[Latest version] We will introduce subsidies and tax reduction systems that can be used for exterior and interior renovation in 2024!

Hello! This is Kakeru Construction! !

Wouldn’t it be great if you could get subsidies and tax breaks for your home’s exterior renovations and be able to reduce your expenses even a little bit?

「I want to do exterior wall painting and roof painting work, but are there any subsidies available from the city?” 」「I want to do interior renovations and plumbing renovations, but are there any subsidies available?」 Yokohama, Kanagawa Prefecture can answer such questions. Here we will introduce subsidies that can be used by those living in the city, as well as subsidies for renovations that can be used in any area with government subsidies! !

Please take a look!

いらすとや

目次

Childcare eco home support project

On September 28th, the children’s eco-housing support project that was held last year has stopped accepting applications and reservations because the subsidy application amount has reached the budget limit.

This year, the Ministry of Land, Infrastructure, Transport and Tourism has newly launched a childcare eco-home support project.

Childcare eco-home support projects are susceptible to rising energy prices
Support of 1 million yen for households with children and young married couples to purchase newly built houses with high energy-saving performance (ZEH level).
By supporting energy-saving renovations of houses, etc.
We will support energy saving investments by households with children and young married couples, etc.
This project aims to achieve carbon neutrality in 2050.

Target people

Those who meet ① and ② below are eligible.

 

①.Those who conclude a construction contract etc. with an eco-home support business and carry out renovation work.

“Eco-home support business” is a person who has registered in advance with this project as a person who handles procedures such as grant application on behalf of the construction orderer and returns the received subsidy to the construction orderer. I am a construction contractor.

※Constructions without a construction contract etc. are not eligible.

 

②.Be the owner of the house to be renovated.

Home owners, etc.
  • Individuals or their families who own and live in a home
  • Individuals or corporations that own housing and rent it out
  • lessee
  • Management association/management association corporation for apartment complexes, etc.

※Purchasing and reselling businesses are also eligible. However, this is limited to cases where the renovation work is ordered to another contractor (there is a construction contract).

Eligible renovation work

This applies to renovation work that falls under ① to ⑧ below.
However, for ④ to ⑧, only if ① to ③ are performed at the same time will be eligible for subsidy *1.
Additionally, construction work for which the total subsidy amount applied for is less than 50,000 yen will not be eligible for subsidy. *2
In addition, when applying, you will need a certificate related to the target construction.

A ①Insulation renovation of openings Either one is required※1 Subsidy is applicable if the total amount of subsidy is 50,000 yen or more※2 Click here for details
②Insulation renovation of external walls, roof/ceiling, or floor Click here for details
③Installation of eco-housing equipment Click here for details
B ④Renovation to accommodate childcare Subsidy only applies if done at the same time as A※1 Click here for details
⑤Disaster prevention upward modification Click here for details
⑥Barrier-free renovation Click here for details
⑦Installation of air conditioner with air purification and ventilation functions Click here for details
⑧Enroll in renovation defect insurance, etc. Click here for details

※ This also applies if the manufacturer of the target product installs the product themselves. *1 As an exception, the grant has been decided in either the “Advanced Window Renovation 2024 Project” implemented by the Ministry of the Environment, the “Water Supply Energy Saving 2024 Project” or the “Rental Collective Hot Water Supply Energy Saving 2024 Project” implemented by the Ministry of Economy, Trade and Industry. If so, it will be treated as including construction that falls under any of ① to ③ above. *2 As an exception, if the grant has been decided in either the “Advanced Window Renovation 2024 Project” implemented by the Ministry of the Environment, the “Water Supply Energy Saving 2024 Project” or the “Rental Collective Energy Saving 2024 Project” implemented by the Ministry of Economy, Trade and Industry. will be eligible for subsidy if the total subsidy amount applied for in the child care eco home support project is 20,000 yen or more.

Examples of renovation projects that are not covered

Renovation works that fall under the following categories are not eligible for subsidy.

  • Work to replace glass installed in part of the door and transom
  • Construction work on parts other than housing such as residential buildings combined with stores, etc.
  • Construction work in which a homeowner, etc. purchases housing equipment and requests a housing business operator to install it.
    (So-called construction work provided by the client or separated from the materials)
  • Construction of windows, glass, and doors in areas other than the exterior skin (partition walls that do not face the outside air)
  • Handrail construction installed outdoors and construction to eliminate outdoor steps
  • Installation work for solar power generation equipment
  • Installation work for household fuel cell cogeneration system (Ene Farm)
  • Installation work for leased equipment
  • Construction using second-hand items

Period covered

Period of construction contract date

The contract date does not matter. This applies to construction contracts concluded before the start of construction.

Construction start date period

From November 2, 2023 to application for grant (at the latest December 31, 2024)

Subsidy amount/subsidy upper limit

Subsidy amount

Total subsidy amount for each target construction content
(Please refer to the details page for each renovation project for the subsidy amount for each target construction project.)

Renovation work performed multiple times

If you perform multiple renovations on the same house, you can apply within the maximum subsidy amount.
However, all subsidy requirements must be met for each application.

Auxiliary upper limit

In principle, the maximum subsidy limit is 200,000 yen per unit.
However, if 4 applies, the subsidy upper limit will be increased.

Increase in subsidy limit

If ① or ② below apply, the subsidy upper limit will be increased as per ③.

① Renovation work carried out by households with children or young married couples on their own residences.
What is a child-rearing household? At the time of application, households with children born on or after April 2, 2005*.
*For construction that starts by March 31, Reiwa 6, after April 2, 2004
What is a young married couple household? are a married couple at the time of application;
Households in which one of the members was born on or after April 2, 1983*. *For construction that starts by March 31, Reiwa 6, after April 2, 1982
 
② When purchasing and renovating an existing house, or when receiving certification as a long-term excellent house (extension/renovation)
③ Increase in the upper limit of subsidy according to ①②
Household attributes Purchase of existing home/presence of long-term quality housing Maximum subsidy amount per unit
Households with children or young married couples When purchasing an existing house*1*2 and renovating it*3 600,000 yen
When receiving certification as a long-term excellent housing (extension/renovation) *4 450,000 yen
When performing renovations other than those listed above*4 300,000 yen
Other households※5 When receiving certification as a long-term excellent housing (extension/renovation) 300,000 yen
When performing renovations other than those listed above 200,000 yen

*1 The sales contract amount must be 1 million yen (tax included) or more. *2 Limited to sales contracts concluded on or after November 2, 2020 (the date of the Cabinet decision on fiscal 2020 economic measures). *3 This applies only when a renovation contract is concluded within three months of the conclusion of the sales contract for a house purchased for the purpose of living in the home. *4 Limited to cases where renovation work is carried out at the residence where the applicant lives. *5 Including corporations and management associations.

Procedure period

Reservation for grant application

From mid-late March 2024 until the budget limit is reached (until November 30, 2024 at the latest)*

Grant application period

From mid-late March 2024 until the budget limit is reached (at least until December 31, 2024)*

*We recommend applying early. *The deadline will be announced depending on the budget execution status. If you have made a reservation for a grant application, you can apply for the grant until the earlier of the reservation deadline or December 31, 2024.

others

Regarding duplication of this subsidy

  • A construction orderer who has received an increase in the upper limit of subsidies for “renovation” for a single house will be required to “build a new custom-built house” or “purchase a new built-for-sale house” again, even if the house is different from the house in question. ” cannot receive subsidies.
  • A construction orderer who has received an increase in the upper limit of subsidies for “renovation” for one house may receive the subsidy for “renovation” for a different house from the concerned house, but ” cannot receive an increase in the subsidy limit.
  • You cannot receive a subsidy for the “new construction of a custom-built home” or the “purchase of a newly built subdivision home” for the same home that has received a “renovation” subsidy.
 

Regarding overlap with the Advanced Window Renovation 2024 Project, the Water Heater Energy Savings 2024 Project, or the Rental Collective Hot Water Heater Energy Savings 2024 Project

Some of the building materials and equipment eligible for “renovation” are also eligible for subsidies under the “Advanced Window Renovation 2024 Project,” “Water Supply Energy Savings 2024 Project,” or “Rental Collective Hot Water Heater Energy Savings 2024 Project.” Both projects can be used together depending on the performance of the target building materials and equipment. (Same construction contract and construction period is also possible)
However, for renovation work that received subsidies under this project, subsidies will be issued in duplicate under the “Advanced Window Renovation Business 2024 Business,” “Water Heater Energy Saving Business 2024 Business,” or “Rental Collective Hot Water Heater Energy Saving Business 2024 Business.” cannot be received.

 

Combined with other subsidies

You cannot receive duplicate subsidies from other national subsidy systems for renovation work that is eligible for the same subsidy. Please note that local government subsidy systems can be used together, except for those that are funded by national funds.

 

Restrictions on property disposal

The construction orderer who received this subsidy project will receive approval from the government or the secretariat for 10 years after the eco-home support business receives the subsidy for the equipment acquired through the subsidy. The property may not be used, transferred, exchanged, loaned, pledged as collateral, or demolished, contrary to the purpose of granting the subsidy. (This does not apply when selling, transferring, or renting a house as a residence.)

 

Storage of accounting documents

The eco-home support business shall clearly separate the expenses required for the subsidy project from other accounting, have a book that records the details of the income and expenditure, organize evidence documents related to the income and expenditure, and maintain these books. and documents must be retained for five years after the end of the fiscal year in which this subsidy was granted.

 

(Excerpt from the child care eco home support project website)

If you would like to see the subsidy amount for other eligible renovations, please see the link below!

Link

In addition to renovations, the Childcare Eco Home Support Project also provides subsidies for the purchase of new custom-built homes and newly built condominiums, so please see the link below.

List of applicable renovation works

Any of the following works from ① to ③ are required, and ④ to ⑧ are only eligible for subsidy if they are performed at the same time as ① to ③. The amount of subsidy will be the total amount of subsidy for renovation work from ① to ⑧.

Target renovation work
① Insulation renovation of openings Any one from ① to ③ is required
② Insulation renovation of exterior walls, roofs/ceilings, or floors
③ Installation of eco-housing equipment
④ Renovation to accommodate childcare Subsidy only applies if done at the same time as ① to ③
⑤ Disaster prevention upward modification
⑥ Barrier-free renovation
⑦ Installation of air conditioner with air purification and ventilation functions
⑧ Enroll in renovation defect insurance, etc.

*Exceptions include the “Project to Promote the Introduction of Advanced Equipment to Improve Housing Insulation Performance” implemented by the Ministry of Economy, Trade and Industry and the Ministry of the Environment, or the “Promotion of Energy in the Household Sector by Promoting the Introduction of High-Efficiency Water Heaters” implemented by the Ministry of Economy, Trade and Industry. If the grant has been decided as “Business Expenses Subsidy”, it will be treated as including construction that falls under any of ① to ③.

Regarding the subsidy amount for insulation renovation of external walls, roofs, ceilings, or floors

Standards for applicable construction work

In principle, non-fluorocarbon products that fall under the following JIS standards, have a thermal conductivity [W/(m・K)] of 0.052 or less, and meet one of the following three types of performance assurance and quality control systems are eligible. is.

Applicable JIS JIS A9504、JIS A9511、JIS A9521、JIS A9523、JIS A9526、JIS A5905、JIS A5901、JIS A5914
performance guarantee and
Quality control system
  1. (1)Products that have obtained JIS certification and display the JIS mark
  2. (2)Items that have not been JIS certified, but have been confirmed by a third party to have the same performance and quality control system as JIS.
  3. (3)Documents proving that self-conformity declaration according to JIS Q1000 or JIS Q17050-1 has been made based on appropriate test methods and number of preliminary test specimens, and that the company has performance and quality control system equivalent to or higher than JIS. etc. (limited to the same degree as confirmation by a third party in (2))
 

Classification of insulation materials

insulation material
classification※1
Thermal conductivity
[W/m・K]
Examples of types of insulation materials
A-1 70.052~0.051
  • Blown-in glass wool insulation material (for ceilings) LFGW1052, LFGW1352, LFGW1852
  • Blown-in rock wool insulation (for ceilings) LFRW2552, LFRW2551, LFRW3051
  • Insulated fiber insulation material (fiberboard) DIB, DIBP
A-2 0.050~0.046
  • Glass wool insulation material (regular product) GW10-48, GW10-49, GW10-50
  • Glass wool insulation material (high performance product) GWHG10-46, GWHG10-47
  • Blown-in glass wool insulation material (for ceilings) LFGW2050
  • Blown-in rock wool insulation (for ceilings) LFRW2547
B 0.045~0.041
  • Glass wool insulation material (regular product) GW12-45, GW16-45, GW20-42
  • Glass wool insulation material (high performance product) GWHG10-43, GWHG10-45, GWHG12-43
  • Rock wool insulation (LA, LB, LC) RWLA, RWLB, RWLC
  • Blown-in rock wool insulation (for ceilings) LFRW2541, LFRW2545, LFRW3045
  • Bead method polystyrene foam insulation material (No. 4) EPS4
  • Polyethylene foam insulation material (Class 1, No. 1, No. 2) PE1.1, PE1.2
C 0.040~0.035
  • Glass wool insulation material (regular product) GW20-40, GW24-38, GW32-36, GW40-36
  • Glass wool insulation material (high performance product) GWHG14-38, GWHG16-37, GWHG16-38, GWHG20-35, GWHG24-35, GWHG24-36, GWHG32-35, GWHG20-36
  • Rock wool insulation RWLD, RWMA, RWMB, RWMC, RWHA, RWHB
  • Insulated fiber insulation material (fiber mat) IM
  • Blown-in glass wool insulation material (for roofs, floors, and walls)
    LFGW2040, LFGW2238, LFGW3240, LFGW3540, LFGW4036, LFGW3238
  • Blown-in rock wool insulation (for ceilings) LFRW2540, LFRW3040, LFRW3039
  • Blown-in rock wool insulation material (for roofs, floors, and walls) LFRW6038
  • Bead method polystyrene foam insulation material (No. 2, No. 3) EPS2, EPS3
  • Extruded polystyrene foam insulation material (1 type) XPS1bA, XPS1bB, XPS1bC
  • Polyethylene foam insulation material (2 types) PE2
  • Blown-in cellulose fiber insulation LFCF2540, LFCF4040, LFCF5040
  • Phenol foam insulation (Class 2 No. 1, Class 3 No. 1) PF2.1A, PF3.1A
  • Phenol foam heat insulation board (3 types, No. 1) PF-B-3.1
  • Sprayed rigid urethane foam for building insulation (Class A 3) NF3
D 0.034~0.029
  • Glass wool insulation material (regular product) GW80-33, GW96-33
  • Glass wool insulation material (high performance product) GWHG20-34, GWHG24-34, GWHG28-33, GWHG28-34, GWHG32-34, GWHG36-32, GWHG38-32, GWHG40-34, GWHG48-33
  • Rockwool insulation RWHC
  • Bead method polystyrene foam insulation material (No. 1) EPS1
  • Extruded polystyrene foam insulation material (2 types) XPS2bA, XPS2bB, XPS2bC
  • Polyethylene foam insulation (3 types) PE3
  • Phenol foam insulation material (class 2, No. 2) PF2.2AⅠ, PF2.2AⅡ
  • Rigid urethane foam insulation material (1 type) PUF1.1
  • Sprayed rigid urethane foam for building insulation (Class A 1, 2) NF1, NF2
E 0.028~0.023
  • Extruded polystyrene foam insulation material (3 types)
    XPS3aA, XPS3bA, XPS3aB, XPS3bB, XPS3aC, XPS3bC
  • Phenol foam insulation material (Class 2 No. 3) PF2.3A
  • Rigid urethane foam insulation material (Type 1, Type 2, Type 3)
    PUF1.2, PUF1.3, PUF2.1A, PUF2.2A, PUF2.2B, PUF2.3, PUF2.4, PUF3.1A, PUF3.1B, PUF3.1C, PUF3.1D, PUF3.2A, PUF3. 2B, PUF3.2C, PUF3.2D
  • Sprayed rigid urethane foam for building insulation (Class A 1H, 2H) NF1H, NF2H
F 0.022 or less
  • Extruded polystyrene foam insulation material (3 types) XPS3aD, XPS3bD
  • Phenol foam insulation (Class 1, No. 1, No. 2, No. 3) PF1.1A, PF1.2C, PF1.2D, PF1.2E, PF1.3B
  • Phenol foam heat insulation board Class 1 No. 2 PF-B-1.2
  • Rigid urethane foam insulation material (2 types) PUF2.1B, PUF2.1C, PUF2.1D, PUF2.1E, PUF2.2C, PUF2.2D, PUF2.2E, PUF2.2F
  1. *1 Among the polystyrene foam sandwich rice straw tatami mats specified by JIS A 5901:2018, PS-C25 and PS-C30, and among the construction material tatami mats specified by JIS A 5914, KT-II and KT-III , KT-K (Type 1 b*2), and KT-N (Type 1 b*2) will be treated as insulation material categories similar to insulation material categories A-1 to C. Additionally, KT-K (Type 3 b*2) and KT-N (Type 3 b*2) will be treated as the same insulation material classification as insulation material classification D. However, if there is no description of the type of extruded polystyrene foam insulation material, it shall be treated as the same insulation material category as insulation material categories A-1 to C.
  2. *2 Indicates the type of extruded polystyrene foam insulation material specified by JIS A 9521:2022.

Subsidy amount for each target construction content

For renovations that use more than the minimum amount of insulation material for each part of the exterior wall, roof, ceiling, or floor after renovation, the subsidy amount shown in the table below will be applied.

classification construction part   Minimum amount of insulation material used (unit: m3 (cubic meter)) Subsidy amount per unit
Classification of insulation material *1 A-1/A-2/B/C D/E/F
Thermal conductivity (unit: W/m・K) 0.052〜0.035 0.034 or less
Housing type Detached houses communal housing Detached houses communal housing
Energy saving standard level outer wall   6.0 1.7 4.0 1.1 112,000 yen
For partial insulation *2 3.0※3 0.9 2.0※3 0.6 56,000yen
roof/ceiling   6.0 4.0 3.5 2.5 40,000yen
For partial insulation *2 3.0 2.0 1.8 1.3 20,000yen
floor   3.0 2.5 2.0 1.5 72,000yen
  (For basic insulation) 0.9 0.375 0.6 0.225
For partial insulation *2 1.5※4 1.3 1.0※4 0.8 36,000yen
  (For basic insulation) 0.45 0.195 0.3 0.12
ZEH level outer wall   11.0 3.1 7.0 1.9 151,000yen
For partial insulation *2 5.5※3 1.6 3.5※3 1.0 75,000yen
roof/ceiling   12.0 8.0 8.0 5.7 54,000yen
For partial insulation *2 6.0 4.0 4.0 2.9 27,000yen
floor   6.0 5.0 3.0 2.3 96,000yen
  (For basic insulation) 1.8 0.75 0.9 0.345
For partial insulation *2 3.0※4 2.5 1.5※4 1.2 48,000yen
  (For basic insulation) 0.9 0.375 0.45 0.18
  1. *1 When using both insulation material classifications “A-1” to “C” and insulation material classifications “D” to “F”, the insulation material classifications “D” to “F” are used when calculating the amount of insulation material used. It can be calculated by multiplying the usage amount of ” by 1.5 and adding it to the usage amount of insulation material classifications “A-1” to “C”.
  2. *2 “Partial insulation” refers to the case where more insulation material is used than the amount of insulation material used for partial insulation shown in the table above.
  3. *3Includes partition walls.
  4. *4 If the ceiling other than the top floor is insulated, the minimum amount of insulation material used for the “floor” will apply.
 
(Excerpt from the child care eco home support project website)

 

point!

Our company, Sho Construction Co., Ltd., will become a registered business in the child care eco home support business! A registered business operator is a business operator that has been registered in advance with the secretariat as a subsidy business operator who will carry out procedures for this project on behalf of those eligible for subsidy!

 

Advanced window renovation 2024 project/Water supply energy saving 2024 project

Continuing from last year, these two projects will be part of the same campaign as the childcare eco home support project!

Advanced window renovation 2024 project

This project provides focused support at a high subsidy amount for renovations that involve replacing windows with advanced insulation performance.

Those eligible for assistance

Those who meet the following 12 criteria will be eligible for assistance.

1.Signing a construction contract with a window renovation business and carrying out window renovation work.

A “window renovating business” is a construction company that is registered with the secretariat as a person who processes the grant application on behalf of the subsidy recipient, receives the grant, and returns the granted subsidy to the subsidy recipient. etc.

  • ※Construction work for which a construction contract, etc. has not been concluded is not covered.
  • ※Window renovating businesses can be registered by registering as a housing energy saving support business for the Housing Energy Saving 2024 Campaign and declaring their participation in this project.
2.Be the owner of a home undergoing window renovation work

Home owners, etc.

  • Individuals or their families who own homes
  • Individuals or corporations that own housing and rent it out
  • lessee
  • Management association/management association corporation for apartment complexes, etc.
  • Purchasing and reselling businesses are also eligible. However, this is limited to cases where the renovation work is ordered to another contractor (there is a construction contract).

Housing eligible for subsidies

What is housing?

In this project, housing refers to houses used for human residence.

  • ※In principle, windows in buildings and rooms that fall under the following categories are not eligible for assistance:
    1. Classified as non-residential use in real estate registration and fixed asset taxation
    2. (Even if ① is a residence) It is actually used for purposes other than residences (stores, facilities, etc.)

The subsidy applies to renovation work performed in 1 below, and the products eligible for subsidy and the subsidy amount vary depending on 2.

1.Existing house

Existing house

As of the date of the construction contract for renovation work, this refers to a house that has been constructed* for one year, or a house that has been inhabited in the past (including houses that are currently occupied).

  • ※In this project, the “construction date” is, in principle, the date on which the inspection certificate is issued.
2.Regardless of the floor on which it is located, it will be classified according to the construction method as shown in the table below.

Detached houses

1.A building with separate housing units

housing complex※

 

A building where multiple residential units or areas for purposes other than housing (stores, warehouses, etc.) coexist.

low-rise apartment complex

Apartment complex with 3 floors or less above ground

Mid-to-high rise apartment complex

Apartment complex with 4 or more floors above ground

  • ※Includes two-family houses, condominiums, row houses, and houses with shops.

Target construction

Construction that satisfies 12 below and does not fall under 3 will be eligible for assistance.

1.Renovations using target products that fall under the table below

“Target products” are products for which the manufacturer has applied for registration and the secretariat has confirmed that they meet certain performance criteria.
The manufacturer issues a “performance certificate” that describes the product’s performance and size.

Construction details

glass replacement

Work that involves removing only the glass from existing windows and replacing them with double-glazed glass, etc., using the existing sash as is.

 

  • *Replace only the shoji frame (glass + frame), do not replace the frame.
    Or, even if new installation is not required, it will be treated as glass replacement.

 

Interior window installation

Construction work that involves installing a new inner window inside an existing window, or removing an existing inner window and replacing it with a new inner window.

 

  • *Limited to those that are installed parallel to the interior side within 50cm from the opening surface of the existing exterior window (door) located on the outer skin.

 

exterior window replacement

Cover method

Work that involves removing the glass from an existing window, installing a new window frame over the existing window frame, and replacing it with double-glazed glass, etc.

chisel construction method

Work to remove existing window glass and window frames, install new window frames, and replace with double-glazed glass, etc.

door replacement

Cover method

Construction work that involves removing the existing door leaving behind the frame, installing a new frame over the existing frame, and replacing the door.

chisel construction method

Work that involves removing the existing door frame, installing a new frame, and replacing the door.

 
  • *Replacement of doors (including inner windows for doors) is under the same contract as other window construction, and will only be eligible for subsidy under this project if applied at the same time.
  • *Limited to installation work at openings in houses that are in contact with the outside air.
  • *This also applies if the manufacturer of the target product installs the product themselves.
2.The subsidy amount is 50,000 yen or more

The amount of subsidy varies depending on the content of the work, how the house is built, and the performance and size of the target product.

  • *Even if multiple windows are being constructed and the application is made separately for this project and the child care eco home support project, the subsidy amount applied for this project alone must be 50,000 yen or more. (The subsidy amount for both projects cannot be combined)
  • *Even if multiple eligible products are installed in the same opening, only one product will be eligible for the subsidy and can be included in the subsidy amount.
3.Examples of renovation projects that are not eligible for subsidies

Construction works that fall under the following conditions are not eligible for subsidy.

  • ×Construction work where the expenses required for the subsidized project are less than the subsidy amount
  • ×Replacement work for windows (glass) and doors that do not face the outside air
    (Door replacement in apartment complexes where the entrance faces an internal hallway, etc.)
  • ×Construction work to replace glass that forms part of the door panel
  • ×Construction work for which only the replacement of the door (including the inner window for the door) is eligible for assistance.
  • ×Construction work that is not under the same contract as the window when replacing a door (including the inner window for the door)
  • ×Construction work performed on buildings, rooms, and plots that are used for purposes other than housing.
  • ×Construction work in which a homeowner, etc. purchases housing equipment and requests a housing business operator to install it.
    (So-called construction work provided by the client or by material separation)
  • ×Installation work for leased equipment
  • ×Construction using second-hand items

Period covered

1.Construction start period

From November 2, 2023 to December 31, 2024 at the latest

What is the start of construction?

This refers to the start of the first construction work included in the concluded construction contract. (This is not limited to window construction that is eligible for assistance)

  • ※If construction begins before the construction contract is signed, it will not be eligible for subsidy.
  • ※Deadlines will be announced depending on the budget limit. The application for grant can be submitted after the construction is completed.

Subsidy amount/subsidy upper limit

1.Subsidy amount

The total amount of the subsidy amount according to the target construction work performed for each opening will be the amount applied for.

Construction details

glass replacement

The amount of subsidy will be determined based on the performance, size and combination of the sash of the target product.
If multiple pieces of glass are replaced in one window, each glass will be eligible for assistance.

Interior window installation

The amount of subsidy will be determined depending on the performance and size of the target product.

exterior window replacement

Cover method

The amount of subsidy will be determined depending on how the building is constructed and the performance and size of the target product.

chisel construction method

The amount of subsidy will be determined depending on how the building is constructed and the performance and size of the target product.

door replacement

Cover method

The amount of subsidy will be determined depending on how the building is constructed and the performance and size of the target product.

chisel construction method

The amount of subsidy will be determined depending on how the building is constructed and the performance and size of the target product.

2.Auxiliary upper limit

The upper limit is 2 million yen per unit.

3.Renovation work performed multiple times

Even if you perform multiple renovations on the same house, you can apply within the maximum subsidy amount.
However, all subsidy requirements must be met for each application.

Grant application period

From mid-late March 2024 until the budget limit is reached
(Until December 31, 2024 at the latest) *1 *2

  • *1 Deadlines will be announced according to the budget limit.
  • *2 Bulk applications for apartment complexes are scheduled to begin in May 2024.

others

1.Combined use with childcare eco home support project

All products eligible for this project are also eligible for subsidies under the child care eco home support project, but some products eligible for the child care eco home support project are also partially eligible for subsidy under this project.
Both businesses can be used together depending on the performance of the product. (The same construction contract and construction period are also possible)

However, even if windows (glass) and doors are eligible for subsidy under both projects, a single window cannot receive subsidy under both projects.
Additionally, even if multiple subsidized windows (glass) or doors are installed in the same opening, you can apply for subsidy for only one of the windows through both projects.

Please be aware that in the unlikely event that you make a duplicate application for the Childcare Eco Home Support Project, regardless of the reason, your application for this project will be invalidated, and measures such as cancellation of the grant decision and refund will be taken. please.

(Excerpt from the website dedicated to the Advanced Window Renovation 2024 project)

For more information, please visit the dedicated website for the Advanced Window Renovation 2024 project!

 

Hot water supply energy saving 2024 project

This is a business that focuses on supporting the installation of high-efficiency water heaters with particularly high energy-saving performance.
 

budget

58 billion yen

  • ※Of this amount, 4 billion yen is planned to be subsidized for the removal of electric water heaters and thermal storage heaters.

Subsidy target

A project that installs high-efficiency water heaters in the following homes, regardless of whether they are single-family homes or apartment buildings*1
(In both cases, this includes the use of leases)

House to be installed

Target audience

Newly built custom home

home builder

Newly built condominium housing

home buyer

Existing house (renovation)

Construction orderer *2

Existing house (purchase) *3

home buyer

  • ※1 Excludes projects that received subsidies in the hot water supply energy conservation project (Supplementary Budget No. 2 for FY2020) (including cases where subsidies were returned).
  • ※2 Purchasing and reselling businesses are not eligible.
  • ※3 If the seller purchases an existing home on the condition that the water heater be replaced, the purchaser will be eligible for the subsidy.
    (This must be confirmed in the real estate sales contract or special agreement)
    Please note that even if you purchase an existing home that has unused eligible equipment installed, it will not qualify for the subsidy as it does not fall under the category of equipment replacement.

Subsidy amount and maximum amount

Subsidy the total amount of subsidies from ① to ③ below.

① Basic amount

A fixed amount is subsidized according to the high-efficiency water heater installed.

  • ※Water heaters eligible for subsidy are limited to those that meet the performance requirements for each device.

Water heater to install

Subsidy amount
(Basic amount)

Auxiliary upper limit

heat pump water heater
(Ecocute)

detail

80,000 yen/unit

Detached house: up to 2 units
Apartment housing, etc.: Up to 1 unit

Electric heat pump/gas instantaneous type
Combined water heater (hybrid water heater)

detail

100,000 yen/unit

household fuel cell
(Ene Farm)

detail

180,000 yen/unit

② Performance additional amount

If the water heater in ① meets higher performance requirements (A to C), a fixed amount will be subsidized according to the performance.

  • ※A to C are limited to those that meet the performance requirements for each water heater or accessory device eligible for subsidy.

Water heater to install

Additional requirements

Subsidy amount (additional amount)

either

both

heat pump water heater
(Ecocute)

detail

A

20,000 yen/unit

50,000 yen/unit

B

40,000 yen/unit

Electric heat pump/gas instantaneous type
Combined water heater (hybrid water heater)

detail

A

30,000 yen/unit

50,000 yen/unit

B

30,000 yen/unit

household fuel cell
(Ene Farm)

detail

C

20,000 yen/unit

③ Additional amount for removal

If the following removal work is performed in conjunction with the installation of the water heater in ①, a fixed amount will be subsidized according to the work.

Construction details

Subsidy amount (additional amount)

Auxiliary upper limit

Removal of thermal storage heater

100,000 yen/unit

Up to 2

Removal of electric water heater

50,000 yen/unit

Up to the number of vehicles receiving assistance in ①

  • ※This additional measure will be implemented with a budget of 4 billion yen, and is scheduled to end as soon as the budget is reached.
  • ※This is limited to renovation work that will be removed after November 2, 2023 due to the installation of a high-efficiency water heater (if you receive assistance for a high-efficiency water heater in the child care eco-home support project, you will not receive an additional charge for removal. yeah). You will also need to apply at the same time as applying for a grant for installing a high-efficiency water heater.
  • ※Please note that the removal of EcoCute is not subject to addition.
  • ※Due to the removal of storage heaters, etc., the electricity rate menu in your contract may change. For more information, please contact your electric power company.

Application category and registered business operator

In principle, each subsidy business operator* according to the application category below will handle procedures such as grant applications.

  • ※You must first register as a hot water energy saving business.

Application category

House to be installed*1

contract

Subsidized business operator

Purchase/construction

Newly built custom home

Construction contract

Construction business operator (construction contractor)

Newly built condominium housing

real estate sales contract

Sales entity (including sales agents)

Existing house
(renovation)

Construction contract

Construction contractor (construction contractor)

Existing house (purchase)

real estate sales contract

Sales entity (including sales agents)

Lease use*2

Newly built custom home

Lease contract
(lease contract)

Conclude a lease contract with the consumer
Lease operator

Newly built condominium housing

Existing house
(renovation)

  • ※It doesn’t matter if it’s a single-family house or an apartment complex. same as below.
  • ※2 Click here for leases eligible for subsidies under these two projects.

Construction start date and grant application period

The definition of the construction start date, the grant application, and the time when it is possible to make a reservation for the grant application are as follows:

Purchase/construction type

House to be installed

Construction start date

Reservations can be made for later

It is possible to apply for subsequent issuance.

Newly built custom home

Construction start date

Construction start date

Handover of house

Newly built condominium housing

House handover date

Conclusion of real estate sales contract

Existing house
(renovation)

Water heater installation start date
(1st unit)

Overall contract work
Start date

Delivery of construction work or
When the joint venturer starts using the water heater, whichever comes first

Existing house (purchase)

House handover date

Conclusion of real estate sales contract

Handover of house

Lease usage type

House to be installed

Construction start date

Reservations can be made for later

It is possible to apply for subsequent issuance.

Newly built custom home

House handover date

Conclusion of lease contract

Handover of house

Newly built condominium housing

Existing house
(renovation)

Water heater installation start date
(1st unit)

Delivery of construction work or
When the joint venturer starts using the water heater, whichever comes first

How to return subsidies

Registered business operators will return the granted subsidy in a manner agreed upon in advance with the recipient of the subsidy.

either

  1. ① Method of appropriating the money to contract fees related to subsidized projects
  1. ②How to pay with cash
  • ※In the case of lease use, this includes offsetting against the lease fee for a certain period of time.

Target period

・Contract period

Before construction start date

・Construction start period

After November 2, 2023

  • ※If there is any doubt about the construction start date, the project may be subject to additional investigation.

・Grant application period

From mid-late March 2024 until the budget limit is reached
(Until December 31, 2024 at the latest) *1 *2

  • ※1Deadlines will be announced depending on the budget limit.
  • ※2 Bulk applications for apartment buildings, etc. are scheduled to begin in May 2024.

Schedule (planned)

・Announcement of target products

Late February 2024

・交付申請の開始

Mid-late March 2024*1

  • ※1 Bulk applications for apartment buildings, etc. are scheduled to begin in May 2024.
    (Excerpt from the website dedicated to the hot water supply energy saving 2024 project)

 

Nursing care renovation subsidy

I would like to talk about subsidies for nursing care renovations that can be used by people in any region if the conditions are met, and about the tax reduction system that can be received by people living in Kanagawa Prefecture who have carried out barrier-free renovation work. Masu.

Japan is experiencing a declining birthrate and aging population. The Japanese government is promoting home care for those who require physical care and support in their daily lives, as medical costs are increasing due to the large number of elderly people and many people wish to receive treatment at home. For those who renovate their homes for nursing care purposes, we provide subsidies for renovation costs using public long-term care insurance.

We will also introduce the target construction work and how to apply, so if you are considering nursing care renovation or are planning to do it someday, please take a look!

Elderly housing renovation cost subsidy system

This is a system that allows you to receive subsidies for nursing care renovation using nursing care insurance.

This system emphasizes home care, and from the perspective of supporting the independence of elderly people, benefits are provided for home renovations such as eliminating steps and installing handrails that are necessary when introducing welfare equipment.

Type of target construction

1)Installing the handrail

2)Eliminating the level difference

3)Changing the material of floors or walkway surfaces to prevent slipping and facilitate movement, etc.

4)Replacing doors with sliding doors, etc.

5)Replacing the toilet with a Western-style toilet, etc.

6)Other home renovations that are necessary in conjunction with the housing renovations listed in the previous items.

Payment limit standard amount

200,000 yen for life (fixed amount regardless of whether nursing care is required or required)

・Insurance benefits are basically 90% (up to 180,000 yen), 80% (up to 160,000 yen) and 70% (up to 140,000 yen) depending on income

It is possible to apply multiple times as long as the amount is within the limit.

・When the level of need for nursing care increases (increases by three levels), or when a person moves, the standard payment limit will be set again to 200,000 yen.

Application procedure flow

Consult with care manager

     ⇩

Selection of construction contractor/request for quotation

     ⇩

Apply to the municipality before construction

     ⇩

Municipalities check the contents and report the results.

     ⇩

Construction of renovation work⇨Completion/Payment to contractor

     ⇩

Apply to the municipality for payment of repair costs after construction

     ⇩

Determining and paying the amount of housing renovation expenses

Documents to be submitted at the time of advance application

①Payment application form ② Construction cost estimate ③ Statement of reasons why home renovation is necessary * ④ Documents that show the expected completion status after the home renovation (dated photo or floor plan of the home, etc.)

*Creator of the statement of reasons: Nursing care support specialist, community comprehensive support center staff, occupational therapist, welfare environment coordinator certification test level 2 or higher, or other equivalent qualifications.

Documents to be submitted at the time of subsequent application

⑤Receipts for the costs required for home renovation ⑥ Construction cost breakdown 7. Documents that can confirm the condition of the home renovation after completion (photographs of before and after renovation for each location such as toilet, bathroom, hallway, etc., as a general rule) ⑧ Letter of consent from the owner of the home (if the owner of the renovated home is not the user)

※However, if there are unavoidable circumstances, ① and ③ can be submitted after the home renovation is completed.

If you would like to see more details, please visit the Ministry of Health, Labor and Welfare’s homepage!

 

Can I get a tax reduction if I do nursing care renovation (barrier-free renovation work)?

Kanagawa Prefecture Fixed asset tax reduction system for houses that have undergone barrier-free renovation work

In order to support the barrier-free renovation of houses, certain barrier-free renovation work has been carried out by March 31, Reiwa 6, and the location of the house must be located within three months from the date of completion of the renovation. Only those who report to the ward office tax division house office in their ward will receive a one-third reduction in the fixed asset tax amount for the house in the year following the completion of renovation work.

Contents of reduction

The fee will be reduced for up to 100m2 of eligible floor space. (No reduction will be made for areas exceeding 100m2.)

It is possible to apply this fee at the same time as other reduction systems, so please contact the housing section of the tax department of the ward office where the house is located.

A reduction under this system can only be applied once per household.

Requirements for reduction

①The house must be more than 10 years old since it was newly built.

②The floor area of the house is 50 m2 or more and 280 m2 or less

③At the time of filing, one of the following persons must reside (residency requirements)

A. Those who are 65 years of age or older as of January 1 of the year following the date on which the renovation work is completed.

B. Those who have received “certification of need for long-term care” or “certification of need for support”

C. Persons with disabilities

④The following applicable construction work is carried out, and the out-of-pocket expense excluding subsidies, etc. is over 500,000 yen.

・Wide the hallway

・Reducing the slope of stairs

・Bathroom improvements

・Improvement of toilets

・Installing handrails

・Elimination of floor differences

・Replacement with sliding door

・ Anti-slip floor surface

⑤The report must be filed within three months from the date of completion of the barrier-free renovation work to the ward office tax department housing section of the ward where the house is located.

・Rental housing is not eligible. Additionally, the proportion of the residential area must be at least 1/2.

– In the case of a sectional ownership house, the floor area of the exclusive area shall be 50 m2 or more and 280 m2 or less. It also covers renovation work on proprietary areas. (Does not apply to shared areas)

We introduced nursing care renovation subsidies that can be used by families that meet the conditions, and a fixed asset tax reduction system that can be used by people living in Kanagawa Prefecture.

If you are interested, please consult your local homepage or care manager and take advantage of it!

*Applications are now closed*〈Yokohama City〉 Subsidy for renovation of vacant houses, etc.

The Vacant House Renovation Subsidy is a system that provides subsidies for renovating vacant houses as community contribution facilities or homes for families raising children, with the aim of promoting distribution and utilization of vacant houses.

Target area

Entire Yokohama City

Buildings eligible for assistance

An earthquake-resistant detached house located in Yokohama that has been vacant for over a year.
*If the building is not earthquake resistant, it will be retrofitted to make it earthquake resistant.

Construction details eligible for subsidy and subsidy amount

If A and B are taken together, up to 2.5 million yen will be subsidized.
*For child-rearing residences, B can only be used in conjunction with A.

  Target expenses Subsidy amount
Local contribution type A: Interior and exterior renovation work aimed at transforming the facility into a “facility that contributes to regional revitalization.”
B: Earthquake retrofitting work
A: 1/2 of the total expenses (up to 1 million yen)
B: 1/2 of the total expenses (up to 1.5 million yen)
Local contribution [simple repair] type a: Interior and exterior renovation work, earthquake-resistant shelter installation work, and exterior construction work aimed at renovating the facility into a “facility that contributes to regional revitalization.”
b: Construction material costs when purchasing materials and carrying out renovations to “facilities that contribute to regional revitalization” (so-called DIY)
1/2 of the total expenses (maximum 1 million yen: total amount of a and b)

 

Application deadline

Registration ends when the budget amount is reached.

<Yokohama City> Summary of subsidy system for renovation of vacant houses, etc.

Local contribution type

Target area Entire Yokohama City
Subsidy recipients *Either ① or ② below

 

① An organization that is organized by citizens (including those currently working or attending school) and that citizens freely participate in and continuously operate.
Example) Neighborhood association, NPO organization, etc.

② Business entity renting the vacant house (must not be in arrears with city taxes and not a violent organization as stipulated by the Yokohama City Organized Crime Exclusion Ordinance)

Buildings eligible for assistance 1) Single-family houses (including mixed-use houses) existing in Yokohama City
2) Property that has not been occupied or otherwise used for more than one year from the time of application
3) Those that do not violate the Building Standards Act and are not certified as specified vacant buildings, etc.
4) Items that are earthquake resistant, and if not earthquake resistant, use this subsidy, etc. to undergo earthquake retrofitting.
5) The owner of the vacant building has agreed to renovate the building and waive the obligation to restore it to its original condition.
etc
Construction details eligible for subsidy

A. Interior and exterior renovation work (including barrier-free construction) with the aim of transforming the facility into a “facility that contributes to regional revitalization”

B. Earthquake retrofitting work

Subsidy amount

A. 1/2 of the total (up to 1 million yen)

B. 1/2 of the total (up to 1.5 million yen)
*In order to ensure cost appropriateness for seismic retrofitting work, the following subsidy limit unit prices have been established.
①Foundation work: 72,700 yen/m
② Load-bearing wall construction: 72,500 yen/m
③Roof construction: 12,100 yen/㎡

*A and B can be used together.
*If you do A and B together, you will receive up to 2.5 million yen in subsidy.

reference [Local contribution type] Subsidy for renovation of vacant houses (Yokohama City official website)

childcare housing type

Target area Entire Yokohama City
Subsidy recipients

*Either ① or ② below

① If you newly acquire a vacant house and move in from outside the city, or
Households with children *1 or young households *2 that relocate from the city due to household separation

② Businesses that rent out vacant houses only to households with children or young married couples who are moving from outside the city or moving from the city due to household separation.

*1 Households with children under 18 years old or pregnant people at the time of application
*2 At the time of application, the total age of the couple (including those who are de facto married, those who have booked their marriage, those who have sworn an oath based on the Yokohama City Partnership Oath Handling Guidelines, and those who intend to do so) must be under 80 years of age.

Buildings eligible for assistance 1) Single-family houses (including mixed-use houses) existing in Yokohama City
2) Property that has not been occupied or otherwise used for more than one year from the time of application
3) Those that do not violate the Building Standards Act and are not certified as specified vacant buildings, etc.
4) Items that are earthquake resistant, and if not earthquake resistant, use this subsidy, etc. to undergo earthquake retrofitting.
etc
Construction details eligible for subsidy

A. Renovation work that contributes to ensuring the safety of children and improving the efficiency of housework and childcare.

B. Earthquake retrofitting work

Subsidy amount

A. 1/2 of the total (up to 1 million yen)

B. 1/2 of the total (up to 1.5 million yen)
*In order to ensure cost appropriateness for seismic retrofitting work, the following subsidy limit unit prices have been established.
①Foundation work: 72,700 yen/m
② Load-bearing wall construction: 72,500 yen/m
③Roof construction: 12,100 yen/㎡

*B can only be used in combination with A.
*If you do A and B together, you will receive up to 2.5 million yen in subsidy.

reference [Childcare housing type] Subsidy for renovation of vacant houses (Yokohama City official website)

(*Excerpt from Yokohama City website)

Block wall improvement subsidy (block wall improvement project)

Subsidies for “block wall improvement projects” will be available in 2024 as well. Continuing from last year, the subsidy limit has been increased by 200,000 yen from 2021, so if you are thinking of renovating your block wall, this is your chance to use the subsidy to do so at a good price.

The “Block Wall Improvement Project” is a subsidy system that subsidizes a portion of the cost of improving dangerous concrete block walls facing roads, etc.
Block walls that do not meet the standards are at risk of collapsing due to earthquakes, etc., leading to accidents.
Additionally, the owner of the block wall may be held responsible for the accident, so inspections and improvements are extremely important to ensure safety.

Target area

Entire Yokohama City

Subsidy recipients

Owner or manager of block walls, etc.

Block wall to be subsidized

Block walls, etc. with a height of 1m or more that face roads, etc. and are likely to collapse during an earthquake.

*“Block walls, etc.” refers to concrete block walls, concrete walls, masonry walls, permanent walls, and other similar walls.
*The risk of collapse will be determined by a city official or an expert commissioned by the city checking the site after receiving a preliminary consultation.
* “Roads, etc.” refer to roads under the Road Act, roads stipulated in Article 42 of the Building Standards Act, open spaces stipulated in Article 43, Paragraph 2, and other similar items approved by the mayor.

Construction details eligible for subsidy

[Removal work]
Construction work that basically removes all block walls, etc. facing roads, etc.
[New construction]
Construction of lightweight fences (net fences, aluminum fences, and other similar fences, with conditions such as the height of the foundation) or construction of new hedges (for roads with a width of less than 4 m), which is carried out in conjunction with the removal of block walls, etc. (not applicable)

Subsidy amount

Upper limit: 500,000 yen (upper limit for removal work and new construction work combined)

Application deadline

*You can apply for the preliminary consultation necessary for granting the subsidy.

Although the 5th year has ended, applications for this year’s subsidy are scheduled to start from April onwards.

(As of the end of January 2020)

Summary of “Block wall improvement subsidy system”

Target area Entire Yokohama City
Subsidy recipients Owner or manager of block walls, etc.
Block wall to be subsidized

Block walls, etc. with a height of 1m or more that face roads, etc. and are likely to collapse during an earthquake.

*“Block walls, etc.” refers to concrete block walls, concrete walls, masonry walls, permanent walls, and other similar walls.
*The risk of collapse will be determined by a city official or an expert commissioned by the city checking the site after receiving a preliminary consultation.
* “Roads, etc.” refer to roads under the Road Act, roads stipulated in Article 42 of the Building Standards Act, open spaces stipulated in Article 43, Paragraph 2, and other similar items approved by the mayor.

Construction details eligible for subsidy Removal work: In principle, all block walls facing roads, etc. are removed.
New construction work: Construction work of lightweight fences, etc. (net fences, aluminum fences, and other similar fences, with conditions such as the height of the foundation) or new hedges (with a width of less than 4 m), carried out in conjunction with the removal of block walls, etc. (Does not apply to roads, etc.)
Subsidy amount

Upper limit: 500,000 yen (upper limit for removal work and new construction work combined)

*The amount of subsidy varies depending on the length of the fence, etc.
●Less than 10m 300,000 yen
●10m to less than 20m 400,000 yen
●Over 20m 500,000 yen

[Removal work]
The lesser of 9/10 of the construction cost to be subsidized or the amount multiplied by length x 13,000 yen/m

[New construction]
1/2 of construction cost eligible for subsidy
or
When constructing a new foundation…Length multiplied by 37,000 yen/m
When using an existing foundation: Length multiplied by 18,000 yen/m
When installing a hedge…Amount calculated by multiplying the length by 13,000 yen/m
whichever is the lower amount

Application deadline *Before applying for a subsidy, it is necessary to have a preliminary consultation, conduct a field survey, etc., and receive a response.
reference Block wall improvement project (Yokohama City official website)

(*Excerpt from Yokohama City website)

 

*Applications are now closed *Energy-saving housing relocation subsidy system

By subsidizing a portion of the costs required for households with children to relocate to energy-efficient housing with the highest level of insulation performance, we aim to promote the spread of housing with higher energy-saving performance and the distribution of vacant houses. This will help encourage people raising children to move and settle in the city.

1 Overview of the subsidy system (households eligible for subsidy, main requirements for subsidy, subsidy amount, etc.)

1-1Households eligible for subsidy

One of the following households *2:

  • Households with children (age under 18 years old as of April 1, 2023, i.e. children born on or after April 2, 2005) at the time of application.
  • Households where the couple is a married couple*1 at the time of application, and one of the members is 49 years old or younger as of April 1, 2023.

*1 Persons who have not registered their marriage but are in a similar situation to a de facto marriage, those who have booked a marriage, based on the “Guidelines for Handling the Yokohama City Partnership Oath” (established on November 13, 2019) Includes those who have taken an oath or declaration and those who intend to do so. However, those making reservations for marriage must be married at the time of reporting.
*2 Relocation to a two-family home (for example, a case where three generations live together) depends on the conditions, so please consult with us in advance.

1-2Main requirements for assistance

A. Relocating to one of the following residences *1,2

対象住宅の要件
  requirements detail

Newly built type

Houses with energy-saving performance of insulation performance class 6 or 7

(1) It must be a newly built house within the city.
(2) It must have an energy-saving performance of 6 or 7 of the insulation performance class (the insulation performance class according to the Japanese Housing Performance Indication Standards).

(3) The residence must be located outside the landslide special warning area.

Renovation type

A house in which all openings such as windows have been insulated (ZEH level or higher) and comply with the new earthquake resistance standards *3

(1) It must be an existing residence within the city.
(2) Of the insulation renovation of openings stipulated in Children’s Eco Home Support Project Subsidy Grant Outline No. 4, Item 2, renovation work must be carried out to meet ZEH level energy saving performance. However, this does not apply to products that already meet ZEH level energy saving performance.

(3) The building must have earthquake resistance.

*1 Register the preservation or transfer of ownership of the new residence by March 31, 2024. Ownership must be held by the members of the subsidized household who are moving into the eligible housing.
*2 Resident registration notifications must be submitted for all members of the subsidy eligible household between April 1, 2023 and March 31, 2024.
*3 Including those who will meet the requirements after relocating.
*4 If you wish to move to a two-family home (for example, three generations living together), please contact us in advance, as this will depend on the conditions.

B. Not relocating from self-owned property* in the city.

*If members of a household eligible for relocation are sharing a property (for example, a husband and wife are relocating together from a jointly owned property), this is not applicable.
*Excludes cases in which a subsidy-eligible household member moves from a property shared with relatives.

C. The conclusion date of any of the following contracts is on or after April 1, 2023.

  • Construction contract for new construction or renovation of a house that meets the conditions (custom-built house type*1, existing house renovation type*2)
  • Purchase and sale contract for acquiring a house that meets the conditions (built-up type, purchase and resale type)

*1 In the case of a custom-built housing type, for example, a contract in which the insulation specifications and construction contract amount are fixed is applicable. If you would like to apply for a reservation, you can do so at the stage of the contract for deciding the design supplier, which is signed before the above contract, or when documents related to the application are exchanged. Please note that the procedures and document names vary depending on the operator, so if you have any questions, please contact us.
*2 In the case of the existing home renovation type, contracts are applicable if it is confirmed that the requirements of the target home (all openings such as windows are insulated (ZEH level or higher), etc.) are met.

1-3Subsidy amount

Subsidy amount

Newly built type

Up to 1 million yen

Basic amount: 700,000 yen

If you move from outside the city, add 300,000 yen

Renovation type

*If a subsidy funded by the country or local government other than this subsidy is granted to an eligible house, it will be necessary to apply for a “construction contract for the construction or renovation of a house that meets the conditions” and “for the acquisition of a house that meets the conditions.” If the amount obtained by deducting the subsidy amount from the amount in the “purchase and sale contract” is less than 700,000 yen (1,000,000 yen if outside the city), the lower amount will be the maximum subsidy amount.

2Application acceptance period

2-1Reservation application (optional)

From April 3, 2023 until the budget limit is reached (until November 30, 2023 at the latest)
What is a reservation application? In order to improve the convenience of households eligible for the subsidy, reservation applications will be accepted at the design stage for new construction or renovation of homes that meet the conditions (custom-built homes, etc.), and at the stage of applying for building certification (for pre-built homes, etc.) If approved, we will secure a budget for 3 months (extendable up to 6 months) from the date of approval.

2-2Main application

From April 3, 2023 until the budget limit is reached (until December 28, 2023 at the latest)

 

(Excerpt from Yokohama City website)

summary

What did you think? This time in the 2024 edition, we introduced subsidies for renovation and nursing care renovation that can be used mainly by people living in Kanagawa Prefecture and Yokohama City!

The Housing Energy Saving 2024 Campaign’s Childcare Eco Home Support Project, Window Renovation 2024 Project, and Hot Water Energy Saving 2024 Project are subsidies that can be used nationwide.

If you are thinking of remodeling your home to save money on the expensive exterior renovation costs, please first check to see if the work is eligible for subsidies.

Official homepage of the child care eco home support project↓

Childcare eco home support project [official] (mlit.go.jp)go.jp)

 

We at Kakeru Construction Co., Ltd. are registered as a child-rearing eco-home support business, so please feel free to contact us about subsidies for exterior renovations!   

Estimates and inspections are of course free! If you have any trouble with roofs, rain gutters, exterior walls, or exterior structures, please contact Sho Construction Co., Ltd.!
We handle everything from temporary scaffolding work to roofing work and exterior wall painting work completely in-house. We are confident that our cost, quality, preparation, and exterior work are comparable to other companies!
We are confident in our work, so we welcome estimates!
I’m glad I asked! We take your requests seriously so that you can understand that.

We also have information on roof construction costs and price plans for roof cover construction methods, so please take a look!

We look forward to hearing from you. Thank you!

Consultations on LINE are also welcome◎

We also update our Instagram from time to time ◎ Please follow us ◎

For roofing, guttering, and exterior work and repairs in Kanagawa, contact Kakerukoumuten Co., Ltd..

AAA is a young company with an average age in the early 20s, but our technology is second to none.

One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!

We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!