For solar panel and battery installation in
Tachikawa City, Tokyo,
trust Kakeru Koumuten!

Kakeru Koumuten is a specialized exterior renovation company based in Aoba Ward, Yokohama City.
As a company strong in roofing work, we are entrusted withsolar panel and battery installation considering roofing and waterproofing!

“How to Choose a Solar Panel Contractor in Tachikawa City”
“Costs for Solar Panel and Battery Installation”
“Subsidies Available for Solar System Installation in Tachikawa City”
We will also explain the above three points!

Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtainingestimates from about three companies!

For solar panel and battery installation in Tachikawa City, trust Kakeru Koumuten
Table of Contents (tap to open/close)
  1. Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Tachikawa City, Tokyo
  2. Roof Inspection Before Installing Solar Panels
  3. Subsidies and Grants That May Be Applicable in Tachikawa City
  4. Price List for Solar Panel and Storage Battery Installation
  5. Breakdown of Installation Capacity, Equipment, and Construction Costs
  6. Self-Estimate and Financial Simulator for Solar Power Generation
  7. Customer Testimonials
  8. Case Studies of Solar Panel Installations
  9. How to Choose a Solar Panel Installation Company in Tachikawa City, Tokyo
  10. Benefits of Introducing Solar Equipment
  11. Points to Consider When Introducing Solar Power Generation
  12. How to Choose Solar Panels
  13. Frequently Asked Questions About Solar and Storage Battery Installation in Tachikawa City
  14. If You Are Looking for a Solar Panel Installation Company in Tachikawa City, Contact Kakeru Koumuten
  15. Characteristics of Tachikawa City, Tokyo and Points for Solar Installation
  16. Service Area in Tachikawa City, Tokyo

Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Tachikawa City, Tokyo

Link Banner to Kakeru Koumuten's Strength Introduction Page

The reasons why our company is entrusted with solar panel installation by customers in Tachikawa City, Tokyo include
that Kakeru Koumuten serves Kanagawa and Tokyo as its service areas,
and our unique strengths in solar panel installation that cannot be imitated by other companies, which have received high praise from many customers.

In solar panel installation projects in Tachikawa City, we have absolute confidence in “cost,” “quality,” and “plans”,
so we would be grateful if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We Can Also Handle Exterior Renovations Other Than Solar Panel Installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Troubles such as leaks that occur with solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It is reassuring to have knowledge about the roof to avoid maintenance and troubles after installation!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!

2.Facilities Specialized in Exterior Renovation

Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases centered around Yokohama City, Kanagawa Prefecture for material storage and showrooms.

In-house Ownership of Scaffolding Materials

Entrance to the material storage areaCompany-owned scaffolding materials
To ensure safety during work on the roof, we own the necessary scaffolding materials for temporary scaffolding based on construction conditions and can assemble scaffolding ourselves.
By performing scaffolding work with our own scaffolding team instead of outsourcing, we can also cut costs on scaffolding work.
We have scaffolding materials for approximately 50 single-family homes!
In Tachikawa City, our own scaffolding team will plan the scaffolding according to the site conditions.

Storage of materials in our large warehouse

Exterior of the material warehouse Interior of the warehouse storing materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, we canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, allowing us torespond quickly in emergencies!

Sorting and transporting waste materials in-house

Waste sorting spaceThe installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.

Exterior remodeling dedicated showroom

Exterior remodeling showroom appearanceShowroom interior
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on the roofing materials!
It is also possible to simulate the revenue and installation costs when introducing solar panels!

Since roofing and exterior wall work often accompany each other, we also provide samples of roofing materials and models that explain the structure, allowing for detailed explanations!

3.All Work Performed by Our Own Team

Diagram of the system for performing scaffolding, painting, and roofing renovations in-house

One of Kakeru Koumuten’s major strengths is all work performed by our own team.

By having Kakeru Koumuten handle everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roofing renovations.
Additionally, one representative will handle everything from the estimate to project completion.
Since the person in charge does not change, whether it’s the sales representative or construction management, smooth communication is possible.

We can perform everything from temporary scaffolding installation to exterior wall painting and roofing renovations in-house!

4. Various Permits and Skilled Workers

Construction industry licenseDisplay of permits and qualifications obtained by Kakeru Koumuten
We have obtained construction industry permits as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting technicians, and we are confident in our construction skills.
We can also handle large-scale roofing projects such as factories!

5. Warranty and Aftercare

Link banner to Kakeru Koumuten's warranty information page

In addition to the manufacturer’s warranty, our solar panel installation work comes with our own workmanship warranty (leakage warranty)!
(The workmanship warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty without performing roof renovation. The workmanship warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary based on the warranty details.)
Aftercare maintenance is available annually, and we send out notification DM every year.
If you have any questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Roof and solar panel inspection response

Our company is equipped to handle various roofing troubles and situations.

If you cannot access the roof at high altitudes, we can utilize drones for inspections!
During leakage investigations, we can also conduct surveys using a thermal imaging camera.

If the power generation of the solar panels decreases due to dirt, we can also perform cleaning with a specialized brush.
We will respond according to the customer’s wishes.

7. Human Resource Development

Training session using models

We create various roof models to conduct practical training for skill enhancement.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct technical training to ensure that each staff member can handle various cases.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Easy-to-Understand Materials and Simulations

Materials and simulation examples provided for solar panel installation

At Kakeru Koumuten Co., Ltd., we provide not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar panel installation guidebook” and a “financial simulation” that takes into account loan interest rates and electricity costs.
The financial simulation can project cumulative income and expenses over 20 to 30 years.
Even customers who are not familiar with solar panel installations will find our materials easy to understand, including important points and potential drawbacks!

We encourage you to obtain comparative estimates and review plans from other companies!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 to 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten Co., Ltd., which specializes in roofing work, has summarized the items to check before installation.

1. Type of roofing material and age The method of securing the panels varies depending on the roofing material, such as slate, tiles, metal roofs, or flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest a roof renovation first.
2. Condition of the substrate and waterproof sheet If the sheathing or roofing (waterproof sheet) beneath the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of leaks.
3. Orientation, slope, and shadows of the roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect power generation. We will create a layout diagram from the drawings and the site, and you can confirm it with the power generation simulation.
4. Shape of the roof and available installation area The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. The number of panels that can be installed varies depending on their size, so we will compare the overall output of the roof.
5. Method of securing and waterproofing details We will confirm whether the method involves drilling holes in the roofing material for securing or using brackets to hold the roofing material. The method of securing varies by technique, so please check the waterproofing treatment of the fastening parts during the estimate.
6. Weight of the roof The roof will become heavier due to the added panels. After investigating the existing roof, substrate, and load-bearing capacity, replacing with lighter roofing materials may also be an option if necessary.
7. Location of equipment installation and wiring We will check the installation locations for the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect costs.

Securing Methods and Checkpoints by Roofing Material

Roof Material Main Fixing Method Pre-installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first.
Tile Roof Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lighter roofing materials before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available.
Flat Roof / Rooftop Fixed by installing a frame Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work.
If you perform roof renovations simultaneously, you may reduce future costs for removing and reinstalling solar panels!
If you carry out roof renovations 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ Click here for roof renovations in Tachikawa City, Tokyo

Subsidies and Grants Potentially Available inTachikawa City, Tokyo

When introducing solar panels or storage batteries in Tachikawa City, Tokyo, there is a possibility of being eligible for “national” and “Tokyo” programs.
The following is based on information confirmed on the official pages of each program as of October 7, 2026. The application status may change depending on the budget and recruitment period, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Timing for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Tokyo Metropolitan “Reiwa 8 Year Household Solar Power Introduction Promotion Project” (Cool Net Tokyo) New installation of certified solar modules in residential properties or their premises within the Tokyo area, with a system under 50kW. Pre-application before installation is required. Existing homes: 150,000 JPY/kW for up to 3.75kW (maximum 450,000 JPY), 120,000 JPY/kW for over 3.75kW
New homes: 120,000 JPY/kW for up to 3.6kW (maximum 360,000 JPY), 100,000 JPY/kW for over 3.6kW
(Additional costs for frame installation, waterproofing work, and renovation defect insurance, etc.)
Pre-application: From May 29, 2026
Grant application and performance report: From June 30, 2026 to March 30, 2029
Tokyo Metropolitan “Reiwa 8 Year Household Storage Battery Introduction Promotion Project” (Cool Net Tokyo) New installation of storage batteries in residential properties within the Tokyo area, and must be SII registered equipment. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries alone. Pre-applications after October 1, 2026 will only be eligible for SII registered products for Reiwa 8. Storage battery package: 100,000 JPY/kWh (maximum 1,200,000 JPY per household)
Storage battery unit expansion: 60,000 JPY/kWh (maximum 720,000 JPY per household)
(Additional incentives for participating in DR demonstrations, etc.)
Pre-application: From May 29, 2026
Grant application and performance report: From June 30, 2026
Tachikawa City Residential Solar Power and Storage Battery Subsidy No specific subsidy program for residential solar power and storage batteries was found on the city’s official page. No specific subsidies have been confirmed. Please check the above Tokyo Metropolitan subsidies. For the latest information from the city, please refer to Tachikawa City’s official page or contact their office.
National “DR Household Storage Battery Project” (Reiwa 7 Year Supplement) New installation of household storage systems that can be utilized for DR (demand response) with registered products. Calculated based on a standard amount of 34,500 JPY per initial effective capacity of 1kWh (subsidy rate within 30% and maximum 600,000 JPY per application). The budget was reached on May 29, 2026, and the public offering has ended (applications are currently not possible).
National “Mirai Eco Housing 2026 Project” (Renovation) Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovations of windows (openings) and structures; applications cannot be made for storage battery installation alone. Solar panels are not included as eligible facilities. Storage battery: 96,000 JPY per household. Ends as soon as the budget limit is reached. Please check the official site for application status.
Please pay attention to the “order of procedures” for subsidies!
In Tokyo, a pre-application before installation is required for subsidies, and starting construction beforehand may result in ineligibility. You must meet the necessary conditions and requirements for the eligible equipment, and applying does not guarantee approval. As of October 7, 2026, there were no city-specific subsidies for residential solar power generation or storage batteries confirmed on the official page of Tachikawa City. Procedures differ by program, so please check before contracting or starting construction.
Kakeru Koumuten Co., Ltd. will guide you on the eligibility conditions for each program after confirming them.

Tokyo “Reiwa 8 Year Household Solar Power Generation Promotion Project”

In Tokyo, through Cool Net Tokyo, subsidies are provided for those installing solar power generation systems in residential homes within the city. The eligible systems are those using certified solar modules installed newly in residential homes or on their premises, with a capacity of less than 50kW. A pre-application before installation is required.

For existing homes, the subsidy amount is 150,000 yen/kW for up to 3.75kW (maximum 450,000 yen), and 120,000 yen/kW for exceeding 3.75kW. Additionally, there are supplementary items such as mounting frame installation, waterproofing work, and renovation defect insurance. Pre-applications are accepted from May 29, 2026, and the application for subsidy and performance report is accepted from June 30, 2026, to March 30, 2029. Please check the official page for details on eligible equipment, conditions, and budget status.
👉 Cool Net Tokyo | Official page for solar power generation

Tokyo “Reiwa 8 Year Household Storage Battery Promotion Project”

Tokyo is also providing subsidies for newly installed storage batteries in residential homes. The subsidy amount is 100,000 yen per 1kWh for storage battery packages (maximum 1,200,000 yen per household), and 60,000 yen per 1kWh for additional storage battery units (maximum 720,000 yen per household), with additional amounts for participation in DR demonstrations.

The eligible equipment is registered with SII (Environmental Collaboration Initiative). If you apply for pre-application after October 1, 2026, only the equipment listed in the Reiwa 8 year SII registered product list will be eligible. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries alone. The acceptance of applications for subsidy and performance reports has started from June 30, 2026.
👉 Cool Net Tokyo | Official page for storage batteries

About Tachikawa City Subsidies

As of October 7, 2026, on the official page of Tachikawa City, there were no city-specific subsidies confirmed for residential solar power generation or storage batteries. The city does have subsidies for insulation renovations for existing homes (which reached the budget limit for the Reiwa 8 year and is no longer accepting applications), but solar power generation and storage batteries are not included.

When introducing solar panels and storage batteries in Tachikawa City, the above-mentioned Tokyo Metropolitan Subsidy will be the main focus. The city’s system may change from year to year, so please check the official page or contact window of Tachikawa City to see if a new system has started.
👉 Here is the official page of Tachikawa City (Subsidy for Existing Housing Insulation Renovation Costs)

National Subsidy “DR Home Storage Battery Project (Support Project for the Introduction of Home Storage Systems for DR Resources)”

The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.

This project targets those who are newly introducing registered storage systems that can be utilized for demand response (DR), and in the fiscal year 2025 supplementary budget, the subsidy amount was determined based on a standard amount of 34,500 JPY per initial effective capacity of 1kWh, with a subsidy rate of up to 30% and a maximum of 600,000 JPY per application. There are also conditions such as contracts and orders made before the grant decision being ineligible.

However, the supplementary budget for fiscal year 2025 reached the budget for grant applications on May 29, 2026, and the public recruitment has ended (the previous year’s supplementary budget for fiscal year 2024 also ended public recruitment on July 2, 2025). Applications are currently not possible, so please check the official site for future public recruitment.

Additionally, there are currently no subsidies confirmed for the installation of solar panels on existing homes.
👉 Here is the official site for the DR Home Storage Battery Project

Solar Panel Installation & Storage Battery Installation Price List

Construction menu for solar panel installation and storage battery installation
⇧ Construction Menu | For costs related to solar panel installation and storage battery installation, click here

Solar Panel Removal and Water Heater Dismantling Service Menu
⇧Service Menu | Click here for costs related to Solar Panel Removal and Water Heater Dismantling

Estimate Guidance

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and storage batteries should be confirmed by separating them into “Equipment Costs (Device Costs)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary greatly depending on the installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Storage Battery Capacity (kWh)

The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatts). Storage batteries are compared in terms of the amount of electricity they can store, expressed in kWh (kilowatt-hours).
The amount of kW that can be placed on the roof varies for each house based on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.

On our pricing page, we list solar panels as approximately 800,000 JPY to 1,200,000 JPY for 3-5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just approximate amounts and can vary based on wiring length, scaffolding area, existing roofing materials, panel layout, etc.)
▶ Service Menu | Click here for costs related to Solar Panel Installation and Storage Battery Installation

Items to Confirm in the Estimate (Cost Verification)

When comparing estimates, it is common to compare different capacities and equipment by only looking at the amounts. Please check if the following items are clearly stated in each company’s estimate!

1. Solar Panels Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls in conjunction with a storage battery.
3. Storage Battery Manufacturer, model number, capacity (kWh), range available during power outages (whole house or specific circuits), installation location.
4. Mounting Frame & Hardware Name of the hardware suitable for the roofing material and the fixing method (whether it is a method that drills holes or a method that grips and secures).
5. Wiring & Electrical Work Wiring route and length, work around the distribution board, presence of a monitor to check power generation.
6. Roof Reinforcement & Waterproofing Details of waterproofing treatment at the fixing points, whether necessary roof repairs and substrate reinforcements are included.
7. Applications How much support is included for applications to the power company, certification applications for selling electricity (FIT), and subsidy applications.
8. Scaffolding Scope and quantity of scaffolding. If roofing work and exterior painting are done simultaneously, check that the same scope and quantity are not counted twice.
9. Removal & Disposal Whether the removal of existing solar thermal water heaters and old panels, as well as disposal costs for waste materials, are included.
10. Tax Classification & Warranty Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, details and duration of manufacturer warranties and workmanship warranties.
Tips for Comparison: “Installation Capacity (kW)” and “Equipment Model Number” should be aligned for comparison!
If the capacity differs, both the price and power generation will change. Kakeru Koumuten Co., Ltd. warmly welcomes competitive estimates, so if you bring estimates from other companies, we will explain the differences for each item!

Self-Estimate and Profit Simulation for Solar Power Generation

Self-Estimate and Profit Simulation for Solar Power Generation

With the simulator above,
you can obtain an approximate estimate and a profit simulation for up to 30 years!
If you know the total solar panel installation capacity for the roof and the capacity of the storage battery, you can obtain an approximate estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.

Customer Feedback

Case Studies of Solar Panel Installation

BEFORE

Metal roof before solar panel installation

AFTER

Roof after solar panel installation

Construction Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh
Base Mounting Hardware Used
 Niigata Manufactured / Aluminum Catch Type Hardware
Fixing Method & Waterproofing Arrangement
 Fixed using catch type hardware gripping the horizontal metal roof (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY
 Estimated recovery period for construction costs: about 8 to 9 years (self-consumption)

 *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system.
Construction Period
 Approximately 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that grants are available, and I would like to know how much can be provided.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement when solar panels are placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of grants that will be provided, and we explained this to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Tachikawa City, Tokyo

There are many solar panel installation contractors available in Tachikawa City, Tokyo, and you may be unsure which contractor to choose.

Therefore, when requesting solar panel installation and battery storage installation work, let’s check the following 4 points.

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the existence of warranties and after-sales maintenance

● Obtain estimates from multiple contractors (3 companies is a guideline)

● Check if they provide support for subsidy applications

By confirming the above 4 points, you will be able to choose a reliable contractor.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Have knowledge not only about solar panels but also about roofs

Defective installation of solar panels may be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing

・Solar panels were installed on a severely deteriorated roof, leading to leaks
・Solar panels were installed on a roof with a short lifespan, requiring a renovation to detach and reattach the solar panels within a few years
・Misjudgment of the type of waterproofing led to incorrect processing, resulting in leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.

▶ Go to “Roof Verification Before Installing Solar Panels” in this article

Confirm the existence of warranties and after-sales maintenance

When choosing a solar installation contractor, let’s confirm the existence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.

While the solar panels and battery storage units come with a manufacturer warranty, also check for the existence of a workmanship warranty in case leaks occur after installation!

For contractors that offer a workmanship warranty, if leaks occur after installation, they may cover the repairs under the warranty, provided it is within the warranty period and conditions.

Additionally, some contractors offer after-sales service separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Changes or damage on the roof may occur in areas that are not visible, so you might not notice them yourself.
By conducting inspections during after-sales maintenance, you can easily detect issues early and prevent major repairs or failures!

Kakeru Koumuten Co., Ltd. provides a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, a roof renovation may be required to provide the warranty.)
We also conduct after-sales maintenance and send out DM every year!
Please check the DM, and if you wish, we will come to perform after-sales maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting solar panel installation, be sure to obtain estimates from multiple contractors.

Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-sales services may differ.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request from your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates, please check the following:

“Check the items in the estimate”
“Type of solar panel”
“Warranties and after-sales services”

Make sure to compare these details carefully! If the quality of the auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making decisions based solely on price!

▶ Go to “Breakdown of Installation Capacity, Equipment, and Construction Costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Check if they provide support for subsidy applications

Subsidies may be available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
There are systems that require personal applications and cannot be handled by the contractor, as well as systems that require prior application before installation, so it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for Tokyo subsidies, prior application before installation) before proceeding with the construction!

In the case of subsidies in Tokyo, the process involves submitting an application for disbursement and performance report after the completion of the work, which will be granted after a review! (The procedure varies depending on the system)

▶ Go to “Subsidies and Grants that May Be Applicable in Tachikawa City” within this article

Benefits of Introducing Solar Power Systems

The benefits of introducing solar panels are summarized in the following five points!

Benefit 1: Economic Benefits

Household Budget Illustration

The biggest benefit of introducing solar panels is the economic advantage!
While the selling price of electricity has decreased compared to ten years ago, you can benefit by reducing the amount of electricity purchased from the utility by consuming the electricity you generate!
As electricity costs rise, the ability to cover your consumption with solar power becomes increasingly attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!

Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply in the 2026 fiscal year. After the fifth year, it is generally more advantageous to use it at home (self-consumption), making the combination with storage batteries a viable option.
👉 Ministry of Economy, Trade and Industry | For purchase prices and periods, click here

Benefit 2: You Can Utilize Subsidies!

Illustration of a person happy to reduce costs

The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the requirements, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In the case of Tachikawa City, there may be applicable programs from the national government and Tokyo Metropolitan Government (the city’s official page does not confirm any unique subsidies for residential solar power and storage batteries).

Benefit 3 Environmentally Friendly!

Environmentally friendly solar power illustration

Solar power generation has a low carbon dioxide emission rate and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices such as power conditioners may produce operational noise.)

Benefit 4 Expect Heat Insulation Effects!!

Illustration of heat insulation by solar panels

By installing the panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, this can help reduce the temperature of the roof, providing expected heat insulation effects!
(Note that this does not improve the building’s insulation performance itself.)

Benefit 5: Electricity can be used even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it becomes possible to use electricity even during emergencies like power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capabilities, you may be able to use electricity from a dedicated outlet during the daytime when generating power.
(Note that the devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Person explaining points to note

Point 1: Maintenance costs can be incurred

A particularly overlooked maintenance cost is for the roof where the solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reinstalling the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing the solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.

It would be reassuring to request a simulation that considers maintenance costs before introducing solar panels!

Point 2: The risk of leaks increases depending on the roofing material

The fixing methods for slate roofs and tile roofs vary by construction method, but in methods that fix hardware to the roofing material or substrate with screws, waterproofing of the fixed parts is crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, replacing the roofing material with a metal roof and fixing the solar panels using the catch method is also an option. (The catch method has compatibility conditions between the roofing material and hardware, and it cannot be used with all metal roofs.)

Catch-type base metal fittings for horizontal metal roofsCatch-type base metal fittings for horizontal metal roofs

Note 3: The roof will become heavier

Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing with a lighter roof may be one option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

Choosing Method 1: Compare based on total roof output

When installing solar panels on the roof, it is important to know how much power can be generated in a limited area, and generating more power is always better!

Solar panels come in various sizes and outputs depending on the manufacturer.
For example, a 350W output panel and a 400W output panel may seem at first glance that the higher output panel is better.
However, if the size of the panel does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed” on the same roof due to the difference in panel size.

400W × 15 panels = 6kW (total output of the roof)
350W × 20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation amount (kWh) will vary depending on conditions such as roof orientation, slope, and shading.

Choosing Method 2: Compare based on degradation rate of solar panels

Solar panels have a degradation rate, and their output gradually decreases after 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation amount.
Choosing solar panels by considering the degradation rate, rather than just the initial output, will lead to a satisfactory decision!

Choosing Method 3: Compare based on warranty period

There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty period varies by manufacturer.
Regarding the output warranty, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies widely!
Since a longer warranty is better, let’s check the warranty period and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar Power and Storage Battery Installation in Tachikawa City

We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Tachikawa City. (Tap to open the answers)

How much does it cost to install solar panels and storage batteries in Tachikawa City, Tokyo?

The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

Guidelines by capacity are available on our solar panel installation and storage battery installation pricing page. We will create a layout diagram from the drawings and site survey and provide a free estimate!

Are there any subsidies available for solar power and storage battery installation in Tachikawa City?

As of October 7, 2026, Tokyo’s subsidies for solar power generation and storage batteries (Cool Net Tokyo) are accepting pre-applications. For storage batteries, only SII registered devices (products registered in Reiwa 8) are eligible from pre-applications made after October 1, 2026. Regarding Tachikawa City, there are no city-specific subsidies for residential solar power generation and storage batteries confirmed on the city’s official page. The national DR household storage battery project has ended its public recruitment.

Since the application status may change, please refer to the subsidy and grant section and consult with us before signing a contract.

Can I apply for subsidies even after the construction is completed?

For many programs, procedures are required before construction. Tokyo’s subsidies require pre-application before installation, and if you install first, you will be ineligible. The procedures differ by program.

Since the order of procedures varies by program, please confirm before signing a contract or starting construction.

Can solar panels be installed on a slate roof? I’m worried about leaks.

It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The fixing method varies by construction method, and when fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.

Kakeru Koumuten is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation, and if deterioration is advanced, we can also propose methods such as roof overlay (cover method) or re-roofing before installation.

My roof is old. Should I do a roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed after 10 to 20 years of installation, the cost for removing and reinstalling solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with durable roofing materials before installation.

Please consult us on how to proceed with the installation after confirming the condition of the roof through a site survey!

Is it better to install a storage battery together with solar panels?

For those who want to use generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.

Additionally, the Tokyo Metropolitan Government’s subsidy for storage batteries is designed for simultaneous installation with solar panels, but applications can also be made for storage batteries alone. You can compare “solar panels only” and “solar panels + storage batteries” through a financial simulation.

How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram based on the drawings and site survey, and provide you with the installation capacity and power generation simulation.

In Tachikawa City, the shading from surrounding buildings and trees varies from house to house. You can check the expected power generation through the power generation simulation.

How long will the construction period be?

In the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is done simultaneously or depending on the shape of the roof and installation capacity.

Additionally, please note that there will be a separate period for applications for subsidies and power companies, so please consult us as soon as possible.

What is the current selling price (FIT)?

For residential use (under 10 kW), from the certification after October 2025, the first 4 years will be 24 yen/kWh, and from the 5th to the 10th year, it will be 8.3 yen/kWh, with the same price applied in the 2026 fiscal year.

The idea is to recover initial costs more quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity costs.

Can you handle maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten sends out annual after-service maintenance notices via DM and visits customers who wish for inspections. We can also clean solar panels with a special brush if the power generation decreases due to dirt.

It can be difficult to check areas on the roof by yourself, so please feel free to consult us if you have any concerns.

Can you also renovate roofs that already have solar panels installed?

Yes, we can. Kakeru Koumuten can remove and reinstall solar panels ourselves, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them in a consistent manner. The removed panels can be stored in our own warehouse.

For information on costs, please visit the solar panel removal and water heater removal pricing page.

Get a free estimate for solar panels and storage batteries in Tachikawa City

Estimates are completely free. We welcome competitive quotes!

If you are looking for a solar panel installation company in Tachikawa City, please consult Kakeru Koumuten

Our company handles many exterior renovations, including solar panels, roof work, and exterior wall work in Tachikawa City, Tokyo.
We have received requests from many customers, including renovation companies and real estate agencies, who have contacted us!

Kakeru Koumuten promises “high-quality renovations at low costs”, and we have received great feedback from numerous customers.
We continue to update our construction performance each year, and we will strive to improve quality to satisfy even more customers in the future.

Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and exterior wall cover methods.
We are also happy to handle small jobs like partial repairs and rain gutter cleaning!

In urgent cases like leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!

“I want to know recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide optimal solutions for your specific requests.
We will never propose unnecessary work focused on profit!
We always stand in our customers’ shoes and will suggest the best construction plans!

We are confident that we will not be outdone by other companies in terms of cost, quality, and organization for exterior work!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if we are found to be inferior to other companies, feel free to decline!

Characteristics of Tachikawa City, Tokyo, and Points for Solar Work

Tachikawa City, Tokyo, is located in the Tama region. The official page of Tachikawa City provides hazard maps for flooding (external water), internal water, and landslides for the Tamagawa and Zanborikawa rivers.
Below are summarized points to consider regarding the residential environment of Tachikawa City and when installing solar panels and storage batteries. (Tap to open)

View the characteristics of Tachikawa City, Tokyo, and points for solar work

■ Check the installation location of storage batteries and power converters against the hazard map assumptions

In the disaster prevention map of Tachikawa City, the expected flooding due to the Tama River and the Zanbori River is color-coded, and you can also check the expectations for internal flooding (a phenomenon where rainwater cannot be drained during heavy rain and causes flooding) and landslide hazard areas. When deciding on the installation location for storage batteries and power conditioners, it is advisable to check the flooding expectations and designated areas on the hazard map for your residence and consider the height and position of the installation for peace of mind.

■ Tokyo’s annual sunshine hours are about 1,927 hours

According to the Japan Meteorological Agency’s average values (1991–2020), Tokyo’s annual sunshine hours are approximately 1,927 hours.
The amount of electricity generated varies by season, so it is important to conduct a year-round generation simulation and select the capacity of the storage battery according to the times when electricity is used the most.

■ Check for shadows from surrounding buildings and trees

In places where buildings or trees are close by, the way shadows are cast varies from house to house depending on the roof’s orientation and height. Since solar panels generate less electricity when shaded, Kakeru Koumuten creates layout diagrams based on the drawings and the actual site conditions, allowing you to confirm through generation simulations. Additionally, in areas close to trees, branches and fallen leaves may accumulate around the panels and rain gutters, so please consult us about inspections and cleaning after installation.

■ No local subsidies confirmed; Tokyo’s subsidies are the main focus

As of October 7, 2026, the official page of Tachikawa City did not confirm any local subsidies for residential solar power generation or storage batteries. Tokyo’s subsidies (Cool Net Tokyo) require prior application before installation, so it is important to check the order of procedures before contracting and starting construction.

■ In narrow front road areas, plan scaffolding and equipment delivery carefully

In areas with narrow front roads or where surrounding buildings are close together, it may be necessary to devise plans for scaffolding and equipment delivery. Kakeru Koumuten will respond according to the site with our own scaffolding team and scaffolding materials.

■ Check the roof condition according to the age of the building

For buildings that have been around for several years, it is important to check the condition of the roofing materials and substrate before installing solar panels. Depending on the roof’s condition, installing them simultaneously with roof renovations can help reduce future costs for removing and re-installing solar panels.

Our company serves Kanagawa Prefecture and Tokyo, and we handle many exterior and solar construction projects in Tachikawa City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!

Service Area in Tachikawa City, Tokyo

Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.

List of Areas in Tachikawa City, Tokyo

Akechi-cho, Tachikawa City / Izumi-cho, Tachikawa City / Ichiban-cho, Tachikawa City / Kashiwacho, Tachikawa City / Kamisuna-cho, Tachikawa City / Saiwai-cho, Tachikawa City / Sakae-cho, Tachikawa City / Shibasaki-cho, Tachikawa City / Sunagawa-cho, Tachikawa City / Takamatsu-cho, Tachikawa City / Nishisuna-cho, Tachikawa City / Hagoromo-cho, Tachikawa City / Fujimicho, Tachikawa City / Midori-cho, Tachikawa City / Wakaba-cho, Tachikawa City

We welcome inquiries via LINE as well◎

LINE

LINE

We are also updating our Instagram regularly◎ Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!