Leave Your Solar Panel Installation in Yokosuka City, Kanagawa Prefecture to Kakeru Koumuten Co., Ltd.!
For
Solar Panel and Battery Installation in Yokosuka City
Trust Kakeru Koumuten!
Kakeru Koumuten is a company specializing in exterior renovations based in Kanagawa Prefecture.
As a company strong in roofing work, we are entrusted with solar panel and battery installation considering roofing and waterproofing!
“How to Choose a Solar Panel Contractor in Yokosuka City”
“Costs for Solar Panel and Battery Installation”
“Subsidies Available for Solar System Installation in Yokosuka City”
We will also explain the above three points!
Installing solar panels carries risks such as “the occurrence of leaks” and other troubles.
To avoid regrets, we recommend obtaining estimates from about three companies!
Table of Contents (Tap to Open/Close)
- Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Yokosuka City
- Roof Inspection Before Installing Solar Panels
- Possible Subsidies and Grants Available in Yokosuka City
- Price List for Solar Panel and Storage Battery Installation
- Breakdown of Installation Capacity, Equipment, and Construction Costs
- Self-Estimate and Profit Simulation for Solar Power Generation
- Customer Testimonials
- Case Studies of Solar Panel Installations
- How to Choose a Solar Panel Installation Contractor in Yokosuka City
- Benefits of Introducing Solar Equipment
- Points to Note When Introducing Solar Power Generation
- How to Choose Solar Panels
- Frequently Asked Questions About Solar and Storage Battery Installation in Yokosuka City
- If You’re Looking for a Solar Panel Installation Contractor in Yokosuka City, Contact Kakeru Koumuten
- Characteristics of Yokosuka City and Points for Solar Construction
- Service Area in Yokosuka City
Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Yokosuka City
Here are the reasons why our company is entrusted with solar panel installation by customers in Yokosuka City.
“Our Unique Strengths in Solar Panel Installation That Other Companies Cannot Imitate”
have received high praise from many customers.
so we would appreciate it if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from any number of companies!
1. We Can Also Handle Exterior Renovations Aside from Solar Panel Installation!


Problems such as leaks caused by solar panel installation may arise from insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there may be cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It is reassuring to have expertise in roofing to avoid maintenance issues and troubles after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!
2.Facilities Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases centered around Yokohama City, Kanagawa Prefecture for material storage and showrooms.
In-house Scaffolding Materials


To ensure safety during work on the roof, we own the necessary scaffolding materials for temporary scaffolding based on construction conditions and can assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs related to scaffolding work.
We have scaffolding materials for approximately 50 single-family homes!
Even if there are height differences on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.
Storage of Materials in Our Large In-house Warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we canrespond quickly in emergencies!
In-house sorting and transportation of waste materials
The installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.
Exterior renovation dedicated showroom


In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on roofing materials!
We can also provide simulations of potential earnings and installation costs when introducing solar panels!
Since roofing and exterior wall work often accompany projects, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!
3.All work performed by our own team
One of Kakeru Koumuten’s major strengths is its complete in-house construction.
By having Kakeru Koumuten manage everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will handle everything from the estimate to project completion.
Since the same person will be in charge, whether it’s sales or construction management, smooth communication is possible.
We can provide consistent in-house construction from temporary scaffolding installation to exterior wall painting and roof renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry permits as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists on staff, and we are confident in our construction techniques.
We can also handle large-scale roof projects such as those for factories!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty for solar panel installation, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless a roof renovation is performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary depending on the warranty details.)
Aftercare is available every year, and we send out annual notification DM.
If you have questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roofing troubles and situations.
Even if you cannot access the roof at high altitudes, we can utilize drones to assist!
During leak investigations, we can also conduct surveys using a thermal imaging camera.
If the power generation of solar panels decreases due to dirt or other factors, we can also provide cleaning services using specialized brushes.
We will respond according to your wishes.
7. Human Resource Development
To improve skills, we create various roofing models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct technical training to ensure that each staff member can handle various scenarios.
8. Creation of Easy-to-Understand Materials and Simulations
Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction will receive materials that clearly summarize important points and disadvantages!
We encourage you to obtain comparative estimates and compare them with other companies’ plans!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 to 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.
| 1. Types of Roofing Materials and Age | The fixing method varies depending on the roofing material, such as slate, tiles, metal roofs, and flat roofs (rooftop waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first. |
| 2. Condition of the Substrate and Waterproof Sheet | If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for signs of leaks. |
| 3. Orientation, Slope, and Shadows of the Roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect the amount of electricity generated. We will create a layout diagram from the drawings and the site, and you can confirm it with a power generation simulation. |
| 4. Shape of the Roof and Usable Area | The number of panels that can be installed (installation capacity) is determined by the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we will compare based on the total output of the roof. |
| 5. Fixing Method and Waterproofing Details | We will check whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please confirm the waterproofing treatment method for the fixed parts during the estimate. |
| 6. Weight of the Roof | The roof will become heavier due to the panels being installed. After investigating the existing roof, substrate, and load-bearing capacity, switching to lighter roofing materials may also be an option if necessary. |
| 7. Location of Equipment Installation and Wiring | We will confirm the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring also affects costs. |
| 8. Ease of Scaffold Setup and Delivery Routes | If there is a height difference on the site, planning for scaffolding and the delivery routes for equipment and materials may require some ingenuity. The width of the front road and the level differences on the site will also be confirmed during the site survey. |
Fixing Methods and Confirmation Points by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets to roof material and substrate with screws) | Waterproofing treatment of fixing parts, cracks or deterioration of slate, condition of substrate. If deterioration is advanced, consider roof overlay method or replacement first. |
| Tile Roof | Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) | Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be a method to replace with lightweight roofing material before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, a method that does not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a frame | Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work. |
If you perform roof renovations 10 to 20 years after installation, there will be additional costs for the removal and reinstallation of solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!
▶ Click here for roof renovations in Yokosuka City
PossibleSubsidies and Grants in Yokosuka City, Kanagawa Prefecture
If you are introducing solar panels or storage batteries in Yokosuka City, there is a possibility that you may be eligible for programs from the “National Government,” “Kanagawa Prefecture,” and “Yokosuka City.”
The following information is based on the official pages of each program as of October 6, 2026. The application status may change depending on the budget, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Timing for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Yokosuka City “Key Measures Acceleration Project Subsidy (Residential Self-Consumption Solar Power Generation Equipment & Combined Storage Battery (Self-Owned))” | For those installing in residential properties within Yokosuka City. Must self-consume 30% or more of generated power and not obtain FIT/FIP certification. Solar carports are excluded. Storage batteries must be introduced simultaneously with solar power (storage batteries alone are not eligible). No delinquency on city taxes. In principle, work must commence after grant decision (prior notification is required in unavoidable circumstances). Performance reports are due by February 15, 2027. | Solar: 70,000 JPY per kW (amounts under 1 kW are rounded down, calculated based on the smaller of panel output and power conditioner output) Storage Battery: One-third of the total of the storage system and construction costs (the limit for the storage system is 141,000 JPY/kWh) |
May 1, 2026 – January 15, 2027 According to the city’s official page (updated October 1, 2026, as of September 30), applications for residential solar power are possible (execution rate 80.4%), while applications for residential storage batteries have closed due to budget limits. |
| Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Residential Solar Power Generation & Storage Battery Installation Subsidy” | Must install both solar power generation and storage systems in residential properties (with ensured seismic performance) within the prefecture. Applications must be made by the individual, and work must commence after grant decision. | Solar: 70,000 JPY per kW Storage Battery: 150,000 JPY per unit |
Phase 1: May 11, 2026 – June 30, 2026 Phase 2: Starts September 7, 2026 (first-come, first-served) As of September 7, 2026, the application amount reached the budget limit, and applications have closed. Please check the prefecture’s official page for future recruitment. |
| National “DR Home Storage Battery Project” (Supplementary Budget for Fiscal Year 2025) | New installation of registered home storage systems that can be utilized for DR (demand response). | Calculated based on an initial effective capacity of 34,500 JPY per kWh (subsidy rate within 3/10; maximum 600,000 JPY per application). | As of May 29, 2026, the budget has been reached, and public recruitment has ended (the official site states there are no plans to reopen applications, and currently, applications cannot be made). |
| National “Mirai Eco Housing 2026 Project” (Renovation) | Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovations of windows (openings) and structures; applications cannot be made for storage battery installation alone. Solar panels are not included as eligible facilities. | Storage Battery: 96,000 JPY per unit | Ends as soon as the budget limit is reached. As of October 5, 2026, the official site shows that the application amount for renovations is 8% of the budget. Please check the official site for application status. |
| Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Self-Consumption Renewable Energy Installation Subsidy” | Corporations and individuals filing blue returns(Personal residences are not eligible). Solar power must have a generation output of 10kW or more, facilities for business use, equipment not certified under FIT/FIP, etc. | Solar Power: 80,000 yen/kW, etc. Storage System: 50,000 yen/kWh (maximum 5,000,000 yen) |
Application closed on September 3, 2026 (when application amount reached budget amount) |
Yokosuka City’s key measure acceleration project subsidy for household storage batteries has ended, and the execution rate for household solar power is also increasing. As a general rule, the city’s subsidy requires that work begins after the grant decision, and Kanagawa Prefecture’s residential subsidies also require that construction starts after receiving the “grant decision.” If work begins beforehand, it will be ineligible. Eligibility conditions, application procedures, and the possibility of combining different systems vary, and applying does not guarantee a grant, so please confirm before contracting and starting work.
Kakeru Koumuten will provide guidance on eligibility conditions and application periods for each system after confirming them.
National Subsidy “DR Household Storage Battery Project (Support Project for Introducing Household Storage Systems for DR Resource Implementation)”
The national government has been implementing the “DR Household Storage Battery Project” to support the installation of household storage batteries.
This program targets those who are introducing new registered storage systems that can be used for demand response (DR), and in the fiscal year 2025 supplementary budget, the subsidy amount was determined based on a standard amount of 34,500 yen per initial effective capacity of 1kWh, with a subsidy rate of up to 30% and a maximum of 600,000 yen per application. There are conditions such as being ineligible for items contracted or ordered before the grant decision.
However, the fiscal year 2025 supplementary budget application amount reached the budget on May 29, 2026, and the public recruitment has ended. The official site also states that there are no plans to reopen public recruitment, and applications are currently not possible. Please check the official site for future public recruitment.
Furthermore, there are currently no subsidies confirmed for the installation of solar panels on existing homes.
👉 Click here for the official site of the DR Household Storage Battery Project
Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Residential Solar Power Generation and Storage Battery Installation Subsidy”
Kanagawa Prefecture provides subsidies for those who install both “solar panels” and “storage batteries” in residential properties.
The subsidy details are 70,000 yen per 1kW of solar power generation, and 150,000 yen per storage system.
For example, if you install a 4kW solar panel and one storage battery, the calculation for the subsidy amount would be 4kW × 70,000 yen + 150,000 yen = 430,000 yen.
The eligibility includes ensuring seismic performance in the residence, the storage system must be a registered product, if construction starts before the grant decision, it will be ineligible, and the application must be made by the individual (proxy applications by contractors are not allowed), among other conditions. The possibility of combining this with Yokosuka City’s subsidies varies by system, so please check the official pages of each system before contracting.
In the fiscal year 2026, the first phase (from May 11 to June 30) and the second phase (starting September 7, on a first-come, first-served basis) were conducted. The second phase has been closed for applications as of September 7, 2026, when the application amount reached the budget limit. For future recruitment, please check the official Kanagawa Prefecture page.
👉 Click here for the official Kanagawa Prefecture page
Kanagawa Prefecture “Fiscal Year 2026 Subsidy for Introducing Self-Consumption Type Renewable Energy” (for businesses)
Kanagawa Prefecture is also implementing subsidies for businesses that introduce “self-consumption type” facilities that use electricity generated by solar panels.
Eligible applicants are corporations or individual business owners filing blue returns, and the introduction to individual residences is not eligible.
Conditions include that the solar power generation must have an output of 10 kW or more, supply power to business facilities within the prefecture, and not be facilities certified under FIT or FIP.
The subsidy amount is 80,000 yen per kW for solar power generation and 50,000 yen per kWh for the accompanying storage system (with a maximum of 5 million yen).
As the application amount reached the budget limit for fiscal year 2026, recruitment was closed on September 3, 2026.
Businesses considering the installation of solar panels on commercial buildings in Yokosuka City should check the official Kanagawa Prefecture page for the next recruitment.
👉 Click here for details
Yokosuka City “Fiscal Year 2026 Subsidy for Accelerating Key Measures (Residential Self-Consumption Type Solar Power Generation Equipment and Co-owned Storage Battery)”
Yokosuka City is implementing the “Subsidy for Accelerating Key Measures” for those who introduce self-owned solar power generation equipment and storage batteries to residences within the city.
● Solar power generation equipment: 70,000 yen per kW (amounts under 1 kW are rounded down; calculated based on the smaller output of the panel and power conditioner)
● Storage battery: One-third of the total of the storage system and construction costs (the upper limit for the storage system is 141,000 yen/kWh)
Storage batteries are eligible only when introduced simultaneously with solar power generation equipment; installation of storage batteries alone is not eligible.
Eligibility is for those installing in residences within Yokosuka City, with conditions including consuming more than 30% of the generated electricity for self-consumption, not obtaining FIT or FIP certification, not being a solar carport, and having no delinquency in municipal taxes. As a general rule, work must commence after the grant decision, and prior notification is required in unavoidable circumstances. The application period is from May 1, 2026, to January 15, 2027, and performance reports must be submitted by February 15, 2027.
On the city’s official page (updated October 1, 2026), it states that as of September 30, 2026, household solar power applications are possible (execution rate 80.4%), while household storage batteries have reached budget limits and are no longer accepting applications. The application status may change, so please check the city’s official page for updates.
👉 Here is the official page of Yokosuka City
Solar Panel Installation & Storage Battery Installation Price List

⇧Service Menu | For costs related to solar panel removal and water heater removal, click here
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and storage batteries should be confirmed by separating “equipment costs (device costs)” and “construction costs”.
Even for the same “complete solar panel installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.
Considerations for Installation Capacity (kW) and Storage Battery Capacity (kWh)
The installation capacity of solar panels is determined by “the output of one panel (W) × number of panels”, with the unit being kW (kilowatts). The storage battery is compared in terms of the amount of electricity it can hold, expressed in kWh (kilowatt-hours).
The amount of kW that can be placed on the roof varies for each house depending on the shape, orientation, and size of the roof. At Kakeru Koumuten Co., Ltd., we create a layout diagram from the blueprints and on-site survey to present the installation capacity.
On our pricing page, we list solar panels as approximately 800,000 yen to 1,200,000 yen for 3 to 5 kW, and 1,200,000 yen to 1,900,000 yen for 6 to 10 kW. (These are just approximate amounts and may vary based on the length of wiring, the scope of scaffolding, existing roofing materials, and the layout of the panels.)
▶ Installation Menu | Costs for Solar Panel Installation and Battery Installation
Items to Check in the Estimate (Cost Confirmation)
When comparing estimates, it is common to compare different capacities and equipment based solely on price. Please check if the following items are clearly stated in each company’s estimate!
| 1. Solar Panels | Manufacturer, model number, output of one panel (W), number of panels, total installation capacity (kW) are written. |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls the battery together. |
| 3. Storage Battery | Manufacturer, model number, capacity (kWh), range usable during a power outage (entire house or specific circuits), installation location. |
| 4. Mounting Frame and Hardware | Name of hardware suitable for roofing materials and method of fixing (whether it is a method that drills holes or a method that clamps and secures). |
| 5. Wiring and Electrical Work | Wiring route and length, work around the distribution board, presence of a monitor to check power generation. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment at fixing points, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Applications | Extent of support for applications to the power company, certification applications for selling electricity (FIT), and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If it is simultaneous with roof work or exterior painting, check that the same scope and quantity are not double-counted. |
| 9. Removal and Disposal | Whether the removal of existing solar thermal water heaters or old panels and disposal costs for waste materials are included. |
| 10. Tax Classification and Warranty | Whether it is tax-inclusive or tax-exclusive, conditions under which additional costs may arise, details and duration of manufacturer warranty and workmanship warranty. |
If the capacities are different, the prices and power generation will also change. Kakeru Koumuten Co., Ltd. welcome comparisons, so if you bring estimates from other companies, we can explain the differences item by item!
Self-Estimate and Profit and Loss Simulator for Solar Power Generation
With the simulator above,
you can get an estimated quote and income simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can obtain an estimated quote and income simulation!
*The simulation results are estimates. Actual income may vary depending on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection and replacement.
Customer Voices
Case Studies of Solar Panel Installation


| Construction Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh class |
| Base Mounting Hardware Used |
| Niigata Manufacturing / Aluminum Catch-Type Hardware |
| Fixing Method & Waterproofing Details |
| Fixed by catching the horizontal metal roof with catch-type hardware (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY Estimated recovery period for construction costs: about 8 to 9 years (self-consumption) *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system. |
| Construction Period |
| About 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the installation of solar panels and storage batteries. I heard that grants are available, and I would like to know how much can be provided. |
Our Proposal
We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the estimate!
How to Choose a Solar Panel Installation Contractor in Yokosuka City
There are many solar panel installation contractors available in Yokosuka City, and you may be unsure which contractor to choose.
Therefore, when requesting solar panel installation and battery storage installation work, let’s confirm the following four points.
● Have extensive knowledge not only about solar panels but also about roofs
● Confirm the presence of warranties and aftercare services
● Obtain estimates from multiple contractors (three companies as a guideline)
● Check if they provide support for subsidy applications
By confirming the above four points, you will be able to choose a reliable contractor.
Knowledge about roofs as well as solar panels
Improper installation of solar panels can be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles caused by insufficient checks on roofs and waterproofing
・Installed solar panels on a severely deteriorated roof, leading to leaks
・Installed solar panels on a roof with a short lifespan, requiring renovations to detach and reattach the solar panels within a few years
・Misjudged the type of waterproofing and performed incorrect treatment, resulting in leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.
▶ Go to “Roof Check Before Installing Solar Panels” in this article
Confirm the presence of warranties and aftercare services
When choosing a solar installation contractor, let’s confirm the presence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.
While solar panels and battery storage units come with manufacturer warranties, also check for the presence of installation warranties in case leaks occur after installation!
For contractors that offer installation warranties, if leaks occur after installation, they may cover the repairs under the warranty, provided it is within the warranty period and conditions.
Additionally, some contractors offer aftercare services separate from warranties, so be sure to check if the contractor you are considering has aftercare services.
Since abnormalities or damages on the roof may not be visible, you might not notice them yourself.
By conducting inspections of hidden areas during aftercare maintenance, you can more easily detect abnormalities early and prevent major repairs or failures!
At Kakeru Koumuten Co., Ltd., the installation of solar panels comes with a leak warranty as part of the workmanship warranty. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty without performing roof renovations.)
We also provide aftercare maintenance, sending out annual DM!
After checking the DM, if you wish, we will visit you for aftercare maintenance!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting solar panel installation, let’s obtain estimates from multiple contractors.
Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-sales services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates, please check:
“Verification of estimate items”
“Type of solar panel”
“Warranties and after-sales services”
and make a detailed comparison! Avoid judging solely based on cost, as using lower-grade materials or skipping processes can reduce costs!
▶ To “Breakdown of installation capacity, equipment, and construction costs” in this article
Check if they provide support for subsidy applications
There may be subsidies available for solar panel installation and battery installation, but if the order of procedures is incorrect or there are deficiencies in the documents, the subsidy may not be granted.
For systems like Kanagawa Prefecture’s housing subsidies, where applications cannot be submitted by contractors and must be done by the individual, it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the prefectural housing subsidy, this means obtaining a grant decision) before proceeding with the construction!
For the prefectural housing subsidy, after the construction is completed, a performance report must be submitted, and it will go through a review process before the grant is awarded! (The flow of procedures varies by system)
▶ To “Subsidies and grants that may be applicable in Yokosuka City” in this article
Benefits of Introducing Solar Equipment
The benefits of introducing solar panels are as follows!
Benefit 1: Economic Benefits
The biggest advantage of introducing solar panels is the economic benefit!
The selling price of electricity has decreased compared to ten years ago, but by consuming the generated electricity, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity costs rise, the ability to cover your power consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!
Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply for the fiscal year 2026. After the fifth year, it tends to be more advantageous to use it at home (self-consumption), making the combination with a storage battery a viable option.
👉 Ministry of Economy, Trade and Industry | For purchase prices and periods, click here
Advantage 2 Subsidies can be utilized!
The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In the case of Yokosuka City, there is a possibility of being eligible for programs from the national government, Kanagawa Prefecture, and Yokosuka City (please check the application status for each program).
Advantage 3 Environmentally friendly!
Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices like power conditioners may have operational noise.)
Advantage 4 Heat insulation effects are expected!!
By installing panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, this can help reduce the temperature rise of the roof, providing a heat insulation effect!
(Note that this does not improve the insulation performance of the building itself.)
Benefit 5 Electricity can be used even during power outages!!
If a storage battery is installed, it becomes possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation functionality, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)
What points should be noted when introducing solar power generation?
Next, we will explain the “three points to note” when installing solar panels!
Point 1 Maintenance costs can be high
A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorated, it is reassuring to renovate it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It would be reassuring to consider maintenance costs in simulations before introducing solar panels!
Point 2 The risk of leaks increases depending on the roofing material
The fixing methods for slate roofs and tile roofs vary by construction method, but when using screws or other fasteners to secure the roofing material and substrate, waterproofing at the fixed points becomes crucial.
If the method involves making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and the fasteners, and it cannot be used with all metal roofs.)
Catch-type base fasteners specifically for horizontal metal roofs
Point 3 The Roof Becomes Heavier
Installing solar panels will make the roof heavier. After investigating the existing roof, substrate, and load capacity, replacing with a lightweight roof may also be one option if necessary.
How to Choose Solar Panels?
There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
We will introduce points to compare when choosing solar panels!
Choosing Method 1 Compare by Total Output of the Roof
When installing solar panels on the roof, it is important to know how much electricity can be generated in a limited area, and generating more electricity is always better!
The sizes and outputs of solar panels vary by manufacturer.
A 350W output panel and a 400W output panel may seem at first glance that the panel with higher output is better.
However, if the size of the panel does not fit well on the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” resulting in different installation capacities on the same roof due to the size difference.
400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of one panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation amount (kWh) will vary depending on conditions such as the roof’s orientation, slope, and shading.
Choosing Method 2 Compare by Degradation Rate of Solar Panels
Solar panels have a degradation rate, and their output gradually decreases after 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation amount.
Choosing solar panels while considering the degradation rate, rather than just the initial output, will lead to a regret-free decision!
Choosing Method 3 Compare by Warranty Period
There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
For output warranties, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies!
Longer warranties are better, so be sure to check the warranty periods and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Power and Storage Battery Installation in Yokosuka City
We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Yokosuka City. (Tap to open answers)
How much does it cost to install solar panels and storage batteries in Yokosuka City?
The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
Guidelines for different capacities are published on the solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!
Are there any subsidies available for solar and storage battery installations in Yokosuka City?
As of October 6, 2026 (the city’s official page was published as of September 30), you can apply for the Yokosuka City Priority Measures Acceleration Project Subsidy (for households), where solar power (70,000 yen per kW) is eligible, and the execution rate is 80.4%. The subsidy for storage batteries (one-third of the total cost of the storage system and installation) has reached its budget and is no longer accepting applications. The Kanagawa Prefecture subsidy (70,000 yen/kW for solar power and 150,000 yen per unit for storage batteries) reached its budget on September 7 for the second phase of the 2026 fiscal year and has closed, and the national DR household storage battery project has ended its public recruitment.
Since the acceptance status may change, please check the subsidy and grant section and consult with us before signing a contract.
Can I apply for subsidies after the construction is completed?
Both the Yokosuka City subsidy and the Kanagawa Prefecture subsidy require procedures to be completed before construction. The city’s subsidy generally requires that work begins after the grant decision (a prior notice is necessary in unavoidable circumstances), and the prefectural subsidy also requires “work to begin after the grant decision”; starting work beforehand will disqualify you from eligibility.
The order of procedures varies by program, so please confirm before signing a contract or starting work.
Can solar panels be installed on a slate roof? I’m worried about leaks.
It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The method of securing varies by construction method, and when securing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is crucial.
Kakeru Koumuten is a company specializing in exterior renovations with strong expertise in roofing work, so we will check the condition of the roof before installation and suggest methods such as roof overlay or replacement if deterioration is advanced.
My roof is old. Should I do a roof renovation first?
It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, there will be additional costs for dismantling the solar panels. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with durable roofing materials before installation.
Please consult us on how to proceed with the installation after confirming the condition of the roof through an on-site survey!
Is it better to install a storage battery together with solar panels?
If you want to use the electricity generated at night or prepare for power outages, simultaneous installation is recommended. The selling price will be 8.3 JPY/kWh after the fifth year, making it more advantageous to use it at home rather than selling it.
Additionally, the subsidy in Kanagawa Prefecture requires the simultaneous introduction of solar power and storage batteries. The subsidy for the Yokosuka City priority measure acceleration project also applies only when storage batteries are installed at the same time as solar power generation equipment; installation of storage batteries alone is not eligible. You can compare “solar power only” and “solar power + storage batteries” using a financial simulation for your consideration.
How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the blueprints and on-site survey, and we will provide you with the installation capacity and power generation simulation.
In Yokosuka City, due to the proximity to hills and mountains, as well as the sea, the shading from surrounding buildings and trees, and the installable capacity will differ from house to house. You can check the expected power generation through the power generation simulation.
How long does the construction period take?
In the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is performed simultaneously or depending on the shape of the roof and installation capacity.
Please note that there will be an additional period for applying for subsidies and to the power company, so please consult us as soon as possible.
What is the current selling price (FIT)?
For residential use (under 10 kW), the selling price will be 24 JPY/kWh for the first 4 years and 8.3 JPY/kWh from the 5th to the 10th year for certifications after October 2025, and the same price will apply for the 2026 fiscal year.
The idea is to recover initial costs quickly in the first four years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity costs.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-maintenance guidance DM and visits customers who wish to have inspections. We can also clean solar panels with a special brush if the power generation decreases due to dirt.
Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.
Can you also handle renovations for roofs that already have solar panels installed?
Yes, we can. Kakeru Koumuten can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them consistently. The removed panels can be stored in our own warehouse.
For costs, please refer to the solar panel removal and water heater removal pricing page.
If you are looking for a solar panel installation company in Yokosuka City, please consult Kakeru Koumuten Co., Ltd.
Our company handles a wide range of exterior renovations from roofing work to exterior wall work, including solar panel installations in Yokosuka City.
We have received requests from many customers, including renovation companies and real estate agencies!
Kakeru Koumuten promises “high-quality renovations at low costs”, and we have received great feedback from numerous customers.
We continue to update our annual construction achievements and strive to improve quality so that we can satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior wall painting, and exterior wall cover methods.
We are also happy to handle small jobs such as partial repairs and rain gutter cleaning!
In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult with us!
“I want to know about recommended solar panels”, “I want to keep costs down as much as possible”, “I just want a quote for now”, we will provide the best solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and will propose the optimal construction plan!
We are confident that we will not be outdone in terms of cost, quality, and organization compared to other companies in exterior work!
We welcome competitive quotes with confidence!
Our estimates are completely free, and if you find that our company is inferior to others, you are free to decline!
Characteristics of Yokosuka City and Points for Solar Work
Yokosuka City is a core city located in the southeastern part of Kanagawa Prefecture, within 50 km of Tokyo.The city is characterized by hilly and mountainous terrain (Kamimachi Hills, Ookusuyama Mountains, Takeyama Mountains) with elevations around 100 to 200 meters, and there are few wide flat areas, and the coastline also has variations. Below are summarized the characteristics of Yokosuka City’s terrain and climate, and points to consider when installing solar panels and storage batteries. (Tap to open)
View the characteristics of Yokosuka City and points for solar work
■ In cities with many hills and mountains, pay attention to the scaffolding and delivery routes on sloped or uneven sites
Yokosuka City is characterized by its many mountains and hills, with few wide flat areas. In sloped areas or sites with elevation differences, careful planning for scaffolding and the transportation routes for equipment and materials such as panels and batteries may be necessary. Kakeru Koumuten Co., Ltd. plans scaffolding tailored to the site even when there are elevation differences, using its own scaffolding team and materials. Additionally, for sites close to mountains and trees, it is important to pay attention to the effects of shadows and the reduction of power generation due to fallen leaves and dirt, and we can also handle cleaning of solar panels and rain gutters with specialized brushes.
■ For locations near the sea, confirm the installation site and equipment specifications in advance
The northeastern part of Yokosuka City is described as a drowned valley of a ria coast, with the west coast having many coastal erosion areas, while the rest is generally composed of sandy beaches and capes. When installing in locations near the sea, it is essential to confirm in advance whether the panels, power conditioners, and batteries meet the manufacturer’s installation conditions (such as whether they are in areas subject to salt damage specifications). If you want to use electricity during a power outage, please consider installing a battery.
■ Prepare for rainfall by checking waterproofing and equipment placement
According to city documents, Yokosuka City tends to have many dry days and low precipitation, while the occurrence of rainfall exceeding 50mm per hour is somewhat frequent. To prepare for heavy rain in a short time, it is important to check the waterproofing of the panel fixing parts and the surrounding environment of the installation site for equipment such as batteries and power conditioners (whether it is a place where water tends to accumulate) before installation. Please check the information about your area on hazard maps and consult us about the installation site.
■ Because conditions differ in hilly, mountainous, and coastal areas, we check roofs and sites individually through on-site surveys
In Yokosuka City, where the conditions of sites near hills and the sea differ, the types of roofs, their ages, and sunlight exposure vary from house to house. At Kakeru Koumuten Co., Ltd., we check the type and condition of the roof and the situation of the site before installation and propose methods for fixing, waterproofing, and scaffolding planning.
■ The annual sunshine hours in neighboring Yokohama City is about 2,018 hours
According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours in Yokohama City, adjacent to Yokosuka City, is about 2,018 hours. Monthly, August (about 206 hours) has the most sunshine, while June during the rainy season (about 136 hours) has the least.
Power generation varies by season and location, so conducting a year-round power generation simulation and selecting battery capacity according to peak electricity usage times are key points.
Our company is based in Kanagawa Prefecture and handles many exterior construction and solar projects in Yokosuka City.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!
Service Area in Yokosuka City
Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and Tokyo.
List of Areas in Yokosuka City
Yokosuka City, Akiya / Yokosuka City, Ashina / Yokosuka City, Abekura / Yokosuka City, Awata / Yokosuka City, Anjindai / Yokosuka City, Ikegami / Yokosuka City, Ikedacho / Yokosuka City, Inaokacho / Yokosuka City, Fuiritocho / Yokosuka City, Iwadō / Yokosuka City, Uchikawa / Yokosuka City, Uchikawa Shinden / Yokosuka City, Uraga / Yokosuka City, Uragaoka / Yokosuka City, Urakami-dai / Yokosuka City, Uragōcho / Yokosuka City, Kamimachi / Yokosuka City, Ota Kazu / Yokosuka City, Otaki-cho / Yokosuka City, Otsu-cho / Yokosuka City, Oyabe / Yokosuka City, Ogawacho / Yokosuka City, Ogino / Yokosuka City, Ouhama Higashimachi / Yokosuka City, Ouhama Minamimachi / Yokosuka City, Ouhama Honmachi / Yokosuka City, Ouhama-cho / Yokosuka City, Obara-dai / Yokosuka City, Kanaya / Yokosuka City, Kamoi / Yokosuka City, Kinugasa Eicho / Yokosuka City, Kinugasa-cho / Yokosuka City, Kōgōcho / Yokosuka City, Kusunokigawacho / Yokosuka City, Kubisato / Yokosuka City, Kumura / Yokosuka City, Kurihama / Yokosuka City, Kurihama-dai / Yokosuka City, Green Heights / Yokosuka City, Kōfūdai / Yokosuka City, Koyasu / Yokosuka City, Koyabe / Yokosuka City, Sakamoto-cho / Yokosuka City, Sakuragaoka / Yokosuka City, Sazima / Yokosuka City, Sazima no Oka / Yokosuka City, Sano-cho / Yokosuka City, Sawara / Yokosuka City, Sarushima / Yokosuka City, Shioiricho / Yokosuka City, Shiomidai / Yokosuka City, Shonan Kokusai Mura / Yokosuka City, Shonan Takatō / Yokosuka City, Shinminato-cho / Yokosuka City, Shinmei-cho / Yokosuka City, Sugarayama / Yokosuka City, Tanaura Izumi-cho / Yokosuka City, Tanaura Daisaku-cho / Yokosuka City, Tanaura Minato-cho / Yokosuka City, Tanaura-cho / Yokosuka City, Takatō / Yokosuka City, Take / Yokosuka City, Tanatodai / Yokosuka City, Tsukui / Yokosuka City, Tsurugaoka / Yokosuka City, Tomari-cho / Yokosuka City, Nagai / Yokosuka City, Nagaura-cho / Yokosuka City, Nagasaka / Yokosuka City, Nagasawa / Yokosuka City, Nagase / Yokosuka City, Natsushima-cho / Yokosuka City, Nishi Uraga / Yokosuka City, Nishi Itsumimachi / Yokosuka City, Negishi-cho / Yokosuka City, Nobi / Yokosuka City, Highland / Yokosuka City, Hazakizaki-cho / Yokosuka City, Hashirimizu / Yokosuka City, Hamamidai / Yokosuka City, Hayashi / Yokosuka City, Higashi Uraga / Yokosuka City, Higashi Itsumimachi / Yokosuka City, Hikari no Oka / Yokosuka City, Hinode-cho / Yokosuka City, Heisaku / Yokosuka City, Fukatadai / Yokosuka City, Fujimimachi / Yokosuka City, Futaba / Yokosuka City, Funakura / Yokosuka City, Funakoshi-cho / Yokosuka City, Heisei-cho / Yokosuka City, Heiwa-dai / Yokosuka City, Itsumi ga Oka / Yokosuka City, Bōyōdai / Yokosuka City, Honmachi / Yokosuka City, Umabori Kaigan / Yokosuka City, Umabori-cho / Yokosuka City, Midorigaoka / Yokosuka City, Minato ga Oka / Yokosuka City, Miharu-cho / Yokosuka City, Miyuki Hama / Yokosuka City, Morizaki / Yokosuka City, An’yū-cho / Yokosuka City, Yamashina-dai / Yokosuka City, Yamanaka-cho / Yokosuka City, Yoshii / Yokosuka City, Yoshikura-cho / Yokosuka City, Yonegahama-dori / Yokosuka City, Wakamatsu-cho / Yokosuka City, Wakamiya-dai
・Trust Kakeru Koumuten for exterior wall painting in Yokosuka City!
・Trust Kakeru Koumuten for roof renovations in Yokosuka City!
・Trust Kakeru Koumuten for exterior renovations in Yokosuka City!
・Kakeru Koumuten Co., Ltd. Project Achievements
・Kakeru Koumuten Co., Ltd. Aftercare Services
・Kakeru Koumuten Co., Ltd. Construction Menu and Price List
・Kakeru Koumuten Co., Ltd. Staff Blog and Announcements
・Explaining the Importance of Comparing Estimates!
・Top 12 Solar Power Generation Manufacturers! Features and Selection Tips!
・What are the installation costs for solar power generation? Comprehensive tips to reduce costs!
・What are the best locations for solar power installation? Key points for site selection!
・Check out our solar power generation estimates here!
We welcome inquiries via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!