

Hello!
We are Kakeru Koumuten Co., Ltd., a specialist in roofing, exterior wall painting, and exterior renovations located in Aoba-ku, Yokohama, Kanagawa Prefecture!
This is a case study of an exterior renovation project in Machida City, Tokyo.
There are several types of exterior renovations, and this project involves a roof overlay (Diplomat Star) work!
We implemented measures against leaks due to the roofing work!
The existing roofing material is Nichihara/Pamir. Pamir is the most famous roofing material known for being not suitable for painting.
This page will explain the actual results of the work done by Kakeru Koumuten!
This project for Mr. M involved siding exterior wall painting and joint replacement work as well!
If you are interested, please take a look at this as well ⇩
Thank you very much for choosing Kakeru Koumuten Co., Ltd. among many contractors.
Roof Replacement Construction Procedure
1. Dismantling Existing Roof Ridge Metal
We will dismantle unnecessary existing roofing materials (ridge metal, snow stops) for the
2. Installing Roofing (Waterproof Sheet)

The roofing used is Nisshin Kogyo/Kappa 23!
It is made of modified asphalt roofing, which is said to have double the durability of regular asphalt roofing.
With the role of primary waterproofing, if the roofing is solid, there will be no leaks!
We will secure it properly so it won’t blow away.[/chat]
3. Fabricating Accessories (Curlicue, Eaves, Valley)

The materials used will be galvalume steel. Since these are identical materials, we will first install the waste eaves!
4. Main Construction (D’s Roofing/Diplomat Star)

5. Ridge Metalwork Processing & Sealing


The nails and screws used for fixing will be made of stainless steel, which is resistant to rust!
6. Cleaning

About Roofing Materials
The roofing material used is the Diplomat Star from Deez Roofing.
Deez Roofing offers a 30-year warranty on the base material.
Our company also provides a 10-year construction warranty!
It uses zinc-aluminum steel, which has the same composition as galvanized steel, known for its rust resistance.
Deez Roofing’s surface stone granules reduce the thermal conductivity to the steel layer. This structure allows for a sufficient air layer between the roofing material and the roof substrate, making it less likely to transfer heat to the attic compared to other roofing materials.
Moreover, the unevenness of the surface stone granules helps to disperse raindrops, causing them to hit the surface in smaller sizes compared to a regular smooth surface. As a result, the high-frequency noise caused by the micro-vibrations of the steel plate when raindrops hit, which is often referred to as the “loud noise” of steel roofs, can be suppressed by the natural stone granule layer on the surface.
By adopting the “interlocking method” that integrates the roofing materials, it boasts performance that can withstand winds of up to 60m/s, as well as excellent fire resistance and waterproofing.
Colors
■ Onyx

■ Cafe

■ Terracotta

■ Evergreen

You can choose from 4 colors!
This time, we completed a roof overlay project at a café, and it turned out exceptionally well!
The customer was very satisfied, and I was also very happy!
Thank you very much!
Please check out other roofing project results here!
What is the roof overlay (cover method)?
The roof overlay method involves leaving the current roof almost intact and placing a new roof on top of it, effectively covering it.
Literally, it is a method of covering a roof with another roof. Therefore, the roof becomes double-layered. It is also referred to as “overlapping roofing” since the roofs are layered on top of each other.
Benefits of the overlay method
Since a “new roof” is placed over the “current roof,” demolition work is almost unnecessary, meaning that very little waste is generated.
This is the biggest feature and leads to various benefits.
The only part that requires demolition and waste disposal is the ridge cap, so compared to complete roof replacement, the cost is lower.
In 2004, regulations regarding the concentration of asbestos in raw materials were changed (for details, please refer to the Ministry of Health, Labour and Welfare website).
Some building materials used in constructions completed before 2004 contain asbestos. Asbestos-containing materials are difficult to demolish due to their high environmental impact, and the costs for demolition and waste disposal are also high. The overlay method, which generates almost no waste, is ideal for such roofs.
Some of you may wonder, “Is it safe to live in a building that uses asbestos-containing materials?” but rest assured. As long as there is no destruction or crushing, it will not disperse into the air.
If you are unsure about the type of roof on your home, please feel free to consult us.
Additionally, the construction can be completed in a shorter time frame compared to painting or complete roof replacement. A shorter construction period means lower labor costs, which in turn makes the costs cheaper.
This also reduces the psychological anxiety of having to live in an unusual environment.
If scaffolding is set up, you may experience inconveniences such as difficulty entering and exiting or not being able to open windows. Being able to return to your normal life in a short period is a significant advantage.
Our company specializes in roofing work, and the roof overlay method is the most frequently performed type of work we do. We are very grateful that we have been continuously engaged in roof overlay projects without interruption.
| Roof Material |
|
|---|---|
| Manufacturer Warranty | 30-Year Warranty |
| Expected Durability | About 45 Years |
| Color Used This Time |
Café
|
Estimates and inspections are, of course, free! If you have any concerns regarding roofs, rain gutters, exterior walls, or exterior work, please consult Kakeru Koumuten Co., Ltd.!
We carry out everything from temporary scaffolding work to roof construction and exterior painting entirely in-house. We are confident that our costs, quality, and planning are unmatched compared to other companies!
We welcome competitive estimates with confidence!
You’ll be glad you chose us! We take every request seriously to ensure your satisfaction.
We also have information on roofing costs and pricing plans for roof overlay (cover method), so please take a look if you’re interested!
We look forward to your inquiries. Thank you very much.
Helpful information about exterior renovations can be found here!
・The Necessity and Timing of Exterior Wall Painting…
・Limited to Kanagawa and Tokyo|For those who want to try DIY exterior wall and roof painting! Scaffolding only! Roof and wall painting DIY plan!
・Introducing roofing materials that cannot be painted or are not recommended!!
・What is the cost range for roof remodeling? Types of construction and how to choose a contractor, etc.
・We will introduce the current roofing materials and remodeling methods!!
・Roof Renovation | What is Roofing? Introducing the important building material, roofing sheets!
・What are the market prices for rain gutter repair and cleaning? Tips on timing, fire insurance, and choosing a contractor!
・Renovation Store in Yokohama, Kanagawa Prefecture | What is Roof Overlay (Roof Cover Method)?
We also welcome consultations via LINE◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!



