[Tokyo, Nishitama-gun] Vacant House and Used Property Renovation | Costs, Subsidies, and Case Studies
For those considering renovations of used properties and vacant houses in Nishitama District
I bought a used property, but I’m not sure if the renovation estimate I received is reasonable.
This is my first full renovation, and I’m worried about making mistakes.
I want to make the most of subsidies and grants.
For such concerns, Kakeru Koumuten Co., Ltd., which has numerous achievements in Nishitama-gun, will clearly explain the key points for a successful renovation.
Get estimates from at least 3 companies!

01Reasons for the Increase in Renovation of Used Properties and Vacant Houses in Nishitama-gun
Nishitama-gun in Tokyo is a mountainous area rich in nature, consisting of four towns and villages: Mizuho Town, Hinode Town, Hinohara Village, and Okutama Town. Surrounded by clear streams, satoyama, and forests, it is becoming increasingly popular as a place to relocate for a natural lifestyle close to the city center or for dual residence.
There are many old wooden houses, vacant houses, and traditional houses, and it is now a time when reviewing seismic resistance and insulation, as well as revitalizing vacant houses, is necessary. For this reason, the option of “buying used single-family homes, traditional houses, or vacant houses and renovating (renovating) them to fit a lifestyle in nature” is expanding in Nishitama-gun.
Rich Natural Living Environment of Satoyama and Clear Streams
A life surrounded by the clear streams of Akigawa and the upper Tama River and forests. There is an active movement to restore and live in used single-family homes and traditional houses.
Generous Support for Vacant Houses and Relocation
There is substantial support for utilizing vacant houses and relocating, such as in Hinohara Village (half of renovation costs covered, up to 1 million yen) and Hinode Town (half of renovation costs for young generations, up to 500,000 yen).
Restoration of Traditional Houses and Old Wooden Structures
Update the charming traditional house with insulation and plumbing for comfort. There has been an increase in consultations for restoration combined with seismic retrofitting.
Considerations for Climate and Exterior in Mountain Areas
In mountainous areas, temperature differences, humidity, and snowfall are present, making it important to consider the exterior, insulation, and roof. Proposals starting from inspections of the roof and exterior walls provide peace of mind.
In this article, we summarize the reasons, points to consider, cost averages, the latest subsidies for 2026, and how to choose a contractor from the perspective of Kakeru Koumuten, which also serves the Nishitama District, for those considering renovating used properties and vacant houses without making mistakes.
The Most Important Thing is “Comparative Estimates”
The most crucial factor in avoiding mistakes in renovations is comparative estimates. First, obtain estimates from at least three companies that serve the Nishitama District. Our company, Kakeru Koumuten Co., Ltd., also receives many consultations and requests for renovations of vacant houses and used properties.
02Reasons for Renovating Vacant Houses and Used Properties

In recent years, the Japanese housing market has expanded options not only for new constructions but also for utilizing used properties through renovations. There is a growing interest in living in renovated and refurbished used houses. Here, we explain the typical reasons for renovating vacant houses and used properties.
Reason 1 To Live Comfortably as Your Own Home
The most common reason for purchasing and renovating a used property is “to live comfortably.” Old houses often have issues with roofs, exterior walls, and plumbing, making them difficult to live in as they are. By renovating and updating the facilities and interiors, you can create a comfortable living environment. Additionally, by changing the layout and refreshing the interior, you can finish a home that suits your family’s lifestyle while keeping costs lower than new construction.
Reason 2 To Increase Asset Value for Sale
More people are purchasing and renovating used properties with the intention of selling them. Used houses are often valued low as they are, but renovations can improve their appearance and performance, thereby increasing their value as properties.
Reason 3 To Utilize as Investment or Business
For purchases made for investment or business purposes, renovations are essential. By transforming into stylish rentals or share houses, you can differentiate from other properties, and depending on the location and planning, you can also expect improved profitability. Initial costs can be lower than new constructions, and depending on the purpose and conditions, there may also be subsidies or tax incentives, leading to an increase in people utilizing vacant houses for business.
03Points to Consider When Renovating Vacant Houses and Used Properties

Point 1 Choose a Reliable Construction Company
First and foremost, it is essential to select a contractor you can trust to handle your renovation. Since used properties have had previous occupants, the internal structure and condition are often not clear until you actually see them. Choose a contractor who can carry out the work properly according to your wishes, the structure of the house, and the surrounding environment, and who also provides aftercare following the construction.
Point 2 Always Check the Condition of the Building
For used properties and vacant houses, it is crucial to confirm which parts have deteriorated and to what extent beforehand. Since the property has been lived in by someone else, many internal damages are often not apparent without investigation. Conduct a current condition survey before starting construction to identify any hidden deterioration.
Point 3 Review Earthquake Resistance and Insulation Performance
In the renovation of used and vacant houses, it is particularly important to review earthquake resistance and insulation. The earthquake resistance standards were significantly revised in 1981, and houses built before that may not meet current standards. Furthermore, in 2000, regulations regarding joints and foundations were strengthened, making older buildings more likely to lack earthquake resistance. Check the condition of the building before starting construction and be sure to check earthquake resistance and insulation.
Point 4 Check Subsidy Programs and Renovation Tax Deductions
To keep construction costs down, it is important to check for subsidies and renovation tax deductions. Subsidies are provided by the national and local governments, and part of the costs for earthquake retrofitting, energy-saving construction, and barrier-free renovations may be supported. Tax deductions include the “housing loan tax deduction” when using a housing loan, as well as systems that allow for partial deductions of costs for certain works even with personal funds. These can sometimes be used in combination, so it is crucial to check in advance and plan to utilize them strategically as a key to successful renovation (for the latest information, see this subsidy section).
04Cost Estimates for Renovating Vacant Houses and Used Properties

The renovation costs for used properties and vacant houses vary significantly depending on the extent of damage and the scope of work. First, please familiarize yourself with the approximate costs by area to serve as a guideline for your financial planning (the table below provides general estimates for typical single-family homes. The interior is based on a single room of about 6 tatami mats, and the exterior is based on the indicated scope of work. Actual estimates will be provided after a site survey).
1. Roof and Exterior Walls
| Construction Content | Estimated Cost |
|---|---|
| Roof Repair & Painting | Approximately 200,000 to 800,000 yen |
| Roof Replacement & Overlay Method | Approximately 700,000 to 2,500,000 yen |
| Exterior Wall Painting | Approximately 600,000 to 1,500,000 yen |
| Exterior Wall Replacement & Overlay Method | Approximately 1,500,000 to 3,000,000 yen |
2. Interior (Interior Finishing)
| Construction Content | Estimated Cost |
|---|---|
| Floor Replacement (Approx. 6 tatami mats, flooring, etc.) | Approximately 100,000 to 300,000 yen |
| Wallpaper Replacement (Approx. 6 tatami mats) | Approximately 50,000 to 150,000 yen |
| Ceiling Repair & Painting (Approx. 6 tatami mats) | Approximately 30,000 to 100,000 yen |
| Renovation from Japanese Room to Western Room (1 room) | Approximately 200,000 to 600,000 yen |
3. Water Facilities
| Construction Content | Estimated Cost |
|---|---|
| Kitchen Replacement | Approximately 450,000 to 1,500,000 yen |
| Bathroom Renovation (Unit Bath) | Approximately 600,000 to 1,500,000 yen |
| Toilet Replacement | Approximately 120,000 to 500,000 yen |
| Vanity Replacement | Approximately 80,000 to 300,000 yen |
4. Equipment & Infrastructure
| Construction Content | Estimated Cost |
|---|---|
| Water Heater Replacement | Approximately 100,000 to 500,000 yen |
| Pipe Replacement (Aging Water Pipes, etc., Partial Work) | Approximately 100,000 to 500,000 yen |
| Electrical Wiring Work (Partial Work) | Approximately 100,000 to 500,000 yen |
| Insulation Renovation (Multiple Window Replacements, Interior Window Installation, etc.) | Approximately 200,000 to 1,000,000 yen |
5. Waterproofing & Earthquake Resistance
| Construction Content | Estimated Cost |
|---|---|
| Balcony Waterproofing Work | Approximately 100,000 to 400,000 yen |
| Seismic Reinforcement Work | Approximately 500,000 to 2,000,000 yen |
6. Exterior Works
| Construction Content | Estimated Cost |
|---|---|
| Entrance Door Replacement | Approximately 200,000 to 500,000 yen |
| Gate and Fence Renovation | Approximately 200,000 to 800,000 yen |
| Parking Lot Improvement (for 1 car, including concrete pouring, etc.) | Approximately 200,000 to 600,000 yen |
*The above are general estimates. Costs may vary depending on the presence of scaffolding, the condition, grade, and area of the building. Waterproofing of rooftops and updating plumbing and wiring for the entire house may exceed the above estimates based on area and method. Please confirm the exact costs through a free on-site survey and estimate.
For more details, please check the construction menu and price list!

05[Latest 2026] Subsidies and Grants Available in Nishitama-gun

One way to renovate used properties and vacant houses cost-effectively is by utilizing the subsidy and grant system. As of 2026, we have summarized the main systems that residents of Nishitama-gun may be able to use.
*The following information is as of September 3, 2026. The content, duration, and budget of the systems change annually, and many will end once the budget limit is reached. Please check for the latest information with our company or the respective offices before applying. Kakeru Koumuten can assist with confirming the systems and providing necessary documents, but the applicant and application method may vary depending on the system.
National Program: Housing Energy Efficiency 2026 Campaign
The government is implementing multiple subsidy projects targeting energy-efficient renovations under the “Housing Energy Efficiency 2026 Campaign.” Construction related to insulation, windows, and water heaters may be eligible for these subsidies.
This program succeeds the “Child-Rearing Green Housing Support Project.” In principle, it requires renovation work that includes insulation improvements for openings (windows) and structural elements, and is applicable to eco-friendly housing equipment, child-rearing compatible renovations, disaster prevention enhancements, and barrier-free renovations.
Subsidy limits: For properties built before 1991, up to 1,000,000 yen per unit (50,000 yen depending on the work), for properties built between 1992 and 2016, up to 800,000 yen per unit (400,000 yen for the same). Eligible construction must start on or after November 28, 2025, and applications are accepted starting June 30, 2026. Reservations must be made by November 16 at the latest, and subsidy applications must be submitted by December 31 at the latest (early termination if budget limits are reached). Applications must be made through registered contractors.
This program covers window insulation renovations such as installing interior windows, replacing exterior windows, and glass replacements. The subsidy amount is significant, making it effective for addressing cold, heat, and condensation issues. It can easily enhance the insulation performance of existing homes.
Subsidy amounts vary based on window construction methods, performance, size, and the type of housing. If the total subsidy amount for one application is less than 50,000 yen, it is not eligible. Applications are accepted starting March 31, 2026, and subsidy applications must be submitted by December 31 at the latest (early termination if budget limits are reached). Applications must be made through registered contractors.
This program targets the replacement of high-efficiency water heaters such as EcoCute, hybrid water heaters, and EneFarm. It is well-suited for older properties planning to replace their water heaters.
Estimated subsidy amounts: EcoCute 70,000 to 100,000 yen per unit, hybrid water heaters 100,000 to 120,000 yen per unit, EneFarm 170,000 yen per unit. Eligible construction must start on or after November 28, 2025, and applications are accepted starting March 31, 2026 (early termination if budget limits are reached).
Tokyo Metropolitan Program
This program covers high insulation windows (installation of interior windows, replacement of exterior windows, glass replacements), high insulation doors, insulation materials, and high insulation bathtubs. It is a program with significant subsidies that can greatly enhance the insulation performance of existing homes.
High-performance, insulated windows and doors have a maximum subsidy of 2 million yen per unit (3 million yen per unit for security windows), insulation materials are covered at one-third of eligible expenses with a cap of 1 million yen, and high-efficiency bathtubs are subsidized at 95,000 yen per unit. Pre-application starts on May 29, 2026, and application submissions are accepted from June 30, 2026. Individuals and corporations owning residential properties in Tokyo are eligible. The program is managed by Cool Net Tokyo. For more details, visit the official page.
This program offers points for replacing with energy-efficient air conditioners, refrigerators, water heaters, and LED lighting. It pairs well with equipment updates when moving into a used property.
Estimated points: 9,000 to 23,000 yen for air conditioners, 14,000 to 26,000 yen for refrigerators, 12,000 points for water heaters (such as eco-cute), and 4,000 yen for LEDs, etc. Replacements are valid until March 31, 2027. Individuals residing in Tokyo are eligible. For more details, visit the official page.
This program broadly supports the installation of solar power, battery storage, high-performance windows, insulation materials, eco-cute, and more in existing homes. It is aimed at those considering used properties with energy-saving equipment.
Battery storage is subsidized at 100,000 yen per kWh, with a maximum of 1.2 million yen per unit. Solar power, insulation, and high-efficiency water heating are also subsidized by type of construction (unit prices to be confirmed). All programs are applicable to existing homes. Applications for the 2026 fiscal year are also being accepted. For more details, visit the official page.
Programs in Nishitama-gun (Mizuho Town, Hinode Town, Hinokigahara Village, Okutama Town)
Nishitama-gun offers especially generous support for vacant houses and relocation in Hinokigahara Village. There are various subsidies available for those who purchase and utilize vacant houses, from renovation to relocation.
Renovation 1/2, maximum 1,000,000 yen; Demolition 1/2, maximum 1,000,000 yen; Disposal of household goods 1/2, maximum 100,000 yen; Purchase interest subsidy, maximum 1,000,000 yen; Relocation 100,000 yen + 50,000 yen per child; Vacant house registration 50,000 yen + 100,000 yen upon moving in. Completion must be within the fiscal year of the grant decision. There are also subsidies for the removal of dilapidated vacant houses and projects to promote the settlement of young households. For details, please visit the official page of Hinohara Village.
A subsidy for households under 40 years old who purchase and renovate a vacant house. Hinode Town also operates a vacant house bank.
For households under 40 years old who purchase and renovate a vacant house (marriage, raising children under 18, etc.), renovation costs are covered 1/2, maximum 500,000 yen. For vacant house owners, household goods organization and disposal are covered 1/2, maximum 500,000 yen. For details, please visit the official page of Hinode Town. *Hinode Town’s “Housing Environment Improvement Subsidy (General Renovation 5% / maximum 100,000 yen)” requires that construction be carried out by local contractors who are members of the town’s Chamber of Commerce, so our company (Aoba-ku, Yokohama) is generally not eligible.
Support for the settlement of young people who build, expand, or purchase new homes. Relocation support funds, interest subsidies, and vacant house banks can be combined.
Relocation and settlement support subsidies and interest subsidy systems (applicable for expansions, renovations, and purchases; subsidy amounts must be confirmed in the guidelines). The settlement promotion support fund provides up to 600,000 yen per household for those who relocate and work from within Tokyo, etc. (up to 1,000,000 yen for starting a business). There is also a “Vacant House Survey and Utilization System.” For details, please visit the official page of Okutama Town.
Support for seismic retrofitting in Mizuho Town, which borders the Sayama Hills and Yokota Air Base. This is effective for seismic retrofitting in conjunction with the purchase of used wooden detached houses.
Seismic diagnosis 1/2, upper limit 100,000 yen; seismic retrofitting 1/2, upper limit 1,000,000 yen; simple seismic retrofitting (for households with income below 2,000,000 yen and elderly or disabled members) 6/10, upper limit 500,000 yen. The target is wooden single-family homes built before May 31, 1981. *The “Housing Renovation Subsidy” and “Renewable Energy & Energy Saving Equipment Subsidy” in Mizuho Town have ended. For details, please visit the official page of Mizuho Town.
*Nishitama-gun is characterized by its rich natural environment in the mountains, with generous support for the utilization of vacant houses and old folk houses, as well as for migration and settlement (such as a 1/2 subsidy for renovations in Hinode Town, upper limit 1,000,000 yen). Each town and village has different systems, amounts, and application processes, and many smaller-scale systems can be confirmed via PDF guidelines, so please check the latest information with each municipal office (Hinode Town Community Development Division / Okutama Town Young Resident Promotion Division / Mizuho Town Urban Planning Division) before applying. Insulation, windows, and solar power can also be combined with the national “Housing Energy Saving 2026” and Tokyo Metropolitan programs.
View information on renovation tax reductions and other systems
- Housing Loan Tax Reduction: If you use a housing loan for renovations that meet certain requirements, income tax and other deductions will be applied based on the year-end balance.
- Renovation Promotion Tax System (Investment-type Tax Reduction): For construction related to seismic retrofitting, energy saving, barrier-free access, and long-term excellent housing, there may be cases where income tax deductions can be received even with personal funds.
- Fixed Asset Tax Reduction: There are systems that reduce fixed asset tax for a certain period for seismic retrofitting, energy-saving renovations, and barrier-free renovations.
- Tokyo’s Insulation and Energy Saving Subsidy: The above “Tokyo Metropolitan System” (energy-saving renovation promotion project for existing homes, Tokyo Zero Emission Points, etc.) can sometimes be combined with the national “Housing Energy Saving 2026 Campaign.” If you are considering renovations for windows, insulation, or high-efficiency equipment, please consult us before starting construction.
While subsidies and tax reductions can sometimes be combined, there are restrictions on duplication for the same construction. Kakeru Koumuten will organize and propose which systems can be used for your construction after conducting a site survey.
06Customer Feedback
Exterior Renovation Case Studies in Nishitama-gun

| Construction Location | Nishitama-gun, Tokyo |
|---|---|
| Work Details | Roof Replacement Work |
| Existing Roofing Material | Keimyuu / Seibari NEO |
| New Materials Used | Ai-G Industrial / Super Galtect |
| Price Range | 600,000 yen – 700,000 yen |
| Completion Month | April 2025 |
Our Proposal
The existing Seibari NEO is a non-asbestos roofing material that requires caution due to its fragility. We proposed to remove the existing roofing material and replace it with the lightweight, insulated, and durable Ai-G Industrial / Super Galtect.
▶ Click here for detailed construction procedures for this roof replacement work!
▶ Roof repairs and renovations in Nishitama-gun can be found here!
▶ Check out Kakeru Koumuten’s renovation achievements here!
07How to Choose a Renovation Contractor for Used Properties and Vacant Houses in Nishitama-gun
There are many renovation companies that serve Nishitama-gun, and it can be confusing to decide which one to choose. When requesting renovations, be sure to check the following five points.
- Experience in renovation work
- Check for warranties and after-sales maintenance
- Obtain estimates from multiple contractors (at least 3 companies)
- Confirm whether the company performs renovations in-house
- Check if they offer color simulations and perspective drawings
1. Experience in renovation work

Many renovation contractors publish their work achievements on their websites. If a contractor provides detailed explanations of the process with photos, it can help you visualize the outcome after the request, giving you peace of mind. If you have concerns, choose a contractor with ample experience.
Google and review sites can also be helpful. It is important to check the content of low ratings, the company’s responses, and the timing of the posts. In particular, Google reviews can be informative, but do not make your decision based solely on reviews; consider the work achievements, estimates, and warranty details comprehensively.
2. Check for warranties and after-sales maintenance

When choosing a contractor, be sure to check for warranties. Some repairs may be done for free within the warranty period. The duration varies by contractor and paint type, but 1 to 10 years is typical (emergency repairs and partial repairs are often not covered). Some contractors also offer after-sales services separate from warranties, so be sure to check that as well.
Kakeru Koumuten Co., Ltd. provides warranties for exterior renovations and sealing work. We also conduct after-sales maintenance, sending out annual notification DM for annual inspections.
Click here for more details on Kakeru Koumuten’s warranties and after-sales maintenance
3. Obtain estimates from multiple contractors (at least 3 companies)

When requesting renovations, be sure to obtain estimates from multiple contractors. Even for the same scope of work, warranties, after-sales services, and prices can vary significantly. Having multiple estimates makes price negotiations easier.
When comparing estimates, it’s important to look closely at not only the cost but also the “items in the estimate,” “confirmation of undercoating materials, sealing materials, and auxiliary paint,” and “confirmation of the process.” Lowering the rank of auxiliary parts or skipping processes can reduce costs, so it’s essential to not make judgments based solely on price.
Learn more about the points to compare in multiple estimates
4. Confirm whether the company performs renovations in-house

Kakeru Koumuten Co., Ltd. conducts detailed hearings and investigations regarding the existing “condition,” “location,” “base materials,” “desired durability,” and “design” to propose the optimal plan. While there is nothing inherently wrong with a system where partner companies perform the work, it is important to confirm whether the contracted company understands the construction details and has clear responsibility for quality control and guarantees. If the work is done in-house, it becomes easier to coordinate with the site and respond quickly in case of any troubles.
5. Check if they offer color simulations and perspective drawings

Choosing colors and envisioning the appearance after construction can be challenging for both exterior and interior work. Having a simulation can reduce the risk of mistakes like “it turned out differently than I imagined.” Since it is difficult to redo once the work is done, it is advisable to choose a company that can provide flexible simulations.
08Reasons why Kakeru Koumuten is chosen for renovations of used houses in Nishitama-gun
One reason is that “Kakeru Koumuten also serves Nishitama-gun,” but
we have initiatives in “vacant house and used property renovations that cannot be imitated by other companies”
which have received high praise from many customers.
We have absolute confidence in “cost,” “quality,” and “plans” for renovations in Nishitama-gun. Please compare with estimates from other companies.
The most important aspect of renovation is comparing estimates. Be sure to request estimates from at least 3 companies that operate in Nishitama-gun!
1. Equipment Specialized for In-House Renovations
Kakeru Koumuten Co., Ltd. has organized warehouses and material storage areas to provide high-quality renovations at low cost. We have 5 bases located in Kanagawa Prefecture and Tokyo, including Aoba-ku, Yokohama and Machida City, Tokyo.
In-House Scaffolding Materials


We can construct the temporary scaffolding required for exterior renovations using our own scaffolding materials and in-house scaffolding team. By not outsourcing, we achieve cost savings on scaffolding construction. We own scaffolding materials for approximately 50 single-family homes.
Storage of Materials in Our Large Warehouse


We store roofing materials and paints. By placing large orders at once, we can procure materials at lower prices, and since we always have stock available, we can respond quickly in emergencies. We also have various tools available for different types of construction, including compressors and cleaning machines.
In-House Waste Separation

In exterior renovations, various waste materials such as paint, wood, and metal are generated. Our company is committed to sorting and recycling waste materials to reduce waste disposal costs.
Showroom Dedicated to Exterior Renovations


In our showroom, you can not only hold meetings but also check actual paint colors and a wide range of catalogs. You can also confirm heat resistance using color simulation and heat-resistant paint testing equipment. The showroom is a 3-minute walk from Eda Station in Aoba-ku, Yokohama, and is accessible from Tokyo as well.
2. In-house Construction Focused on Exterior Work

A major strength of Kakeru Koumuten is our in-house construction focused on exterior work. By maintaining a consistent system from inquiry to project completion, we can provide high-quality renovations at reduced costs. A single representative handles everything from the estimate to project completion, ensuring smooth communication without changes in sales or construction management. From the installation of temporary scaffolding to exterior wall painting and roof renovations, our skilled craftsmen carry out the work. We are confident in our plans and costs, so we welcome competitive estimates.
3. Various Permits Obtained & Skilled Workers on Staff


We have obtained licenses for the construction industry and for the collection and transportation of industrial waste. We also have nationally certified sheet metal workers and painting specialists on staff, ensuring confidence in our construction techniques. We are capable of handling large-scale painting projects for factories and apartment complexes.
4. Warranty and Aftercare
Exterior wall painting and joint sealing work come with a warranty. Aftercare is available annually, and we send out notification DM each year. If you have concerns about the warranty, please click the image above for more information.
5. Flexible and Prompt Response

We are equipped to handle various exterior troubles and situations. If you cannot access the roof at height, we can respond using a drone. We also use a thermal imaging camera for leak investigations. We respond according to our customers’ wishes and also accept emergency measures for sudden leaks.
6. Human Resource Development

To improve skills, we create various models and conduct practical training. Since the construction methods and materials used differ based on the existing materials and shapes for exterior renovations, we conduct regular skill enhancement training to ensure that each staff member can respond to various sites.
Click here for company information
7. Flexible Simulations for Both Exterior and Interior!
Kakeru Koumuten Co., Ltd. is dedicated to helping our customers choose colors and designs for both exterior and interior renovations, ensuring satisfaction with their important buildings.
7-1. Exterior Renovation Simulation

We offer color simulations for exterior wall painting, as well as simulations for metal siding and roof overlays. We can create simulations from actual photos of your building and propose several color patterns based on our recommendations. We also accommodate requests for “test painting” and “paint board arrangements” to confirm actual color tones.
7-2. Interior Renovation Simulation

We also support simulations and perspective drawings for interior renovations. Based on your preferred style, such as modern, we can suggest recommended simulations. We create realistic perspectives based on actual floor plans.
8. Solar Panel and Storage Battery Installation Work Available!

As part of renovations for used properties, more customers are introducing solar power systems, which have generous subsidies. Kakeru Koumuten Co., Ltd. also handles solar power installation work and can propose solar panels tailored to the shape of your roof. We can also accept requests for estimates and power generation simulations only.
09Renovation of Used Properties and Vacant Houses in Nishitama District | Frequently Asked Questions
We answer some of the most frequently asked questions from those considering renovations for used properties and vacant houses in Nishitama District.
Is it better to renovate after buying a used property or to consult before purchasing?
If possible, please consult with us before making a purchase decision. Used properties often have deterioration that is not visible at first glance, and it is not uncommon to encounter unexpected construction costs after purchase. By having Kakeru Koumuten check the condition of the property you are considering in advance and providing an estimate for necessary renovations, you can establish a feasible financial plan.
What should be the priority for renovations in a used house in Nishitama District?
工事の内容によりますが、フルリフォームの場合は仮住まいが必要になることが多いです。期間は工事の規模や内容によって異なりますが、一般的には1ヶ月から3ヶ月程度を見込んでおくと良いでしょう。具体的な期間については、現地調査後にお見積もりをお出しする際に詳しくご説明いたします。
The scope of work depends on the project. For exterior renovations and partial interior work, it is often possible to carry out the work while you remain in your home. However, for large-scale full renovations that include water areas, we may recommend temporary housing. The estimated duration is about 2 to 4 weeks for exterior work and approximately 1 to 3 months or more for full renovations. We will provide you with a schedule in advance and propose a plan that minimizes the impact on your daily life.
Is Nishitama-gun within your service area? Are there any travel fees?
Yes, Nishitama-gun is within the service area of Kakeru Koumuten. Our headquarters is located in Aoba-ku, Yokohama, and we have five bases in Kanagawa and Tokyo, including Aoba-ku, Yokohama and Machida City, Tokyo, covering the entire Kanagawa and Tokyo areas. Estimates are completely free, and we do not engage in aggressive sales tactics. Please feel free to consult with us first.
Leave your renovations in Nishitama-gun to Kakeru Koumuten!
“I want my renovation to last a long time with just one project,” “I want to keep costs down as much as possible,” “I want to improve insulation because my home is hot”—we will propose the best solutions for your specific requests. We will not suggest unnecessary work that prioritizes profit.
We are confident in our costs, quality, and planning, so we welcome competitive estimates. Estimates are completely free.
Get your free estimate or consultation here
If you find our company to be inferior to others, feel free to decline without hesitation.
View Kakeru Koumuten’s project examples
View our service menu and price list
10Features of Nishitama-gun
Nishitama-gun in Tokyo is a nature-rich area consisting of four towns and villages: Mizuho Town, Hinode Town, Hinohara Village, and Okutama Town. Surrounded by clear streams, satoyama, and forests, it is becoming increasingly popular as a place for natural living and dual residence close to the city center.
There are many old wooden houses, vacant homes, and traditional houses, leading to a growing demand for seismic and insulation improvements, as well as the renovation and revitalization of vacant homes. Kakeru Koumuten is headquartered in Aoba-ku, Yokohama, and offers a wide range of exterior and interior renovations throughout Kanagawa and Tokyo. We can handle exterior work such as temporary scaffolding, roofing, and painting with in-house construction.
Areas We Can Renovate
Kakeru Koumuten accepts requests throughout Kanagawa and Tokyo.
Service Areas in Nishitama-gun, Tokyo (4 towns and villages)
Mizuho Town (Hakonegasaki / Ishibata / Tonogaya / Nagaoka / Komagatake Fujisan / Fujisan Kurihara Shinden, etc.) / Hinode Town (Okuno / Hirai, etc.) / Hinohara Village (Honjuku / Kazuma / Hitosato / Fujiwara, etc.) / Okutama Town (Hikawa / Furusato / Kodanba / Nibara / Tōura, etc.)
・Check out Kakeru Koumuten’s renovation case studies here!
・Nishitama-gun | Roof replacement case from Seibari NEO to Super Galtect
・Roof repair and renovation in Nishitama-gun, Tokyo can be found here!
・Exterior renovations in Nishitama-gun, Tokyo can be found here!
・Exterior painting in Nishitama-gun, Tokyo can be found here!
・Kakeru Koumuten Co., Ltd. construction menu and price list
・Reasons why Kakeru Koumuten is chosen can be found here!
・Information about Kakeru Koumuten’s warranty and aftercare
・Company overview of Kakeru Koumuten Co., Ltd.
・Staff blog and announcements from Kakeru Koumuten Co., Ltd.
Consultations via LINE are also very welcome◎
We are also updating our Instagram regularly◎ Please follow us!
株式会社翔工務店へ
株式会社翔工務店は平均年齢20代後半の若い会社ですが、技術はどこにも負けていません。
いちばんの強みは、足場工事、屋根工事、塗装工事とすべて自社で行えること。一般には分業されるこの業界にあって、一式で頼めるので管理に手間がかからず、コストも抑えることが出来ます。何より、トラブルがあればすぐにかけつけます!
自信をもって、宣言できます。私たちは、神奈川で一番若くて親切なリフォーム屋です!





