For solar panel and battery installation in
Meguro, Tokyo,
trust Kakeru Koumuten!

Kakeru Koumuten is a company specializing in exterior renovations based in Aoba Ward, Yokohama City.
As a company strong in roofing work, we are entrusted withsolar panel and battery installation considering roofing and waterproofing!

“How to Choose a Solar Panel Contractor in Meguro”
“Costs for Solar Panel and Battery Installation”
“Subsidies Available for Solar System Installation in Meguro”
We will also explain the above three points!

Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtainingthree estimates!

Trust Kakeru Koumuten for solar panel and battery installation in Meguro, Tokyo
Table of Contents (tap to open/close)
  1. Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Meguro, Tokyo
  2. Roof Inspection Before Installing Solar Panels
  3. Possible Subsidies and Grants Available in Meguro
  4. Price List for Solar Panel and Storage Battery Installation
  5. Breakdown of Installation Capacity, Equipment, and Construction Costs
  6. Self-Estimate and Profit Simulation for Solar Power Generation
  7. Customer Testimonials
  8. Case Studies of Solar Panel Installations
  9. How to Choose a Solar Panel Installer in Meguro, Tokyo
  10. Benefits of Introducing Solar Equipment
  11. Points to Note When Introducing Solar Power Generation
  12. How to Choose Solar Panels
  13. Frequently Asked Questions About Solar and Storage Battery Installation in Meguro
  14. If You’re Looking for a Solar Panel Installer in Meguro, Contact Kakeru Koumuten
  15. Characteristics of Meguro, Tokyo and Points for Solar Construction
  16. Service Area in Meguro, Tokyo

Reasons Kakeru Koumuten is Chosen for Solar Panel Installation in Meguro, Tokyo

Link Banner to Kakeru Koumuten's Strengths Page

The reasons why our company is entrusted with solar panel installation by customers in Meguro, Tokyo include
one reason being that “Kakeru Koumuten serves Kanagawa and Tokyo as its service areas”,
and we have “strengths in solar panel installation that cannot be imitated by other companies”, which has received high praise from many customers.

In solar panel installation work in Meguro, we have absolute confidence in “cost,” “quality,” and “plans”,
so we would appreciate it if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We Can Also Handle Exterior Renovations Other Than Solar Panel Installation!

Installation work of solar panels on the roofSolar panels installed on the roof
Troubles such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It is reassuring to have expertise in roofing to avoid maintenance issues and troubles after installation!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!

2.Facilities Specialized in Exterior Renovation

Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases centered in Yokohama City, Kanagawa Prefecture for material storage and showrooms.

In-house Scaffolding Materials

Entrance to the material storage areaIn-house owned scaffolding materials
To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding according to the construction conditions, allowing us to assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs for scaffolding work.
We own scaffolding materials for approximately 50 houses!
Even in residential areas like Meguro Ward, our in-house scaffolding team will plan scaffolding according to the site conditions.

Storage of Materials in Our Large In-house Warehouse

Appearance of the material warehouse Interior of the warehouse storing materials
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you can purchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we can respond quickly in emergencies!

In-house sorting and transportation of waste materials

Sorting space for waste materialsThe installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.

Exterior renovation dedicated showroom

Appearance of the exterior renovation dedicated showroomInterior of the showroom
In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are attached to the roofing materials!
We can also provide simulations of the potential revenue and installation costs when introducing solar panels!

Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!

3.All work performed by our own team

Diagram of the system for performing scaffolding, painting, and roofing renovations in-house

One of Kakeru Koumuten’s major strengths is its complete in-house construction.

By having Kakeru Koumuten manage everything from inquiries to project completion in a consistent manner, we can keep costs down while providing high-quality roof renovations.
Additionally, one representative will handle your case from the estimate to the completion of the work.
Since the person in charge does not change, whether it’s the sales representative or the construction management representative, smooth communication is possible.

We can perform consistent in-house construction from temporary scaffolding installation, exterior wall painting, to roof renovations!

4. Various Permits Obtained & Skilled Workers on Staff

Construction Industry LicenseDisplay of Permits and Qualifications Obtained by Kakeru Koumuten
We have obtained construction industry licenses as well as permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists on staff, and we are confident in our construction techniques.
We can also handle large-scale roofing projects such as those for factories!

5. Warranty and Aftercare Maintenance

Link Banner to Kakeru Koumuten's Warranty Information Page

In addition to the manufacturer’s warranty for solar panel installation work, our own construction warranty (leakage warranty) is also included!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless a roof renovation is performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary based on the warranty details.)
Aftercare maintenance is available every year, and we send out notification DM each year.
If you have questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Roof and Solar Panel Inspection Response

Our company is equipped to handle various roofing troubles and situations.

Even if you cannot access the roof at high altitudes, we can utilize drones to assist!
During leak investigations, we can also conduct inspections using a thermal imaging camera.

If the power generation of solar panels decreases due to dirt or other factors, we can also provide cleaning services using specialized brushes.
We will respond according to your preferences.

7. Human Resource Development

Training using models

To improve skills, we create various roofing models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly provide technical training to ensure that each staff member can handle various cases.

Company Overview神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

8. Creation of Easy-to-Understand Materials and Simulations

Examples of materials and simulations provided during solar panel installation

Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and a “profit and loss simulation” that takes into account loan interest rates and electricity costs.
The profit and loss simulation can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction will receive materials that clearly summarize important points and disadvantages!

We encourage you to obtain comparative estimates and compare them with other companies’ plans!

Roof Inspection Before Installing Solar Panels

Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “Is it okay to install them directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, specializing in roofing work, has summarized the items to check before installation.

1. Types of Roofing Materials and Age The fixing method varies depending on the roofing materials such as slate, tiles, metal roofs, and flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first.
2. Condition of Substrate and Waterproof Sheet If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it will affect the fixing strength of the fittings and waterproofing. We will also check for any signs of leaks.
3. Orientation, Slope, and Shadows of the Roof The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, can affect the amount of electricity generated. We will create a layout diagram from the drawings and the site, and you can confirm it with a power generation simulation.
4. Shape of the Roof and Usable Area The number of panels that can be installed (installation capacity) is determined by the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we will compare based on the total output of the roof.
5. Fixing Method and Waterproofing Details We will check whether the method involves drilling holes in the roofing material for fixing or using fittings to secure the roofing material. The fixing method varies by technique, so please confirm the waterproofing treatment of the fixing parts during the estimate.
6. Weight of the Roof The roof will become heavier due to the panels being installed. After investigating the existing roof, substrate, and load capacity, switching to lighter roofing materials may also be an option if necessary.
7. Installation Location of Equipment and Wiring We will confirm the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect costs.

Fixing Methods and Confirmation Points by Roofing Material

Roof Material Main Fixing Method Pre-Installation Check Points
Slate Roof Varies by method (e.g., fixing brackets to the roof material and substrate with screws) Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first.
Tile Roof Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will secure to the substrate) Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lightweight roofing materials before installation.
Metal Roof (Horizontal and Vertical) Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available.
Flat Roof / Rooftop Fixed by installing a frame Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work.
If you carry out roof renovations at the same time, you may be able to reduce future costs for removing and reinstalling solar panels!
If you perform roof renovations 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!

▶ Click here for roof renovations in Meguro, Tokyo

Subsidies and Grants That May Be Applicable inMeguro, Tokyo

If you are introducing solar panels or storage batteries in Meguro, Tokyo, there may be programs from the “National Government,” “Tokyo Metropolitan Government,” and “Meguro Ward” that are applicable.
The following information is based on the official pages of each program as of October 7, 2026. The application status may change due to budget and recruitment periods, so please check the latest information before contracting or starting work.

Eligibility Conditions and Application Timing for Subsidy Programs

Program Main Eligibility Conditions Subsidy Amount Application Period & Status
Tokyo Metropolitan Government “Reiwa 8 Year Household Solar Power Introduction Promotion Project” (Cool Net Tokyo) New installation of certified solar modules in residential properties or their premises within Tokyo, with a system capacity of less than 50kW. Pre-application before installation is required. Existing homes: 150,000 JPY/kW for 3.75kW or less (maximum 450,000 JPY), 120,000 JPY/kW for over 3.75kW
New homes: 120,000 JPY/kW for 3.6kW or less (maximum 360,000 JPY), 100,000 JPY/kW for over 3.6kW
(Additional costs for mounting frames, waterproofing work, and renovation defect insurance, etc.)
Pre-application: From May 29, 2026
Grant application and performance report: From June 30, 2026 to March 30, 2029
Tokyo Metropolitan Government “Reiwa 8 Year Household Storage Battery Introduction Promotion Project” (Cool Net Tokyo) New installation of storage batteries in residential properties within Tokyo, and must be SII registered equipment. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries only. Pre-applications after October 1, 2026 will only be for SII registered products for Reiwa 8. Storage battery package: 100,000 JPY/kWh (maximum 1,200,000 JPY per household)
Storage battery unit expansion: 60,000 JPY/kWh (maximum 720,000 JPY per household)
(Additional incentives for participation in DR demonstrations, etc.)
Pre-application: From May 29, 2026
Grant application and performance report: From June 30, 2026
Meguro Ward “Subsidy for Installation Costs of Residential Renewable Energy and Energy-Saving Equipment” Reiwa 8 Year Individuals or managers/management corporations defined by the Building Unit Ownership Act are eligible. Installation must be completed between January 1 and December 31, 2026, and pre-application is not required (contracts can be made before application). All necessary documents must be submitted at the time of application. Solar power generation system: 30,000 JPY per kW (maximum 150,000 JPY)
Home storage system: Within one-third of the equipment’s main price (maximum 70,000 JPY)
Application acceptance: From June 1, 2026 to January 29, 2027 (first-come, first-served)
As of September 29, 2026, the application amount against the budget is reported to be 82.2% on the ward’s official page. The program may end once the budget is reached.
National Government “DR Household Storage Battery Project” (Reiwa 7 Year Supplement) New installation of household storage systems that can be utilized for DR (demand response) with registered products. Calculated based on an initial effective capacity of 34,500 JPY per kWh (subsidy rate within 3/10; maximum 600,000 JPY per application). The budget was reached on May 29, 2026, and the public recruitment has ended (applications cannot be made currently).
National Government “Mirai Eco Housing 2026 Project” (Renovation) Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovation of windows (openings) and the building structure; applications cannot be made for the installation of storage batteries alone. Solar panels are not included as eligible facilities. Storage Battery: 96,000 JPY/unit Ends as soon as the budget limit is reached. Please check the official website for the application status.
Please pay attention to the “order of procedures” for subsidies!
In Tokyo, a pre-application before installation is required for subsidies, and starting construction beforehand may disqualify you. In Meguro City, pre-application is not necessary, and contracts can be made before application, but you must meet requirements such as the timing of installation handover and necessary documents, and it is not guaranteed that you will receive the subsidy upon application. The Meguro City subsidy is on a first-come, first-served basis, and applications will close once the budget is reached. For combined use with national and Tokyo subsidies, please check the official pages of each system. Procedures differ by system, so please confirm before contracting or starting construction.
At Kakeru Koumuten, we will guide you on the eligibility conditions for each system after confirming them.

Tokyo “Reiwa 8 Year Household Solar Power Generation Promotion Project”

Tokyo is providing subsidies for those installing solar power generation systems in residential homes through Cool Net Tokyo. The target is systems using certified solar cell modules installed newly in residential homes or on their premises, with a capacity of less than 50 kW. A pre-application before installation is required.

For existing homes, the subsidy amount is 150,000 JPY/kW for 3.75 kW or less (maximum 450,000 JPY), and 120,000 JPY/kW for over 3.75 kW. Additionally, there are supplementary items such as installation of mounting frames, waterproofing work, and renovation defect insurance. The pre-application period is from May 29, 2026, and the application for subsidy and performance report is from June 30, 2026, to March 30, 2029. For details on eligible equipment and conditions, as well as the budget status, please check the official page.
👉 Cool Net Tokyo | Official page for solar power generation is here

Tokyo “Reiwa 8 Year Household Storage Battery Promotion Project”

Tokyo is also providing subsidies for newly installed storage batteries in residential homes. The subsidy amount is 100,000 JPY per kWh for storage battery packages (maximum 1,200,000 JPY/unit), and 60,000 JPY per kWh for additional storage battery units (maximum 720,000 JPY/unit), with additional amounts for participation in DR demonstrations.

The target is equipment registered with SII (Environmental Collaboration Initiative). If you apply for pre-application after October 1, 2026, only equipment listed in the Reiwa 8 year SII registered product list will be eligible. This project is intended for simultaneous installation with solar power, but applications can be made for storage batteries alone. The application for subsidy and performance report has been open since June 30, 2026.
👉 Cool Net Tokyo | Official page for storage batteries is here

Meguro City “Subsidy for Installation Costs of Renewable Energy and Energy-Saving Equipment for Residential Use”

Meguro City is providing subsidies for those installing renewable energy equipment and energy-saving equipment in residential homes. The subsidy amount for Reiwa 8 year is 30,000 JPY per kW for solar power generation systems (maximum 150,000 JPY), and up to 70,000 JPY for home storage systems, which is within one-third of the equipment’s main price. The targets are individuals or managers of buildings as defined by the law concerning the ownership of buildings.

No prior application required, and contracts can be made before application, but installation delivery must be between January 1, 2026, and December 31, 2026. Applications can be submitted online or by mail from June 1, 2026, to January 29, 2027, on a first-come, first-served basis. All necessary documents must be submitted at the time of application. According to the district’s official page, as of September 29, 2026, the percentage of application amounts against the budget is 82.2%.
👉 Here is the official page of Meguro Ward (Subsidy for installation costs of renewable energy and energy-saving equipment for residential use)

National Subsidy “DR Household Storage Battery Project (Support Project for the Introduction of Household Storage Systems for DR Resources)”

The government has been implementing the “DR Household Storage Battery Project” to support the installation of household storage batteries.

This program targets those who are newly introducing registered products’ storage systems that can be used for demand response (DR), and in the fiscal year 2025 supplementary budget, the subsidy amount is determined based on a standard amount of 34,500 JPY per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum of 600,000 JPY per application. There are conditions such as those contracted or ordered before the grant decision are not eligible.

However, the fiscal year 2025 supplementary budget application amount reached the budget on May 29, 2026, and the public recruitment has ended (the previous fiscal year’s supplementary budget also ended public recruitment on July 2, 2025). Applications are currently not possible, so please check the official site for future public recruitment.

Additionally, there are currently no subsidies confirmed for the installation of solar panels for existing homes.
👉 Here is the official site for the DR Household Storage Battery Project

Solar Panel Installation & Storage Battery Installation Price List

Construction menu for solar panel installation and storage battery installation
⇧ Construction Menu | For costs regarding solar panel installation and storage battery installation, click here

Solar panel removal and hot water heater removal service menu
⇧Service Menu | Click here for costs related to solar panel removal and hot water heater removal

Estimate guidance

Breakdown of Installation Capacity, Equipment, and Construction Costs

The costs for solar panels and storage batteries should be checked separately as “Equipment Costs (Equipment Price)” and “Construction Costs”.
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.

Considerations for Installation Capacity (kW) and Storage Battery Capacity (kWh)

The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatt). Storage batteries are compared based on the amount of electricity they can store, expressed in kWh (kilowatt-hour).
The amount of kW that can be installed on a roof varies for each house based on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.

On our pricing page, we list solar panels at approximately 800,000 JPY to 1,200,000 JPY for 3-5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just rough estimates and may vary based on wiring length, scaffolding range, existing roofing materials, panel layout, etc.)
▶ Service Menu | Click here for costs related to solar panel installation and storage battery installation

Items to Check in the Estimate (Cost Verification)

When comparing estimates, it is common to compare different capacities and equipment by looking only at the amounts. Please check if the following items are clearly stated in the estimates from each company!

1. Solar Panels Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) are specified.
2. Power Conditioner Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls in conjunction with a storage battery.
3. Storage Battery Manufacturer, model number, capacity (kWh), range usable during a power outage (entire house or specific circuits), installation location.
4. Mounting Frame and Fittings Name of the fittings suitable for the roofing material and the method of securing them (whether it is a method that drills holes or a method that grips and secures).
5. Wiring and Electrical Work Wiring route and length, work around the distribution board, presence of a monitor to check power generation.
6. Roof Reinforcement and Waterproofing Details of waterproofing treatment at the fixed parts, whether necessary roof repairs and substrate reinforcements are included.
7. Application Extent of support for applications to the power company, certification application for selling electricity (FIT), and subsidy applications.
8. Scaffolding Scope and quantity of scaffolding. If roof work and exterior painting are done simultaneously, check that the same scope and quantity are not counted twice.
9. Removal and Disposal Whether the removal of existing solar thermal water heaters and old panels, as well as disposal costs for waste materials, are included.
10. Tax Classification and Warranty Whether it is tax-inclusive or tax-excluded, conditions under which additional costs may arise, and details and duration of manufacturer and workmanship warranties.
Tips for Comparison: “Installation Capacity (kW)” and “Equipment Model Number” should be aligned for comparison!
If the capacity differs, both the price and power generation will change. Kakeru Koumuten Co., Ltd. welcome multiple estimates, so if you bring estimates from other companies, we will explain the differences for each item!

Self-Estimate and Profit Simulation for Solar Power Generation

Self-Estimate and Profit Simulation for Solar Power Generation

With the simulator above,
you can obtain an approximate estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can get an approximate estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.

Customer Voices

Case Studies of Solar Panel Installations

BEFORE

Metal roof with horizontal seams before solar panel installation

AFTER

Roof after solar panel installation

Construction Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3kW
 Battery: 5kWh class
Base Mounting Hardware Used
 Niigata Manufacturing/Aluminum Catch Type Hardware
Fixing Method & Waterproofing Arrangement
 Fixed by gripping the horizontal metal roof with catch type hardware (Catch Method)
Price Range
 2,200,000 JPY~2,300,000 JPY
 *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY
 Expected recovery period for construction costs: about 8 to 9 years (self-consumption)

 *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system.
Construction Period
 About 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that grants are available, and I would like to know how much can be provided.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have understood the expected amount of grants that will be provided, and we explained this to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Meguro, Tokyo

There are many solar panel installation companies that serve Meguro Ward, Tokyo, and you may be unsure which one to choose.

Therefore, when requesting solar panel installation and battery storage installation work, let’s check the following 4 points.

● Have extensive knowledge not only about solar panels but also about roofs

● Confirm the presence of warranties and aftercare maintenance

● Obtain estimates from multiple companies (3 companies as a guideline)

● Check if they provide support for subsidy applications

By confirming the above 4 points, you will be able to choose a reliable company.

Which Solar Power Installation Company is Best? Introducing How to Choose Without Regret!When considering the introduction of solar power generation, the mos...

Have knowledge not only about solar panels but also about roofs

Defective installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.

⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing

・Solar panels were installed on a severely deteriorated roof, leading to leaks
・Solar panels were installed on a roof with a short lifespan, necessitating a renovation to detach the solar panels within a few years
・Misjudgment of the type of waterproofing led to incorrect processing and resulted in leaks
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.

▶ Go to “Roof Verification Before Installing Solar Panels” in this article

Confirm the presence of warranties and aftercare maintenance

When choosing a solar installation company, let’s confirm the presence of warranties. It’s important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.

Solar panels and battery storage units come with manufacturer warranties, but also check for the presence of a workmanship warranty in case leaks occur after installation!

If the company offers a workmanship warranty, they may cover any leaks that occur after installation within the warranty period and conditions.

Additionally, some contractors offer after-sales service separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Changes or damage on the roof may occur in areas that are not visible, so there is a possibility that customers may not notice them.
By conducting inspections during after-sales maintenance, we can detect abnormalities early, making it easier to prevent major repairs or failures!

Kakeru Koumuten Co., Ltd. provides a rain leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed.)
We also conduct after-sales maintenance and send out annual DM!
After checking the DM, if you wish, we will visit for after-sales maintenance!

About Kakeru Koumuten Co., Ltd. WarrantyKakeru Koumuten Co., Ltd. provides a simple explanation of our roof construction, exterior wall painting, and sealing work guarantees!! We do not require any advance or interim payments!!...

Obtain estimates from multiple contractors (3 companies as a guideline)

When requesting solar panel installation, be sure to obtain estimates from multiple contractors.

Even for the same manufacturer and the same construction content, costs may vary, as well as warranties and after-sales services.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request services from your preferred contractor at a lower price, we recommend obtaining estimates from multiple contractors.

When comparing estimates, please check:

“Check the items in the estimate”
“Type of solar panel”
“Warranties and after-sales services”

Make sure to compare these details carefully! If the quality of the auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making judgments based solely on price!

▶ Go to “Breakdown of Installation Capacity, Equipment, and Construction Costs” in this article

[Yokohama City] The Importance of Comparing Estimates for Roof Renovation and Key Points to Consider! /* ===== 翔工務店|横浜市 屋根リフォーム見積もり記事(貼り付け専用・JIN干渉対策済) ===== */ #toc_co...

Check if they provide support for subsidy applications

Subsidies may be available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
Some systems require personal applications and cannot be handled by the contractor, and some require prior applications before installation, so it is reassuring to have a contractor who can support you in preparing necessary documents and understanding the application process.
Complete the procedures specified for each system (for Tokyo’s subsidy, a prior application is required) before proceeding with the construction! In Meguro Ward, prior application is not required, and contracts can be made even before the application!

In the case of subsidies in Tokyo, the process involves submitting a grant application and performance report after the completion of the work, followed by a review before the grant is awarded! For the subsidy in Meguro Ward, you need to gather the necessary documents and apply after the installation handover, which will also go through a review before the grant is awarded! (The procedure varies depending on the system.)

▶ Go to “Subsidies and Grants that May Be Applicable in Meguro Ward” within this article

Benefits of Introducing Solar Power Equipment

The benefits of introducing solar panels are summarized in the following five points!

Benefit 1: Economic Advantage

Illustration of household budget

The biggest advantage of introducing solar panels is the economic benefit!
While the selling price of electricity has decreased compared to ten years ago, you can gain benefits by reducing the electricity purchased from the power company through self-consumption of the generated electricity!
As electricity prices rise, the ability to cover consumption with solar power becomes increasingly attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!

Furthermore, the selling price (FIT) for residential use (under 10kW) will be set at “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the fifth year, it tends to be more advantageous to use it at home (self-consumption), making the combination with a storage battery a viable option.
👉 For details on purchase prices and periods, visit the Agency for Natural Resources and Energy

Benefit 2 Utilizing Subsidies!

Illustration of a happy person saving costs

The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
Reducing the actual burden amount through subsidies is a significant advantage!
In the case of Meguro Ward, in addition to national and Tokyo metropolitan programs, there may be eligibility for the Meguro Ward Residential Renewable Energy and Energy Conservation Equipment Installation Cost Subsidy (30,000 yen per kW for solar power generation, with a maximum of 150,000 yen; for storage systems, within one-third of the main unit price, with a maximum of 70,000 yen) (No prior application is required for the ward’s subsidy, and it is on a first-come, first-served basis).

Benefit 3 Environmentally Friendly!

Illustration of environmentally friendly solar power generation

Solar power generation contributes to the mitigation of global warming by reducing carbon dioxide emissions and dependence on fossil fuels.
Since solar panels themselves do not produce noise or exhaust gases during the power generation process, they are considered an environmentally friendly method of generating electricity. (Devices such as power conditioners may have operational noise.)

Benefit 4 Expect heat insulation effects!!

Illustration of heat insulation by solar panels

By installing them on the roof or rooftop, the panels block direct sunlight from hitting the roof.
Especially in summer, they can help suppress the rise in roof temperature, providing expected heat insulation effects!
(Note that this does not improve the insulation performance of the building itself.)

Benefit 5 Electricity can be used even during power outages!!

Illustration of a house that can use electricity during a power outage

If a storage battery is installed, it is possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capability, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)

What are the Benefits of Installing Solar Panels? An Explanation of the Surprisingly Unknown Disadvantages!In recent years, due to rising electricity costs, increased environm...

What points should be noted when introducing solar power generation?

Next, we will explain the “three points to note” when installing solar panels!

Illustration of a person explaining points to note

Point 1 Maintenance costs are incurred

A particularly overlooked maintenance cost is for the roof where the solar panels are installed.
If you perform roof renovations 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing the solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.

It is reassuring to ask for a simulation that considers maintenance costs before introducing solar panels!

Point 2 The risk of leaks increases depending on the roofing material

The methods for securing slate roofs and tile roofs vary depending on the construction method, but in methods that fix brackets to roofing materials and substrates with screws, waterproofing treatment at the fixed points is crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing treatment, but if you are concerned about making holes, one option is to replace the roofing material itself with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and the brackets, and it cannot be used with all metal roofs.)

Catch-type base brackets for horizontal metal roofsCatch-type base brackets for horizontal metal roofs

Note 3: The roof will become heavier

Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load-bearing capacity, replacing it with a lighter roof may also be an option if necessary.

13 Common Troubles with Solar Power Installation! Introducing Solutions and Preventive Measures!By installing solar power generation at home, you can expect various...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output and costs vary widely.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

How to Choose 1: Compare by Total Output of the Roof

When installing solar panels on the roof, it is important to know how much electricity can be generated in a limited area, and the more electricity generated, the better!

Solar panels come in various sizes depending on the manufacturer, and their outputs differ.
For example, a 350W output panel and a 400W output panel may seem at first glance that the higher output panel is better.
However, if the size of the panel does not fit well with the roof, “20 panels of 350W can be installed, while only 15 panels of 400W can be installed,” meaning that the number of panels that can be installed on the same roof may differ due to the size of the panels.

400W×15 panels = 6kW (total output of the roof)
350W×20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than the output of a single panel!
*The above calculations are for total output (kW). The actual electricity generation (kWh) will vary depending on conditions such as the roof’s orientation, slope, and shading.

How to Choose 2: Compare by Degradation Rate of Solar Panels

Solar panels have a degradation rate, and their output gradually decreases over 10 years and 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output warranty value is a standard figure for guarantees and does not indicate the actual degradation rate or the amount of electricity generated.
Choosing solar panels while considering the degradation rate, not just the initial output, will lead to a decision without regrets!

How to Choose 3: Compare by Warranty Period

There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding output warranties, some manufacturers offer a 30-year warranty, while others provide a 10-year warranty, so it varies widely!
A longer warranty is always better, so be sure to check the warranty periods and conditions of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

Frequently Asked Questions about Solar and Battery Installation in Meguro Ward

We have compiled frequently asked questions from customers considering the installation of solar panels and batteries in Meguro Ward. (Tap to open the answers)

How much does it cost to install solar panels and batteries in Meguro Ward, Tokyo?

The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.

Guidelines for different capacities are published on the solar panel and battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!

Are there any subsidies available for solar and battery installation in Meguro Ward?

As of October 7, 2026, Tokyo’s subsidies for solar power generation and batteries (Cool Net Tokyo) are accepting pre-applications. For batteries, only SII registered devices (registered products for Reiwa 8) will be eligible from pre-applications made after October 1, 2026. The subsidy for renewable energy and energy-saving equipment installation costs for residential use in Meguro Ward (30,000 yen per kW for solar power generation, with a maximum of 150,000 yen; for battery systems, within one-third of the main price, with a maximum of 70,000 yen) is open until January 29, 2027, and the official page of the ward states that as of September 29, 2026, the application amount ratio against the budget is 82.2% (first-come, first-served, and will end once the budget is reached). The national DR household battery project has already closed its public recruitment.

Since the acceptance status may change, please check the subsidy and grant section and consult with us before signing a contract.

Can I apply for subsidies after the construction is completed?

For many programs, procedures are required before construction. Tokyo’s subsidies require pre-application before installation, and if you install it first, you will be excluded. On the other hand, Meguro Ward’s grants do not require pre-application, and contracts can be made before application. Procedures vary by program.

Since the order of procedures differs by program, please confirm before signing a contract or starting construction.

Can solar panels be installed on slate roofs? I’m worried about leaks.

It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate beforehand. The fixing method varies depending on the construction method, and when fixing brackets to the roofing material or substrate, waterproof treatment of the fixed parts is essential.

Kakeru Koumuten Co., Ltd. is a specialized exterior renovation company strong in roofing work, so we will check the condition of the roof before installation and suggest methods such as roof overlay (cover method) or re-roofing if deterioration is advanced.

My roof is old. Should I do a roof renovation first?

It depends on the condition of the roof. If a roof renovation is needed 10 to 20 years after installation, the cost of removing and reinstalling solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate to a highly durable roofing material before installation.

Please consult us on how to proceed with the installation after checking the condition of the roof during the on-site survey!

Should I install a storage battery together with the solar panels?

If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for surplus electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.

Additionally, the Tokyo Metropolitan Government’s subsidy for storage batteries is designed for simultaneous installation with solar panels, but you can also apply for just the storage battery. You can compare “solar panels only” and “solar panels + storage battery” through a financial simulation.

How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?

The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten Co., Ltd., we create a layout diagram based on the drawings and on-site survey, and provide you with the installation capacity and power generation simulation.

Even in residential areas of Meguro Ward, the shadow cast by surrounding buildings varies from house to house. You can check the expected power generation through the power generation simulation.

How long will the construction period be?

For the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary depending on whether roofing work is done simultaneously and the shape and installation capacity of the roof.

Please note that there will be an additional period for applications for subsidies and power companies, so please consult us as soon as possible.

What is the current selling price (FIT)?

For residential use (less than 10 kW), from the certifications after October 2025, the first 4 years will be 24 yen/kWh, and from the 5th to the 10th year it will be 8.3 yen/kWh, and the same prices will apply in the 2026 fiscal year.

The idea is to recover initial costs quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten Co., Ltd. provides a financial simulation that takes into account loan interest rates and electricity costs.

Can you handle maintenance and inspections after installation?

Yes, we can. Kakeru Koumuten Co., Ltd. sends out annual after-maintenance notices via DM and visits customers who wish to have inspections. We can also clean solar panels with a special brush if the power generation decreases due to dirt.

The roof is a place that is difficult to check by yourself, so if you have any concerns, please feel free to consult us.

Can you also handle renovations for roofs that already have solar panels installed?

Yes, we can. Kakeru Koumuten Co., Ltd. can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them consistently. The removed panels can be stored in our own warehouse.

For costs, please refer to the solar panel detachment and water heater removal pricing page.

Free estimates for solar panels and storage batteries in Meguro City

Estimates are completely free. We welcome competitive estimates!

If you are looking for a solar panel installation contractor in Meguro City, please consult Kakeru Koumuten Co., Ltd.

Our company handles many exterior renovations, including roof work and exterior wall work, in Meguro City, Tokyo, including solar panel installations.
We have received requests from many customers, including renovation companies and real estate agencies, who have contacted us!

Kakeru Koumuten Co., Ltd. promises “high-quality renovations at low costs”, and we have received great feedback from numerous customers.
We continue to update our construction performance every year, and we will strive to improve quality to satisfy even more customers in the future.

Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and exterior wall cover methods.
We are also happy to handle small jobs like partial repairs and rain gutter cleaning!

In urgent cases like leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult us!

“I want to know about recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide the best solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and propose the optimal construction plan!

We are confident that we will not be outdone in terms of cost, quality, and organization compared to other companies in exterior construction!
We are confident, so we welcome competitive estimates!
Estimates are completely free, and if you find our company to be inferior to others, you are free to decline!

Characteristics of Meguro City, Tokyo, and Points for Solar Construction

Meguro Ward, Tokyo, is located in the southwestern part of the 23 wards and is adjacent to Shibuya Ward, Shinagawa Ward, Setagaya Ward, and Ota Ward. The official page of Meguro Ward provides a flood hazard map (indicating flooded areas and their extent) and a landslide hazard map, with landslide warning areas also present within the ward.
We have summarized points to consider when installing solar panels and storage batteries in the residential environment of Meguro Ward below. (Tap to open)

View the characteristics of Meguro Ward, Tokyo, and points for solar construction

■ Check the installation location of storage batteries and power conditioners against the hazard map assumptions

The flood hazard map of Meguro Ward shows the areas that could be flooded and the extent of flooding for the maximum expected scale of flooding. Additionally, the landslide hazard map includes landslide warning areas within the ward (in April 2025, Tokyo designated new warning areas, and the map was updated in October of the same year). When deciding on the installation location for storage batteries and power conditioners, it is reassuring to check the flood assumptions and designated warning areas for your residence on the hazard map and consider the height and position of the installation.

■ Tokyo’s annual sunshine hours are approximately 1,927 hours

The Japan Meteorological Agency’s average values (1991-2020) indicate that Tokyo has approximately 1,927 hours of sunshine annually.
Since power generation varies by season, it is important to conduct annual power generation simulations and choose the capacity of the storage battery to match the times when electricity is used most.

■ Check the shadows of surrounding buildings in areas where residences are close together

In areas where residences are adjacent, the way shadows from surrounding buildings fall varies for each house depending on the roof’s orientation and height. Since solar panels generate less power when shaded, Kakeru Koumuten Co., Ltd. creates layout diagrams based on blueprints and the actual site conditions, allowing you to confirm through power generation simulations.

■ No prior application is required for the ward’s subsidies, but pay attention to the timing of installation handover and documents

The subsidies from Meguro Ward can be applied for before the contract is signed, and no prior application is necessary; however, the installation handover must occur between January 1 and December 31, 2026. It is essential to submit all necessary documents at the time of application, so it is important to prepare the documents in conjunction with the construction schedule.

■ In places with narrow front roads, plan scaffolding and equipment delivery creatively

In areas with narrow front roads or where surrounding buildings are close together, it may be necessary to devise plans for scaffolding and equipment delivery. Kakeru Koumuten Co., Ltd. will respond to the site conditions with our own scaffolding team and owned scaffolding materials.

■ Check the roof condition according to the age of the building

For buildings that have been around for many years, it is important to check the condition of the roofing materials and substrate before installing solar panels. Depending on the condition of the roof, installing them simultaneously with roof renovations can reduce future costs for removing and reinstalling solar panels.

■ Subsidies require prior application in Tokyo, but no prior application is needed in Meguro Ward

In Tokyo, prior application to Cool Net Tokyo is required before installation. In Meguro City, the Subsidy for Installation Costs of Residential Renewable Energy and Energy-Saving Equipment does not require prior application and will end once the budget is reached on a first-come, first-served basis. It is important to check the procedures and periods for each system in advance, in conjunction with the timing of the construction.

Our company serves Kanagawa Prefecture and Tokyo, and we handle many exterior and solar construction projects in Meguro City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us for any sudden troubles!

Service Area in Meguro City, Tokyo

Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.

List of Areas in Meguro City, Tokyo

Aobadai, Meguro City / Ookayama, Meguro City / Ohashi, Meguro City / Kakinokizaka, Meguro City / Kamimeguro, Meguro City / Komaba, Meguro City / Gohongi, Meguro City / Shimomeguro, Meguro City / Jiyugaoka, Meguro City / Senzoku, Meguro City / Hiramachi, Meguro City / Takaban, Meguro City / Chuocho, Meguro City / Nakacho, Meguro City / Nakane, Meguro City / Nakameguro, Meguro City / Haramachi, Meguro City / Higashigaoka, Meguro City / Higashiyama, Meguro City / Himonya, Meguro City / Mita, Meguro City / Midorigaoka, Meguro City / Minami, Meguro City / Meguro Honcho, Meguro City / Meguro, Meguro City / Yakumo, Meguro City / Yutenji, Meguro City

We welcome inquiries via LINE as well◎

LINE

LINE

We are also updating our Instagram regularly◎Please follow us◎

Instagram
Instagram
For roof, gutter and exterior construction and repairs in Kanagawa,
contact Kakeru Koumuten Co., Ltd.

Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.

Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.

We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!