This is a case study of a roof renovation project in Asahi-ku, Yokohama, Kanagawa Prefecture.
The work involved a roof overlay (cover method)!
We implemented leak prevention measures through the roof overlay!
We received this request from our long-time partner, D Construction!
Thank you very much for choosing Kakeru Koumuten Co., Ltd. from among many contractors.
Roof Overlay Construction Procedure
1. Existing Ridge and Snow Stops Demolition
We will dismantle only the ridge flashing and snow stops that obstruct the overlay work.

2. Roofing Installation (Waterproof Sheet)
The roofing material used this time is modified asphalt. It is expected to have double the durability of asphalt roofing!


3. Fabrication of Accessories (Karakusa and Keraba)
We will process and install the keraba and karakusa.

4. Skylight Metal Fabrication
5. Main Construction
Yoko-dan Roof S will be installed, and then we will place a purlin at the ridge and wall edges. This time, we used a cedar purlin, but there are also purlins made of corrosion-resistant resin.
6. Ridge Metal Fabrication
We will process and install the ridge metal. We will firmly apply sealing on the inside of the joints.
For the wall edges, we will process and install a component called rain stop metal.

7. Cleaning
We will remove footprints and debris that have fallen around the house and inside the rain gutters, and do a thorough cleaning.
We strive to make the area cleaner after construction than it was before!
That concludes the construction!
Roofing Material Used
The roofing material used this time is Yoko-dan Roof S from Nichiha Corporation.
Yoko-dan Roof S comes with a 15-year coating, 20-year red rust, and 25-year perforation manufacturer warranty.
It is a high-performance metal insulated roof made of metal steel plate (high-durability painted galvalume steel plate), insulation (rigid urethane foam), and aluminum laminate backing material, all molded together.
It is lightweight, earthquake-resistant, and exhibits excellent insulation performance throughout the year, achieving long maintenance due to its high durability.
Color
This time, we completed a roof overlay (cover method) with Black S, and it turned out exceptionally well!
The customer was very satisfied, and I was also very happy!
Thank you very much!
Please check out other roofing work examples here!
What is the Roof Overlay (Cover Method)?
The roof overlay (cover method) involves leaving the existing roof almost intact and placing a new roof on top of it, effectively covering it.
Literally, it is a method of covering a roof with another roof. Therefore, the roof becomes double-layered. Since the roof is laid over the existing one, it is also referred to as “overlapping roofing.”
Advantages of the Overlay Method
Since a “new roof” is placed over the “existing roof,” demolition work is almost unnecessary, meaning that very little waste is generated.
This is the biggest feature and leads to various advantages.
The only parts that require demolition and waste disposal are the ridge cap, making it more cost-effective compared to complete roof replacement.
In 2004, regulations regarding the concentration of asbestos in raw materials were changed (for more details, please visit the Ministry of Health, Labour and Welfare’s website).
Some building materials used in structures built before 2004 contain asbestos. Asbestos-containing materials are difficult to demolish due to their high environmental impact, and the costs for demolition and waste disposal are also high. The overlay method, which generates almost no waste, is ideal for such roofs.
Some may wonder, “Is it safe to live in a building that uses asbestos-containing materials?” but rest assured. As long as there is no destruction or crushing, it will not disperse into the air.
If you are unsure about the type of roof on your home, please feel free to consult us.
Additionally, the construction can be completed in a shorter time frame compared to painting or complete replacement. A shorter construction period means lower labor costs, which in turn makes the overall cost more affordable.
This also reduces the psychological anxiety of having to live in an unusual environment.
When scaffolding is set up, there may be inconveniences such as difficulty entering and exiting or opening windows. Being able to return to normal life in a short period is a significant advantage.
Our company specializes in roofing work, and the roof overlay (cover method) is the most frequently performed type of work we undertake. We are very grateful that we have been continuously engaged in roof overlay (cover method) projects without interruption.
| Roof Material | Nichiha/Yoko Warm Roof αs![]() |
|---|---|
| Manufacturer Warranty | Coating 15 years, Rust 20 years, Perforation 25 years |
| Color Used This Time |
Black S |
Trust Kakeru Koumuten for Roof Renovations in Aoba-ku, Yokohama!
Our company is based in Yokohama, and we have extensive experience in roof renovations in Aoba-ku, Yokohama.
We are happy to assist with roof overlay work, roof replacement, and partial roof repairs such as leak fixes.
If you have any questions or concerns, such as “I just want to know the estimate for a roof renovation” or “I want to know about roofing materials,” please feel free to contact us!
Kakeru Koumuten is a renovation company strong in exterior renovations, and we carry out all work from temporary scaffolding to roofing and exterior painting completely in-house.
We are confident that our “cost, quality, and efficiency” in exterior renovation work are unmatched compared to other companies!
We are confident in our exterior renovations, so we welcome competitive estimates!
We offer comprehensive construction guarantees and aftercare maintenance, and we have received positive feedback for our appropriate proposals that match our customers’ future life plans and cost performance!
We want you to think, “I’m glad I asked them!” We take every request seriously and work diligently on it.
We also have information on roofing costs and pricing plans for the roof overlay method, so please take a look if you’re interested!
We look forward to your inquiries. Thank you very much.
Helpful information about exterior renovations can be found here!
・Aoba-ku, Yokohama | We performed roof renovation and leak prevention using the Overhead Roof aS!
・Aoba-ku, Yokohama | Roofing work | We carried out roof overlay (cover method) and joint sealing work!
・Aoba-ku, Yokohama | We performed roof overlay (cover method) using Super Galtect Fluorine!
・Painting DIY Plan! A must-see for those who want to try DIY roof and exterior wall painting! We will only set up the scaffolding!
・What is the cost range for roof renovation? Types of construction and how to choose a contractor, etc.
・2024 Edition! Grants and subsidies available for renovations, and reduction systems!
・How much does it cost to repair the roof? We will introduce the cost range!
・Cost of Roof Overlay|Kakeru Koumuten’s Roofing Plan!
・Cost of Leak Repairs|Kakeru Koumuten’s Leak Repair Plan!
・Renovation Store in Kanagawa Prefecture, Yokohama | What is Roof Overlay (Roof Cover Method)?
Consultations via LINE are also very welcome◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!