Leave Your Solar Panel Installation Work in Zama City, Kanagawa Prefecture to Kakeru Koumuten Co., Ltd.!
For
Solar Panel and Battery Installation in
Zama City, Kanagawa Prefecture, trust Kakeru Koumuten!
Kakeru Koumuten is a specialized exterior renovation company headquartered in Aoba Ward, Yokohama City.
As a company strong in roofing work, we are entrusted with solar panel and battery installation considering roofing and waterproofing!
“How to Choose a Solar Panel Contractor in Zama City”
“Costs for Solar Panel and Battery Installation”
“Subsidies Available for Solar System Installation in Zama City”
We will also explain the above three points!
Installing solar panels carries risks such as “the occurrence of leaks” and other troubles.
To ensure you have no regrets about your solar panel installation, we recommend obtaining estimates from about three companies!
Table of Contents (Tap to Open/Close)
- Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Zama City, Kanagawa Prefecture
- Roof Inspection Before Installing Solar Panels
- Possible Subsidies and Grants Available in Zama City
- Price List for Solar Panel and Storage Battery Installation
- Breakdown of Installation Capacity, Equipment, and Construction Costs
- Self-Estimate and Profit Simulation for Solar Power Generation
- Customer Testimonials
- Case Studies of Solar Panel Installations
- How to Choose a Solar Panel Installer in Zama City, Kanagawa Prefecture
- Benefits of Introducing Solar Equipment
- Points to Consider When Introducing Solar Power Generation
- How to Choose Solar Panels
- Frequently Asked Questions About Solar and Storage Battery Installation in Zama City
- If You Are Looking for a Solar Panel Installer in Zama City, Contact Kakeru Koumuten
- Characteristics of Zama City, Kanagawa Prefecture and Points for Solar Installation
- Service Area in Zama City, Kanagawa Prefecture
Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Zama City, Kanagawa Prefecture
Regarding why we are entrusted with solar panel installation by customers in Zama City, Kanagawa Prefecture,
one reason is that Kakeru Koumuten has a base in Kanagawa Prefecture,
and we have unique strengths in solar panel installation that cannot be imitated by other companies, which has received high praise from many customers.
so we would appreciate it if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from as many companies as possible!
1. We Also Handle Exterior Renovations Other Than Solar Panel Installation!

Problems such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if you are knowledgeable about solar panels, there may be cases where the roof and waterproofing at the installation site are outside your expertise, so caution is necessary.
It’s reassuring to have someone knowledgeable about roofs to avoid maintenance issues and troubles after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent troubles after solar panel installation!
2.Facilities Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has organized the following warehouses and material storage areas to provide low-cost, high-quality solar work and exterior renovations.
We have established five bases centered around Yokohama City, Kanagawa Prefecture for material storage and showrooms.
In-house Scaffolding Materials


To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding according to the construction conditions and can assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs for scaffolding work.
We have approximately enough scaffolding materials for 50 single-family homes!
Even in Zama City, where residential areas mix with hilly, plateau, and lowland areas, our in-house scaffolding team plans scaffolding according to the local conditions.
Storage of Materials in Our Large In-house Warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, so we canrespond quickly in emergencies!
Sorting and transporting waste materials in-house
The installation of solar panels often involves roofing work, generating various waste materials such as paint, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.
Exterior renovation dedicated showroom


In the showroom, you can not only have meetings but also
check the actual foundation brackets for solar panels and see how they are installed on roofing materials!
We can also provide simulations for potential earnings and installation costs when introducing solar panels!
Since roofing and exterior wall work often accompany each other, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!
3.All work performed by our own team
One of Kakeru Koumuten’s major strengths is its complete in-house construction.
By having Kakeru Koumuten handle everything from inquiries to project completion in a consistent manner, we can keep costs down and provide high-quality roof renovations.
Additionally, one representative will assist you from the estimate to the completion of the work.
Since the担当者 such as sales and construction management do not change, smooth communication is possible.
We can provide consistent in-house construction from temporary scaffolding installation, exterior wall painting, to roof renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry permits and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal and painting technicians, and we are confident in our construction skills.
We can also handle large-scale roof projects such as factories!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty for solar panel installation work, our own construction warranty (leakage warranty) is also included!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed. The construction warranty is separate from the manufacturer’s product warranty, and the scope and conditions vary depending on the warranty details.)
Aftercare is available every year, and we send out notification DM each year.
If you have any questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roofing troubles and situations.
If you cannot access the roof at high altitudes, we can utilize drones to assist!
During leak investigations, we can also conduct inspections using a thermal imaging camera.
If the power generation of solar panels decreases due to dirt and other factors, we can provide cleaning with a specialized brush.
We will respond according to your wishes.
7. Human Resource Development
To improve skills, we create various roof models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly provide technical training so that each staff member can handle various cases.
8. Creation of Easy-to-Understand Materials and Simulations
Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and “profit and loss simulations” that take into account loan interest rates and electricity costs.
Profit and loss simulations can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction will receive materials that clearly summarize important points and disadvantages!
We encourage you to obtain comparative estimates and compare them with other companies’ plans!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 to 30 years.
Confirming whether it is okay to place them directly on the current roof before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, which specializes in roofing work, has summarized the items to check before installation.
| 1. Types of Roofing Materials and Age | The fixing method varies depending on the roofing materials such as slate, tiles, metal roofs, and flat roofs (roof waterproofing). If the remaining lifespan of the roofing material is short, we may suggest roof renovation first. |
| 2. Condition of Substrate and Waterproof Sheet | If the sheathing or roofing (waterproof sheet) under the roofing material is damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of water leakage. |
| 3. Orientation, Slope, and Shadows of the Roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, will affect the power generation. We will create a layout diagram from the drawings and the site, and you can confirm it with a power generation simulation. |
| 4. Shape of the Roof and Usable Area | The number of panels (installation capacity) that can be placed depends on the shape and size of the roof. Since the number of panels that can be installed varies depending on the panel size, we will compare based on the total output of the roof. |
| 5. Fixing Method and Waterproofing Details | We will check whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please confirm the waterproof treatment method for the fixing parts during the estimate. |
| 6. Weight of the Roof | The roof will become heavier due to the panels being placed on it. After investigating the existing roof, substrate, and load-bearing capacity, switching to lighter roofing materials may also be an option if necessary. |
| 7. Installation Location of Equipment and Wiring | We will confirm the installation locations for the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect the cost. |
Fixing Methods and Confirmation Points by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets to the roof material and substrate with screws) | Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is significant, consider roof overlay (cover method) or replacement first. |
| Tile Roof | Fixed with brackets and methods suitable for the type of tile (even methods that do not drill holes in the tiles will secure to the substrate) | Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lighter roofing materials before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a frame | Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work. |
If you plan to renovate the roof 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, renovating to a highly durable roofing material before installation may help reduce costs in the long run.
Kakeru Koumuten is strong in roofing work and can also handle the removal and reinstallation of solar panels in-house, so please consult us according to the condition of your roof!
▶ Click here for roof renovations in Zama City, Kanagawa Prefecture
Subsidies and Grants Potentially Available inZama City, Kanagawa Prefecture
If you are introducing solar panels or storage batteries in Zama City, you may be eligible for programs from the “National Government,” “Kanagawa Prefecture,” and “Zama City.”
The following information is based on the official pages of each program as of October 6, 2026. The application status may change depending on the budget and application period, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Timing for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Zama City “Smart House Related Equipment Installation Subsidy” (Solar Power Generation & Lithium-ion Storage Batteries) | Residents within the city (must not have any tax arrears; please check the city’s official page for detailed eligibility). Must be unused and not leased. Solar power systems must be based on a supply and demand contract with the power company and have a maximum output of less than 10kW; storage batteries must be products eligible for the Ministry of the Environment’s ZEH support project. Application must be submitted at least 14 days before the start date of installation work. | Solar Power: 10,000 yen/kW (maximum 40,000 yen) Storage Battery: Fixed amount of 40,000 yen |
Applications are being accepted from April 1, 2026 (first-come, first-served; will end once the budget is reached) The budget amount is 4 million yen, with a remaining budget of 903,000 yen as of September 30, 2026 |
| Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Residential Solar Power Generation & Storage Battery Installation Subsidy” | For single-family homes or multi-family residences within the prefecture, the installation of both solar power generation and storage batteries must be combined in a seismically resilient home. Applications must be submitted by the individual, and construction must begin after the grant decision. | Solar Power: 70,000 yen/kW Storage Battery: 150,000 yen/unit |
Phase 1: May 11, 2026 – June 30, 2026 Phase 2: September 7, 2026 – September 30, 2026 (first-come, first-served) Phase 2 has reached its application deadline. Please check the prefecture’s official page for future recruitment. |
| National “DR Home Storage Battery Project” (Fiscal Year 2025 Supplement) | Newly introduce home storage systems that can be utilized for DR (demand response) with registered products. | Calculated based on a standard amount of 34,500 yen per initial effective capacity of 1kWh (subsidy rate within 3/10; maximum 600,000 yen per application). | As of May 29, 2026, the budget has been reached, and the public offering has ended (applications cannot be submitted at this time). |
| National “Mirai Eco Housing 2026 Project” (Renovation) | Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovations of windows (openings) and the building structure; applications cannot be made for just the installation of storage batteries. Solar panels are not included as eligible facilities. | Storage Battery: 96,000 yen/unit | Ends once the budget cap is reached. Please check the official site for application status. |
| Kanagawa Prefecture “Fiscal Year 2026 Kanagawa Prefecture Self-Consumption Type Renewable Energy Installation Subsidy” | Corporations and individual business owners filing blue returns (individual residences are not eligible). Solar power must have a generation output of 10kW or more, be for business facilities, and not be equipment certified under FIT/FIP. | Solar Power: 80,000 yen/kW, etc. Storage System: 50,000 yen/kWh (maximum 5 million yen) |
Recruitment ended on September 3, 2026 (application amounts reached the budget). |
In Zama City, it is necessary to apply for subsidies at least 14 days before the start date of the installation work, and applications will close once the budget is reached on a first-come, first-served basis. As of September 30, 2026, the remaining budget is reported to be 903,000 yen, so please check the application status early. The subsidy for housing in Kanagawa Prefecture requires that you start construction after receiving the “grant decision”, and the application deadline for the second term of Reiwa 8 has already passed. According to the city’s official page, it is possible to combine the city’s subsidy with national and prefectural subsidies, but it is important to confirm the individual conditions at the city’s office. It is not guaranteed that you will receive the subsidy just by applying, so please check before signing a contract or starting construction.
At Kakeru Koumuten, we will confirm the eligibility conditions for each program and provide guidance on whether we can assist.
Zama City “Smart House Related Equipment Installation Subsidy” (Solar Power Generation & Lithium-ion Storage Battery)
Zama City provides a Smart House Related Equipment Installation Subsidy for those installing solar power generation systems or lithium-ion storage batteries in their homes. Conditions include being a resident of the city and having no delinquent city taxes.
The subsidy amount is 10,000 yen per kW for solar power generation (up to 40,000 yen) and fixed amount of 40,000 yen for lithium-ion storage batteries. The solar power system must have a maximum output of less than 10 kW, and the storage battery must be a product eligible for the Ministry of the Environment’s ZEH support project; applications for storage batteries only are also accepted.
Applications are accepted from April 1, 2026, and against a budget of 4 million yen, the remaining budget as of September 30, 2026, is 903,000 yen. Applications must be made at least 14 days before the start date of the installation work, and it is important to confirm the timing of the work and the order of applications before signing a contract.
👉 Click here for the official Zama City page
National Subsidy “DR Home Storage Battery Project (Support Project for Home Storage Systems for DR Resource Introduction)”
The national government has been implementing the “DR Home Storage Battery Project” to support the installation of home storage batteries.
This program targets those who are introducing new storage systems of registered products that can be used for demand response (DR), and in the supplementary budget for Reiwa 7, the subsidy amount was determined based on a standard amount of 34,500 yen per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum of 600,000 yen per application. There are conditions such as that contracts or orders made before the grant decision are not eligible.
However, the supplementary budget for Reiwa 7 reached the application amount on May 29, 2026, and the public offering has ended (the previous year’s supplementary budget for Reiwa 6 also ended on July 2, 2025). Applications are currently not possible, so please check the official site for future public offerings.
Furthermore, there are currently no subsidies confirmed for the installation of solar panels for existing homes.
👉 Click here for the official DR Home Storage Battery Project site
Kanagawa Prefecture “Reiwa 8 Fiscal Year Kanagawa Prefecture Residential Solar Power Generation and Storage Battery Installation Subsidy”
In Kanagawa Prefecture, subsidies are provided for those who install both “solar panels” and “storage batteries” together in their homes.
The subsidy amounts are 70,000 yen per kW of solar power generation output and 150,000 yen per storage system.
For example, if you install a 4kW solar panel and one storage battery, the calculation for the subsidy amount would be 4kW × 70,000 yen + 150,000 yen = 430,000 yen.
Conditions include that the storage system must be a registered product, if construction begins before the subsidy decision is made, it will be ineligible, and the application must be made by the individual (applications by contractors on behalf of the homeowner are not allowed). The home must also meet earthquake resistance performance standards. Please confirm the compatibility with other subsidy programs, as it may vary by program.
In Reiwa 8, the first application period (May 11 – June 30) and the second application period (September 7 – September 30, first-come-first-served) were held, and the second period has reached its application deadline. For future recruitment, please check the official page of Kanagawa Prefecture.
👉 Click here for the official page of Kanagawa Prefecture
Kanagawa Prefecture “Reiwa 8 Fiscal Year Kanagawa Prefecture Self-Consumption Type Renewable Energy Installation Subsidy” (for businesses)
Kanagawa Prefecture also offers subsidies for businesses that install “self-consumption type” facilities that use electricity generated by solar panels.
Eligible applicants are corporations or individual business owners filing blue returns, and installations in individual residences are not eligible.
Solar power generation must have an output of 10kW or more, supply electricity to business facilities within the prefecture, and not be equipment certified under FIT or FIP.
The subsidy amount is 80,000 yen per kW of solar power generation and 50,000 yen per kWh for the storage system installed together (with a maximum of 5 million yen).
In Reiwa 8, the application amount reached the budget limit, and applications were closed on September 3, 2026.
If you are a business considering the installation of solar panels on commercial buildings in Zama City, please check the official page of Kanagawa Prefecture for the next recruitment.
👉 Click here for details
Solar Panel Installation and Storage Battery Installation Price List

⇧Service Menu | For Costs of Solar Panel Installation and Storage Battery Installation, Click Here

⇧Service Menu | For Costs of Solar Panel Removal and Water Heater Removal, Click Here
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and storage batteries should be checked separately as “Equipment Costs (Device Costs)” and “Construction Costs.”
Even for the same “Complete Solar Panel Installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.
Considerations for Installation Capacity (kW) and Storage Battery Capacity (kWh)
The installation capacity of solar panels is determined by “Output of One Panel (W) × Number of Panels”, with the unit being kW (kilowatt). Storage batteries are compared based on the amount of electricity they can store, expressed in kWh (kilowatt-hour).
The amount of kW that can be installed on a roof varies for each house based on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.
On our pricing page, we list solar panels as approximately 800,000 JPY to 1,200,000 JPY for 3-5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are just approximate amounts and can vary based on wiring length, scaffolding range, existing roofing materials, panel layout, etc.)
▶ Service Menu | For Costs of Solar Panel Installation and Storage Battery Installation, Click Here
Items to Confirm in the Estimate (Cost Confirmation)
When comparing estimates, it is common to compare different capacities and equipment just by looking at the amounts. Please check if the following items are clearly stated in each company’s estimate!
| 1. Solar Panels | Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW). |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls the battery together. |
| 3. Battery | Manufacturer, model number, capacity (kWh), range usable during a power outage (entire house or specific circuits), installation location. |
| 4. Mounting Frame and Hardware | Name of the hardware suitable for the roofing material and the method of securing it (whether it involves drilling holes or clamping). |
| 5. Wiring and Electrical Work | Wiring route and length, work around the distribution board, presence of a monitor to check power generation. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment at the fixed points, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Applications | Extent of support for applications to the power company, certification applications for selling electricity (FIT), and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If roof work and exterior painting are done simultaneously, check that the same scope and quantity are not counted twice. |
| 9. Removal and Disposal | Whether the removal of existing solar water heaters and old panels, as well as disposal costs for waste materials, are included. |
| 10. Tax Classification and Warranty | Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, and details and duration of manufacturer and workmanship warranties. |
If the capacities differ, both the amount and power generation will change. Kakeru Koumuten Co., Ltd. welcome comparisons, so if you bring estimates from other companies, we will explain the differences item by item!
Self-Estimate and Profit Simulation for Solar Power Generation
With the simulator above,
you can perform a rough estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the battery, you can perform a rough estimate and profit simulation!
*The simulation results are approximate. Actual profits may vary based on assumptions such as electricity rates, self-consumption ratios, selling prices, and costs for equipment inspection or replacement.
Customer Feedback
Case Studies of Solar Panel Installation


| Construction Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh range |
| Base Mounting Hardware Used |
| Niigata Manufactured / Aluminum Catch Type Hardware |
| Fixing Method & Waterproofing Arrangement |
| Fixed by catching the horizontal metal roof with catch type hardware (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY Estimated recovery period for construction costs: about 8 to 9 years (self-consumption) *The grant amount and recovery estimate are based on the system and calculations at the time of construction, and may differ under the current system. |
| Construction Period |
| Approximately 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the installation of solar panels and storage batteries. I heard that grants are available, and I would like to know how much will be provided. |
Our Proposal
We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the estimate!
How to Choose a Solar Panel Installation Contractor in Zama City, Kanagawa Prefecture
There are many solar panel installation contractors available in Zama City, Kanagawa Prefecture, and you may be unsure which contractor to choose.
Therefore, when requesting solar panel installation and battery storage installation work, let’s check the following 4 points.
● Have extensive knowledge not only about solar panels but also about roofs
● Confirm the existence of warranties and aftercare maintenance
● Obtain estimates from multiple contractors (3 companies as a guideline)
● Check if they provide support for subsidy applications
By confirming the above 4 points, you will be able to choose a reliable contractor.
Knowledge about roofs as well as solar panels
Improper installation of solar panels can be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles due to insufficient verification of roofs and waterproofing
・Solar panels installed on a deteriorated roof causing leaks
・Solar panels installed on a roof with a short lifespan, requiring renovations for removal and reinstallation within a few years
・Misjudging the type of waterproofing and applying incorrect treatment, resulting in leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.
▶ Go to “Roof Verification Before Installing Solar Panels” in this article
Confirm the existence of warranties and aftercare maintenance
When choosing a solar installation contractor, let’s confirm the existence of warranties. It is important to check not only the duration of the warranty but also the coverage, exclusions, and cost conditions.
Solar panels and battery storage units come with manufacturer warranties, but also check for the existence of workmanship warranties in case leaks occur after installation!
For contractors that offer workmanship warranties, if leaks occur after installation within the warranty period and conditions, they may cover the repairs under the warranty.
Additionally, some contractors offer after-sales service separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Changes or damage on the roof can occur in areas that are not visible, so there is a possibility that customers may not notice them themselves.
By conducting inspections during after-sales maintenance, you can easily prevent major repairs or breakdowns by detecting abnormalities early!
Kakeru Koumuten Co., Ltd. provides a leak warranty as part of the workmanship warranty for solar panel installations. (The warranty for solar panel installations is 10 years, and depending on the condition of the roof before installation, a roof renovation may be required to provide the warranty.)
We also conduct after-sales maintenance and send out annual direct mail!
Please check the direct mail, and if you wish, we will visit for after-sales maintenance!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting solar panel installation, be sure to obtain estimates from multiple contractors.
Even for the same manufacturer and the same construction content, costs may vary, and warranties and after-sales services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request services from your preferred contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates,
“Check the items in the estimate”
“Type of solar panel”
“Warranties and after-sales services”
and make careful comparisons to make your decision! If the quality of the auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid making decisions based solely on price!
▶ Go to “Breakdown of Installation Capacity, Equipment, and Construction Costs” in this article
Check if they provide support for subsidy applications
There may be subsidies available for solar panel installations and battery installations, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
For systems like Kanagawa Prefecture’s housing subsidies, where the contractor cannot apply on your behalf and personal application is required, it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the prefectural housing subsidy, this includes the grant decision) before proceeding with the construction!
For the prefectural housing subsidy, after the construction is completed, a performance report must be submitted, and the flow involves a review before the grant is provided! (The flow of procedures varies by system)
▶ To “Subsidies and Grants That May Be Applicable in Zama City” within this Article
Benefits of Introducing Solar Power Systems
The benefits of introducing solar panels are summarized in the following 5 points!
Benefit 1: Economic Advantages
The biggest advantage of introducing solar panels is the economic benefit!
Although the selling price of electricity has decreased compared to 10 years ago, you can gain benefits by reducing the amount of electricity you purchase from power companies by consuming the electricity you generate!
As electricity costs rise, the ability to cover your consumption with solar power becomes increasingly attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!
For residential use (under 10kW), the selling price (FIT) will be set at “24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the 5th year, it is generally more advantageous to use the electricity at home (self-consumption), making the combination with storage batteries a viable option.
👉 Ministry of the Environment | For purchase prices, periods, etc., click here
Benefit 2: You Can Utilize Subsidies!
The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the criteria, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In the case of Zama City, there may be subsidies available from the city and Kanagawa Prefecture, so please check the latest application status.
Benefit 3: Environmentally Friendly!
Solar power generation has low carbon dioxide emissions and reduces dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices like power conditioners may have operational noise.)
Benefit 4: Expect Heat Insulation Effects!!
By installing panels on the roof or rooftop, they block direct sunlight from hitting the roof.
Especially in summer, it can help reduce the temperature rise of the roof, providing expected heat insulation effects!
(Note that this does not improve the building’s insulation performance itself.)
Benefit 5: Electricity can be used even during power outages!!
If a storage battery is installed, it becomes possible to use electricity even during emergencies such as power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capability, you may be able to use electricity from a dedicated outlet during daytime generation.
(Note that the devices, output, and duration that can be used during a power outage vary depending on the model and wiring method.)
What points should be noted when introducing solar power generation?
Next, we will explain the “three points to note” when installing solar panels!
Point 1: Maintenance costs can be incurred
A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform a roof renovation 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorated, it is reassuring to renovate it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It would be reassuring to consider maintenance costs in the simulation before introducing solar panels!
Point 2: The risk of leaks increases depending on the roofing material
The fixing methods for slate roofs and tile roofs vary by construction method, but when fixing hardware to the roofing material or substrate with screws, waterproofing of the fixed parts becomes crucial.
In methods that involve making holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure thorough waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions with the roofing material and hardware, and it cannot be used with all metal roofs.)
Foundation brackets for horizontal metal roofs
Note 3: The roof will become heavier
Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load capacity, switching to a lighter roof may also be an option if necessary.
How to choose solar panels?
There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!
Choosing Method 1: Compare based on total roof output
When installing solar panels on the roof, it is important to know how much power can be generated in a limited area, and generating more power is always better!
Solar panels come in various sizes and outputs depending on the manufacturer.
A panel with 350W output and a panel with 400W output may seem that the higher output panel is better at first glance.
However, if the size of the panel does not fit well with the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” resulting in different numbers of panels that can be installed on the same roof due to size differences.
400W × 15 panels = 6kW (total output of the roof)
350W × 20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation amount (kWh) will vary depending on conditions such as roof orientation, slope, and shading.
Choosing Method 2: Compare based on degradation rate of solar panels
Solar panels have a degradation rate, and their output gradually decreases over 10 or 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation amount.
By not deciding solely based on initial output and considering the degradation rate, you can choose solar panels without regrets!
Choosing Method 3: Compare based on warranty period
Solar panel warranties include various types such as “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
For output warranties, some manufacturers offer a 30-year warranty, while others offer a 10-year warranty, so it varies!
Longer warranties are better, so be sure to check the warranty period and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Power and Storage Battery Installation in Zama City
We have compiled frequently asked questions from customers considering the installation of solar panels and storage batteries in Zama City. (Tap to open the answers)
How much does it cost to install solar panels and storage batteries in Zama City, Kanagawa Prefecture?
The cost varies depending on the installation capacity, equipment, and condition of the roof. In the above construction example (solar panel 4.3kW + storage battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
Guidelines by capacity are published on the solar panel and storage battery installation pricing page. We will create a layout diagram from the drawings and on-site survey and provide a free estimate!
Are there any subsidies available for solar power and storage battery installation in Zama City?
As of October 6, 2026, Zama City’s “Smart House Related Equipment Installation Subsidy” (10,000 yen/kW for solar power, up to 40,000 yen; 40,000 yen for lithium-ion storage batteries) is currently accepting applications on a first-come, first-served basis (the remaining budget as of September 30, 2026, is 903,000 yen). The Kanagawa Prefecture subsidy (70,000 yen/kW for solar power, 150,000 yen per unit for storage batteries) is approaching the application deadline for the second phase of fiscal year 2026, and the national DR household storage battery project has ended its public recruitment.
Since the application status may change, please refer to the subsidy and grant section and consult with us before signing a contract.
Can I apply for subsidies after the construction is completed?
For many programs, procedures are required before construction. The subsidy for Zama City requires applications to be submitted “up to 14 days before the construction start date,” and the Kanagawa Prefecture subsidy requires “construction to start after the grant decision,” meaning that if installation is done beforehand, it may not be eligible.
The order of procedures varies by program, so please confirm before signing a contract or starting construction.
Can solar panels be installed on slate roofs? I’m worried about leaks.
Installation is possible on slate roofs, but it is necessary to check the condition of the roofing material and substrate. The method of securing the panels varies by construction method, and when securing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is essential.
Kakeru Koumuten is a company specializing in exterior renovations with strong expertise in roofing, so we will check the condition of the roof before installation and suggest methods such as roof overlay or replacement if deterioration is advanced.
The roof is old. Should I do a roof renovation first?
It depends on the condition of the roof. If a roof renovation is needed within 10 to 20 years after installation, the cost of removing and reattaching the solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate to a highly durable roofing material before installation.
After confirming the condition of the roof during the on-site survey, please consult with us on how to proceed with the installation!
Is it better to install a storage battery together with solar panels?
If you want to use the generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.
Additionally, the subsidy in Kanagawa Prefecture requires the simultaneous introduction of solar panels and storage batteries, while the subsidy in Zama City can be applied for with just the storage battery (the storage battery must be a product eligible under the Ministry of the Environment’s ZEH support project). You can compare “solar panels only” and “solar panels + storage battery” through a financial simulation.
How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and on-site survey, and provide you with the installation capacity and power generation simulation.
Zama City has varied topography, including hilly areas, plateaus, and lowlands, and the way shadows are cast by neighboring houses and trees differs from one house to another. You can check the expected power generation through the power generation simulation.
How long will the construction period be?
In the above construction example (solar panel 4.3 kW + storage battery), it took about 3 days. The duration may vary if roof work is performed simultaneously or depending on the shape of the roof and installation capacity.
Please note that additional time is required for applications for subsidies and power companies, so please consult with us as soon as possible.
What is the current selling price (FIT)?
For residential use (less than 10 kW), the selling price from certifications after October 2025 will be 24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year, and the same price will apply in the 2026 fiscal year.
The idea is to recover initial costs quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity costs.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-service maintenance notifications via direct mail and visits customers who request inspections. We can also clean solar panels using a special brush if the power generation decreases due to dirt.
Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.
Can you also handle renovations for roofs that already have solar panels installed?
Yes, we can. Kakeru Koumuten can detach and reattach solar panels in-house, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them all in one go. The removed panels can be stored in our warehouse.
For costs, please refer to the solar panel detachment and hot water heater removal pricing page.
For those looking for a solar panel installation contractor in Zama City, please consult Kakeru Koumuten
Our company handles a wide range of exterior renovations, including solar panels, roofing work, and exterior wall work in Zama City, Kanagawa Prefecture.
We receive requests from many customers, including renovation companies and real estate agencies!
Kakeru Koumuten promises “high-quality renovations at low cost”, and we have received great feedback from numerous customers.
We continue to update our construction performance records every year, and we will strive to improve quality to satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and cover method for exterior walls.
We are also happy to handle small jobs such as partial repairs and rain gutter cleaning!
In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult with us!
“I want to know about recommended solar panels”, “I want to keep costs down as much as possible”, “I just want an estimate for now”, we will provide optimal solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and will propose the best construction plan!
We are confident that we will not lose in terms of cost, quality, and planning compared to other companies in exterior construction!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if our company is found to be inferior to others, you are free to decline!
Characteristics of Zama City, Kanagawa Prefecture and Points for Solar Construction
Zama City is located in the central part of Kanagawa Prefecture, and according to the city’s official page, it has an area of approximately 17.57 km², with a city area of about 5.3 km east-west and 4.0 km north-south. The terrain is divided by the Zama Hills running north-south, with the eastern side being the Sagamino Plateau and the western side being the alluvial lowland along the Sagami River.
Below are the characteristics of Zama City and points to consider when installing solar panels and storage batteries. (Tap to open)
View the characteristics of Zama City and points for solar construction
■ A terrain mixed with hills, plateaus, and lowlands. Shadow checks should be done for each individual house.
Zama City’s Geography and Location (Official City Site) introduces that Zama City has the Zama Hills running north-south, with the Sagamino Plateau to the east and the alluvial lowlands along the Sagami River to the west, with an elevation ranging from approximately 24m to about 89m. The city area is compact, but the locations of residential areas vary between hills, plateaus, and lowlands, and the shadows cast by surrounding buildings and trees differ from house to house. At Kakeru Koumuten, we create layout diagrams based on the blueprints and the actual site conditions, allowing you to confirm through power generation simulations.
■ Confirm the Installation Locations of Equipment for Lowland Homes
The western side of the city corresponds to the lowlands along the Sagami River. When deciding on the installation locations for storage batteries and power conditioners, it is reassuring to check the flood risk for your residence on a hazard map. We will propose installation locations considering wiring routes and ease of inspection.
■ Confirm Fixing Methods According to the Type of Roof
Not only in Zama City, but the fixing methods for solar panels differ depending on roofing materials such as slate, tiles, and metal roofs. In methods that fix brackets to the roof, waterproofing treatment of the fixed parts is crucial, so we will confirm the combination of roofing materials and methods during the estimate.
■ City Subsidies are on a First-Come, First-Served Basis. Applications Must Be Made 14 Days Before Construction Starts
Zama City’s Smart House Related Equipment Installation Subsidy (Official City Site) has been accepting applications since April 1, 2026, and as of September 30, 2026, the remaining budget is reported to be 903,000 yen (total budget of 4,000,000 yen). The program will end once the budget is reached, and applications must be made at least 14 days before the start date of the installation work. It is important to confirm the timing of the work and the order of applications before signing the contract.
■ Check the Condition of the Roof According to Its Age
For homes that have been built for several years, it is important to check the condition of the roofing materials and substrate before installing solar panels. Depending on the condition of the roof, installing them simultaneously with roof renovations can reduce future costs for removing and reinstalling solar panels.
■ Pay Attention to Roof Dirt Such as Fallen Leaves and Dust
If dirt such as fallen leaves and dust accumulates on the roof, it may affect power generation. Kakeru Koumuten can also handle cleaning solar panels with specialized brushes and rain gutter cleaning.
Our company is based in Kanagawa Prefecture and handles many exterior and solar construction projects in Zama City.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!
Service Area in Zama City, Kanagawa Prefecture
Kakeru Koumuten accepts requests throughout Kanagawa Prefecture and all of Tokyo.
List of Areas in Zama City, Kanagawa Prefecture
Iridani Nishi, Zama City / Iridani Higashi, Zama City / Kurihara, Zama City / Kurihara Chuo, Zama City / Komatsubara, Zama City / Sagamigaoka, Zama City / Sagamino, Zama City / Zama, Zama City / Nitta-juku, Zama City / Sobudai, Zama City / Tachinodai, Zama City / Nishikurihara, Zama City / Higashihara, Zama City / Hibarigaoka, Zama City / Hirono-dai, Zama City / Midorigaoka, Zama City / Minamikurihara, Zama City / Myouou, Zama City / Yotsuya, Zama City
・Please leave the exterior wall painting in Zama City, Kanagawa Prefecture to Kakeru Koumuten!
・Please leave the roof renovation in Zama City, Kanagawa Prefecture to Kakeru Koumuten!
・Please leave the exterior renovation in Zama City, Kanagawa Prefecture to Kakeru Koumuten!
・Kakeru Koumuten Co., Ltd. construction achievements
・Kakeru Koumuten Co., Ltd. aftercare services
・Kakeru Koumuten Co., Ltd. construction menu and price list
・Kakeru Koumuten Co., Ltd. staff blog and announcements
・Explaining the importance of comparative estimates and key points!
・12 major manufacturers of solar power generation! Also introducing features and selection points!
・What are the installation costs for solar power generation? Thoroughly explaining tips to reduce costs!
・What are the best locations for installing solar power generation? Also introducing key points for site selection!
・Here is the introduction to solar power generation estimates!
We welcome inquiries via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!





