Leave the installation of solar panels in Higashikurume City, Tokyo to Kakeru Koumuten Co., Ltd.!
For solar panel and battery installation in
Higashikurume City, Tokyo,
trust Kakeru Koumuten!
Kakeru Koumuten is a company specializing in exterior renovations.
As a company strong in roofing work, we are entrusted withsolar panel and battery installation considering roofs and waterproofing!
“How to choose a solar panel contractor in Higashikurume City, Tokyo”
“Costs for solar panel and battery installation”
“Subsidies applicable for solar system installation in Higashikurume City, Tokyo”
We will also explain the above three points!
Installing solar panels carries risks such as“the occurrence of leaks” and other troubles.
To ensure you do not regret your solar panel installation, we recommend obtainingquotes from about three companies!
Table of contents (tap to open/close)
- Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Higashikurume City, Tokyo
- Roof Inspection Before Installing Solar Panels
- Subsidies and Grants That May Be Applicable in Higashikurume City, Tokyo
- Price List for Solar Panel and Storage Battery Installation
- Breakdown of Installation Capacity, Equipment, and Construction Costs
- Self-Estimate and Profit Simulation for Solar Power Generation
- Customer Testimonials
- Case Studies of Solar Panel Installations
- How to Choose a Solar Panel Installation Company in Higashikurume City, Tokyo
- Benefits of Introducing Solar Equipment
- Points to Consider When Introducing Solar Power Generation
- How to Choose Solar Panels
- Frequently Asked Questions About Solar and Storage Battery Installation in Higashikurume City, Tokyo
- If You Are Looking for a Solar Panel Installation Company in Higashikurume City, Tokyo, Contact Kakeru Koumuten
- Characteristics of Higashikurume City, Tokyo and Key Points for Solar Installation
- Service Area in Higashikurume City, Tokyo
Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Higashikurume City, Tokyo
Here are the reasons why our company is entrusted with solar panel installation by customers in Higashikurume City, Tokyo.
“Our Unique Strengths in Solar Panel Installation That Cannot Be Imitated by Other Companies”
have received high praise from many customers.
so we would appreciate it if you could compare our estimates with those of other companies.
Because we are confident, we welcome estimates from any number of companies!
1. We Also Handle Exterior Renovations Aside from Solar Panel Installation!


Issues such as leaks that occur during solar panel installation may be caused by insufficient checks on the roof and waterproofing at the installation site.
Even if one is knowledgeable about solar panels, there are cases where the roof and waterproofing at the installation site are outside their expertise, so caution is necessary.
It is reassuring to have expertise in roofing to avoid maintenance and issues after installation!
Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing for quick responses to maintenance and urgent issues after solar panel installation!
2.Facilities Specialized in Exterior Renovation
Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide solar work and exterior renovations at low cost and high quality.
We have established five bases for material storage and showrooms.
In-house Ownership of Scaffolding Materials


To ensure safety during work on the roof, we own the scaffolding materials necessary for temporary scaffolding according to construction conditions and can assemble scaffolding in-house.
By not outsourcing scaffolding work and using our own scaffolding team, we can also cut costs related to scaffolding work.
We own scaffolding materials for approximately 50 single-family homes!
Even if there are height differences on the site, our in-house scaffolding team will plan the scaffolding according to the local conditions.
Storage of Materials in Our Large Warehouse

We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you canpurchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, enabling us torespond quickly in emergencies!
Sorting and Transporting Waste Materials In-House
The installation of solar panels often involves roofing work, generating various waste materials such as paints, wood, and metal.
By sorting and recycling waste materials, we can significantly cut waste disposal costs.
Exterior Renovation Dedicated Showroom


In the showroom, not only can you have meetings, but you can also
check the actual foundation brackets for solar panels and see how they are installed on roofing materials!
We can also provide simulations for the revenue and installation costs when introducing solar panels!
Since roofing and exterior wall work often accompany renovations, we also have samples of roofing materials and models that explain the structure, allowing for detailed explanations!
3.All Work Performed by Our Own Team
One of Kakeru Koumuten’s major strengths is its complete in-house construction.
By having a consistent system from inquiry to project completion, Kakeru Koumuten can offer high-quality roof renovations at reduced costs.
Additionally, one representative will handle everything from the estimate to the completion of the work.
Since the same person will manage the sales and construction supervision, smooth communication is possible.
We can provide consistent in-house construction from temporary scaffolding installation, exterior wall painting, to roof renovations!
4. Various Permits and Skilled Workers


We have obtained construction industry licenses and industrial waste collection and transportation permits!
We also have nationally certified sheet metal workers and painting technicians, and we are confident in our construction techniques.
We can also handle large-scale roof work for factories and other facilities!
5. Warranty and Aftercare
In addition to the manufacturer’s warranty for solar panel installation work, we also provide our own construction warranty (leakage warranty)!
(The construction warranty for solar panel installation is 10 years. Depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed. The construction warranty is separate from the manufacturer’s product warranty, and the coverage and conditions vary based on the warranty details.)
Aftercare is available annually, and we send out notification DM every year.
If you have questions about the warranty, please click on the image above!
6. Flexible and Prompt Response
Our company is equipped to handle various roofing troubles and situations.
If you cannot access the roof at high altitudes, we can utilize a drone to assist!
During leak investigations, we can also conduct inspections using a thermal imaging camera.
If the power generation of solar panels decreases due to dirt, we can provide cleaning services using specialized brushes.
We will respond according to the customer’s wishes.
7. Human Resource Development
To improve skills, we create various roof models and conduct practical training.
Since the construction methods vary depending on the shape and slope of the roof, we regularly conduct technical training to ensure that each staff member can handle various scenarios.
8. Creation of Easy-to-Understand Materials and Simulations
Kakeru Koumuten provides not only “estimates,” “layout diagrams,” and “power generation simulations” but also a “solar construction guidebook” and “profit and loss simulations” that take into account loan interest rates and electricity costs.
Profit and loss simulations can be created for projected cumulative profits and losses over 20 to 30 years.
Even customers who are not familiar with solar construction will receive materials that clearly summarize important points and disadvantages!
We encourage you to obtain comparative estimates and review plans from other companies!
Roof Inspection Before Installing Solar Panels
Once solar panels are installed, they will remain on the roof for 20 or 30 years.
Confirming “Is it okay to install directly on the current roof?” before installation is the key point to prevent leaks and unnecessary expenses!
Kakeru Koumuten, specializing in roofing work, has summarized the items to check before installation.
| 1. Types of Roofing Materials and Age | The fixing method varies depending on the roofing material, such as slate, tiles, metal roofs, and flat roofs (rooftop waterproofing). If the remaining lifespan of the roofing material is short, we may suggest a roof renovation first. |
| 2. Condition of Substrate and Waterproof Sheet | If the sheathing boards or roofing (waterproof sheet) under the roofing material are damaged, it will affect the fastening strength and waterproofing. We will also check for any signs of leaks. |
| 3. Orientation, Slope, and Shadows of the Roof | The orientation and slope of the roof surface, as well as shadows from neighboring houses, trees, and utility poles, can affect power generation. We will create a layout diagram from the drawings and the site, and you can check it with a power generation simulation. |
| 4. Shape of the Roof and Usable Area | The number of panels that can be installed (installation capacity) is determined by the shape and size of the roof. The number of panels that can be installed varies depending on the size of the panels, so we will compare based on the overall output of the roof. |
| 5. Fixing Method and Waterproofing Details | We will confirm whether the method involves drilling holes in the roofing material for fastening or using brackets to secure the roofing material. The fixing method varies by technique, so please check the waterproofing treatment method for the fastening parts during the estimate. |
| 6. Weight of the Roof | The roof will become heavier due to the panels being installed. After investigating the existing roof, substrate, and load capacity, switching to lighter roofing materials may be an option if necessary. |
| 7. Installation Location of Equipment and Wiring | We will check the installation location of the power conditioner and storage battery, as well as the wiring route to the distribution board. The length of the wiring will also affect the cost. |
| 8. Ease of Scaffolding Setup and Delivery Route | If there is a height difference on the site, planning for scaffolding and the delivery route for equipment and materials may require some ingenuity. The width of the front road and the step differences on the site will also be checked during the site survey. |
Fixing Methods and Checkpoints by Roofing Material
| Roof Material | Main Fixing Method | Pre-Installation Check Points |
|---|---|---|
| Slate Roof | Varies by method (e.g., fixing brackets to the roof material and substrate with screws) | Waterproof treatment of fixing parts, cracks or deterioration of slate, condition of the substrate. If deterioration is advanced, consider roof overlay (cover method) or replacement first. |
| Tile Roof | Fixed with brackets and methods suited to the type of tile (even methods that do not drill holes in the tiles will fix to the substrate) | Type and condition of tiles, substrate, load-bearing capacity. Depending on the investigation results, there may be methods to replace with lighter roofing materials before installation. |
| Metal Roof (Horizontal and Vertical) | Fixed with catch-type brackets that grip the roof material (depends on the combination of roof material and brackets) | Whether the roof material and brackets are compatible, installation conditions from the roof material manufacturer. If compatible, methods that do not drill holes may be available. |
| Flat Roof / Rooftop | Fixed by installing a frame | Type and deterioration status of the waterproof layer, waterproofing around the frame. Consider in conjunction with the timing of waterproofing work. |
If you plan to renovate the roof 10 to 20 years after installation, there will be additional costs for removing and reinstalling solar panels. If the roof is deteriorating, it may be more cost-effective in the long run to renovate to a highly durable roofing material before installation.
Kakeru Koumuten Co., Ltd. specializes in roofing work and can also handle the removal and reinstallation of solar panels, so please consult us based on the condition of your roof!
▶ Click here for roof renovations in Higashikurume City, Tokyo
Possible Subsidies and Grants inHigashikurume City, Tokyo
If you are introducing solar panels or storage batteries in Higashikurume City, Tokyo, there is a possibility that national and Tokyo metropolitan systems may apply. According to the official page of Higashikurume City, “Currently, there are no unique subsidy systems from the city.”
The following is based on the content checked on the official pages of each system as of October 7, 2026. The acceptance status may change depending on the budget, so please check the latest information before contracting or starting work.
Eligibility Conditions and Application Period for Subsidy Programs
| Program | Main Eligibility Conditions | Subsidy Amount | Application Period & Status |
|---|---|---|---|
| Tokyo “Household Solar Power Generation Promotion Project” | Individuals, corporations, or management associations installing unused solar power systems (output under 50kW, JET certification, etc.) in residential properties within Tokyo. The generated power must be used for residential purposes. Pre-application is required | Existing homes: 15,000 JPY per kW for up to 3.75kW (maximum 450,000 JPY), 12,000 JPY/kW for over 3.75kW and under 50kW New homes: 12,000 JPY/kW for up to 3.6kW (maximum 360,000 JPY), 10,000 JPY/kW for over 3.6kW |
For the fiscal year 2026, pre-applications are being accepted from May 29 (will end once the budget is reached). From the pre-applications for fiscal year 2026, submission of certificates issued by financial institutions will be mandatory at the time of performance reporting. |
| Tokyo “Household Storage Battery Promotion Project” | Owners of eligible equipment (storage batteries registered with SII, excluding national and local governments). Must be installed between April 1, 2026, and March 30, 2031. If pre-applying after October 1, 2026, only products registered with the national SII for fiscal year 2026 will be eligible | Storage battery package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household) Additional amount for participating in DR demonstration (100,000 JPY per unit; 150,000 JPY per unit if energy management equipment is installed) Expansion of storage battery unit: 60,000 JPY/kWh (maximum 720,000 JPY per household) |
For the fiscal year 2026, pre-applications are being accepted from May 29. Grant application and performance reporting will start from June 30. |
| National “DR Household Storage Battery Project” (Fiscal Year 2025 Supplement) | Newly introducing household storage systems that can be utilized for DR (demand response) with registered products. | Calculated based on a standard amount of 34,500 JPY per initial effective capacity of 1kWh (subsidy rate within 30% and maximum 600,000 JPY per application). | The budget was reached on May 29, 2026, and the public offering has ended (there are no plans to reopen the public offering as stated on the official website, and applications cannot be submitted at this time). |
| National “Mirai Eco Housing 2026 Project” (Renovation) | Storage batteries are one of the eligible facilities, but they must be combined with essential works such as insulation renovation of windows (openings) and structures; applications cannot be made for just the installation of storage batteries. Solar panels are not included as eligible facilities | Storage battery: 96,000 JPY per household | Ends once the budget limit is reached. As of October 5, 2026, the application amount for renovations is displayed as 8% of the budget on the official website. Please check the official site for the current status. |
Tokyo’s subsidies for solar power and storage batteries require pre-application. For storage batteries pre-applying after October 1, 2026, only national SII registered products will be eligible, and equipment requirements will change. Higashikurume City currently does not have its own subsidy program, as stated on the city’s official page. Eligibility conditions, application procedures, and the possibility of combining programs differ by program, and applying does not guarantee a grant, so please confirm before contracting or starting work.
Kakeru Koumuten Co., Ltd. will guide you on the eligibility conditions and application periods for each program after confirming them.
National Subsidy “DR Home Battery Project (Support Project for Introducing Home Storage Systems for DR Resource Implementation)”
The government has been implementing the “DR Home Battery Project” to support the installation of home storage batteries.
This program targets those who are introducing new registered storage systems that can be utilized for demand response (DR), and in the fiscal year 2025 supplementary budget, the subsidy amount is determined based on a standard amount of 34,500 JPY per initial effective capacity of 1 kWh, with a subsidy rate of up to 30% and a maximum subsidy amount of 600,000 JPY per application. There are also conditions such as that contracts or orders made before the grant decision are not eligible.
However, the supplementary budget for fiscal year 2025 reached its application budget on May 29, 2026, and the public offering has ended. The official site also states that there are no plans to reopen the public offering, and currently, applications cannot be made. Please check the official site for future public offerings.
Additionally, there are currently no subsidies confirmed for the installation of solar panels on existing homes.
👉 Click here for the official site of the DR Home Battery Project
Tokyo “Promotion Project for Introducing Solar Power Generation in Homes”
This is a subsidy for those who are newly installing unused solar power generation systems in residential homes in Tokyo. The simultaneous installation of storage batteries is not a condition.
●Existing homes: For systems below 3.75 kW, 150,000 JPY per kW (maximum 450,000 JPY); for systems over 3.75 kW and under 50 kW, 120,000 JPY per kW
●New homes: For systems below 3.6 kW, 120,000 JPY per kW (maximum 360,000 JPY); for systems over 3.6 kW and under 50 kW, 100,000 JPY per kW
●There are also additional amounts for the installation of rooftop frames and waterproofing work
The target is to install unused panels with an output of less than 50 kW that have obtained JET certification, for use in the residential part of the home. The process involves pre-application followed by a grant application after installation, and starting from the pre-application for fiscal year 2026, submission of a certificate issued by a financial institution during the performance report is mandatory.
The official page of Tokyo states that pre-applications are being accepted from May 29, 2026. It will end as soon as the budget is reached, so please check the official page for the application status.
👉 Click here for the official page of Tokyo (Cool Net Tokyo)
Tokyo “Promotion Project for Introducing Storage Batteries in Homes”
This is a subsidy for the installation costs of storage battery systems aimed at increasing self-consumption of electricity generated by solar power and improving energy independence during emergencies.
●Storage battery package: 100,000 JPY per kWh (maximum 1,200,000 JPY per household)
●Additional for participating in DR verification: 100,000 JPY per unit (150,000 JPY per unit if energy management equipment is installed)
●Expansion of storage battery units: 60,000 JPY per kWh (maximum 720,000 JPY per household)
The target is the owner of the subsidized equipment (excluding national and local public organizations), and it is a condition that the installation must be completed between April 1, 2026, and March 30, 2027. If you apply in advance after October 1, 2026, only the products registered in the national SII for the fiscal year 2026 will be eligible.
The official page of Tokyo states that advance applications are being accepted from May 29, 2026. For detailed information, including conditions for combinations with solar power generation, please check the official page.
👉 Here is the official page of Tokyo (Cool Net Tokyo)
About the Subsidy System in Higashikurume City
The official page of Higashikurume City (subsidy and support systems related to energy conservation and renewable energy from Tokyo and the national government) states, “Currently, there is no unique subsidy system in the city” (updated July 28, 2026). For residential solar power generation and storage batteries, the above-mentioned systems from Tokyo and the national government will be the main focus. The city’s official page introduces information on systems such as Cool Net Tokyo from Tokyo and the national government. Please check the latest information before making a contract, as systems may change.
👉 Here is the official page of Higashikurume City
Solar Panel Installation & Storage Battery Installation Price List

⇧Service Menu | For costs related to solar panel removal and hot water heater removal, click here
Breakdown of Installation Capacity, Equipment, and Construction Costs
The costs for solar panels and storage batteries should be confirmed by separating them into “equipment costs” and “construction costs.”
Even for the same “complete solar panel installation,” the amount can vary significantly depending on the installation capacity, equipment grade, and roof condition.
Understanding Installation Capacity (kW) and Battery Capacity (kWh)
The installation capacity of solar panels is determined by “output of one panel (W) × number of panels”, with the unit being kW (kilowatts). Storage batteries are compared based on the amount of electricity they can store, represented in kWh (kilowatt-hours).
The amount of kW that can be placed on the roof varies for each house based on the roof’s shape, orientation, and size. At Kakeru Koumuten, we create layout diagrams from blueprints and on-site surveys to present the installation capacity.
On our pricing page, we list solar panels at approximately 800,000 JPY to 1,200,000 JPY for 3-5 kW, and 1,200,000 JPY to 1,900,000 JPY for 6-10 kW. (These are rough estimates and can vary based on wiring length, scaffolding range, existing roofing materials, panel layout, etc.)
▶ Construction Menu | Costs for Solar Panel and Storage Battery Installation
Items to Confirm in the Estimate (Cost Verification)
When comparing estimates, it is common to compare different capacities and equipment by only looking at the amounts. Please check if the following items are clearly stated in each company’s estimate!
| 1. Solar Panels | Manufacturer, model number, output per panel (W), number of panels, total installation capacity (kW) should be specified. |
| 2. Power Conditioner | Manufacturer, model number, capacity, number of units, installation location (indoor/outdoor). Also check if it is a type that controls the battery together. |
| 3. Storage Battery | Manufacturer, model number, capacity (kWh), range available during power outages (whole house or specific circuits), installation location. |
| 4. Mounting Frame and Hardware | Name of the hardware suitable for the roofing material and the method of securing it (whether it involves drilling holes or clamping to secure). |
| 5. Wiring and Electrical Work | Wiring route and length, work around the distribution board, presence of a monitor to check power generation. |
| 6. Roof Reinforcement and Waterproofing | Details of waterproofing treatment for fixed parts, whether necessary roof repairs and substrate reinforcements are included. |
| 7. Application | Extent of support for applications to the power company, certification application for selling electricity (FIT), and subsidy applications. |
| 8. Scaffolding | Scope and quantity of scaffolding. If roof work and exterior painting are done simultaneously, check that the same scope and quantity are not double-counted. |
| 9. Removal and Disposal | Whether the removal of existing solar thermal water heaters and old panels, as well as disposal costs for waste materials, are included. |
| 10. Tax Classification and Warranty | Whether prices are tax-inclusive or tax-exclusive, conditions under which additional costs may arise, details and duration of manufacturer warranty and workmanship warranty. |
If the capacity differs, both the price and power generation will change. Kakeru Koumuten Co., Ltd. warmly welcomes comparative estimates, so if you bring estimates from other companies, we will explain the differences for each item!
Self-Estimate and Profit Simulation for Solar Power Generation
With the simulator above,
you can obtain an approximate estimate and a profit simulation for up to 30 years!
If you know the total installation capacity of solar panels on the roof and the capacity of the storage battery, you can get an approximate estimate and profit simulation!
*Simulation results are approximate. Actual profits may vary based on conditions such as electricity rates, self-consumption ratio, selling price of electricity, and costs for equipment inspection or replacement.
Customer Voices
Case Studies of Solar Panel Installations


| Construction Details |
| Solar Panel Installation Battery Installation |
| Existing Roofing Material |
| Horizontal Metal Roof (Super Galtect) |
| Installation Capacity |
| Solar Panel: 4.3kW Battery: 5kWh |
| Base Mounting Hardware Used |
| Niigata Manufacturing / Aluminum Catch Type Hardware |
| Fixing Method & Waterproofing Arrangement |
| Fixed using catch type hardware gripping the horizontal metal roof (Catch Method) |
| Price Range |
| 2,200,000 JPY~2,300,000 JPY *Due to the grant being provided, the actual burden amount is approximately 1,000,000 JPY Expected recovery period for construction costs: about 8 to 9 years (self-consumption) *The grant amount and recovery estimate are based on the system and calculations at the time of construction and may differ under the current system. |
| Construction Period |
| About 3 days |
| Completion Month |
| April 2025 |
| Inquiry Details |
| I am considering the installation of solar panels and storage batteries. I heard that grants are available, and I would like to know how much will be provided. |
Our Proposal
We visited to provide an estimate and created a layout diagram for the solar panels from the drawings!
The layout diagram shows the arrangement of solar panels when placed on the roof.
Since we can also determine the installation capacity, it allows for power generation simulations and financial simulations.
We have also understood the expected amount of the grant, so we explained it to the customer along with the estimate!
How to Choose a Solar Panel Installation Contractor in Higashikurume City, Tokyo
There are many solar panel installation contractors available in Higashikurume City, Tokyo, and you may be unsure which contractor to choose.
Therefore, when requesting solar panel installation and storage battery installation work, let’s check the following four points.
● Have extensive knowledge not only about solar panels but also about roofs
● Confirm the existence of warranties and aftercare maintenance
● Obtain estimates from multiple contractors (three companies as a guideline)
● Check if they provide support for subsidy applications
By confirming the above four points, you will be able to choose a reliable contractor.
Have knowledge about roofs as well as solar panels
Defective installation of solar panels can sometimes be caused by a lack of knowledge and verification regarding roofs and waterproofing.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site of the solar panels is also crucial.
⚠︎Examples of troubles caused by insufficient verification of roofs and waterproofing
・Solar panels were installed on a severely deteriorated roof, resulting in leaks
・Solar panels were installed on a roof with a short lifespan, necessitating a renovation to detach and reattach the solar panels within a few years
・Misjudgment of the type of waterproofing led to incorrect processing, resulting in leaks
and more
When installing solar panels, understanding the condition and type of the existing roof allows for installation that avoids unnecessary expenses and unexpected troubles.
▶ Go to “Roof Verification Before Installing Solar Panels” in this article
Confirm the existence of warranties and aftercare maintenance
When choosing a solar installation contractor, let’s confirm the existence of warranties. It is important to check not only the duration of the warranty but also the scope of coverage, disclaimers, and cost conditions.
Solar panels and storage batteries come with manufacturer warranties, but also check for the existence of construction warranties in case leaks occur after installation!
For contractors that offer construction warranties, if leaks occur after installation within the warranty period and conditions, they may cover the repairs under the warranty.
Additionally, some contractors provide aftercare services separate from warranties, so make sure to check if the contractor you are considering has aftercare services.
Since abnormalities or damages on the roof may be in hidden areas, you may not notice them yourself.
By conducting inspections of hidden areas during aftercare maintenance, you can more easily detect abnormalities early and prevent major repairs or failures!
At Kakeru Koumuten Co., Ltd., the installation of solar panels comes with a leak warranty as part of the workmanship warranty. (The warranty for solar panel installation is 10 years, and depending on the condition of the roof before installation, we may not be able to provide a warranty unless roof renovations are performed.)
We also conduct aftercare maintenance and send out annual DM!
Please check the DM, and if you wish, we will visit you for aftercare maintenance!
Obtain estimates from multiple contractors (3 companies as a guideline)
When requesting the installation of solar panels, let’s obtain estimates from multiple contractors.
Even for the same manufacturer and the same work content, costs may vary, and warranties and after-sales services may differ.
Additionally, obtaining multiple estimates makes it easier to negotiate prices.
To request your desired contractor at a lower price, we recommend obtaining estimates from multiple contractors.
When comparing estimates, please check:
“Check the estimate items”
“Types of solar panels”
“Warranties and after-sales services”
and make a detailed comparison! If the rank of auxiliary materials is low or if steps are skipped, costs can be reduced, so avoid judging solely based on price!
▶ Go to “Breakdown of installation capacity, equipment, and construction costs” in this article
Check if they provide support for subsidy applications
There may be subsidies available for the installation of solar panels and storage batteries, but if the order of procedures is incorrect or if there are deficiencies in the documents, the subsidy may not be granted.
Since there are systems that require prior application, such as the Tokyo subsidy, it is reassuring to have a contractor that supports the preparation of necessary documents and the flow of procedures.
Complete the procedures specified for each system (for the Tokyo subsidy, prior application is required) before proceeding with the construction!
For the Tokyo subsidy, after installation, you will need to submit a grant application and performance report, which will be reviewed before the grant is provided! (The flow of procedures varies by system)
▶ Go to “Subsidies and grants that may be applicable in Higashikurume City, Tokyo” in this article
Benefits of Introducing Solar Equipment
The benefits of introducing solar panels are as follows!
Benefit 1: Economic Benefits
The biggest advantage of introducing solar panels is the economic benefit!
The selling price of electricity has decreased compared to ten years ago, but by consuming the electricity generated, you can reduce the amount of electricity purchased from the utility company and gain benefits!
As electricity prices rise, the ability to cover your power consumption with solar power becomes attractive!
If you plan to use the generated electricity at night, installing a storage battery is essential!
Furthermore, the selling price (FIT) for residential use (under 10kW) will be set as “24 yen/kWh for the first four years, and 8.3 yen/kWh from the fifth to the tenth year” for certifications after October 2025, and the same price will apply for the 2026 fiscal year. After the fifth year, it is likely to be more advantageous to use it at home (self-consume) rather than sell it, making the combination with a storage battery a viable option.
👉 For purchase prices and periods, visit the Agency for Natural Resources and Energy
Advantage 2 You can utilize subsidies!
The conditions and amounts of subsidies vary by prefecture and municipality, but if you meet the conditions, you may be able to utilize subsidies!
Reducing the actual burden through subsidies is a significant advantage!
In Higashikurume City, there is a possibility of being eligible for national and Tokyo Metropolitan programs. The city’s official page states that there are currently no unique subsidy programs (please check the official page for the status of Tokyo Metropolitan programs).
Advantage 3 Environmentally friendly!
Solar power generation has low carbon dioxide emissions and can reduce dependence on fossil fuels, contributing to the mitigation of global warming.
Solar panels themselves do not produce noise or exhaust gases during the generation process, making them an environmentally friendly method of power generation. (However, devices such as power conditioners may have operational noise.)
Advantage 4 Heat insulation effects are expected!!
By installing them on the roof or rooftop, the panels block direct sunlight from hitting the roof.
Especially in summer, it can help reduce the temperature of the roof, providing expected heat insulation effects!
(This does not improve the insulation performance of the building itself)
Benefit 5 Electricity can be used even during power outages!!
If a storage battery is installed, it becomes possible to use electricity even during emergencies like power outages!
Even without a storage battery, if you have a power conditioner with autonomous operation capability, you may be able to use electricity from a dedicated outlet during daytime generation.
(The devices, output, and duration that can be used during a power outage vary depending on the model and wiring method)
What points should be noted when introducing solar power generation?
Next, we will explain the “three points to note” when installing solar panels!
Point 1 Maintenance costs can be incurred
A particularly overlooked maintenance cost is for the roof where solar panels are installed.
If you perform roof remodeling 10 to 20 years later, there will be costs for removing and reattaching the solar panels.
If the existing roof is deteriorated, it is reassuring to remodel it with durable roofing materials before installing solar panels!
Additionally, there will be costs for regular inspections of the equipment, repairs or replacements of the power conditioner, and updates due to the deterioration of the storage battery.
It would be reassuring to ask for a simulation considering maintenance costs before introducing solar panels!
Point 2 The risk of leaks increases depending on the roofing material
The fixing methods for slate roofs and tile roofs vary by construction method, but in methods where fixtures are secured to the roofing material or substrate with screws, waterproofing of the fixed parts is crucial.
In methods that create holes in the roof, the risk of leaks inevitably arises.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method. (The catch method has compatibility conditions between the roofing material and fixtures, and it cannot be used with all metal roofs)
Catch-type base hardware for horizontal metal roofs
Note 3: The roof will become heavier
Since solar panels will be installed, the roof will become heavier. After investigating the existing roof, substrate, and load capacity, replacing with a lighter roof may be one option if necessary.
How to choose solar panels?
There are many manufacturers of solar panels, and their output and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; it is important to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!
How to choose 1: Compare based on the total output of the roof
When installing solar panels on the roof, it is important to know how much power can be generated in a limited area, and generating more power is always better!
Solar panels vary in size and output depending on the manufacturer.
A panel with an output of 350W and a panel with an output of 400W may seem that the higher output panel is better at first glance.
However, if the size of the panel does not fit well with the roof, “20 panels of 350W can be installed, while only 15 panels of 400W can be installed,” meaning the number of panels that can be installed on the same roof can differ due to the size of the panels.
400W × 15 panels = 6kW (total output of the roof)
350W × 20 panels = 7kW (total output of the roof)
As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!
It is important to consider the total output of the roof rather than the output of a single panel!
*The above is a calculation of total output (kW). The actual power generation amount (kWh) will vary depending on conditions such as roof orientation, slope, and shading.
How to choose 2: Compare based on the degradation rate of solar panels
Solar panels have a degradation rate, and their output gradually decreases over 10 or 20 years.
The degree of output reduction after long-term use varies by product. The manufacturer’s output guarantee value is a standard figure for warranty purposes and does not indicate the actual degradation rate or power generation amount.
Choosing solar panels considering the degradation rate, rather than just the initial output, will lead to a more satisfactory choice!
How to choose 3: Compare based on warranty years
There are several types of warranties for solar panels, including “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
For output warranties, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies widely!
It’s always better to have a longer warranty, so let’s check the warranty periods and conditions of the manufacturers you are considering!
Frequently Asked Questions about Solar Panel and Battery Installation in Higashikurume City, Tokyo
We have compiled frequently asked questions from customers considering the installation of solar panels and batteries in Higashikurume City, Tokyo. (Tap to open the answers)
How much does it cost to install solar panels and batteries in Higashikurume City, Tokyo?
The cost varies depending on the installation capacity, equipment, and roof condition. In the above construction example (solar panel 4.3kW + battery, completed in April 2025), it was 2.2 million yen to 2.3 million yen.
Estimates by capacity are available on the solar panel and battery installation pricing page. We will create a layout diagram from the drawings and site survey and provide a free estimate!
Are there any subsidies available for solar and battery installation in Higashikurume City, Tokyo?
As of October 7, 2026, Tokyo’s “Solar Power Generation Promotion Project for Households” (for existing homes, 15,000 yen per kW for up to 3.75 kW, with a maximum of 450,000 yen) and “Battery Installation Promotion Project for Households” (100,000 yen per kWh, with a maximum of 1.2 million yen per household) are accepting pre-applications starting May 29, 2026, as stated on the official Tokyo (Cool Net Tokyo) page. Currently, there are no unique subsidy programs in Higashikurume City, as noted on the official page of Higashikurume City. The national DR household battery project has ended its public recruitment.
Since the application status may change, please refer to the subsidy and grant section and consult with us before signing a contract.
Can I apply for subsidies after the construction is completed?
This depends on the system. Tokyo’s subsidies require pre-application. Conditions such as whether you can contract or start construction before applying or submitting vary by system, so please confirm before signing a contract.
The order of procedures varies by system, so please check before signing a contract or starting construction.
Can solar panels be installed on a slate roof? I’m worried about leaks.
It is possible to install on a slate roof, but it is necessary to check the condition of the roofing material and substrate. The fixing method varies by construction method, and if the method involves fixing brackets to the roofing material or substrate, waterproofing treatment of the fixed parts is crucial.
Kakeru Koumuten is a specialist in exterior renovations strong in roofing work, so we will check the condition of the roof before installation and propose methods such as roof overlay (cover method) or replacement if deterioration is progressing.
My roof is old. Should I do a roof renovation first?
It depends on the condition of the roof. If a roof renovation is needed after 10 to 20 years of installation, the cost for removing and reinstalling solar panels will be incurred separately. If the remaining lifespan of the roof is short, it may be more cost-effective to renovate with highly durable roofing materials before installation.
Please consult us on how to proceed with the installation after confirming the condition of the roof through an on-site survey!
Is it better to install a storage battery together with solar panels?
For those who want to use generated electricity at night or prepare for power outages, simultaneous installation is recommended. The selling price for electricity will be 8.3 yen/kWh after the fifth year, making it more advantageous to use it in your home rather than selling it.
Additionally, the subsidy for storage batteries in Tokyo (for Reiwa 8, it is 100,000 yen per kWh, with a maximum of 1,200,000 yen per household) is a program aimed at increasing self-consumption of electricity generated by solar power. You can compare “solar only” and “solar + storage battery” through a financial simulation.
How many kW can be installed on my roof? Is it okay for north-facing roofs or roofs with shadows?
The capacity that can be installed varies depending on the shape, orientation, and size of the roof. At Kakeru Koumuten, we create a layout diagram from the drawings and on-site survey, and provide you with the installation capacity and generation simulation.
Higashikurume City is located almost in the center of the Musashino Plateau, and the shape and orientation of the roof, as well as the shading from surrounding buildings, will differ for each house. You can check the expected generation amount through the generation simulation.
How long will the construction period be?
In the above construction example (solar panels 4.3 kW + storage battery), it took about 3 days. The duration may vary depending on whether roof work is done simultaneously and the shape and installation capacity of the roof.
Please note that there will be an additional period for applying for subsidies and to the power company, so please consult us as soon as possible.
What is the current selling price (FIT) for electricity?
For residential use (under 10 kW), the selling price from certifications after October 2025 will be 24 yen/kWh for the first 4 years, and 8.3 yen/kWh from the 5th to the 10th year, with the same price applied for the 2026 fiscal year.
The idea is to recover initial costs more quickly in the first 4 years and then focus on self-consumption. Kakeru Koumuten provides a financial simulation that takes into account loan interest rates and electricity costs.
Can you handle maintenance and inspections after installation?
Yes, we can. Kakeru Koumuten sends out annual after-maintenance DM notices and visits for inspections upon request. We can also clean solar panels with a special brush if the generation amount decreases due to dirt.
Since it is difficult to check areas on the roof by yourself, please feel free to consult us if you have any concerns.
Can you also handle renovations for roofs that already have solar panels installed?
Yes, we can. Kakeru Koumuten can remove and reinstall solar panels ourselves, allowing us to remove the panels, perform roof overlay (cover method) or re-roofing, and then reinstall them consistently. The removed panels can be stored in our own warehouse.
For costs, please refer to the solar panel removal and water heater removal pricing page.
If you are looking for a solar panel installation company in Higashikurume City, Tokyo, please consult Kakeru Koumuten.
Our company handles a wide range of exterior renovations, including solar panels, roof work, and exterior wall work in Higashikurume City, Tokyo.
We have received requests from many customers, including renovation companies and real estate agencies!
Kakeru Koumuten promises “high-quality renovations at low cost”, and we have received great feedback from numerous customers.
We continue to update our annual construction achievements and will strive to improve quality to satisfy even more customers in the future.
Our company can perform all exterior renovations, not only roof overlay work and re-roofing, but also partial roof repairs, exterior painting, and exterior cover methods.
We are also happy to handle small jobs such as partial repairs and rain gutter cleaning!
In urgent cases such as leak repairs, we may be able to provide emergency measures without setting up scaffolding, as long as safety can be ensured, so please consult with us!
“I want to know about recommended solar panels”, “I want to keep costs as low as possible”, “I just want an estimate for now”, we will provide the best solutions for your specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in our customers’ shoes and will propose the best construction plan!
We are confident that we will not lose in terms of cost, quality, and planning compared to other companies in exterior construction!
We are confident, so we welcome competitive quotes!
Estimates are completely free, and if you find our company to be inferior to others, feel free to decline!
Characteristics of Higashikurume City, Tokyo and Points for Solar Construction
Higashikurume City is located approximately 24 kilometers northwest of the city center, almost in the center of the Musashino Plateau, with an area of 12.88 square kilometers. The elevation gently slopes from 70 meters to 40 meters from west to east, with the Kurokame River and Ochiai River flowing east through the center of the city, as stated on the official city page. It is introduced that the Kanto loam layer is thickly deposited, and spring water can be seen in various places along the river, with the “Ochiai River and Minamisawa Spring Group” being selected as the only “Heisei Water Selection” in Tokyo in Heisei 20. Below are the characteristics of the terrain in Higashikurume City, Tokyo, and points to be careful about when installing solar panels and storage batteries. (Tap to open)
View the characteristics of Higashikurume City, Tokyo and points for solar construction
■ Gently sloping plateau with an elevation of 70 to 40 meters. Check the height differences and road widths on-site for each property.
The city area is located on a gently sloping plateau from west to east, with few significant undulations in the terrain. However, the height differences of the site, the width of the front road, and the distance from neighboring houses vary from one house to another, which may require ingenuity in the way scaffolding is set up and in the delivery routes for panels and storage batteries. At Kakeru Koumuten Co., Ltd., our own scaffolding team plans the scaffolding according to the site conditions, creates layout diagrams from the drawings and site surveys, and you can confirm this through a power generation simulation.
■ Check the hazard map for flooding and internal water, and landslide warning areas for the Kurokawa and Ochiai rivers. Pay attention to the installation locations of equipment.
The flood hazard map for Higashikurume City assumes the maximum possible rainfall in the area for the Kurokawa and Ochiai rivers (total rainfall of 657 millimeters over 24 hours, maximum rainfall of 156 millimeters over 1 hour) and displays a “flood prediction area map” showing external flooding and internal flooding where rainwater accumulates in low-lying areas beyond the capacity of the sewer pipes. The same page also notes that there are 15 landslide warning areas and 9 special landslide warning areas designated in the city, updated on October 27, Reiwa 6. Depending on where the power conditioner and storage batteries are installed, separate from the panels on the roof, the impact during flooding may vary. Please check the assumptions for your residence on the city’s map and consult with us regarding the installation locations and heights in conjunction with the installation conditions of the manufacturers you will be using.
■ The types and ages of roofs vary from house to house. Check the roof and waterproofing before installation.
Even within the same city, the types of roofs, their ages, and the shapes of the sites vary from house to house. The capacity and fixing methods that can be installed also change depending on the shape and orientation of the roof and the roofing materials used. At Kakeru Koumuten Co., Ltd., we will confirm the type and condition of the roof and the site conditions before installation, and propose fixing methods, waterproofing arrangements, and scaffolding plans.
■ The annual sunshine hours at the Tokyo Observatory are approximately 1,927 hours.
According to the Japan Meteorological Agency’s average values (1991-2020), the annual sunshine hours at the Tokyo Observatory are approximately 1,927 hours, with January (approximately 193 hours) being the most and June during the rainy season (approximately 124 hours) being the least. (This is a reference value, not based on observations in Higashikurume City.)
The amount of electricity generated in Higashikurume City can also change due to shadows from surrounding buildings and trees, so conducting a year-round power generation simulation and selecting the capacity of the storage batteries to match the times of high electricity usage are key points.
Our company handles many exterior construction and solar power projects in Higashikurume City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us for any sudden troubles!
Service Area in Higashikurume City, Tokyo
Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and all of Tokyo.
List of Areas in Higashikurume City, Tokyo
Kaminohara, Higashikurume City / Gakuencho, Higashikurume City / Kanayama-cho, Higashikurume City / Koyama, Higashikurume City / Saiwaicho, Higashikurume City / Shimosato, Higashikurume City / Shinkawacho, Higashikurume City / Jinhotacho, Higashikurume City / Asama-cho, Higashikurume City / Daimoncho, Higashikurume City / Takiyama, Higashikurume City / Chuo-cho, Higashikurume City / Nobidome, Higashikurume City / Hachiman-cho, Higashikurume City / Hikawadai, Higashikurume City / Higashihoncho, Higashikurume City / Hibarigaoka Danchi, Higashikurume City / Honcho, Higashikurume City / Maezawa, Higashikurume City / Minamisawa, Higashikurume City / Minamicho, Higashikurume City / Yanagikubo, Higashikurume City / Yayoi, Higashikurume City
・Exterior wall painting in Higashikurume City, Tokyo, is entrusted to Kakeru Koumuten Co., Ltd.!
・Roof renovation in Higashikurume City, Tokyo, is entrusted to Kakeru Koumuten Co., Ltd.!
・Exterior renovation in Higashikurume City, Tokyo, is entrusted to Kakeru Koumuten Co., Ltd.!
・Kakeru Koumuten Co., Ltd. construction achievements
・Kakeru Koumuten Co., Ltd. aftercare services
・Kakeru Koumuten Co., Ltd. construction menu and price list
・Kakeru Koumuten Co., Ltd. staff blog and announcements
・Explaining the importance of comparative estimates and points to consider!
・Top 12 solar power generation manufacturers! Features and selection tips are also introduced!
・What are the installation costs for solar power generation? Thorough explanation of tips to reduce costs!
・What are the best locations for solar power generation installation? Points for selecting installation locations are also introduced!
・Here is the introduction to solar power generation estimates!
We welcome consultations via LINE as well◎
contact Kakeru Koumuten Co., Ltd.
Kakeru Koumuten is a young company whose team is, on average, in their late twenties, but our skills are second to none.
Our greatest strength is that we handle scaffolding, roofing and painting entirely in-house. In an industry where these tasks are usually divided among contractors, our complete service simplifies project management and helps keep costs down. Above all, if a problem arises, we respond promptly.
We proudly describe ourselves as the youngest and most helpful renovation company in Kanagawa!






