Leave your solar panel installation work in Nishitokyo City, Tokyo to Kakeru Koumuten Co., Ltd.!

For solar panel and storage battery installation in
Nishi-Tokyo City, Tokyo,
Kakeru Koumuten is at your service!

Kakeru Koumuten is a company specializing in exterior renovations.
We have handled numerous exterior renovations in Nishi-Tokyo City, Tokyo,
and we are also entrusted with the installation of solar panels and storage batteries!
Here, we would like to introduce “Reasons why Kakeru Koumuten is chosen for solar panel installation”.

“How to Choose a Solar Panel Contractor in Nishi-Tokyo City, Tokyo”
“About the Costs of Solar Panel and Storage Battery Installation”
“About Subsidies Available for Solar System Installation in Nishi-Tokyo City, Tokyo”

We will also explain the above three points!

The installation of solar panels carries risks such as “the occurrence of leaks” and other troubles.
To ensure a satisfactory solar panel installation, it is essential to obtain estimates from at least three companies!

For customers considering the introduction of solar panels in Nishi-Tokyo City, Tokyo,
this information will definitely be helpful, so please take a look!

目次

Reasons Why Kakeru Koumuten is Chosen for Solar Panel Installation in Nishi-Tokyo City, Tokyo

Regarding why we are entrusted with solar panel installation by customers in Nishi-Tokyo City, Tokyo,
“Our strengths in solar panel installation that cannot be imitated by other companies”
have received high praise from many customers.

In the solar panel installation work in Nishitokyo City, Tokyo, we have absolute confidence in “cost,” “quality,” “plan”.
We would be grateful if you could compare our estimates with those of other companies.

Because we are confident, we welcome estimates from any number of companies!

1. We also handle exterior renovations other than solar panel installation!

 
Most troubles such as leaks caused by solar panel installation are due to the lack of knowledge of the solar panel installation contractors.
While specialized contractors have knowledge about solar panels, many lack knowledge regarding the roof and waterproofing at the installation site, which is a reality.
For peace of mind and to avoid maintenance issues or troubles after construction, it is safer to have expertise in roofing!

Kakeru Koumuten Co., Ltd. is strong in roofing work and can also detach and attach solar panels in-house, allowing us to respond quickly to maintenance and urgent troubles after solar panel installation!

2. Equipment specialized for exterior renovations

Kakeru Koumuten Co., Ltd. has prepared the following warehouses and material storage areas to provide solar work and exterior renovations at low cost and high quality. We have established five bases for material storage and showrooms.

In-house ownership of scaffolding materials


We own the scaffolding materials necessary for the installation of solar panels, allowing us to assemble the scaffolding in-house.
By conducting scaffolding work with our own scaffolding team instead of outsourcing, we can also cut costs on scaffolding construction expenses.
We have scaffolding materials for approximately 50 single-family homes!

Storage of materials in our large in-house warehouse

 
We store roofing materials and paints, and we can also store removed solar panels.
By ordering a large quantity of materials at once, you can purchase materials at a lower cost!
Additionally, we always have a stock of roofing materials, allowing us to respond quickly in emergencies!

In-house sorting and transportation of waste materials

The installation of solar panels often involves roofing work, generating various types of waste materials such as paint, wood, and metal.
Most contractors dispose of these materials all at once, but by sorting and recycling the waste, significant cost savings on waste disposal can be achieved.

Exterior Renovation Dedicated Showroom


In our showroom, not only can you have meetings, but you can also:
Check the actual foundation brackets for solar panels and see how they are installed on the roofing materials!
We can also provide simulations for the potential earnings and installation costs when introducing solar panels!

Since roofing and exterior wall work often accompany each other, we have samples of roofing materials and models that illustrate the structure, allowing us to provide detailed explanations!

3.Complete In-House Construction

One of Kakeru Koumuten’s major strengths is our complete in-house construction.

From inquiry to project completion, everything is handled by Kakeru Koumuten Co., Ltd. This allows us to keep costs down while providing high-quality roof renovations.
Additionally, one representative will assist you from the estimate to the completion of the work.
Since the same person will handle sales and construction management, smooth communication is possible.

We can provide consistent in-house construction from temporary scaffolding installation, exterior wall painting, to roof renovations!

4. Various Permits Obtained & Skilled Workers on Staff


We have obtained construction industry permits and permits for industrial waste collection and transportation!
We also have nationally certified sheet metal workers and painting specialists on staff, and we are confident in our construction techniques.
We can also handle large-scale roof projects such as those for factories!

5. Warranty and Aftercare

In addition to the manufacturer’s warranty for solar panel installation, we also provide our own rain leak warranty!
Aftercare is available annually, and we send out notification DM each year.
If you have any questions about the warranty, please click on the image above!

Maintenance of Solar Power Generation|Thorough Explanation of Importance, Frequency, and Cost Estimates!When introducing solar power generation, it is essential to consider...

6. Flexible and Prompt Response

Our company is equipped to handle various roofing troubles and situations.

If you cannot access the roof due to height, we can utilize a drone to assist!
During rain leak investigations, we can also conduct surveys using a thermal imaging camera.

If the power generation of the solar panels decreases due to dirt, we can also provide cleaning with a specialized brush.
We will respond according to your preferences.

7. Human Resource Development

We create various roof models to enhance skills and conduct practical training.
Since the construction method changes depending on the shape and slope of the roof, we regularly provide technical training so that each staff member can handle various cases.

翔工務店
Corporate Profile神奈川で家の外装・屋根の工事、修理なら一番若くて親切な株式会社翔工務店にお任せください。 株式会社翔工務店はリフォームを通して美しく理想の生活空間を創るお手伝いをしています。外装改修、外壁塗装、雨樋修理清掃、屋根の塗装や重ね葺き葺き変えなどの部分的な修理まで、お客様のどのようなご要望にも全力でお応えします。...

Subsidies and Grants That May Be Applicable in Nishitokyo City, Tokyo

National Subsidy “Support Program for the Introduction of Storage Battery Systems in Homes”

The government is implementing the “Support Program for the Introduction of Storage Battery Systems in Homes” to assist with the installation of storage batteries.

This subsidy provides 30,000 yen per kWh (with a maximum limit of 600,000 yen) to those who install residential storage batteries that meet certain conditions.

Additionally, this program is part of the government’s efforts to promote zero carbon emissions and renewable energy, allowing for further advancement of “self-consumption” of electricity when used in conjunction with solar power generation.

For detailed eligibility requirements and application methods, please check the official website.

👉 Click here for the official website

Tokyo’s Subsidy Program “Promotion of Solar Power Generation Installation in Households”

Disaster-resistant and health-promoting insulation and solar housing expansion project

Eligible Participants

Individuals or entities installing solar power generation systems in residential properties within Tokyo
Applicants must be the owners or lessors of the subsidized equipment.

Requirements

Individuals or entities installing solar power generation systems in residential properties within Tokyo (individuals, corporations, management associations, etc.)
Not only homeowners but also businesses that enter into lease/loan agreements through contract methods can apply.
Applicants must meet the conditions specified in the grant guidelines, such as being the owner or lessor of the subsidized equipment.

Subsidy Rate and Amount

Newly Built Homes

Up to 3.6 kW: 120,000 yen/kW
Over 3.6 kW to under 50 kW: 100,000 yen/kW

Newly built homes with a maximum of 3.6 kW: 360,000 yen

Existing Homes

Up to 3.75 kW: 150,000 yen/kW
Over 3.75 kW to under 50 kW: 120,000 yen/kW

Existing homes with a maximum of 3.75 kW: 450,000 yen

* The subsidy amount is provided based on the total eligible expenses (equipment costs + construction costs) as the upper limit.

For more details, please click here!

上乗せ補助金

Solar power generation systems with excellent functionality (Functional PV)
If there is an installation of certified functional PV (e.g., building-integrated types), there is an additional subsidy on top of the solar main subsidy. Here are examples from three companies.

DMM.com LLC DMM32-HL4-248AG
Additional amount: 20,000 yen per kW

Choshu Industry Co., Ltd. CS-120B91L,R (trapezoidal panel)
Additional amount: 50,000 yen per kW

Aiko Energy Japan Co., Ltd. AIKO-A445-MAH54Tm
Additional amount: 80,000 yen per kW

Subsidy Program for Updating Power Conditioners Related to Solar Power Generation Systems

Eligible Participants
This subsidy is available to residents in Tokyo who already have a solar power generation system installed and are replacing only the power conditioner.

Requirements and Conditions
The power conditioner to be replaced must be unused.
Regarding solar modules, they must have JETPVm certification or IECEE-PV-FCS certification, or be products of equal or higher standards.

Subsidy Rate and Amount
Half of the update costs will be subsidized, with a maximum of 100,000 yen per power conditioner.

For more details, please click here!

Tokyo Metropolitan Subsidy: “Promotion of Home Battery Installation”

Disaster-Resilient and Health-Contributing Insulation and Solar Housing Expansion Project

Eligible Participants
This subsidy program targets individuals and families installing new battery systems in homes within Tokyo. It is a condition of the subsidy that a solar power generation system is already installed or is installed simultaneously.

Requirements
Eligible batteries must be registered with SII (Environmental Co-Creation Initiative), and overlapping subsidies from other municipalities or public corporations are not permitted. The installation period is from April 1, 2025, to March 30, 2029, and a “Grant Application and Performance Report” must be submitted after a prior application.

Subsidy Rate and Amount
Subsidies will be provided as a fixed amount (per kWh) for the installation costs of the battery. Instead of a percentage of the costs, a predetermined amount will be granted as the maximum. Additionally, participating in Demand Response (DR) demonstrations will provide further subsidies.

Battery package (new installation): The maximum subsidy is 120,000 yen per 1 kWh of storage capacity. Furthermore, an additional 100,000 yen can be added for participation in DR demonstrations.

Subsidies for expanding storage units (additional to existing storage batteries): Up to 80,000 yen per 1 kWh is subsidized, with the condition that solar panels are already installed. Additional benefits from participating in DR are also eligible.

Energy management devices and IoT-related equipment: Participation in DR demonstrations is mandatory, and half of the eligible expenses (up to 100,000 yen) will be subsidized.

For more details, please click here!

Tokyo’s Subsidy Program “Used Residential Solar Panel Recycling Promotion Project”

Eligible Participants

Owners of solar panels that have been disposed of in Tokyo.

Requirements

Eligible Solar Panels

Must be used residential solar panels that have been disposed of from homes in Tokyo.
The subsidy amount will be calculated based on the total output (kW) of the panels.

Recycling Processing Contractor

Processing must be conducted by a designated industrial waste intermediate processing contractor by the Tokyo government.
Processing must occur at facilities listed as designated processing contractors.

Procedural Requirements

Submit necessary documents (industrial waste management slip, panel output certification, contracting documents, etc.) in accordance with the “Implementation Guidelines,” “Grant Guidelines,” and “Subsidy Application Guide.”
Detailed requirements are specified, including obtaining explanations and consent from the owner regarding the removal and recycling of solar panels.

Subsidy Rate and Amount

The “processing costs” required for recycling used residential solar panels at designated industrial waste processing facilities are eligible for subsidies.

Subsidy Amount

The basic subsidy amount is calculated as output (kW) of the solar panel × 25,000 yen

(Decimal points below the third place are truncated, and amounts under 1,000 yen are also truncated).

Example: For a used panel with an output of 3.5 kW → ⌊3.500⌋kW × 25,000 yen = 87,500 yen
(The decimal points below the third place are truncated, and amounts under 1,000 yen are also truncated).

For more details, please click here!

There is no subsidy program for the installation of residential solar panels unique to Nishitokyo City.

Examples of Solar Panel Installation

BEFORE

AFTER

Construction Details
 Solar Panel Installation
 Battery Installation
Existing Roofing Material
 Horizontal Metal Roof (Super Galtect)
Installation Capacity
 Solar Panel: 4.3KW
 Battery: 5KW class
Base Mounting Hardware Used
 Niigata Manufactured Sales / Aluminum Catch Type Hardware
Price Range
 2.2 million yen to 2.3 million yen
 *Due to the grant received, the actual burden amount is approximately 1 million yen
 Estimated time for recovering construction costs: about 8 to 9 years (self-consumption)
Construction Period
 About 3 days
Completion Month
 April 2025
Inquiry Details
I am considering the installation of solar panels and storage batteries.
I heard that subsidies are available, and I would like to know how much subsidy I can receive.

Our Proposal

We visited to provide an estimate and created a layout diagram for the solar panels based on the blueprints!
The layout diagram shows the arrangement of solar panels when installed on the roof.
Since we can also determine the installation capacity, we can perform power generation simulations and financial simulations.
We have also understood the expected amount of subsidies, which we explained to the customer along with the estimate!

How to Choose a Solar Panel Installation Contractor in Nishitokyo, Tokyo

There are many solar panel installation contractors available in Nishitokyo, Tokyo, and it can be confusing to choose the right one.

Therefore,when requesting solar panel installation or storage battery installation work, make sure to check the following 4 points.

● Knowledgeable not only about solar panels but also about roofs

● Confirm the presence of warranties and after-sales maintenance

● Obtain estimates from multiple contractors (at least 3 companies)

● Check if they provide support for subsidy applications

By confirming the above 4 points, you will be able to choose a reliable contractor.

太陽光発電の設置業者はどこがいい?後悔しない選び方を紹介!太陽光発電の導入を検討する際、最も重要といえるのが「業者選び」です。 設備そのものの性能や価格も大切ですが、設置の品質やアフターサービ...

Knowledge of roofing in addition to solar panels

Many causes of poor installation of solar panels stem from a lack of knowledge on the part of the contractor.
While knowledge about solar panels is certainly important, understanding the roof and waterproofing at the installation site is also crucial.

⚠︎Examples of troubles due to contractor’s lack of knowledge

・Solar panels were installed on a severely deteriorated roof, resulting in leaks..
・Solar panels were installed on a roof with a short lifespan, necessitating a costly removal and reinstallation within a few years..
・Misjudgment of the type of waterproofing led to incorrect treatment and subsequent leaks..
and more

When installing solar panels, understanding the condition and type of the existing roof allows you to avoid unnecessary expenses and unexpected troubles.

Confirm the presence of warranties and after-sales maintenance

When choosing a solar installation contractor, check for warranties.

While solar panels and batteries come with manufacturer warranties, also confirm whether there is a construction warranty in case leaks occur after installation!

If the contractor has a warranty period, they will respond free of charge in case of leaks after installation.

Additionally, some contractors offer after-sales services separate from warranties, so be sure to check if the contractor you are considering has after-sales service.
Since abnormalities or damage on the roof can be in hidden areas, you may not notice them yourself.
By conducting inspections during after-sales maintenance, you can detect issues early and prevent major repairs or failures!

Kakeru Koumuten Co., Ltd. provides a leak warranty as part of the construction warranty for solar panel installations.
We also conduct after-sales maintenance and send out annual DM notifications!
Please check the DM, and if you wish, we will come to perform after-sales maintenance!

翔工務店の保証について
Warranty and Payment翔工務店の屋根工事、外壁塗装工事、シーリング工事の保証など簡単にご説明させて頂いております!! 弊社では前金、中間金は頂いておりません!!...

Obtain estimates from multiple contractors (at least 3 companies)

When requesting solar panel installation, obtain estimates from multiple contractors.

Even if the same manufacturer is used and the same construction work is performed, costs, warranties, and after-sales services may vary.

Additionally, obtaining multiple estimates makes it easier to negotiate prices.

To request your desired repair contractor at a lower price, it is essential to obtain estimates from multiple contractors.

When comparing estimates,

Check the estimate items
Type of solar panels
Warranties and after-sales services

let’s carefully compare and make a judgment! Avoid making decisions based solely on cost, as using lower-grade materials or skipping processes can reduce costs!

【横浜市】屋根リフォームの相見積もりの重要性と比較するポイントを解説します!こんにちは!株式会社翔工務店です! 横浜市の屋根リフォーム専門店の翔工務店です!こちらのページでは屋根リフォームの見積りをとる...

Check if they provide support for subsidy applications

Subsidies are often available for the installation of solar panels and storage batteries, but there is a possibility that they may not be granted due to application errors.
If you proceed with the support of the contractor, there should be no issues with the application.
Make sure to apply for the subsidy before starting the construction and proceed with the work only after it has been accepted!

After the construction, the flow will be that the subsidy will be decided and granted!

Benefits of Introducing Solar Power Equipment

The benefits of introducing solar panels are summarized in the five points below!

Benefit 1: Economic Benefits

The biggest advantage of introducing solar panels is the economic benefit!
Although the selling price of electricity has decreased compared to ten years ago, the soaring electricity costs allow you to gain benefits by consuming the electricity you generate!
Electricity costs are expected to continue to rise, making it attractive to cover your consumption with solar power generation!
If you plan to use the generated electricity at night, installing a storage battery is essential!

Benefit 2: Subsidies can be utilized!

The conditions and amounts of subsidies vary by prefecture and municipality, but there is a high probability that you can apply for subsidies! The reduction in the actual burden amount due to subsidies is a significant advantage!

Benefit 3 Environmentally Friendly!

Solar power generation contributes to the reduction of greenhouse gas emissions and decreases dependence on fossil fuels, thus helping to mitigate global warming.
It is considered an environmentally friendly method of power generation as it does not produce noise or harmful substances during the process.

Benefit 4: Improved Insulation Effect!!

By installing it on the roof or rooftop, insulation properties are enhanced.
Especially in summer, it can effectively block direct sunlight, leading to significant heat insulation benefits!

Benefit 5: Electricity can be used even during power outages!!

By installing a storage battery, it becomes possible to use electricity even during emergencies such as power outages!

太陽光パネルを設置するメリットは?意外と知らないデメリットも解説!近年では、電気代の高騰や環境意識の向上、それから災害時の備えといった背景から、太陽光パネルの設置に興味や関心を持つ方が増えました。 こ...

What Points Should Be Noted When Introducing Solar Power Generation?

Next, we will explain the “three points to note” when installing solar panels!

Point 1: Maintenance Costs Are Incurred

The maintenance costs refer more to the roof where the solar panels are installed rather than the solar panels themselves.
If you perform roof renovations after 10 to 20 years, there will be costs for removing and reinstalling the solar panels.
If the existing roof is deteriorating, it is reassuring to renovate it with durable roofing materials before installing the solar panels!

It would be reassuring to request a simulation that takes maintenance costs into account before introducing solar panels!

Point 2: The Risk of Leaks Increases Depending on the Roofing Material

Slate roofs and tile roofs require holes to be made in the roof to secure solar panels. This inevitably increases the risk of leaks due to the holes.
Of course, we will ensure proper waterproofing, but if you are concerned about making holes, one option is to replace the roofing material with a metal roof and secure the solar panels using the catch method.

Special Catch Base Hardware for Horizontal Metal Roofs

Note 3: The Roof Will Become Heavier

With the installation of solar panels, the roof will become heavier. In the case of tile roofs, it may be reassuring to replace them with lighter roofing materials.

太陽光発電の設置でよくあるトラブル13選!対処法や予防策も紹介!太陽光発電を自宅に設置することで、電気代の削減や売電による収入など、さまざまな効果に期待できます。 近年では、国や自治体による補助金制...

How to Choose Solar Panels?

There are many manufacturers of solar panels, and their output (power generation) and costs vary.
It is not simply a matter of “this manufacturer has the best solar panels”; what is important is to choose solar panels that are suitable for your life plan and building!
Here are some points to consider when comparing solar panels!

Choosing Method 1: Compare Based on Total Roof Power Generation

When installing solar panels on the roof, it is important to consider how much power can be generated in the limited area, and generating more power is always better!

Solar panels vary in size and power generation depending on the manufacturer.
For example, a 350W panel and a 400W panel may seem that the higher output panel is better at first glance.
However, if the size of the panels does not fit well on the roof, there may be cases where “20 panels of 350W can be installed” and “15 panels of 400W can be installed,” leading to different numbers of panels that can be installed on the same roof due to size differences.

400W × 15 panels = 6kW (total roof power generation)
350W × 20 panels = 7kW (total roof power generation)

As shown above, even if the output of a single panel is lower, the total output of the roof may be higher!

It is important to consider the total output of the roof rather than just the output of a single panel!

Choosing Method 2: Compare Based on Degradation Rate of Solar Panels

Solar panels have a degradation rate, and their power generation gradually decreases over 10 years and 20 years.

After 30 years, some may see a 40% decrease in power generation, while others may only decrease by about 10%. By considering the degradation rate along with the initial power generation, you can choose solar panels without regrets!

Choosing Method 3: Compare Based on Warranty Period

The warranty for solar panels includes several types such as “output warranty,” “natural disaster warranty,” and “system warranty,” and the warranty periods vary by manufacturer.
Regarding the output warranty, some manufacturers offer a 30-year warranty while others provide a 10-year warranty, so it varies widely!
A longer warranty is always better, so let’s check the warranties of the manufacturers you are considering!

Does solar power generation work on rainy days? Tips to prevent a decrease in power generation!For those considering the introduction of solar power generation, yo...

If you are looking for a solar panel installation contractor in Nishitokyo, Tokyo, please consult Kakeru Koumuten Co., Ltd.

Our company handles many exterior renovations, including solar panels, roof work, and exterior wall work in Nishitokyo, Tokyo.
We receive requests from many customers, including renovation companies and real estate companies, who have contacted us!

Kakeru Koumuten Co., Ltd. promises “high-quality renovations at low cost”, and we have received positive feedback from many customers.
We continue to update our construction performance every year, and we will strive to improve quality so that even more customers can be satisfied in the future.

Our company can perform all exterior renovations, not only roof overlay work and re-roofing but also partial roof repairs, exterior painting, and exterior wall cover methods.
We are also happy to handle small jobs such as partial repairs and rain gutter cleaning!

In case of emergencies like roof leaks or if temporary measures can be taken without scaffolding, please consult us!

I want to know recommended solar panels“, “I want to keep costs down as much as possible“, “I just want an estimate for now, we will provide optimal solutions for specific requests.
We will never propose unnecessary work that prioritizes profit!
We always stand in the customer’s position and will propose the best construction plan!

We are confident that we will not be outdone by other companies in terms of cost, quality, and planning for exterior work!
We welcome competitive estimates!
Estimates are completely free, and if our company is found to be inferior to others, you can feel free to decline!

Features of Nishitokyo, Tokyo

Nishitokyo is located in the western part of Tokyo and is a livable city where a rich natural environment harmonizes with urban functions. It is situated on the Musashino Plateau, with many green parks and street trees, allowing residents to enjoy the beauty of nature throughout the seasons.

The climate is mild, making it relatively comfortable to live in year-round, with beautiful seasonal landscapes such as cherry blossoms in spring and autumn leaves.

Transportation access is excellent, with the Seibu Shinjuku Line and Seibu Ikebukuro Line running through the city. It is only about 20 minutes to Ikebukuro Station and Shinjuku Station in the city center, making it very convenient for commuting and schooling. Additionally, the bus routes are well-developed, making it easy to move around the city and neighboring areas.

As for tourist attractions, the “Tama Six Cities Science Museum,” adjacent to Koganei Park, features one of the world’s largest planetariums and is popular. Furthermore, “Higashi-Fushimi Inari Shrine” is known as a historic shrine, and the calm atmosphere of the grounds provides relaxation for visitors. Also, “Ikoi no Mori Park,” where you can enjoy nature walks, serves as a place of relaxation for the citizens.

Our company handles a lot of exterior construction and solar panel installation in Nishitokyo City, Tokyo.
We are happy to assist with partial roof repairs such as roof overlay work, roof replacement, and leak repairs, as well as other repairs! Please feel free to consult us about any sudden troubles!

Service Areas in Nishitokyo City, Tokyo

Kakeru Koumuten Co., Ltd. accepts requests throughout Kanagawa Prefecture and all of Tokyo.

List of Areas in Nishitokyo City, Tokyo

Izumicho, Nishitokyo City / Kitaharacho, Nishitokyo City / Kitamachi, Nishitokyo City / Sakaemachi, Nishitokyo City / Shibakubocho, Nishitokyo City / Shimohoya, Nishitokyo City / Shinmachi, Nishitokyo City / Sumiyoshicho, Nishitokyo City / Tanashimachi, Nishitokyo City / Nakamachi, Nishitokyo City / Nishiharamachi, Nishitokyo City / Higashimachi, Nishitokyo City / Higashifushimi, Nishitokyo City / Hibarioka, Nishitokyo City / Hibarioka Kita, Nishitokyo City / Fujimachi, Nishitokyo City / Hoyamachi, Nishitokyo City / Midorimachi, Nishitokyo City / Minamimachi, Nishitokyo City / Mukodai, Nishitokyo City / Yanagisawa, Nishitokyo City / Yatodacho, Nishitokyo City

We also welcome consultations via LINE

LINE

LINE

We are also updating our Instagram regularly◎ Please follow us, thank you◎

Instagram
Instagram
For roofing, guttering, and exterior work and repairs in Kanagawa, contact Kakerukoumuten Co., Ltd..

AAA is a young company with an average age in the early 20s, but our technology is second to none.

One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!

We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!