For solar panel and storage battery installation in
Hadogaya Ward, Yokohama,
trust Kakeru Koumuten!

Kakeru Koumuten is a remodeling company specializing in exterior renovations, based in Aoba Ward, Yokohama.
As a company strong in roofing work, we are entrusted withsolar panel and storage battery installations considering roofing and waterproofing!

“How to Choose a Solar Panel Contractor in Hadogaya Ward”
“Costs for Solar Panel and Storage Battery Installation”
“Subsidies Available for Solar System Installation in Hadogaya Ward”
We will also explain the above three points!

Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure a satisfactory solar panel installation, we recommend obtainingthree or so estimates!

For solar panel and storage battery installation in Hadogaya Ward, Yokohama, trust Kakeru Koumuten
Table of Contents (tap to open/close)
  1. Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Hodogaya Ward, Yokohama
  2. Roof Inspection Before Installing Solar Panels
  3. Possible Subsidies and Grants Available in Hodogaya Ward
  4. Price List for Solar Panel and Storage Battery Installation
  5. Breakdown of Installation Capacity, Equipment, and Labor Costs
  6. Self-Estimate and Financial Simulator for Solar Power Generation
  7. Customer Testimonials
  8. Case Studies of Solar Panel Installations
  9. How to Choose a Solar Panel Installer in Hodogaya Ward, Yokohama
  10. Benefits of Introducing Solar Equipment
  11. Points to Consider When Introducing Solar Power Generation
  12. How to Choose Solar Panels
  13. Frequently Asked Questions About Solar and Storage Battery Installation in Hodogaya Ward
  14. If You Are Looking for a Solar Panel Installer in Hodogaya Ward, Contact Kakeru Koumuten
  15. Characteristics of Hodogaya Ward, Yokohama and Key Points for Solar Installation
  16. Service Area in Hodogaya Ward, Yokohama

Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Hodogaya Ward, Yokohama

Link banner to Kakeru Koumuten's strengths introduction page

The reasons why our company is entrusted with solar panel installation by customers in Hodogaya Ward, Yokohama include
one reason being that Kakeru Koumuten has a base in the same city of Yokohama,
and we have unique strengths in solar panel installation that cannot be imitated by other companies, which has received high praise from many customers.

In solar panel installation projects in Hodogaya Ward, we have absolute confidence in “cost,” “quality,” and “plans”,
so we would appreciate it if you could compare our estimates with those of other companies.

Because we are confident, we welcome multiple estimates!

1. We Can Also Handle Exterior Renovations Aside from Solar Panel Installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Troubles such as leaks that occur during the installation of solar panels may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It is reassuring to have knowledge about the roof to avoid maintenance and troubles after installation!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!

2.Equipment Specialized in Exterior Renovation

Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases centered in Yokohama City, Kanagawa Prefecture for material storage and showrooms.

In-house Ownership of Scaffolding Materials

Entrance to the material storage areaCompany-owned scaffolding materials
To ensure safety during work on the roof, we own the necessary scaffolding materials for temporary scaffolding based on construction conditions, allowing us to set up scaffolding ourselves.
By conducting scaffolding work with our own scaffolding team instead of outsourcing, we can also cut costs related to scaffolding work.
We have approximately enough scaffolding materials for 50 single-family homes!
Even in the residential areas of Hodogaya Ward, where hilly terrain and lowlands along the river are adjacent, our own scaffolding team will plan the scaffolding according to the local conditions.

Storage of materials in our large warehouse

Exterior of the material warehouse Interior of the warehouse storing materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, we canpurchase materials at a lower cost!
Additionally, since we always have a stock of roofing materials, we can ensurequick responses in emergencies!

Sorting and transporting waste materials in-house

Space for sorting waste materialsThe installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly reduce waste disposal costs.

Exterior remodeling dedicated showroom

Exterior remodeling dedicated showroom appearanceShowroom interior
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on the roofing materials!
Simulations for potential earnings and installation costs when introducing solar panels are also available!

Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!

3.All Work Performed by Our Own Team

Diagram of the system for performing scaffolding, painting, and roof remodeling by our own team

One of Kakeru Koumuten’s major strengths is all work performed by our own team.

By having a consistent system from inquiry to completion, Kakeru Koumuten can provide high-quality roof remodeling at reduced costs.
Additionally, one representative will handle everything from the estimate to project completion.
Since the same person is responsible throughout, smooth communication is possible.

We can perform everything from temporary scaffolding installation to exterior wall painting and roof remodeling with our own team!

4. Various Permits and Skilled Workers

Construction industry permit displayDisplay of permits and qualifications obtained by Kakeru Koumuten
We have obtained construction industry permits and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal and painting technicians, and we are confident in our construction skills.
We can also handle large-scale roofing projects such as factories!

5. Warranty and Aftercare

Link banner to Kakeru Koumuten's warranty information page

In addition to the manufacturer’s warranty, our solar panel installation work comes with our own workmanship warranty (leakage warranty)!
(The workmanship warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovation is performed. The workmanship warranty is separate from the manufacturer’s product warranty, and the coverage and conditions vary based on the warranty details.)
Aftercare maintenance is available annually, and we send out notification DM each year.
If you have any questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Inspection response for roofs and solar panels

Our company is equipped to handle various roof troubles and situations.

Even if you cannot access the roof at high altitudes, we can respond using a drone!
During leakage investigations, we can also conduct inspections using a thermal imaging camera.

If the power generation of the solar panels decreases due to dirt, we can also clean the solar panels using a specialized brush.
We will respond according to the customer’s wishes.

7. Human Resource Development

Training session using models

We create various roof models for skill enhancement and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly provide technical training so that each staff member can handle various cases.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Clear Materials and Simulations

Materials and simulation examples provided for solar panel installation

At Kakeru Koumuten Co., Ltd., we provide not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar panel installation guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar panel installations will find the materials easy to understand, including important points and disadvantages!

We encourage you to obtain comparative estimates and review plans from other companies!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “whether it is okay to install them directly on the current roof” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, specializing in roofing work, has summarized the items to check before installation.

1. Type of roofing material and age The fixing method varies depending on the roofing material, such as slate, tiles, metal roofs, or flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest a roof renovation first.
2. Condition of the substrate and waterproof sheet If the sheathing or roofing (waterproof sheet) beneath the roofing material is damaged, it will affect the fixing strength and waterproofing. We will also check for any signs of leaks.
3. Orientation, slope, and shadows of the roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect the power generation. We will create a layout diagram from the drawings and the site, and you can confirm it with the power generation simulation.
4. Shape of the roof and installable area The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. The number of panels that can be installed varies depending on the size of the panels, so we will compare based on the overall output of the roof.
5. Fixing method and waterproofing details We will check whether the method involves drilling holes in the roofing material for fixing or using brackets to secure the roofing material. The fixing method varies by technique, so please confirm the waterproofing treatment of the fixing parts at the time of the estimate.
6. Weight of the roof The roof will become heavier due to the panels. After investigating the existing roof, substrate, and load capacity, replacing with lighter roofing materials may be an option if necessary.
7. Installation location of equipment and wiring We will confirm the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect costs.

Fixing Methods and Checkpoints by Roofing Material

Roof Material Main Fixing Method Pre-Installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproof treatment of fixed parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first.
Tile Roof Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lighter roofing materials before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available.
Flat Roof / Rooftop Fixed by installing a framework Type and deterioration status of the waterproof layer, waterproofing around the framework. Consider in conjunction with the timing of waterproofing work.
If you perform roof renovations simultaneously, you may reduce future costs for removing and reinstalling solar panels!
If you carry out roof renovations 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, it may be more cost-effective in the long run to renovate to a highly durable roofing material before installation.
Kakeru Koumuten is strong in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ Click here for roof renovations in Hodogaya Ward, Yokohama City

PotentialSubsidies and Grants

If you are introducing solar panels or storage batteries in Hodogaya Ward, you may be eligible for programs from the “National Government,” “Kanagawa Prefecture,” and “Yokohama City.”
The following information is based on the official pages of each program as of October 6, 2026. The application status may change depending on the budget, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Period for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Yokohama City “Yokohama Green Energy Partnership Project (YGrEP)” Reiwa 8 Fiscal Year Yokohama residents installing eligible equipment at their homes. Solar power must be newly installed, and either a storage battery, eco-cute, or electric vehicle must be installed simultaneously or already in place. Solar Power: 15,000 JPY/kW (up to 4 kW)
Storage Battery: 120,000 JPY per case
(Refund via cashless points, etc.)
Participation & Installation Support Application: June 15, 2026 – December 25, 2026 (Application before installation)
Installation Completion Application: By January 22, 2027
Ends when budget limit is reached
Kanagawa Prefecture “Reiwa 8 Fiscal Year Kanagawa Prefecture Residential Solar Power Generation and Storage Battery Installation Subsidy” Must install both solar power generation and storage battery at a residence in the prefecture. Applications must be made by the individual, and construction can begin after grant approval. Solar Power: 70,000 JPY/kW
Storage Battery: 150,000 JPY per unit
Phase 1: May 11, 2026 – June 30, 2026
Phase 2: September 7, 2026 – September 30, 2026 (First-come, first-served)
Phase 2 has reached its application deadline. Please check the prefecture’s official page for future applications.
National “DR Home Storage Battery Project” (Reiwa 7 Fiscal Year Supplement) New installation of home storage systems using registered products that can be utilized for DR (demand response). Calculated based on an initial effective capacity of 1 kWh at 34,500 JPY (subsidy rate within 3/10; maximum 600,000 JPY per application). As of May 29, 2026, the budget has been reached, and applications are now closed (currently not accepting applications).
National “Mirai Eco Housing 2026 Project” (Renovation) Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovation of windows (openings) and structures; applications cannot be made for just the installation of storage batteries. Solar panels are not included as eligible equipment. Storage Battery: 96,000 JPY per unit Ends when the budget limit is reached. Please check the official site for application status.
Yokohama City “Solar Power Generation Installation Support Subsidy” Small and medium-sized enterprises and sole proprietors in Yokohama City (residential use is not eligible). There are conditions for the target audience and equipment, such as being self-consumption type equipment. Solar Power + Storage System: 100,000 JPY/kW (up to 5,000,000 JPY)
Solar Power Only: 80,000 JPY/kW (up to 4,000,000 JPY)
May 1, 2026 – October 30, 2026, 5 PM (First-come, first-served until budget limit is reached)
Kanagawa Prefecture “Reiwa 8 Fiscal Year Kanagawa Prefecture Self-Consumption Type Renewable Energy Installation Subsidy” Corporations and individuals filing blue returns(Individual residences are excluded)。Solar power must have a generation output of 10kW or more, facilities for business use, equipment not certified for FIT/FIP, etc. Solar power: 80,000 JPY/kW, etc.
Storage system: 50,000 JPY/kWh (maximum 5,000,000 JPY)
Applications closed on September 3, 2026 (when application amounts reached the budget)
Please pay attention to the “order of procedures” for subsidies!
YGrEP requires a “participation and introduction support application” before installation, while Kanagawa Prefecture’s residential subsidies require not only the acceptance of applications but also construction to commence after receiving “grant approval”. If you start installation or construction beforehand, you will be excluded from eligibility. The prefectural residential subsidies are granted after completion of construction and submission of performance reports and reviews. The order of procedures varies by program, and applying does not guarantee a grant, so please confirm before contracting or starting work.
Kakeru Koumuten will guide you on eligibility conditions and business requirements for each program after confirming them.

National Subsidy “DR Home Battery Project (Support Project for the Introduction of Home Storage Systems for DR Resource Implementation)”

The government has been implementing the “DR Home Battery Project” to support the installation of home storage batteries.

This program targets those introducing new storage systems of registered products that can be utilized for demand response (DR). In the fiscal year 2025 supplementary budget, the subsidy amount was determined based on an initial effective capacity of 1kWh at 34,500 JPY, with a subsidy rate of up to 30% and a maximum of 600,000 JPY per application. There are conditions such as excluding items contracted or ordered before grant approval.

However, the fiscal year 2025 supplementary budget reached its application amount on May 29, 2026, and the public offering has ended (the previous fiscal year’s supplementary budget also ended on July 2, 2025). Applications are currently not possible, so please check the official site for future public offerings.

Additionally, there are currently no subsidies specifically for the installation of solar panels on existing homes confirmed by the government.
👉 Click here for the official site of the DR Home Battery Project

Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Residential Solar Power Generation and Storage Battery Installation Subsidy”

Kanagawa Prefecture provides subsidies for those who install both “solar panels” and “storage batteries” in their homes.

The subsidy details are 70,000 JPY per kW of solar power generation output and 150,000 JPY per storage system.
For example, if you install a 4kW solar panel and one storage battery, the subsidy amount calculation would be 4kW × 70,000 JPY + 150,000 JPY = 430,000 JPY.

Conditions include that the storage system must be a registered product, if construction begins before grant approval, it will be excluded, and the application must be made by the individual (proxy applications by contractors are not allowed). It is also possible to combine this with YGrEP in Yokohama City.

For the fiscal year Reiwa 8, the first application period (May 11 – June 30) and the second application period (September 7 – September 30, first-come-first-served) have been conducted, and the second period has reached its application deadline. For future recruitment, please check the official Kanagawa Prefecture page.
👉 Click here for the official Kanagawa Prefecture page

Kanagawa Prefecture “Reiwa 8 Fiscal Year Kanagawa Prefecture Subsidy for Self-Consumption Type Renewable Energy Introduction” (for businesses)

Kanagawa Prefecture is also implementing subsidies for businesses introducing “self-consumption type” facilities that use electricity generated by solar panels.

Eligible applicants are corporations or individual business owners filing blue returns, and the introduction to individual residences is not eligible.
Conditions include solar power generation with an output of 10kW or more, supplying electricity to business facilities within the prefecture, and being equipment not certified under FIT or FIP.

The subsidy amount is 80,000 yen per kW for solar power generation and 50,000 yen per kWh for the accompanying storage system (with a maximum of 5 million yen).
As the application amount reached the budget amount for the fiscal year Reiwa 8, applications were closed on September 3, 2026.

Businesses considering the installation of solar panels on commercial buildings in Hodogaya Ward should check the official Kanagawa Prefecture page for the next recruitment.
👉 Click here for details

Yokohama City “Subsidy for Solar Power Generation Introduction” (for businesses)

Yokohama City is implementing a system to subsidize part of the introduction costs for small and medium-sized enterprises and individual business owners within the city for solar power generation equipment and other installations.

Residential solar power generation is not eligible, and for households, the YGrEP below will be the contact point. Businesses installing solar panels on stores, offices, factories, etc., within Hodogaya Ward may have the possibility to utilize this, but simply running a business from home does not guarantee eligibility. It is necessary to confirm the requirements for small and medium-sized enterprises and individual business owners, as well as the condition of being self-consumption type equipment (equipment intended for selling electricity is not eligible).

The subsidy amount is 100,000 yen per kW when introducing both solar power generation and storage systems simultaneously (maximum of 5 million yen), and 80,000 yen per kW for solar power generation only (maximum of 4 million yen).
The application period for the fiscal year Reiwa 8 is from May 1, 2026, to October 30, 2026, at 5 PM, on a first-come-first-served basis until the budget limit is reached. Installation of equipment and commencement of construction must be conducted after the grant decision date.

For detailed conditions and application methods, please check the official website of Yokohama City.
👉 Click here for the official Yokohama City page

Yokohama City “Reiwa 8 Year Yokohama Green Energy Partnership Project (YGrEP)”

Yokohama Green Energy Partnership (YGrEP) is a project aimed at realizing a decarbonized society.

Yokohama City is providing cashless point rewards to households in the city that participate in YGrEP and install eligible equipment (see eligible equipment below). Residents of Hodogaya Ward are also eligible.

◎Eligible Equipment and Reward Amounts◎

● Solar Power Generation Equipment (new installation): 15,000 JPY/kW (up to 4 kW)
* It is a condition to install or have already installed either a storage battery, eco-cute, or electric vehicle simultaneously.

● Storage Battery: 120,000 JPY per case

● Eco-Cute: 20,000 JPY per case

● Electric Vehicle/Plug-in Hybrid Vehicle (set with solar power generation equipment): 100,000 JPY per case
* It is a condition to install or have already installed solar power generation equipment simultaneously with the storage battery, eco-cute, or electric vehicle (set).

● Electric Vehicle alone (without solar power generation equipment): 50,000 JPY per case

● Fuel Cell (Enefarm): 30,000 JPY per case

● Solar Heat Utilization System: 50,000 JPY per case

● V2H Charging and Discharging Equipment: 100,000 JPY per case

For example, if you install a 4 kW solar panel and a storage battery simultaneously, the calculation for the reward amount would be 60,000 JPY for solar power + 120,000 JPY for the storage battery = a total of 180,000 JPY.

The application process is “Participation and Installation Support Application (before installation) → Installation of Equipment → Completion Application”, and equipment installed before the installation support application is not eligible. The participation and installation support application for Reiwa 8 Year is from June 15, 2026, to December 25, 2026, and the completion application is until January 22, 2027, and will end once the budget limit is reached.
If selling electricity, only the surplus that cannot be used at home is eligible, and submission of monitoring data such as power generation amounts approximately once a year is also a condition. Additionally, only V2H charging and discharging equipment is eligible for point rewards for businesses.

For information on application methods, combining with national and Kanagawa Prefecture subsidy projects, point rewards, and more, please check the special site here or contact us.

Solar Panel Installation & Battery Installation Price List

Solar Panel Installation & Battery Installation Service Menu
⇧Service Menu | Click here for costs related to Solar Panel Installation & Battery Installation

Solar Panel Removal & Water Heater Removal Service Menu
⇧Service Menu | Click here for costs related to Solar Panel Removal & Water Heater Removal

Estimate Guidance

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and batteries should be confirmed by separating them into “Equipment Costs (Device Costs)” and “Construction Costs.”
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Battery Capacity (kWh)

The installation capacity of solar panels is determined by “the output of one panel (W) × number of panels”, with the unit being kW (kilowatts). The battery is compared in terms of the amount of electricity it can store, represented in kWh (kilowatt-hours).
The amount of kW that can be placed on the roof varies for each house depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram based on the blueprints and on-site survey, and we will present the installation capacity.

On our pricing page, we list the cost of solar panels as approximately 800,000 yen to 1,200,000 yen for 3 to 5 kW, and 1,200,000 yen to 1,900,000 yen for 6 to 10 kW. (These are just approximate amounts and may vary based on the length of wiring, the scope of scaffolding, existing roofing materials, and the layout of the panels.)
▶ Installation Menu | Costs for Solar Panel Installation and Battery Installation

Items to Check in the Estimate (Cost Confirmation)

When comparing estimates, it is common to compare different capacities and equipment based solely on price. Please check if the following items are clearly stated in each company’s estimate!

1. Solar Panels Manufacturer, model number, output of one panel (W), number of panels, total installation capacity (kW) are listed.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls in conjunction with the battery.
3. Battery Manufacturer, model number, capacity (kWh), range usable during a power outage (whole house or specific circuits), installation location.
4. Mounting Frame and Hardware Name of the hardware suitable for the roofing material and the method of securing it (whether it is a method that drills holes or a method that clamps to secure).
5. Wiring and Electrical Work Wiring route and length, work around the distribution board, and whether there is a monitor to check the amount of electricity generated.
6. Roof Reinforcement and Waterproofing Details of waterproofing treatment at the fixed points, and whether necessary roof repairs and substrate reinforcements are included.
7. Applications How much support is included for applications to the power company, certification for selling electricity (FIT), and subsidy applications.
8. Scaffolding Scope and quantity of scaffolding. If it is simultaneous with roof work or exterior painting, check that the same scope and quantity are not double-counted.
9. Removal and Disposal Whether the removal of existing solar thermal water heaters or old panels and the disposal costs of waste materials are included.
10. Tax Classification and Warranty Whether the price is tax-inclusive or tax-exclusive, conditions under which additional costs may arise, and the details and duration of both manufacturer and workmanship warranties.
Tips for Comparison: “Installation Capacity (kW)” and “Equipment Model Numbers” should be aligned for comparison!
If the capacities differ, the price and amount of electricity generated will also change. Kakeru Koumuten welcome comparisons, so if you bring estimates from other companies, we will explain the differences item by item!

Self-Estimate and Profit Simulation for Solar Power Generation

Self-estimation and financial simulation for solar power generation

With the simulator above,
you can obtain a rough estimate and a financial simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can get a rough estimate and financial simulation!
*The simulation results are approximate. Actual financial results may vary depending on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection and replacement.

Customer Feedback

Case Studies of Solar Panel Installations

BEFORE

Metal roof before solar panel installation

AFTER

Roof after solar panel installation

Construction Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh
Base Mounting Hardware Used
 Niigata Manufactured / Aluminum Catch Type Hardware
Fixing Method & Waterproofing Details
 Fixed using catch type hardware gripping the horizontal metal roof (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 *Due to the subsidy being granted, the actual burden amount is approximately 1,000,000 JPY
 Estimated recovery period for construction costs: about 8 to 9 years (self-consumption)

 *The subsidy amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system.
Construction Period
 Approximately 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that subsidies are available, and I would like to know how much will be granted.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels based on the drawings!
The layout diagram shows the arrangement of solar panels on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the subsidy, so we explained it to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Hodogaya Ward, Yokohama

There are many solar panel installation contractors available in Hodogaya Ward, Yokohama, and you may be unsure which one to choose.

Therefore, when requesting solar panel installation and battery storage installation work, let’s confirm the following four points.

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the presence of warranties and after-sales maintenance

● Obtain estimates from multiple contractors (three companies is a guideline)

● Check if they provide support for subsidy applications

By confirming the above four points, you will be able to choose a reliable contractor.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Knowledge about roofs as well as solar panels

Defective installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing

・Solar panels installed on a severely deteriorated roof causing leaks
・Solar panels installed on a roof with a short lifespan, requiring renovations for removal and reinstallation within a few years
・Misjudging the type of waterproofing and incorrect processing leading to leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unforeseen troubles.

▶ Go to “Roof Verification Before Installing Solar Panels” in this article

Confirm the presence of warranties and after-sales maintenance

When choosing a solar installation contractor, let’s confirm the presence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.

Solar panels and battery storage units come with manufacturer warranties, but also check for the presence of installation warranties in case leaks occur after installation!

For contractors that offer installation warranties, if leaks occur after installation, they may be able to respond under the warranty, provided it is within the warranty period and conditions.

Additionally, some contractors offer after-sales service separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Changes or damage on the roof can occur in areas that are not visible, so there is a possibility that customers may not notice them.
By conducting inspections during after-sales maintenance, you can easily prevent major repairs or failures by discovering issues early!

Kakeru Koumuten Co., Ltd. provides a leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, a roof renovation may be required to provide the warranty.)
We also conduct after-sales maintenance and send out annual DM!
If you check the DM and wish to proceed, we will visit you for after-sales maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting solar panel installation, be sure to obtain estimates from multiple contractors.

Even for the same manufacturer and the same work content, costs may vary, and warranties and after-sales services may differ.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request services from your preferred contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates, please check the following:

“Check the items in the estimate”
“Type of solar panel”
“Warranties and after-sales services”

Make sure to compare these details carefully! If the rank of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid judging solely based on price!

▶ Go to “Breakdown of Installation Capacity, Equipment, and Construction Costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Check if they provide support for subsidy applications

There may be subsidies available for solar panel installations and battery installations, but if you make mistakes in the order of procedures or if there are deficiencies in the documents, you may not receive the subsidy.
Some systems, like the housing subsidies in Kanagawa Prefecture, require personal applications and cannot be handled by the contractor, so it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the prefectural housing subsidy, this means obtaining a grant decision) before proceeding with the construction!

For the prefectural housing subsidy, after the construction is completed, you will need to report the results, and after a review, the subsidy will be granted! (The flow of procedures varies by system.)

▶ Go to “Subsidies and Grants That May Be Applicable in Hodogaya Ward” within this article

Benefits of Introducing Solar Power Equipment

The benefits of introducing solar panels are summarized in the following 5 points!

Benefit 1: Economic Advantage

Household Budget Illustration

The biggest advantage of introducing solar panels is the economic benefit!
While the selling price of electricity has decreased compared to ten years ago, you can gain benefits by reducing the amount of electricity purchased from the utility company through self-consumption of generated power!
As electricity prices rise, the ability to cover your consumption with solar power becomes attractive!
If you plan to use the generated power at night, the installation of a storage battery is essential!

For residential use (under 10kW), the selling price (FIT) for electricity will be set at “24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the 5th year, it is generally more advantageous to use it at home (self-consumption) rather than selling it, making the combination with a storage battery a viable option.
👉 Ministry of Economy, Trade and Industry | For purchase prices, periods, etc., click here

Benefit 2: You Can Utilize Subsidies!

Illustration of a Person Happy to Reduce Costs

The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the criteria, you may be able to utilize subsidies!
The reduction of the actual burden amount through subsidies is a significant advantage!
In the case of Hodogaya Ward, subsidies from Yokohama City’s YGrEP and Kanagawa Prefecture may be applicable.

Benefit 3: Environmentally Friendly!

Environmentally Friendly Solar Power Illustration

Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices like power conditioners do have operational noise.)

Benefit 4: Expect Heat Insulation Effects!!

Illustration of heat shielding by solar panels

By installing the panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, it can help reduce the temperature rise of the roof, providing a heat shielding effect!
(Note that this does not improve the insulation performance of the building itself.)

Benefit 5 Use electricity even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it becomes possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capability, you may be able to use electricity from a dedicated outlet during daytime generation.
(Note that the devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Person explaining points to note

Point 1 Maintenance costs can be incurred

A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.

It is reassuring to request a simulation that considers maintenance costs before introducing solar panels!

Point 2 The risk of leaks increases depending on the roofing material

The fixing methods for slate roofs and tile roofs differ by construction method, but in methods that fix hardware with screws to the roofing material or substrate, waterproofing of the fixed parts is crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, replacing the roofing material with a metal roof and fixing the solar panels using the catch method is also an option. (The catch method has compatibility conditions between the roofing material and hardware, and it cannot be used with all metal roofs.)

Base metal fittings for horizontal metal roofsBase metal fittings for horizontal metal roofs

Note 3: The roof becomes heavier

Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing it with a lightweight roof may be one option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “This manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

Choosing Method 1: Compare by Total Output of the Roof

When installing solar panels on the roof, it is important to know how much electricity can be generated in a limited area, and the more electricity generated, the better!

Solar panels come in various sizes and outputs depending on the manufacturer.
A panel with 350W output and a panel with 400W output may seem that the panel with higher output is better at first glance.
However, if the size of the panel does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” leading to different installable quantities on the same roof due to the size difference.

400W × 15 panels = 6kW (total output of the roof)
350W × 20 panels = 7kW (total output of the roof)
As shown above, even if the output of one panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual electricity generation (kWh) will vary depending on conditions such as roof orientation, slope, and shading.

Choosing Method 2: Compare by Degradation Rate of Solar Panels

Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or electricity generation itself.
By not deciding solely based on initial output and considering the degradation rate, you can choose solar panels without regrets!

Choosing Method 3: Compare by Warranty Period

There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding output warranties, some manufacturers offer a 30-year warranty, while others provide a 10-year warranty, so it varies widely!
Since a longer warranty is generally better, let’s check the warranty periods and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar Power and Storage Battery Installation in Hodogaya Ward

We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Hodogaya Ward. (Tap to open the answers)

How much does it cost to install solar panels and storage batteries in Hodogaya Ward, Yokohama City?

The cost varies depending on the installation capacity, equipment, and condition of the roof. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

For guidelines based on capacity, please refer to the solar panel installation and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide you with a free estimate!

Are there any subsidies available for solar power and storage battery installation in Hodogaya Ward?

As of October 6, 2026, the application period for Yokohama City’s YGrEP (15,000 yen/kW for solar power, up to 4kW; 120,000 yen per case for storage batteries) is ongoing (it will end once the budget limit is reached). The Kanagawa Prefecture subsidy (70,000 yen/kW for solar power; 150,000 yen per unit for storage batteries) is approaching the application deadline for the second term of fiscal year 2026, and the national DR household storage battery program has ended its public recruitment.

Since the application status may change, please check the subsidy and grant section and consult with us before signing a contract.

Can I apply for subsidies after the construction is completed?

For many programs, procedures are required before construction. Yokohama City’s YGrEP requires “participation and introduction support application” before installation, and Kanagawa Prefecture’s subsidy requires “start of construction after grant decision,” so if you install first, you will be ineligible.

The order of procedures varies by program, so please confirm before signing a contract or starting construction.

Can solar panels be installed on a slate roof? I’m worried about leaks.

It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The fixing method varies by construction method, and in methods that fix brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.

Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation, and if deterioration is advanced, we can also propose methods such as roof overlay (cover method) or replacement before installation.

My roof is old. Should I do roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed after 10 to 20 years of installation, the cost for removing and reinstalling solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with durable roofing materials before installation.

Please consult us on how to proceed with the installation after confirming the condition of the roof through an on-site inspection!

Is it better to install a storage battery together with solar panels?

If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for surplus electricity will be 8.3 JPY/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.

Additionally, the subsidies in Kanagawa Prefecture require the combined installation of solar panels and storage batteries, and Yokohama City’s YGrEP also requires a combination with storage batteries. You can compare “solar only” and “solar + storage battery” through a financial simulation.

How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram based on the drawings and on-site inspection, and we will provide you with the installation capacity and power generation simulation.

In Hodogaya Ward, there are residential areas with hilly terrain, and the shadows cast by neighboring houses, retaining walls, trees, and elevation differences vary from house to house. You can check the expected power generation through the power generation simulation.

How long does the construction period take?

In the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is done simultaneously or depending on the shape and installation capacity of the roof.

Please note that additional time is required for applications for subsidies and to the power company, so please consult us as soon as possible.

What is the current selling price (FIT)?

For residential use (less than 10 kW), from the certifications after October 2025, the first four years will be 24 JPY/kWh, and from the fifth to the tenth year, it will be 8.3 JPY/kWh, and the same prices will apply in the 2026 fiscal year.

The idea is to recover initial costs more quickly in the first four years and then focus on self-consumption. At Kakeru Koumuten, we provide a financial simulation that takes into account loan interest rates and electricity costs.

Can you handle maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten sends out annual after-maintenance notices via direct mail and visits for inspections upon customer request. We can also clean solar panels using specialized brushes if power generation decreases due to dirt.

Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.

Can you also renovate roofs that already have solar panels installed?

Yes, we can. Kakeru Koumuten can remove and reinstall solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them in a consistent manner. The removed panels can be stored in our own warehouse.

For costs, please refer to the solar panel removal and water heater removal pricing page.

Get a free estimate for solar panels and storage batteries in Hodogaya Ward

Estimates are completely free. We welcome competitive quotes!

If you are looking for a solar panel installation contractor in Hodogaya Ward, please consult Kakeru Koumuten

Our company handles a wide range of exterior renovations, including solar panels, roofing work, and exterior wall work in Hodogaya Ward, Yokohama City.
We receive requests from many customers, including renovation companies and real estate agencies!

Kakeru Koumuten promises “high-quality renovations at low costs”, and we have received positive feedback from numerous customers.
We continue to update our annual construction achievements and strive to improve quality to satisfy even more customers in the future.

Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and exterior cover methods.
We are also happy to assist with small jobs such as partial repairs and rain gutter cleaning!

In urgent cases such as leak repairs, we may be able to provide temporary measures without setting up scaffolding, as long as safety can be ensured, so please consult us!

“I want to know about recommended solar panels”, “I want to keep costs as low as possible”, “I just want an estimate for now”, we will provide the best solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and propose the best construction plans!

We are confident that we will not lose in terms of cost, quality, and organization compared to other companies in exterior construction!
We welcome competitive quotes because we are confident!
Estimates are completely free, and if our company is found to be inferior to others, you are free to decline!

Characteristics of Hodogaya Ward, Yokohama City, and Points for Solar Construction

Hodogaya Ward, Yokohama City, is located in the central part of Yokohama City, covering an area of 21.93 km2.
We have summarized the characteristics of Hodogaya Ward’s terrain and housing situation, as well as points to consider when installing solar panels and storage batteries below. (Tap to open)

View the characteristics of Hodogaya Ward, Yokohama City, and points for solar construction

■ Hilly terrain with many ups and downs, and lowlands along the river

Topography of Hodogaya Ward is characterized by a hilly terrain with many slopes, with the highest point in Imai Town at an elevation of 97.0m and the lowest point in Tenno Town at an elevation of 0.1m. Additionally, the ward’s urban development materials describe the area as consisting of lowland areas along the Kairikawa and Imai rivers, surrounded by three hilly regions, with an elevation difference of 30 to 50m between the lowland and hilly areas, separated by steep slopes (as of the 2017 fiscal year).
In residential areas on hilly terrain, the orientation of roofs, elevation differences, and the shadows cast by neighboring houses, retaining walls, and trees vary from house to house. Kakeru Koumuten Co., Ltd. creates layout diagrams based on blueprints and site conditions, and we confirm through power generation simulations. In areas with slopes and elevation differences, our own scaffolding team plans the scaffolding to fit the site.

■ An Area with Expanding Residential Zones and Remaining Greenery

According to the same materials (as of 2013), about 90% of building uses in the ward are residential or mixed-use facilities, spreading across almost the entire urbanization area. The ward’s main indicators show that the urbanization area ratio is 78.5% (by the end of the 2024 fiscal year), and the green coverage ratio is 29.4% (for the 2019 fiscal year).
In areas with many houses, it is important to check the condition of roofing materials and substrates before installing solar panels. Depending on the condition of the roof, installing them simultaneously with roof renovations can reduce future costs for removing and reinstalling solar panels. In properties close to trees, we also check for dirt from fallen leaves and the effects of shadows.

■ Different Subsidy System for Commercial Buildings like Stores and Offices

When installing on commercial buildings such as stores, offices, or warehouses, there is a different subsidy system than for households. The subsidies for small and medium-sized enterprises and sole proprietors in Yokohama City are accepted until 5:00 PM on October 30, 2026 (first-come, first-served, until budget limits are reached), and there may be cases where certain conditions exclude eligibility.

■ Yokohama’s Annual Sunshine Duration is Approximately 2,018 Hours

The Japan Meteorological Agency’s average values (1991-2020) indicate that Yokohama’s annual sunshine duration is approximately 2,018 hours. Monthly, August has the most sunshine, while June, during the rainy season, has the least.
Power generation varies by season, so conducting annual power generation simulations and selecting battery capacity to match peak electricity usage times are key points.

■ Consideration for Residential Area Rules

In Hodogaya Ward, there are building agreements for Yokohama Nishitani Residential Area, Kamihoshikawa Subdivision, Este Avenue Hodogaya, Mitsuzawa Area, Tokiwadai 166, Tokiwadai Midorigaoka, and Higashi-Totsuka Green Town (7 cases), although the same rules do not apply throughout the entire ward. In areas with agreements related to roof installations, it is necessary to confirm the details in advance.

Our company is based in Yokohama City and handles many exterior construction and solar power projects in Hodogaya Ward, Yokohama City.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us for any sudden troubles!

Service Area in Hodogaya Ward, Yokohama City

Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and Tokyo Metropolis.

List of Areas in Hodogaya Ward, Yokohama City

Shinraicho, Hodogaya Ward / Imaicho, Hodogaya Ward / Iwaicho, Hodogaya Ward / Iwasakicho, Hodogaya Ward / Iwamacho, Hodogaya Ward / Okazawacho, Hodogaya Ward / Kasumidai, Hodogaya Ward / Kaitocho, Hodogaya Ward / Kamadaicho, Hodogaya Ward / Kamayacho, Hodogaya Ward / Kamisugatacho, Hodogaya Ward / Kamihoshikawa, Hodogaya Ward / Karibacho, Hodogaya Ward / Kawashimacho, Hodogaya Ward / Kawabecho, Hodogaya Ward / Kobecho, Hodogaya Ward / Gontazaka, Hodogaya Ward / Sakaiokicho, Hodogaya Ward / Sakaihoncho, Hodogaya Ward / Sakamotocho, Hodogaya Ward / Sakuragaoka, Hodogaya Ward / Shinsakuragaoka, Hodogaya Ward / Setogaya, Hodogaya Ward / Tsukimidai, Hodogaya Ward / Tennocho, Hodogaya Ward / Tokiwadai, Hodogaya Ward / Nishikubocho, Hodogaya Ward / Nishitani, Hodogaya Ward / Nishitani, Hodogaya Ward / Hatsuneko, Hodogaya Ward / Hanamidai, Hodogaya Ward / Higashikawashimacho, Hodogaya Ward / Fujizukacho, Hodogaya Ward / Butsukimukai, Hodogaya Ward / Butsukimukanishi, Hodogaya Ward / Hozen, Hodogaya Ward / Hoshikawa, Hodogaya Ward / Hodogayacho, Hodogaya Ward / Mineokacho, Hodogaya Ward / Minezawacho, Hodogaya Ward / Miyadacho, Hodogaya Ward / Myojindai, Hodogaya Ward / Wada, Hodogaya Ward

Consultations via LINE are also very welcome◎

LINE

LINE

We are also updating our Instagram regularly◎ Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!