and fittings, sealing of exterior walls, and the waterproof layer on rooftops during deterioration diagnosis.

② Potential for Liquefaction

The city has published a liquefaction hazard map with a 50m mesh (created in August, Heisei 25). The map indicates the potential for liquefaction, but high potential areas do not guarantee that liquefaction will occur. The condition of cracks in exterior walls, unevenness in exterior structures and parking lots, and around piping will be checked during diagnosis.

③ Flooding Along Rivers and Rainwater Drainage

The city’s flood, landslide, and internal water hazard map includes flooding assumptions for the Sagami River, Koide River, Chino River, Komayoshi River, and Mekujiri River (revised version from September, Reiwa 3). On March 31, Reiwa 8, rainwater flooding assumption areas were also designated. The condition of rooftop drains, drainage pipes, and water gradients around parking lots will be a focus of inspection along with any damage or blockages in the waterproof layer.

④ Overlapping Appearance Rules

There are areas where procedures are required when changing the color or appearance of exterior walls and roofs due to notifications under the Landscape Act, special scenic town development areas, and district plans. Even if repainting in the same color, there are areas where notifications and submission of drawings may be required, so it is important to check the rules applicable to the site before obtaining estimates.

Source: Chigasaki City “Chigasaki City Tsunami Hazard Map”/Same “Chigasaki City Liquefaction Hazard Map”/Same “Chigasaki City Flood, Landslide, and Internal Water Hazard Map”/Same “Notification Based on the Landscape Act (Outside Designated Areas)”

Key Points to Consider When Proceeding with Construction in Chigasaki City

Issue Current Situation in Chigasaki City and Kakeru Koumuten’s Response
Notification under the Landscape Act (for buildings with 8 or more units) Repairs that change the appearance or color modifications are subject to notification for buildings above a certain scale. Before notification, pre-consultation and landscape simulation must be conducted, and the notification should be submitted at least 30 days before the start of construction. The city also requests notification for exterior walls that are being repainted in the same color. We recommend confirming the procedures with the Landscape Greenery Division (phone 0467-81-7182) before signing a contract. Our company will also verify this during the investigation.
Special Landscape Town Planning Area (Chigasaki Coast, Fishing Port Area / Hamamihira) All buildings within the area are subject to notification, including exterior wall repainting. Since compliance with color standards is a key issue, it is important to check the standards before deciding on colors and to share the completed image with the management association and neighbors through color simulation.
Hamamihira District and other large apartment complexes For properties with many buildings and units, diagnosis of deterioration for each building and a plan for whether to conduct repairs collectively or by building and year is necessary. We will propose multiple plans for comparison and assist in preparing explanatory materials for the general meeting.
Buildings in areas with district plans In areas with district plans, notification to the mayor is required at least 30 days before starting construction. Whether large-scale repairs require notification depends on the specifics of the district and the judgment of the Building Guidance Division, so please confirm in advance. Our company will also investigate this during the survey.
Mixed-use buildings and stores along main roads and in front of stations For buildings facing roads with high pedestrian and vehicle traffic, the placement of scaffolding, pedestrian flow, and delivery time adjustments are crucial. We will consider the operations of tenants and stores and propose plans after confirming the site.
Narrow roads and buildings close to neighboring properties In areas with narrow roads or properties close to neighboring buildings, careful consideration is needed for scaffolding installation, material delivery, water spray from high-pressure washing, and paint odors. Our own scaffolding team will assess the site and plan the scaffolding layout and protection area, and we will also greet and inform the neighbors in advance.
Buildings along the coast, rivers, or in low-lying areas Buildings close to the sea will have a focused diagnosis on rust of metal parts, sealing, and the condition of waterproof layers. In areas along rivers or in low-lying regions, we will inspect rooftop drains, drainage pipes, and the water slope around parking lots to ensure there are no damages or blockages in the waterproof layers before proposing specifications.
Rental apartments, condominiums, and buildings For rental properties, there are concerns about informing tenants during construction and the impact on occupancy rates after completion. We can assist in creating notification documents for tenants and propose an image change through color simulation.
Parking lots during construction Parking spaces on the side where scaffolding will be erected need to be temporarily cleared. For buildings with limited parking availability, securing temporary relocation for vehicles may take time. Starting 2 to 3 months before construction, we will coordinate with you regarding the availability of nearby coin parking and monthly rentals.
* When considering the color of the exterior walls, we recommend checking in advance whether your property is subject to landscape law notifications, special landscape town planning areas, or district plans. For inquiries about landscape, please contact the Landscape Division of Chigasaki City Urban Department (Phone: 0467-81-7182), and for district plans, please consult the Building Guidance Division. We will also investigate this during our survey.

* Kakeru Koumuten has five bases in Yokohama City and serves the entire Chigasaki area, including Hamamihira, Minami Lake, Kagawa, Enzo, and Matsubayashi.

Signs of Deterioration Requiring Major Repairs and Timing

Generally, major repairs are estimated to occur every 12 to 15 years. According to a survey by the Ministry of Land, Infrastructure, Transport and Tourism, the actual repair cycle is most commonly 13 years, with about 70% falling within the 12 to 15 year range, and the cycle tends to shorten with each occurrence. However, the actual judgment should be based on the condition of deterioration rather than just the number of years, so if you observe symptoms like those listed below, we recommend an early on-site survey.

Part Dangerous Signs of Deterioration if Left Unattended Main Countermeasures
Exterior Wall (Painted Surface) Chalking (white powder on hands), fading, cracks wider than 0.3mm, blistering or peeling of the paint film Substrate repair + exterior wall painting
Exterior Wall (Tile Surface) Tile lifting or falling off, chipping of joints, efflorescence, hollow sound when tapped Injection for lifting, replacement, clear waterproofing
Sealing Cracks in joints, shrinkage, peeling, hardening Re-sealing
Roof and Balcony Bloating or breaking of the waterproof layer, puddles, clogged drains, rain leaks to lower floors Urethane waterproofing, sheet waterproofing, drain renovation
Metal Parts and Steel Stairs Rust, peeling of the paint film, corrosion of treads Grinding + rust prevention + painting, component replacement
Roof Lifting of ridge cap, cracking or warping of slate, moss, misalignment of tiles Roof painting, overlay method, re-roofing
Concrete Spalling (exposed rebar with rust stains), water leakage from cracks Spalling repair + resin mortar filling
Common Corridor and Stair Floors Lifting, peeling, or opening at the ends of long sheets, exposure of the substrate Replacement of long sheets + substrate waterproofing

Estimated Repair Cycles by Part (Ministry of Land, Infrastructure, Transport and Tourism Guidelines)

Part/Work Recommended Cycle Part/Work Recommended Cycle
Exterior Wall Painting (Repainting) 12-15 years Sealing Replacement 12-15 years
Exterior Wall Painting (Existing Removal + Painting) 24-30 years Iron Part Painting 5-7 years
Roof Waterproofing (Repair) 12-15 years Water Supply Pipe (Rehabilitation/Replacement) 19-23 years/30-40 years
Roof Waterproofing (Removal/New Installation) 24-30 years Drainage Pipe (Rehabilitation/Replacement) 19-23 years/30-40 years

*The above is a reference example of guidelines and is not a uniform construction deadline. The actual cycle will be set according to the specifications, location conditions, and deterioration status of the building.

Source: Ministry of Land, Infrastructure, Transport and Tourism “Guidelines for Long-Term Repair Planning” (Revised June 2024, PDF) / Ministry of Land, Infrastructure, Transport and Tourism “Survey on Actual Conditions of Large-Scale Repair Work for Condominiums in FY2021”

Depending on the building, a statutory exterior wall inspection may be required. For buildings subject to periodic reporting under Article 12 of the Building Standards Act, an inspection through comprehensive tapping, etc. (including infrared inspections that meet requirements) is required for parts of the exterior wall made of tiles, stone, mortar, etc., that may pose a danger to pedestrians due to falling, under certain conditions such as exceeding 10 years from completion or exterior wall renovation. In Chigasaki City, the submission destination for periodic reports is the city’s Building Guidance Division. On the city’s periodic reporting system page, it is stated that for collective housing, it is limited to “housing for the elderly with services,” and the target is determined by the floor area conditions for each floor. Mixed-use buildings that include stores, hotels, and other target uses require individual confirmation of use and scale (Chigasaki City Building Guidance Division, Building Safety Section, Phone: 0467-81-7185). Even if not subject to statutory inspections, regular inspections and maintenance to prevent falling of exterior walls are essential. (Periodic reports for elevators, etc., are under a different system. Please consult us if you are unsure.)

Examples of Large-Scale Renovation Work

This is an example of exterior renovation work on a mixed-use building undertaken by Kakeru Koumuten. The building had leaks occurring in several places, and it was renovated by combining clear waterproofing for the tile exterior wall and roof waterproofing.

Exterior Renovation Work for Mixed-Use Building (Tile Wall Waterproofing + Roof Waterproofing)

BEFORE

Exterior of mixed-use building before large-scale renovation | Stains on tiles and overgrown vines

AFTER

Exterior of mixed-use building after large-scale renovation | Tile replacement and clear waterproofing for renovation

Work Details Partial tile replacement / Painting of ancillary parts (pipes, water cutting) / Roof waterproofing work (urethane waterproofing) / Wall tile waterproofing (Seven S) / Sealing work around sashes / Repair of wall tile mortar joints / Removal of vines
New Materials Used Wall tiles: Kunishiro Tiles / Painting of ancillary parts: Radical silicone paint / Roof waterproofing: High-strength urethane (Sarasene A) / Wall tile waterproofing: Seven S
Price Range 4,000,000 – 4,100,000 JPY
Construction Period 45 days
Location Not disclosed
Background to the Construction Due to leaks occurring from several areas including the exterior walls and roof, we proposed waterproofing for the entire exterior wall. Seven S is a clear waterproofing material for tile walls, and while it is somewhat expensive, it offers high waterproofing performance, making it recommended for cases where leaks are occurring from multiple areas of the exterior wall.

Customer Feedback

Process from On-Site Survey to Completion of Work

From inquiry to completion of work and aftercare, a single representative will consistently handle your case. In the case of management associations, a resolution at the general meeting is required, so starting the process 1 to 1.5 years before the desired start date allows for a smoother progression.

  1. Contact Us (Free) Please reach out via phone, form, or LINE. If you have estimates from other companies, just presenting those is fine.
  2. On-site Investigation & Building Diagnosis (Free) We will conduct a survey of the exterior walls, check for cracks, sealing, and waterproofing layers, and if necessary, use drones or thermal imaging to investigate the roof, high places, and leak areas. For properties in Chigasaki City, we will check whether they are located near the station or along main roads, the distance to neighboring properties, the width of the road and delivery routes, pedestrian traffic, drainage, rust on metal parts and fittings, and parking lots.
  3. Investigation Report & Estimate Submission We will provide a deterioration diagnosis report with photos and an estimate detailing quantities, methods, and materials for each work item. We can also propose multiple plans.
  4. Plan Decision & Contract Confirm colors through color simulations, paint samples, and trial applications. For management associations, we can assist in preparing materials for general meetings. In areas subject to district planning, landscape planning, or building agreements, we will also explain the considerations for color choices.
  5. Notification to Residents & Neighbors We will distribute construction notifications, visit neighbors to greet them, and set up a bulletin board at the entrance (with a schedule and laundry information). If temporary relocation of parking is necessary, adjustments will be made at this stage.
  6. Temporary Scaffolding Installation & Various Works Our own scaffolding team will set up the scaffolding, followed by high-pressure washing → substrate repair → sealing → exterior wall painting & tile repair → waterproofing → metal parts & auxiliary work in that order. A responsible person will inspect and take construction photos at each stage.
  7. Completion Inspection, Scaffolding Dismantling & Handover We will confirm the finish in the presence of the customer and provide construction photos, a report on the paints used, and a warranty certificate.
  8. Aftercare Maintenance We will send out annual DM notifications, and inspections can be conducted every year. Simple repairs such as partial sealing are provided free of charge.

Resident Communication, Additional Work Approval, Inspection Reports

Equally important as the construction itself is “when, what, and with what materials we report”. At Kakeru Koumuten, we provide materials and reports in the following four situations.

Situation Materials Provided / Actions Taken
Before Construction
Building Diagnosis
We will provide a deterioration diagnosis report with photos. This document summarizes the deteriorated areas and the basis for the proposed scope of work.
Before Construction to During Construction
Notification to Residents & Neighbors
We will distribute construction notifications, visit neighbors to greet them, and provide information on the schedule and laundry through the entrance bulletin board.
During Construction
Approval for Additional Work
For deterioration discovered after scaffolding is set up, we will present photos along with quantities and costs, and proceed with construction only after obtaining approval.
During Construction to Completion
Inspection Report
A responsible person will inspect each stage and take construction photos. Upon completion, we will confirm the finish in the presence of the customer and provide construction photos, a report on the paints used, and a warranty certificate.

* For management associations, it is smooth to decide in advance who will approve additional work (such as the chairman or repair committee) and the estimated amount that requires approval before the contract.

What Will Life Be Like During Construction? Impact on Residents

Large-scale repairs are principally carried out while residents remain in their homes. However, there will be restrictions on daily life while scaffolding is in place. Most troubles can be prevented by providing advance notice, so Kakeru Koumuten Co., Ltd. thoroughly explains and posts information before construction begins.

Impacts What Actually Happens / Our Response
Laundry On days of high-pressure washing, painting, and waterproofing, outdoor drying will not be possible. We will inform residents via bulletin boards and individual mailboxes about “which side will be worked on today” and will ensure as many days as possible for outdoor drying.
Window Opening and Closing In addition to washing and painting days, there may be times when windows cannot be opened due to protective measures, drying, and waterproofing work. We will provide information for each stage, so please check the postings and notifications. We will schedule work to avoid consecutive days of closed windows.
Balcony During floor waterproofing and handrail painting, we ask for temporary relocation of personal items, potted plants, and air conditioning outdoor units. The timing will be notified in advance for each unit.
Noise and Odor The period of substrate repair (breaking and drilling) will generate the most noise. Working hours are generally from 8 AM to 5 PM, and we will accommodate requests such as refraining from work on Sundays and holidays. Low-odor paint options are also available.
Security and Privacy Scaffolding can become a potential access route. We can take measures such as using mesh sheets to block sightlines and installing locks and sensor lights on the scaffolding’s access stairs at night. We also ensure thorough etiquette training for visitors.
Parking Vehicles on the side where scaffolding will be erected will need to be temporarily relocated. Since securing a new parking location may take time, we will work together to secure a new parking spot 2 to 3 months before construction starts.
Pets, Small Children, and Working from Home If you have sensitivities to noise, please inform us in advance, and we may be able to adjust the work schedule accordingly. Please feel free to let us know.
Rented Rooms We can assist property owners in creating notification documents for residents. If there are concerns about the impact of construction on occupancy rates, we can also suggest an image change using color simulations.

How to Choose a Large-Scale Repair Contractor and Ordering Method

There are many large-scale repair contractors that serve Chigasaki City, and you may be unsure which one to choose. When requesting renovations for apartments, condominiums, or buildings, please check the following four points.

● Extensive experience in large-scale repairs

● Confirm the presence of warranties and aftercare services

● Obtain estimates from multiple contractors (at least 3 companies)

● Confirm whether they are self-managed

Extensive Experience in Large-Scale Repairs

Large-scale repair contractors often have websites that showcase their exterior renovation work. If they provide detailed explanations of repair content with photos, it can offer reassurance as a reference when you actually make a request.

Using ratings from Google and review sites can be effective when comparing large-scale repair contractors! Be cautious if there are many negative reviews. If there are few reviews, also check the construction track record, the content of explanations, and the management system.

Large-scale repair work involves not only the construction itself but also potential troubles with residents and nearby neighbors. Therefore, it is necessary to post updates on the progress of the work and information about laundry on bulletin boards to prevent troubles before they occur. Kakeru Koumuten Co., Ltd. specializes in exterior work, and we receive many requests for exterior renovations of apartments and condominiums.

Check for warranties and aftercare services

When choosing a large-scale repair company, make sure to check for warranties. If any issues such as leaks occur after construction, having a leak warranty from the contractor means you can have it repaired at no cost, which is reassuring! A company that offers a warranty is a sign of confidence in their work, making it a criterion for selecting a contractor.

Warranty periods vary by contractor and the nature of the work, but typically range from 1 to 10 years. Emergency repairs or partial fixes often do not come with a leak warranty. Some contractors also offer aftercare services separate from warranties, so be sure to check for warranties and aftercare services.

At Kakeru Koumuten Co., Ltd., we send out annual direct mail for aftercare maintenance, allowing for yearly inspections. We also provide simple repairs such as partial sealing at no cost.

Obtain estimates from multiple contractors (at least 3 companies)

When requesting large-scale repairs, be sure to obtain estimates from multiple contractors. It is important to get estimates from at least 3 companies and compare their estimates and reports! Even for the same work, costs can vary between contractors, and warranties and aftercare services may differ. Additionally, obtaining multiple estimates makes price negotiations easier.

When comparing estimates, consider not only the cost but also the “items in the estimate,” “methods and materials for substrate repair and exterior wall painting,” and “confirmation of the process.” Avoid judging solely based on cost, as lower costs can result from using lower-quality materials or skipping processes. Especially since substrate repair work is not easily visible from the outside, ensure that the repair method is appropriate for the condition of the substrate!

Check these points on the estimate (checklist)

Confirmation Items Points to Consider
Is there an excessive use of “lump sum” notation? Are the quantities and unit prices clearly stated? With “Exterior Wall Repair Lump Sum,” comparisons and verifications cannot be made.
Do the quantities match the actual measurements? Are there quantities recorded that are far from the drawings or actual measurements? This is the area where inflation is most likely to occur.
Proportion of miscellaneous expenses Details and proportions of site management costs, general management costs, and statutory welfare costs. According to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, the average is about 10% of the construction cost (excluding common temporary costs), but it varies depending on the scale and conditions of the building, so there is no uniform standard.
Are the names of materials written? Are the manufacturer names, product names, grades, and number of coats for paints and waterproofing materials specified?
Treatment of quantities for substrate repairs This is an item that cannot be accurately measured until scaffolding is erected. It is crucial to specify whether it is “estimated quantity” or “actual quantity settlement,” and the agreements for increases or decreases.
Warranties and after-inspection Warranty periods for each construction, frequency of inspections, and scope of free support.
Company backing Types of construction industry licenses, track record of similar scale and structure projects, and presence of qualified personnel.

Confirm whether it is managed in-house

Large-scale repair work includes various tasks such as “substrate repair work,” “exterior wall painting,” “waterproofing work,” and “pipe replacement,” and the plan details will change based on the actual deterioration state and customer preferences.

There are cases where contractors that completely outsource to subcontractors lack knowledge and experience, leading to proposals for repairs in irrelevant areas or unnecessary work. If you request a subcontractor after investigation, it may incur additional time and costs. By managing in-house with knowledge and experience, responsible construction can be achieved at a lower cost.

Additionally, contractors that outsource to subcontractors may have delayed responses in case of any troubles during construction. It is safer to avoid having a company that has not actually discussed with the customer manage the construction. Kakeru Koumuten performs everything from temporary scaffolding installation to exterior wall painting and waterproofing work in-house, managed by knowledgeable and experienced personnel!

There are three ordering methods. The choice affects the approach.

Especially for management associations, it is necessary to decide “how to request” before “which company to hire.” The main ordering methods are as follows:

Method Procedure Advantages Disadvantages
Responsibility Construction Method The construction company handles investigation, design, construction, and management all at once. No additional costs for commissioning design consultants (investigation and design costs may be included in the construction costs) / A single point of contact reduces the burden on the management association / Responsibility is clearly defined / The period until ordering can sometimes be shortened. Specifications tend to be left to the construction company, making it difficult to compare side by side / Third-party checks are hard to implement, requiring the management association to verify price, specifications, and construction status.
Design Supervision Method A design office or consultant conducts the investigation and design, while a separate company handles the construction. Allows for comparison of construction companies under the same conditions / Independent supervision during construction. Consulting fees are required separately / Care must be taken regarding conflicts of interest and collusion risks / The period tends to be prolonged.
Management Company Prime Contract Method The management company acts as the prime contractor, with subcontractors performing the construction. Easy coordination with daily management / Minimal effort required from the management association. Intermediate margins can make it more expensive / Competition principles are less likely to be effective.
We believe that the responsibility construction method is often suitable for small to medium-sized buildings. This is because the burden of consulting fees increases as the number of units decreases. However, the weaknesses of the responsibility construction method are “difficulty in making side-by-side comparisons” and “difficulty in third-party checks,” so verification of price, specifications, and construction status is necessary regardless of the method. Therefore, Kakeru Koumuten provides estimates that clearly state quantities, methods, and materials for each construction item, allowing you to compare with other companies on the same level. If you bring in estimates from other companies, we can also recreate them under the same conditions.

Collusion and Inappropriate Consulting Issues in Large-Scale Renovations and Self-Defense Measures

Latest 2026 In the large-scale renovation industry, inappropriate orders linked between design consultants and construction companies have long been a concern. The Ministry of Land, Infrastructure, Transport and Tourism issued warnings and notifications to management associations in January 2017 and April 2023, and on September 28, 2026, the Japan Fair Trade Commission announced that it had issued exclusion orders to 38 companies and a total of 1.63788 billion yen in payment orders to 37 companies regarding large-scale renovation work commissioned by condominium management associations in the Kanto region.

*This content is based on the announcement by the Japan Fair Trade Commission (September 28, 2026).

Three Typical Methods

① Dummy Estimates

Prior to receiving orders, companies decide on a contractor, while other companies only provide a formal high estimate, creating a “fixed race.” This gives the impression to the management association that they have properly obtained competitive estimates.

② Collusion with Design Supervisors

Consultants contract at extremely low design supervision fees while receiving kickbacks from the high construction costs of affiliated contractors. Beware of design supervision fees that are too low as they are a warning sign.

③ Back Margin

A certain percentage of the contract amount is given as a kickback, which is then added to the construction costs as an expense. As a result, the management association ends up paying extra.

Source: Ministry of Land, Infrastructure, Transport and Tourism “On the Proper Ordering of Large-Scale Repair Work for Condominiums” (Notification dated April 3, Reiwa 5, PDF)

Self-Defense Measures for Management Associations

  • Obtain independent estimates from multiple companies
  • Consult with neutral third parties such as condominium management professionals or architects
  • Document the contractor selection process in minutes to ensure transparency
  • Confirm the reasons for abnormally low consulting fees
  • Include a penalty clause in the contract for cases of collusion
  • Avoid concentrating information with a single consultant and verify specifications independently
Kakeru Koumuten welcomes such fair bidding and opportunities for third-party comparisons. Because we keep costs down through our own construction, and provide estimates that clearly specify quantities, methods, and materials, we believe this makes us advantageous enough to be compared on the same level. We welcome competitive estimates.

Frequently Asked Questions about Large-Scale Repairs in Chigasaki City

How much does large-scale repair in Chigasaki City cost?
For condominiums, according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey for the fiscal year 2021, about 70% fall within the range of 750,000 to 1,500,000 yen (excluding consumption tax and common temporary construction costs), with the most common range being 1,000,000 to 1,250,000 yen. Based on our construction records, the cost for a two-story wooden apartment ranges from 2,000,000 to 4,000,000 yen, for a three-story steel or RC apartment from 4,000,000 to 9,000,000 yen, and for small condominiums or mixed-use buildings from 5,000,000 to 15,000,000 yen. The cost varies depending on the condition of the substrate and whether waterproofing or roofing work is needed, so we will provide an estimate through a free on-site survey.
How often should large-scale repairs be conducted?
Generally, a cycle of 12 to 15 years is recommended, and the actual cycle is most commonly 13 years according to the Ministry of Land, Infrastructure, Transport and Tourism’s survey, with about 70% falling within the 12 to 15-year range. However, the decision should be based on the condition of deterioration rather than just the number of years. If deterioration of sealing, lifting of tiles, or rupture of the waterproof layer is observed, it is better to carry out repairs without waiting for the cycle, as this can ultimately reduce costs. Older buildings tend to have a greater proportion of tile repairs and metal part replacements during the second and third repairs.
How long does the construction period take? Can residents stay during the work?
The estimated duration is about 3 weeks to 2 months for apartments, 1.5 to 3 months for small condominiums or buildings, and about 4 to 6 months for condominiums with over 50 units. Residents can remain in their homes during the construction. However, there will be restrictions on drying laundry outside and opening windows while scaffolding is in place, so we take thorough measures to minimize the impact on daily life, including distributing advance notices, providing information on the schedule and laundry through bulletin boards, and strictly adhering to working hours.
How long should I expect from the start of planning to the completion of construction?
For management associations, it typically takes about 1 to 1.5 years for establishing a repair committee, conducting building diagnostics, selecting contractors, and obtaining resolutions at general meetings, followed by 3 to 6 months for the construction itself. Overall, it is advisable to plan for about 2 years to proceed comfortably. If you are using subsidies or tax incentives, please also factor in the time required to obtain management plan certification (which requires prior confirmation and a resolution at a general meeting).
Are there any subsidies available for large-scale repairs in Chigasaki City?
There were no confirmed subsidies specifically for large-scale repair work from publicly available information for either Chigasaki City or Kanagawa Prefecture. However, if it is a condominium, you may be eligible for a reduction in fixed property tax under the “Condominium Longevity Promotion Tax System” if certain conditions are met (Chigasaki City offers a one-third reduction for the following year’s tax). The city also provides subsidies for seismic diagnostics of old earthquake-resistant condominiums and has a management plan certification system. If the work includes windows and insulation, it may qualify for “Advanced Window Renovation 2026” or “Mirai Eco Housing 2026.” The application timing and applicants differ by program, so please check the eligibility conditions and application procedures for each program before contracting or starting construction.
I heard that fixed property taxes can be reduced through large-scale repairs. Is that true?
Yes, it is true if the conditions are met. Under the Condominium Longevity Promotion Tax System, if a condominium that is over 20 years old and has more than 10 units conducts large-scale repairs that contribute to longevity, the fixed property tax for each residential unit can be reduced by one-third for the following year’s tax, up to the equivalent of 100 square meters (urban planning tax is not included). This applies to work completed between April 1, 2023, and March 31, 2027, and a declaration must be made within three months of completion. The declaration should be submitted to the Chigasaki City Asset Tax Division, Building Evaluation Section (phone 0467-81-7142). It is a requirement to be a certified management plan condominium or a management association that has received advice and guidance, and preparations such as raising repair reserve funds may take time, so it is recommended to start the process more than a year before the construction.
Are there any changes to subsidies starting from the fiscal year 2026?
Yes, there are. The national “Child-Rearing Green Housing Support Project” has been abolished and reorganized into the successor “Mirai Eco Housing 2026 Project.” Management associations and management association corporations can also become joint project participants, allowing for insulation renovations in common areas. Additionally, the “Long-Term Excellent Housing Renovation Promotion Project” will end in fiscal year 2025, and it will not be implemented in fiscal year 2026. The “Advanced Window Renovation 2026 Project” has started accepting bulk applications for apartment buildings from May 29, 2026 (the application process is handled by registered contractors). Please be careful not to base your financial planning on outdated information.
What should I do if the repair reserve fund is insufficient?
選択肢は主に4つです。①劣化診断のうえで緊急性の低い工事を次回に送る、②工事範囲や仕様を見直す、③補助金などの支援制度を確認する、④修繕積立金の増額や住宅金融支援機構の融資を検討する、です。同機構のマンション共用部分リフォーム融資は担保不要で、管理計画認定の取得や省エネ・耐震工事の実施により金利が最大年0.6%引き下げられます。なお、防水とタイル剥落対策の先送りは結果的に高くつくことが多いため、切り分けの判断はご相談ください。
Can you handle large-scale repairs for complexes and large condominiums with many buildings and units?
Yes, we can discuss this. In Chigasaki City, there are areas like the Hamamihiradai district where redevelopment of complexes is progressing. We also accept inquiries for properties with many buildings and units. For properties with many buildings, it is important to conduct deterioration diagnosis for each building, plan the process of whether to do it all together or divide it by building or year, and form consensus at the general meeting. Kakeru Koumuten Co., Ltd. targets condominiums with over 100 units as a cost estimate and will provide proposals that allow for comparison of multiple process plans.
What happens to the parking for residents during construction?
Vehicles on the side where scaffolding will be set up will need to be temporarily moved. In buildings with limited parking availability, it may take time to secure a relocation spot. Kakeru Koumuten Co., Ltd. will coordinate with you about the availability of nearby coin parking and monthly parking starting 2 to 3 months before construction begins.
Can I freely decide the color of the exterior walls?
Generally, the color of the building is decided by the management association or the owner; however, there are procedures and standards for buildings that fall under the Landscape Act, special landscape town planning areas, and district plans. Notifications under the Landscape Act are required for buildings over 10 meters in height, with a total floor area of 1,000㎡ or more, or with 8 or more planned units when making repairs that change the appearance or color. Notifications must be submitted at least 30 days before construction begins. The city also requests notifications for repainting exterior walls in the same color. In the special landscape town planning areas around Chigasaki Beach and the fishing port, repainting of exterior walls for all buildings in the area is subject to notification. For inquiries regarding landscape, please contact the Landscape Greenery Division (phone 0467-81-7182), and for district plans, please consult the Building Guidance Division. We will also investigate what applies to your property during our survey. Sharing a color simulation of the completed image can facilitate discussions with neighbors and the management association.
Are there differences in construction depending on the location, such as near the station, residential areas, along the coast, or in complexes?
Chigasaki City has areas with different environments, including the urban area around Chigasaki Station, the coastal area facing Sagami Bay, the Hamamihiradai district where redevelopment of complexes is progressing, and low-lying areas along rivers such as the Sagami River. Depending on the location, there may be differences in road width, distance from neighboring properties, pedestrian traffic flow, and types of buildings (mixed-use buildings, wooden apartments, condominiums, complexes, etc.), which may require ingenuity in setting up scaffolding and transporting materials. Kakeru Koumuten Co., Ltd. has its own scaffolding team that will check the site and plan the transportation route and scaffolding layout. Additionally, the city publishes hazard maps for tsunamis, liquefaction, flooding, and internal water, and buildings close to the sea focus on inspecting rust on metal parts, sealing, waterproofing layers, and drainage on rooftops and sites in low-lying areas. The degree of deterioration varies by building, so we conduct individual diagnoses during on-site surveys.
Which should I choose, the responsibility construction method or the design supervision method?
For buildings with fewer units, the burden of consulting fees tends to be heavier, so we believe that the responsibility construction method is often more suitable for small to medium-sized buildings. The design supervision method allows for comparison of construction companies under the same conditions since a third party creates the specifications; however, it incurs separate consulting fees and requires caution regarding conflicts of interest and collusion risks. Even with the responsibility construction method, verification of price, specifications, and construction status is essential. Kakeru Koumuten Co., Ltd. provides estimates that clearly state quantities, methods, and materials for each construction item, allowing you to compare them on the same level as other companies.
How can I detect collusion in large-scale repairs?
There are three typical methods. ① Deciding on the contractor in advance and having other companies submit only formal high estimates, known as “dummy estimates.” ② A consultant contracts at an extremely low design supervision fee and receives kickbacks from affiliated contractors, leading to collusion. ③ Adding a portion of the contract amount as a back margin to the construction costs. Countermeasures include obtaining independent estimates, consulting with a neutral third party, keeping minutes of the selection process, and including penalty clauses in the contract.
How many companies should I get estimates from?
最低3社をおすすめします。多すぎると比較しきれず、少なすぎると競争が働きません。大切なのは社数よりも「同じ土俵を作ってから比べること」です。共通の仕様書や数量表を作って同一条件で依頼し、「一式」表記を認めず内訳明細を必須にすると、金額差が範囲の違いなのか単価の違いなのかがはっきりします。
What is the difference if we have our own scaffolding?
In large-scale repair projects, temporary construction accounts for about 20% of the total cost (according to the Ministry of Land, Infrastructure, Transport and Tourism’s FY2021 survey). By not outsourcing scaffolding work, we can easily control costs in this area, and our in-house scaffolding team can flexibly respond to sudden changes in the schedule or additional work. Kakeru Koumuten Co., Ltd. owns scaffolding materials for approximately 100 single-family homes and plans scaffolding on-site according to the site conditions.
I’m in the middle of getting multiple estimates; can I just have a look at your estimate?
Of course, that’s possible. If you bring in estimates from other companies, we will check for free whether the items, quantities, construction methods, and materials are appropriate, and provide you with an estimate under the same conditions. We welcome multiple estimates.
Can I request just emergency repairs for a leak?
Yes. As a preliminary step before large-scale repairs, we also accept requests for emergency repairs or partial repairs for leaks. We will identify the cause using thermal imaging or drones and propose the minimum necessary repairs.
Can you handle roofing or exterior materials that contain asbestos?
Yes, we can. We have qualified personnel, including asbestos work supervisors and building material surveyors, who can conduct the legally required preliminary surveys and handle the cover method or removal of asbestos-containing roofing materials. The availability of subsidies for investigation and removal costs when there is sprayed asbestos may vary by year, so please check in advance with the municipal office. We will also provide guidance from the investigation stage.
What happens if large-scale repairs are not done?
There are risks such as personal injury accidents due to falling exterior tiles, structural deterioration from rusting rebar, leaks, and a decrease in asset value. Furthermore, buildings subject to periodic reporting under Article 12 of the Building Standards Act require investigations through full probing, etc., under certain conditions, such as when more than 10 years have passed since completion or exterior wall renovations for tile or mortar-finished walls. The submission destination for periodic reports in Chigasaki City is the city’s Building Guidance Division, and on the city’s page, it states that for collective housing, it is limited to “service-equipped housing for the elderly.” Mixed-use buildings, including stores, require individual confirmation (Chigasaki City Building Guidance Division, Building Safety Section, Phone: 0467-81-7185). Even if not subject to statutory investigations, regular inspections and maintenance are essential, so please consult us if you are unsure about your judgment.
How much does large-scale repair for an apartment (about 10 units) cost?
For a wooden two-story building with 6 to 10 units, it is estimated to be between 2 million and 4 million yen, and for a three-story steel or RC building with 10 to 20 units, it is estimated to be between 4 million and 9 million yen based on our company’s track record (including scaffolding, substrate repairs, exterior wall painting, sealing, and waterproofing). It is common for apartments to undergo repairs every 10 to 15 years. For owners, there is an increasing trend to change the appearance through color simulation at the same time as repairs to improve occupancy rates.

If you are looking for large-scale repair contractors in Chigasaki City, contact Kakeru Koumuten

Our company is based in Yokohama City and has handled many exterior wall renovations and large-scale repairs for condominiums and apartments in Chigasaki City. We are happy to assist not only with large-scale repair work but also with partial repairs and leak repairs. In urgent cases such as leaks, emergency measures may be possible, so please feel free to consult us. “I want it to last long with one renovation” “I want to keep costs as low as possible” “I want to improve insulation performance because the indoors are hot” We will propose the best solutions for your specific requests and future repair plans.

From temporary scaffolding work to roofing and exterior painting, all work is performed by our own team. We are confident that we will not be outdone in terms of cost, quality, and scheduling compared to other companies, so we welcome multiple estimates!

On-site surveys, estimates, and color simulations are all free of charge

Please feel free to consult us via the inquiry form, phone, or LINE.
It’s perfectly fine to just present estimates from other companies.

Request a Free Estimate Consult via LINE

Large-Scale Repair Work Service Area

Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and the entirety of Tokyo.

Service Area in Chigasaki City, Kanagawa Prefecture
Akabane / Akamatsu Town / Asahigaoka / Amanuma / Imajuku / Enzo / Kagawa / Kozakura Town / Kowada / Saiwaicho / Shioimidai / Shimoterao / Shimomachiya / Jukkenzaka / Matsubayashi / Shirahama Town / Shineicho / Serizawa / Daikancho / Takada / Chigasaki / Tsutsumi / Tsurugadai / Deguchi Town / Tokiwacho / Tomoe / Nakakaigan / Nakajima / Yukitani / Minami Lake / Nishikubo / Hagioka / Hama Susuga / Hama Take / Hamanosato / Hamamihirama / Higashikaigan Minami / Higashikaigan Kita / Hishinuma / Hishinuma Kaigan / Hibari Gaoka / Fujimimachi / Heita Shinmachi / Heiwa Town / Honjuku Town / Honmura / Matsuou / Matsukaze Dai / Matsugaoka / Matsunami / Mizuki / Misumi Town / Midoriga Hama / Murota / Motomachi / Yanagijima / Yanagijima Kaigan / Yahata / Wakamatsu Town

Consultations via LINE are also very welcome◎

LINE

Kakeru Koumuten LINE Official Account Add Friend

We are also regularly updating our Instagram◎ Please follow us!

Instagram
Kakeru Koumuten Official Instagram

For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!