目次
Zushi City, Kanagawa Prefecture | Construction Data
Roof Overlay Construction Procedure
1. Dismantling Existing Metal Sheets
The durability of wooden purlins is approximately 10 to 15 years. Once the durability period is exceeded, corrosion and discoloration occur, leading to the detachment and scattering of ridge metal.
2. Installing Roofing (Waterproof Sheet)
With the role of secondary waterproofing, as long as the roofing is properly installed, it generally does not leak. We will ensure it is firmly attached so it won’t be blown away by the wind.
Since there are various durability periods and characteristics for roofing sheets, it is important to choose roofing sheets that match the durability of the new roof and the roof slope!
3. Insulation Sheet and Component Processing (Curlicue and Eaves)
Before the main roof construction, we will process and install components such as curlicues and eaves. The components used are the genuine components of Galttect, made of SGL steel plate!
The ridge metal is our original integrated waste board type ridge substrate. Expected durability of about 30 years, making it a highly wind-resistant ridge substrate.
4.Main Construction (Aijii Industry / Super Galtect)

After processing the accessories
Once the installation reaches the ridge, we will set up the necessary materials to secure the ridge metal called “kanban.” We offer three types of kanban: cedar, resin, and galvalume steel, and this time we used galvalume steel!
Galvalume steel is expected to have three times the durability of cedar! Unlike resin or cedar, it does not crack, providing peace of mind!
Even if rainwater enters from the ridge, it has a mechanism to discharge rainwater to the outside, demonstrating high waterproofing performance!
It is perfect for the Super Galtect ridge substrate!
5. Ridge Metal Processing and Sealing at Various Locations
The screws used for fixation are stainless steel with waterproof packing that is resistant to rust!
Unlike nails, screws with packing are less likely to come loose
and securely fix the ridge metal to the kanban!
Although it is not visible after construction,
installing a face plate inside the ridge cap
enhances waterproofing!
It firmly protects the ridge, which is a critical point of the roof.
6. Cleaning
After the
Additionally, we will wipe away any footprints left on the roof to ensure it looks clean.
About Roofing Materials

The roofing material used is Ai-Gi Kogyo / Super Galtect. Super Galtect comes with a 15-year coating warranty and a 25-year perforation warranty from the manufacturer, along with a 10-year construction warranty from our company! Additionally, it is made of SGL steel, which is resistant to rust.
The insulation material is tightly applied from edge to edge of the roofing material, creating a metal sheet that integrates steel and insulation. During installation, insulation is applied even to the parts where the roofing materials overlap, and the surface is coated with a high heat-reflective paint, allowing for a cool summer and a warm winter.
Moreover, it has soundproofing properties, which reduce the sound of rain. Being lighter than other roofing materials also minimizes the sway during earthquakes, providing an additional earthquake-resistant feature.
It excels in finish, durability, insulation, soundproofing, and wind resistance, and our company’s construction achievements show that Ai-Gi Kogyo’s Super Galtect is the most frequently used, gaining significant attention!
Color
■Shade Black

■Shade Brown

■Shade Blue

■Shade Moss Green

■Shade Charcoal

■New Color Shade Wine Red

You can choose from these 6 colors!
This time, we completed the overlay work with Shade Blue, and it turned out very well!
The customer was extremely satisfied, and I was very happy too!
Thank you very much!
Please check out other roofing work achievements from here!
| Roof Material |
|
|---|---|
| Manufacturer Warranty | Coating 15 years, Red Rust 20 years, Puncture 25 years |
| Expected Durability | Approximately 35 to 40 years |
| Color Used This Time |
|
Leave Your Roofing Work in Zushi City, Kanagawa to Kakeru Koumuten!
Our company has a wealth of experience in roof renovations in Zushi City, Kanagawa.
We are happy to assist with roof overlay work, roof replacement, and even partial roof repairs such as leak fixes!
Whether you want to “make it last with one renovation,” “keep costs as low as possible,” “improve insulation because the indoors are hot,” or “just do a temporary fix for the water leak,” we will propose the best plan tailored to your specific needs!
Zushi City Area List
Ikego, Zushi City / Kotsubo, Zushi City / Sakurayama, Zushi City / Shinjuku, Zushi City / Zushi, Zushi City / Numama, Zushi City / Kuki, Zushi City / Yamanone, Zushi City
Long-Term Reliability
All the roofing materials we use come with reliable products that offer long-term warranties!
For example, the Super Galtect we used this time comes with a 15-year paint warranty and a 25-year hole warranty from the manufacturer. We also provide a 10-year construction warranty, so you can use it with peace of mind for a long time after just one renovation.
Super Galtect is a lightweight roofing material that excels in durability and cost performance, but we also offer roofing materials with even higher durability and better insulation properties, so please feel free to consult us!
Summary
Estimates and inspections are, of course, free! If you have any concerns regarding roofs, rain gutters, exterior walls, or exteriors, please consult Kakeru Koumuten Co., Ltd. in Kanagawa Prefecture!
Kakeru Koumuten is a company strong in exterior renovations. From temporary scaffolding work to roofing and exterior painting work—completely in-house construction! We are confident that in terms of “cost, quality, and efficiency”, we do not fall behind compared to other companies!
We are confident in our exterior renovations, so we welcome competitive estimates! Our construction warranties and aftercare services are comprehensive, and we have received positive feedback for our appropriate proposals that match cost performance and our customers’ future life plans!
“I’m glad I asked them!” We take every request seriously to ensure you feel this way.
We look forward to your inquiries. Thank you very much.
Here for helpful information about exterior renovations!
・【Zushi City, Kanagawa】|After Maintenance|We conducted the first-year inspection for those who had exterior wall painting and joint replacement work done!
・【Zushi City, Kanagawa】|Exterior Wall Painting|We performed exterior wall heat-insulating painting and joint replacement work!
・【Zushi City, Kanagawa】We conducted exterior wall painting and joint sealing work using high-durability paint with a durability of approximately 26 years, as well as roof repair work!
・For exterior renovations in Zushi City, Kanagawa, trust Kakeru Koumuten Co., Ltd.!
・For roof renovations in Zushi City, Kanagawa, trust Kakeru Koumuten Co., Ltd.!
・For rain gutter repairs and cleaning in Zushi City, Kanagawa, trust Kakeru Koumuten Co., Ltd.!
・For solar panel installation work in Zushi City, Kanagawa, trust Kakeru Koumuten Co., Ltd.!
・For exterior wall cleaning in Zushi City, Kanagawa, trust Kakeru Koumuten Co., Ltd.!
・For waterproofing work in Zushi City, Kanagawa, trust Kakeru Koumuten Co., Ltd.!
・For leak repairs in Zushi City, Kanagawa, trust Kakeru Koumuten Co., Ltd.!
・After Maintenance by Kakeru Koumuten Co., Ltd.
・Construction Menu and Price List of Kakeru Koumuten Co., Ltd.
・Kakeru Koumuten Co., Ltd. Staff Blog & Announcements
We welcome consultations via LINE as well◎
AAA is a young company with an average age in the early 20s, but our technology is second to none.
One of our greatest strengths is that we can do all of our own scaffolding, roofing, and painting work. In this industry, where work is generally divided, we are able to provide a complete set of services, which saves time and effort in management and reduces costs. Above all, if there is any trouble, we will come to you right away!
We can confidently declare this. We are the youngest and most friendly renovator in Kanagawa!



