Construction example

Roof Overlay (Cover Method) | Akishima City | We Performed Roof Overlay Using Super Galtect!

BEFORE

AFTER

Hello!
We are Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior wall painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of an exterior renovation project in Akishima City, Tokyo.
The work this time involves the roof overlay (cover method) using Super Galtect!

We received an inquiry from a customer in Akishima City after they saw our website!

Thank you very much for choosing Kakeru Koumuten Co., Ltd. from among many contractors.

 

 

Roof Overlay Construction Procedure

1. Dismantling Existing Ridge and Snow Stops

We will dismantle unnecessary parts (ridge flashing) for the overlay method! The lifespan of wooden purlins is about 10 to 15 years. Exceeding the lifespan can lead to corrosion and discoloration, resulting in the ridge flashing coming loose or being blown away.

2. Installing Roofing (Waterproof Sheet)

The roofing used is Jouyu Pulp Industry/Sunlight G!
It is made of modified asphalt roofing, which is said to have double the durability of regular asphalt roofing.
If the roofing is solid as a primary waterproofing measure, there will be no leaks!

We will firmly attach it to prevent it from blowing away!

3.Accessory Processing (Karakusa, Keraba, Valley)

Before the main roof construction, we will process and install accessories such as keraba, karakusa, and valley metal!
The accessories used are the genuine accessories from Galtect, made of SGL copper plate!

4. Main Construction (Aiji Industrial/Super Galtect)


After processing the accessories, we will install the Galtect main body up to the ridge!
Once we reach the ridge, we will install necessary materials called “kanbari” to secure the ridge metal. There are two types of kanbari: cedar and resin, and this time we used the resin type!
The resin type is expected to have twice the durability compared to the cedar type!

5. Ridge Metal Processing & Sealing at Various Locations


Next, we will process and install the ridge metal. We will firmly apply sealing on the inside of the joints. For the wall edges, we will process and install a component called rain stop metal.
The nails and screws used for fixing are made of stainless steel, which is resistant to rust!

6. Cleaning


We will clean up the debris that has fallen onto the balcony and rain gutters. We will thoroughly remove items like nails and metal scraps that could cause injuries. Additionally, we will wipe away any footprints left on the roof to ensure it looks pristine.

About Roofing Materials

The roofing material used is the Super Galtect from Aijii Industrial.
The Super Galtect comes with a manufacturer warranty of 15 years for the coating and 25 years for perforation.
Our company also provides a 10-year construction warranty!

Made of SGL steel plate, it is resistant to rust.
Insulation material is tightly adhered from edge to edge of the roofing material, creating a metal plate that integrates steel and insulation.
When installed, insulation is applied even to the parts where the roofing materials interlock, and the surface is coated with a high heat-reflective paint, allowing for a cool summer and a warm winter.
Additionally, it has soundproofing properties, reducing the noise of rain.
Being lighter compared to other roofing materials, it also minimizes the sway during earthquakes, contributing to earthquake resistance.
It excels in finish, durability, insulation, soundproofing, and wind resistance, and the Super Galtect from Aijii Industrial is the most frequently used in our construction projects, gaining significant attention!

Color

■Shade Black
Shade Black
■Shade Brown
Shade Brown
■Shade Blue
Shade Blue
■Shade Moss Green
Shade Moss Green
■Shade Charcoal
Shade Charcoal

New Color Shade Wine Red

You can choose from these 6 colors!

This time, the cover work with Shade Black turned out exceptionally well!
The customer was very satisfied, and I was also very happy!
Thank you very much!

Please check out other roofing work examples from here!

Summary

Roof Material

Aiji Giken/Super Galtect

Manufacturer Warranty Coating 15 years, Red Rust 20 years, Puncture 25 years
Expected Durability Approximately 40 years
Color Used This Time

Shade Black

Shade Black

 

Estimates and inspections are, of course, free! If you have any concerns regarding roofs, rain gutters, exterior walls, or exteriors, please consult Kakeru Koumuten Co., Ltd.!
We carry out everything from temporary scaffolding work to roof construction and exterior painting completely in-house. We are confident that our costs, quality, and efficiency in exterior work surpass those of other companies!
We welcome competitive estimates with confidence!
You will be glad you chose us! We take every request seriously to ensure you feel this way.

We also have information on roofing costs and pricing plans for the roof overlay (cover method), so please take a look if you’re interested!

We look forward to your inquiries. Thank you very much.

Helpful information about exterior renovations can be found here!

LINE consultations are also welcome◎

We are regularly updating our Instagram◎ Please follow us◎

For roofing, guttering, and exterior work and repairs in Kanagawa, contact Kakerukoumuten Co., Ltd..

AAA is a young company with an average age in the early 20s, but our technology is second to none.

One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!

We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!